• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 317
  • 17
  • 17
  • 17
  • 16
  • 15
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 327
  • 327
  • 92
  • 90
  • 82
  • 79
  • 58
  • 52
  • 47
  • 42
  • 37
  • 33
  • 32
  • 28
  • 24
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Grandes objetos na Amazônia : das velhas lógicas hegemônicas às novas centralidades insurgentes, os impactos da Hidrelétrica de Belo Monte às escalas da vida /

Padinha, Marcel Ribeiro. January 2017 (has links)
Orientador: Arthur Magon Whitacker / Banca: Maria Encarnação Beltrão Sposito / Banca: Marcio José Catalan / Banca: José Sobreiro Filho / Banca: Maria José Martinelle Silva Calixto / Resumo: Esta tese analisou os impactos socioespaciais às escalas da vida das pessoas atingidas, por um "grandes projeto", a UHE Belo Monte, construída no rio Xingu, Amazônia brasileira. Estes "grandes objetos" promovem a re(des)estruturação dos territórios onde são implantados, causando fortes impactos as espacialidades existentes e historicamente constituídas de ribeirinhos, camponeses, indígenas, bem como de moradores da periferia da cidade de Altamira - Pará - Amazônia. Analisamos então a força "espoliadora" destes grandes empreendimentos sobre as populações "subalternizadas", a partir de uma proposição teórica de base escalar, que envolve considerar o espaço como "polimorfo". Espaço-espacialidade, a técnica e a escala foram usados como instrumentais metodológicos para a realização da leitura de nossa realidade empírica. Os impactos à escala da vida das pessoas "desterritorializadas" seja na mobilidade seja na imobilidade se fazem sentir, tendo em vista à condição espacial de pertencimento, apropriação e identificação que diferentes sujeitos exercem junto a seus territórios e lugares. Não obstante, como respostas a esse processo espoliador, são verificados uma série de estratégias de luta e resistência em relação a projetos de cunho "desenvolvimentistas". Apesar da condução da obra com mãos de ferro, por parte do Estado brasileiro, constituiu-se forte oposição ao projeto UHE Belo Monte. Movimentos Sociais de distintas escalas de atuação, de diferentes locais no planeta, juntaram-s... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: This thesis analyzed socio-spatial impacts on the life scales of people affected by a "big project", the Belo Monte HPP, built on the Xingu River, Brazilian Amazon. These "great objects" promote the re - de - structuring of the territories where they are implanted, causing a strong impact on the existing and historically constituted spatiality of river dwellers, peasants, natives, as well as residents of the outskirts of the city of Altamira - Pará - Amazônia. We then analyze the "spoiling" force of these large enterprises on "subalternized" populations, based on a scalar-based theoretical proposition, which involves considering space as a "polymorph". Space-spatiality, technique and scale were used as methodological tools for the realization of the reading of our empirical reality. The life-scale impacts of "deterritorialized" people on both mobility and immobility are felt in view of the spatial condition of belonging, appropriation and identification that different subjects carry out in their territories and places. Nonetheless, as a response to this spillover process, a series of strategies of struggle and resistance are verified in relation to "developmentalist" projects. Despite the Brazilian government's hand in hand with iron hands, it was a strong opposition to the Belo Monte HPP project. Social Movements of different scales of action, from different places on the planet, joined the impacted ones of Altamira and region, constituting, therefore, a great field of confr... (Complete abstract click electronic access below) / Résumé: Cette thèse a analysé les impacts socio-spatiaux sur les échelles de vie des personnes affectées par un «grand projet», le HPP de Belo Monte, construit sur la rivière Xingu, en Amazonie brésilienne. Ces « grands objets » favorisent re (dé) structuration des territoires où ils sont déployés, provoquant des conséquences graves en bordure existants et historiquement constitué spatialité, paysans, indigènes, ainsi que les habitants de la périphérie de la ville d'Altamira - Pará - Amazon. puis analysé la force « prédateurs » de ces grands projets sur les populations « sous-officier » d'une base théorique échelle proposition, qui consiste à considérer l'espace comme « polymorphes ». Espace-spatialité, technique et échelle ont été utilisés comme outils méthodologiques pour la réalisation de la lecture de notre réalité empirique. Les impacts sur l'échelle de la vie des gens « dépossédés » est la mobilité dans l'immobilité se fait sentir, en vue de la condition spatiale d'appartenance, la propriété et l'identification des différents sujets exercent sur leurs territoires et lieux. Néanmoins, en réponse à ce processus de débordement, une série de stratégies de lutte et de résistance sont vérifiées par rapport à des projets «développementalistes». Malgré la main de fer du gouvernement brésilien, c'était une forte opposition au projet de Belo Monte HPP. Les mouvements sociaux de différentes gammes de performance, de différents endroits de la planète, ont rejoint l'impact et de la région d... (Résumé complet accès életronique ci-dessous) / Resumen: Esta tesis analizó los impactos socioespaciales a las escalas de la vida de las personas afectadas, por un "gran proyecto", la UHE Belo Monte, construida en el río Xingu, Amazonia brasileña. Los "grandes objetos" promueven la reestructura de los territorios donde se implantan, causando fuertes impactos las espacialidades existentes e históricamente constituidas de ribereños, campesinos, indígenas, así como de moradores de la periferia de la ciudad de Altamira - Pará - Amazonia. Analizamos entonces la fuerza "espoliadora" de estos grandes emprendimientos sobre las poblaciones "subalternizadas", a partir de una proposición teórica de base escalar, que implica considerar el espacio como "polimorfo". La espacialidad, la técnica y la escala se utilizaron como instrumentos metodológicos para la realización de la lectura de nuestra realidad empírica. Los impactos a la escala de la vida de las personas "desterritorializadas" ya sea en la movilidad o en la inmovilidad se hacen sentir, teniendo en vista la condición espacial de pertenencia, apropiación e identificación que diferentes sujetos ejercen junto a sus territorios y lugares. No obstante, como respuestas a ese proceso espoliador, se verifican una serie de estrategias de lucha y resistencia en relación a proyectos de cuño "desarrollistas". A pesar de la conducción de la obra con manos de hierro, por parte del Estado brasileño, se constituyó una fuerte oposición al proyecto UHE Belo Monte. Los movimientos sociales de distintas es... (Resumen completo clicar acceso eletrônico abajo) / Doutor
62

Modernização, ordenamento do território e desigualdade socioespacial às margens do reservatório de Corumbá IV : a perspectiva das comunidades rurais tradicionais

Mejia, Lidia 11 1900 (has links)
Dissertação (mestrado)—Universidade de Brasília, Instituto de Ciências Humanas, Departamento de Geografia, 2007. / Submitted by Luanna Maia (luanna@bce.unb.br) on 2009-03-06T15:24:37Z No. of bitstreams: 1 Dissertacao Lidia Mejia 29_11.pdf: 2383033 bytes, checksum: 83aa22d08d044ea08f2fe7d9ce6c354c (MD5) / Approved for entry into archive by Luanna Maia(luanna@bce.unb.br) on 2009-03-06T16:09:06Z (GMT) No. of bitstreams: 1 Dissertacao Lidia Mejia 29_11.pdf: 2383033 bytes, checksum: 83aa22d08d044ea08f2fe7d9ce6c354c (MD5) / Made available in DSpace on 2009-03-06T16:09:06Z (GMT). No. of bitstreams: 1 Dissertacao Lidia Mejia 29_11.pdf: 2383033 bytes, checksum: 83aa22d08d044ea08f2fe7d9ce6c354c (MD5) / A construção de barragens e usinas hidrelétricas auxilia o desenvolvimento econômico das nações há mais de um século. O controle e regularização de vazões, a irrigação, o abastecimento de água e a geração de energia elétrica estão entre os diversos usos de barragens. O desenvolvimento industrial foi implantado tardiamente no Brasil, provocando migrações e acelerando o crescimento urbano. Este fenômeno veio acompanhado, nas últimas décadas, de exigências do setor tecnológico agrícola. Um processo que tem gerado demandas cada vez maiores por abastecimento de água e energia. Com a finalidade de responder a esta crescente necessidade, em Goiás, estado localizado no centrooeste do País, foi construída a Usina Hidrelétrica de Corumbá IV. Trata-se de um dos grandes empreendimentos voltados para o desenvolvimento e a infraestrutura regional, sobretudo para o Distrito Federal, vizinho à região. Contudo, seu projeto, divulgado como inovador, tem causado polêmicas desde os primeiros passos da concessão. Por outro lado, a obra da usina e o armazenamento do reservatório têm provocado significativas alterações nos municípios de sua área de influência, em particular as comunidades rurais tradicionais. Assim, a dissertação tem por objetivo analisar os efeitos sócio-espaciais do reservatório hidrelétrico de Corumbá IV, dando ênfase ao ordenamento territorial dos municípios lindeiros. Achados indicam que há limitações e contradições inerentes ao ordenamento territorial e desenvolvimento sustentável que condicionam o alcance do acordo social que contemple a heterogeneidade dos usos dos recursos e dos territórios. Ao analisar a perspectiva da comunidade tradicional sobre o empreendimento, constatou-se com esta pesquisa, a persistência de um modelo de desenvolvimento cujas transformações econômicas não são acompanhadas de novas alternativas que possam representar uma melhoria na qualidade de vida com a inserção de comunidades tradicionais aos processos de produção contemporâneos. ___________________________________________________________________________________________ABSTRACT / The construction of dams and hydroelectric power plants has promoted the economic development of nations for more than a century. The control and stabilization of spillways, irrigation, water provision and electric power generation are among the several uses of dams. The industrial development was implanted late in Brazil, provoking migrations and accelerating the urban growth. This phenomenon came accompanied, in the last decades, by demands from the agricultural technological sector; a process that has caused a greater demand for water and energy supply. As a response to this increasing need, in Goiás, a state located in the central-west of the country, it was built Corumbá Hydroelectric Power Plant IV. It is one of the greatest undertakings directed to the development and the regional infrastructure, above all for the Federal District, which is near this region. However, its project, though considered innovative, has caused polemics since its concession. Moreover, the construction works of the power plant and its reservoir have been provoking significant changes in the nearby districts, particularly in the traditional rural communities. Thus, the goal of this dissertation is to analyze the socio-spatial effects of the hydroelectric reservoir of Corumbá IV, giving emphasis to the land use planning of surrounding districts. Findings indicate that there are limitations and inherent contradictions to land use planning and sustainable development which submit to certain conditions the scope of social agreement that should promote the heterogeneous use of the resources and the land. When analyzing the community's traditional perspective about the undertaking, it was verified with this research, the persistence of a development model whose economic transformations are not accompanied by new alternatives which should represent an improvement in life quality with the inclusion of traditional communities to the processes of contemporary production.
63

Modelo de negociação de contratos bilaterais de médio prazo para centrais hidrelétricas de pequeno porte - PCH / Computer model for small hydro power plant mid-term billateral contract negotiation

Jannuzzi, Denis Perez 24 October 2008 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Elétrica, 2008. / Submitted by Diogo Trindade Fóis (diogo_fois@hotmail.com) on 2009-09-15T12:28:41Z No. of bitstreams: 1 2008_DenisPerezJannuzzi.pdf: 589933 bytes, checksum: 6820ffbdee37f50faf388d190f3f4db6 (MD5) / Approved for entry into archive by Luis Felipe Souza Silva(luis@bce.unb.br) on 2009-09-15T18:42:00Z (GMT) No. of bitstreams: 1 2008_DenisPerezJannuzzi.pdf: 589933 bytes, checksum: 6820ffbdee37f50faf388d190f3f4db6 (MD5) / Made available in DSpace on 2009-09-15T18:42:00Z (GMT). No. of bitstreams: 1 2008_DenisPerezJannuzzi.pdf: 589933 bytes, checksum: 6820ffbdee37f50faf388d190f3f4db6 (MD5) Previous issue date: 2008-10-24 / Este trabalho apresenta uma proposta de aplicativo computacional que visa auxiliar a tomada de decisão na negociação de contratos bilaterais em médio prazo (12 meses), em termos estatísticos e probabilísticos, no âmbito do Ambiente de Contratação Livre (ACL) do mercado de eletricidade sob o foco do Agente Gerador de Energia Elétrica. Este Agente Gerador específico deve atender aos seguintes pré-requisitos: ser possuidor de PCH ou UHE de pequeno porte passíveis de inclusão nos critérios estabelecidos por meio da Resolução ANEEL n° 652/2003 e não ser participante do Mecanismo de Realocação de Energia (MRE). O contexto do trabalho envolve o estudo de critérios essenciais destinados a análise da tomada de decisão, tais como Lucro, Insuficiência de Lastro de Energia e Custo de Oportunidade. Estes critérios foram escolhidos com base nas seguintes primícias: o Lucro representa a condição básica de sobrevivência do ente econômico no mercado competitivo, a Insuficiência de Lastro de Energia estabelece a medida da garantia do fornecimento conforme contrato, e por fim, o Custo de Oportunidade representa o nível de arrependimento que o agente estará sujeito em face da decisão tomada. Com vistas a oferecer adequada visão da caracterização do Agente Gerador de Energia Elétrica, na parte inicial, o trabalho apresenta os aspectos introdutórios e regulatórios a respeito do assunto. A seguir, são apresentados os métodos de previsão utilizados na geração de amostras aleatórias das grandezas relacionadas, tais como Geração da Usina (PG), Geração do Submercado (PGS), Energia Natural Afluente (YS) e Preço de Liquidação das Diferenças PLD (?S), assim como os resultados dos mesmos. Por conseguinte, é realizada uma avaliação dos resultados das distribuições probabilísticas utilizadas, Uniforme e Normal. O resultado da avaliação sugere que a distribuição Uniforme é mais apropriada na geração de amostras como padrão a ser adotado para as grandezas estudadas. No último capítulo, é apresentado o método de Otimização adotado, bem como seus resultados e análises. A intenção ao final da otimização é proporcionar ao Agente, valores contratuais de Energia e Preço limites, que subsidiem as possibilidades de negociação, de forma a obter a maximização do lucro esperado. Ou seja, a partir destes valores limites, o agente tem parâmetros criteriosos e suficientes para a adoção de uma tomada de decisão cujos riscos sejam conhecidos. __________________________________________________________________________________________ ABSTRACT / This work presents a proposal for a computer application to help the decision-making in the negotiation of bilateral contracts in the medium term (12 months), in statistical and probabilistic terms, under the Free Contracting Environment (ACL) of the electricity market from the electric power generator agent point of view. This specific agent must meet the following prerequisites: be the owner of small hydro power plant as defined by the criteria established through Resolution ANEEL N° 652/2003, and not be part of the Reallocation Mechanism of Energy (MRE). The context of this work involves the study of essential criteria for decision-making, analysis, such as Profit, Energy Ballast Failure and Opportunity Cost. These criteria were elected based on the following concepts: Profit is the basic condition for economic survival in a competitive market; Energy Ballast Failure establishes the extent of power supply contract collateral; and last, the Opportunity Cost represents the level of regret that the agent will be subject via-a- is decision made In order to provide the adequate definition for Electric Power Generator Agent, this work presents in its initial part an introduction to regulatory issues related to the scope the proposed subject. The following chapters present the forecasting methods utilized to obtain the random samples of related variables, such as, Generation of Power (PG), Generation of Submarket (PGS), Natural Energy Affluent (YS), Price of Unconcealed Liquidation (λS), and their results. Then, it presents an evaluation of the results obtained from the Uniform and Normal probability distributions. The result of the evaluation suggests that the Uniform distribution is more appropriate for the generation of samples to be used as standard for the studied quantities.
64

Modelação numérica de transientes hidráulicos em circuitos de usinas hidrelétricas

Simmari, Natalia María Baccardatz January 2006 (has links)
O conhecimento dos transientes hidráulicos em condutos sob pressão é de grande importância, uma vez que é geralmente nesses regimes que acontecem as pressões e velocidades extremas. Neste trabalho analisam-se os transientes que ocorrem em usinas hidrelétricas devido às manobras de operação nos grupos geradores (entrada ou saída de operação e aumento ou diminuição da potência gerada) e às rejeições de carga. Foi desenvolvido e verificado um modelo numérico para a simulação de transientes hidráulicos em circuitos de usinas hidrelétricas com configurações similares às da usina hidrelétrica (UHE) Serra da Mesa, implantada no rio Tocantins e pertencente a FURNAS Centrais Elétricas. O modelo desenvolvido foi verificado com dados teóricos tomados da bibliografia (Wylie et al.,1993 e Abreu et al.,1995), com dados obtidos numa estrutura de laboratório e na UHE Serra da Mesa. A estrutura existente no Laboratório de Hidráulica Experimental e Recursos Hídricos de FURNAS apresenta semelhança geométrica de 1:50 com a UHE Serra da Mesa. Os dados da UHE Serra da Mesa foram obtidos numa rejeição total de carga de três turbinas de 1180 MW, registrada em fevereiro de 1999, e numa rejeição total de carga de uma turbina de 350 MW, quando a usina se encontrava operando com duas unidades e gerando uma potência total de 643 MW, registrada em novembro de 2004. O modelo permite simular todas as possíveis manobras na usina como, por exemplo, a modelação de manobras independentes nas três turbinas. Foi concluído que, para se obter resultados corretos no sistema chaminé de equilíbrio-túnel de fuga, é importante considerar a variação do nível no canal de fuga, assim como determinar corretamente as perdas de carga no túnel de fuga. Da análise e da comparação dos resultados do modelo numérico com os dados obtidos na UHE Serra da Mesa, no modelo de laboratório e nos casos teóricos, verificou-se o bom desempenho do modelo no que se refere à boa reprodução das pressões, velocidades e níveis no circuito hidráulico, bem como a reprodução do comportamento das turbinas durante o transiente. / The knowledge of hydraulic transients in pressure pipes is of great importance, once that it’s generally in such regimes that occur extreme pressures and velocities. In this work, the occurring transients in power plants caused by turbine-generator groups operation (start or finish of generation and increase or decrease of the generated power) and by load rejections are analyzed. A numerical model was developed and verified for the simulation of hydraulic transients in hydroelectric power plant circuits with similar configurations to the Serra da Mesa hydroelectric power plant, implanted in Tocantins river, owned by “FURNAS Centrais Elétricas”. The developed model was verified by theoretical cases taken from the bibliography (Wylie et al., 1993 and Abreu et al., 1995), by data obtained in a laboratory structure and field data from the UHE Serra da Mesa. The scaled model, located at the “Laboratório de Hidráulica Experimental e Recursos Hídricos” of FURNAS, is a 1:50 ratio representation of the UHE Serra da Mesa. The data from the UHE Serra da Mesa were obtained in a total load rejection of 1180 MW (three turbines), registered in February 1999, and a total load rejection of 350 MW (one turbine), at which time the plant was operating with two units and generating a total power of 643 MW, registered in November 2004. The model allows the simulation of all possible plant maneuvers, for example, independent maneuver of all three turbines simulation. It was concluded that to obtain the correct results in the system surge tank - outlet tunnel, it is important to consider the variation of the outlet canal level and to determine correctly the charge losses in the outlet tunnel. Analyzing and comparing the results of the numerical model with the data of Serra da Mesa hydropower plant, with the data of the laboratory model and with the theoretical cases, it was verified the good performance of the model, referred to the good reproduction of pressures, velocities and levels in the hydraulic circuit and it was also verified the good reproduction of the turbines data during the transient.
65

Entre aqueles que incomodam

Silva, Elis do Nascimento January 2016 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro de Filosofia e Ciências Humanas, Programa de Pós-Graduação em Antropologia Social, Florianópolis, 2016. / Made available in DSpace on 2017-05-23T04:16:28Z (GMT). No. of bitstreams: 1 345676.pdf: 3199456 bytes, checksum: 7b69bb76414f9bdfeb15cff224b83783 (MD5) Previous issue date: 2016 / A política energética brasileira, consolidada na década de 1970, atrelou-se ao modelo de desenvolvimento econômico e industrial proposto pelos governos militares a partir de 1964, período em que grandes projetos hidrelétricos começam a ser implantados em algumas regiões do país através de um planejamento estratégico do Estado brasileiro. Neste contexto, a Eletrosul (Centrais Elétricas do Sul do Brasil S.A) formulou um projeto para a exploração integral do potencial energético da bacia do rio Uruguai (SC/RS), denominado Projeto Uruguai, o qual previa a implantação de cerca de 22 aproveitamentos hidrelétricos em seu trecho nacional. Entretanto, os locais selecionados para a implantação desse conjunto de hidrelétricas na bacia do rio Uruguai correspondem aos territórios tradicionalmente ocupados pelas populações indígenas originárias dessa região, como as Kaingang e Guarani, constituindo os efeitos dos empreendimentos propostos pela Eletrosul uma ameaça à vida e aos direitos desses povos. Visto o cenário nacional e internacional no qual é concebido e formulado o Projeto Uruguai, nos anos 1970, a Eletrosul realizou naquele período uma série de estudos para o levantamento do potencial energético da bacia do rio Uruguai e convidou, por intermédio do Grupo de Estudos do Rio Uruguai (GERU), o Programa de Pós-Graduação em Ciências Sociais da (PPGCS/UFSC), representado à época pelo professor Silvio Coelho dos Santos, para a realização de estudos antropológicos sobre os possíveis efeitos das hidrelétricas propostas às populações indígenas desta região hidrográfica do Sul do Brasil. Elaborados durante o regime de ditadura civil-militar que se impunha no país, num contexto marcado por denúncias de práticas de genocídio e etnocídio pela política indigenista brasileira, o antropólogo Silvio Coelho dos Santos realizou, junto às equipes de pesquisadores/as coordenadas por ele, estudos acerca dos potenciais efeitos deletérios desse conjunto de hidrelétricas às populações indígenas da bacia do rio Uruguai, nos anos 1970 e 1980. Esses estudos são considerados pioneiros no histórico de relacionamento entre o Setor Elétrico, a Antropologia e os Povos Indígenas no país. A partir do espólio documental contido no acervo do professor e antropólogo Silvio Coelho dos Santos, situado no Núcleo de Estudos de Populações Indígenas (NEPI/UFSC), bem como das representações de alguns/mas interlocutores/as envolvidos/as, esta pesquisa busca reconstituir, compreender e analisar as relações entre os projetos hidrelétricos, os Povos Indígenas e a Antropologia no Sul do Brasil, de forma especial nos anos 1970 e 1980, a partir do estudo de caso da práxis de Silvio Coelho dos Santos no âmbito do Projeto Uruguai.<br> / Abstract : The brazilian energy policy consolidated in the 1970s was related to the model of economic and industrial development proposed by the military governments since the coup in 1964, when huge hydroelectric projects began to be implemented in some regions of the country through strategic planning of the Brazilian State. In this context, the Eletrosul (Electric Company of Southern Brazil S.A) formulated a project to fully exploit the energy potential of the Uruguay River basin (SC/RS), called Uruguay Project, which estimated the implementation of approximately 22 dam projects in its national stretch. However, the sites selected for the implementation of these hydroelectric dams in the Uruguay River basin pass through to the territories traditionally occupied by indigenous communities, such as the Kaingang and Guarani. Thus, the effects of these projects proposed by Eletrosul are a threat to the lives and rights of these First Nations. Considering the national and International scenario in which the Uruguay Project was conceived and formulated, the Eletrosul conducted, during that period (1970s), a series of studies to survey the energy potential of the Uruguay River basin and invited - through the Uruguay River Study Group (GERU), the Postgraduate Program in Social Sciences of the Federal University of Santa Catarina (PPGCS/UFSC) ? the professor Silvio Coelho to carry out anthropological studies to measure the possible consequences of the hydroelectric plants to the indigenous communities of this hydrographic region. Although in a dictatorial context, in the 1970s and 1980s, marked by practices of genocide and ethnocide carried out by Brazilian indigenous policies, the anthropologist Silvio Coelho dos Santos accomplished with the teams of researchers coordinated by him, studies on the deleterious effects of this set of hydropower to the indigenous populations of the Uruguay River basin. These studies are considered pioneers in the historical relationships between the Electric Sector, Anthropology and the Indigenous Peoples in the country. This research intent to understand the relationships between hydroelectric projects, indigenous communities and anthropology in Southern Brazil, by doing a case study of the praxis of Silvio Coelho dos Santos in the Uruguay Project setting, analyzing both his documentary collection localized in the Nucleus of Studies of Indigenous Populations (NEPI/UFSC) and the representations of some interlocutors that were involved.
66

O monitoramento de fauna como ferramenta para a perícia ambiental: estudo de caso em empreendimento hidroelétrico

Karvat, Elio Tadeu January 2015 (has links)
Dissertação (mestrado profissional) - Universidade Federal de Santa Catarina, Centro de Ciências Biológicas, Programa de Pós-Graduação em Perícias Criminais Ambientais, Florianópolis, 2015. / Made available in DSpace on 2016-10-19T12:53:44Z (GMT). No. of bitstreams: 1 338220.pdf: 3050836 bytes, checksum: 69f1b9d2c333606a266fd66e5420472e (MD5) Previous issue date: 2015 / Este estudo de caso foi aplicado em um empreendimento hidroelétrico, UHE Foz do Chapecó, com objetivo de levantar e analisar dados de monitoramento de fauna para saber quais poderiam contribuir na realização de perícias ambientais. Para tal, foi produzida análise descritiva das principais atividades abarcadas no planejamento e execução, além de aspectos importantes das informações remetidas, onde se apontou as falhas, deficiências e os ajustes verificados. Foi constatado que as principais deficiências ocorreram previamente ao seu início e relacionaram-se ao diagnóstico deficiente da fauna pelos Estudos de Impacto Ambiental - EIA, início das obras de instalação do empreendimento antes do monitoramento e deficiências no desenho amostral que não incluiu áreas controle. As dificuldades verificadas durante a execução e envio dos dados poderiam, na maioria dos casos, terem sido corrigidas. Para avaliar de forma abrangente a qualidade dos dados enviados ao órgão licenciador foi elaborado e aplicado um Índice de Adequabilidade dos Dados do Monitoramento ? IADM, baseado nos indicadores de esforço amostral empregado e na apresentação dos resultados dos índices de diversidade e riqueza de espécies. O IADM obtido foi satisfatório, com grau de adequação de 64% do esperado. Também foi avaliado que as análises constantes do Relatório Técnico Final, condiziam com os dados obtidos e estavam adequados ao que havia sido requerido pelo órgão licenciador. Da avaliação geral e do cumprimento dos objetivos propostos para o trabalho, verificou-se que, devido às deficiências prévias ao início das atividades, houveram dificuldades de descrever a evolução das comunidades de fauna. Foi atendido o objetivo geral proposto para esse estudo de caso com a apresentação das principais deficiências e de ferramentas para avaliar a execução do monitoramento, o que pode auxiliar na realização de perícias ambientais congêneres e na melhoria dos processos de monitoramento de fauna desenvolvidos no âmbito do licenciamento ambiental.<br> / Abstract : This case study was applied on a hydroelectric project, HPP Foz do Chapecó, in order to raise and analyze wildlife monitoring data to see which could contribute to the achievement of environmental expertise. To do this, descriptive analysis of the main activities encompassed the planning and execution was produced, as well as important aspects of the information sent, where it pointed out the failures, shortcomings and checked adjustments. It was found that the main shortcomings occurred prior to the beginning and were related to poor diagnosis of wildlife by the Environmental Impact Assessment (EIA), the beginning of the project installation works before the monitoring and deficiencies in sampling network that did not include control areas. The difficulties encountered during the execution and delivery of the data could, in most cases, have been corrected. To assess comprehensively the quality of data sent to the licensing body was developed and implemented one Suitability Index of Monitoring Data - MDRI, based on employee sampling effort indicators and presentation of results of diversity indices and species richness. The MDRI obtained was satisfactory, with adequate level of 64% of expected. It was also assessed that the constant analysis of the Final Technical Report, matched with the data obtained and were appropriate to what was required by the licensing authority. The general assessment and meeting the objectives proposed for the job, it was found that due to deficiencies prior to the start of activities was difficult to describe the evolution of the animal communities. It was granted the general objective proposed for this case study with the presentation of the main shortcomings and tools to evaluate the implementation of monitoring, which can assist in the realization of similar environmental skills and improving wildlife monitoring processes within the environmental licensing.
67

Considerações sobre planejamento de eclusagens na hidrovia Tietê-Paraná

Silva, Haroldo [UNESP] 03 December 2015 (has links) (PDF)
Made available in DSpace on 2016-04-01T17:55:18Z (GMT). No. of bitstreams: 0 Previous issue date: 2015-12-03. Added 1 bitstream(s) on 2016-04-01T18:01:18Z : No. of bitstreams: 1 000860113.pdf: 2471141 bytes, checksum: b5261aa5bd4c932026573b5de7778890 (MD5) / O sistema de eclusas da hidrovia Tietê-Paraná possibilita que embarcações vençam os desníveis formados pelas barragens das usinas hidrelétricas, construídas com finalidade de uso múltiplo das águas, o que viabiliza o transporte de passageiros e mercadorias, integrando a hidrovia a um importante corredor de transporte do estado de São Paulo. Este trabalho tem como objetivo identificar as principais variáveis que impactam a eficiência do processo de eclusagem e analisar seus efeitos no desempenho da navegação. As variáveis selecionadas foram utilizadas no estudo de casa nas eclusas de Barra Bonita, Bariri, Ibitinga, Promissão e NOva Avanhandava, anexas às usinas hidrelétricas de mesmo nome, para verificar, por meio de aplicação de questionário, observação e análise documental, a influência dessas variáveis no desempenho da navegação. As eclusas funcionam 24 horas por dia durante o ano todo, tendo suas operações interrompidas a cada dois anos, por um período de até 30 dias, para manutenção preventiva nos equipamentos do sistema de transposição. Essa prática tem sido muito importante para que as eclusas tenham, historicamente, alcançado índices médios de disponibilidade anual de 99%, contribuindo significativamente para a atratividade do modal. A demanda pela hidrovia, fator que contibui para a busca do equilíbrio da matriz de transportes do país, tem gerado formação de filas de embarcações em eclusas em alguns períodos do dia, fato ocorrido com frequência até o mês de maio de 2014. Após essa data, houve diminuição do fluxo de embarcações nas eclusas avaliadas devido à interrupção da navegação entre os rios Paraná e Tietê, em decorrência do baixo nível de água no reservatório da usina hidrelétrica Três Irmãos, porém permanece, nesse trecho, o transporte de cana-de-açúcar, areia e passageiros. Este trabalho contribui com a indicação da principal causa de formação de filas... / The lock system of Tietê-Paraná waterway enables vessels diferent levels formed by the dams of hydroelectric power plants, built with the purpose of multiple use water, which enables the transport of passengers and goods, integrating this waterway as an important transport corridor of the São Paulo'state. The aim of this study is to identify the key variables that influence the operations of locking process and analyze their effects on the performance of shipping. The selected variables were used in the case study at the Barra Bonita, Bariri, Ibitinga, Promissão and Nova Avanhandava's locks, attached to the hydroelectric power plants at same name, to verify through a questionnaire, observation and document analysis, the influence of these variables on the overall performance of navigation. The locks operate 24 hours a day throughout the year and have their operations interrupted every two years, for a period of 30 days to perform preventive maintenance on the equipments. This practice has been very important for locks, historically, reaching average levels of availability of 99% per year, contributing to modal attractiveness. The demand for this waterway, an important factor for the balance of the country'cargo transportation matrix, causes formation of queues of vessels at loocks, in some periods of the day, actually occurred frequently until the month of may 2014. Thus, this work contributes indicating the leading cause of queuing in locks, and suggests the adoption of systematic procedures for loocking process, as a means to organize the vessel's traffic and increase the productivity of companies that operates in a Tiete-Paraná waterway
68

Avaliação da viabilidade de implantação de uma micro- central hidroelétrica para atender consumidores localizados em regiões isoladas

Alves, Gilberto Manoel [UNESP] 30 October 2007 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:31:37Z (GMT). No. of bitstreams: 0 Previous issue date: 2007-10-30Bitstream added on 2014-06-13T19:41:58Z : No. of bitstreams: 1 alves_gm_dr_botfca.pdf: 2388859 bytes, checksum: a9afe369492a39c755c70c4b5397af45 (MD5) / Apesar dos pequenos aproveitamentos hidrelétricos terem recebido um pouco mais de atenção após a privatização das concessionárias de energia elétrica, muitas são as famílias, especialmente do meio rural, que não têm acesso à energia elétrica por residirem em locais mais distantes dos centros urbanos. Esta pesquisa teve como objetivo analisar a viabilidade de implantação de uma microcentral hidrelétrica como uma alternativa energética para consumidores não atendidos por energia elétrica convencional, através da concessionária. O aproveitamento em estudo localiza-se na Fazenda Madeira no município de São José do Rio Claro, localizado ao norte do estado do Mato Grosso. O desenvolvimento deste trabalho foi fundamentado em estudos teóricos e práticos, fazendo uso de métodos experimentais para a estimativa e avaliação do potencial hidrelétrico, através de critérios de hidrologia existentes no local. Após levantamento entre fabricantes nacionais, constatou-se a viabilidade da instalação da microcentral hidrelétrica com turbina Hélice devido as suas características técnicas e econômicas. São apresentados os resultados do projeto, desenhos e a construção da turbina. A instalação da microcentral proporcionará melhorias e facilidades na principal atividade da fazenda que é a criação, engorda e abate de gado, a qual representa grande importância social e econômica para a região / Although small hydroelectric exploitations have received some sort of attention after the concessionaires privatization of electric energy, having competition and concourse in mind, nevertheless, there are many families, especially in rural areas, that do not have access to electric energy for living in locations distant from urban centers. This research had as objective to analyze the viability of one implantation micro-hydroelectric plants as an energy alternative for non-supported conventional electric energy consumers, through the concessionaire. The exploitation in study is situated in the Fazenda Madeira in the city of São José do Rio Claro, located to the north of the state of the Mato Grosso. The development of this work was based on theoretical and practical studies, making use of experimental methods for estimation and evaluation of the hydroelectric potential, through local existent hydrology standards. After survey between national manufacturers, it was verified viability of the implantation of the micro-hydroelectric plants with turbine Helix just its characteristics techniques and economics. The results of the project, drawings and the construction of the turbine are presented. The installation of the micro-hydroelectric will bring improvements and facilities to the main activity of the farm that are the creation, fattening and slaughtering of cattle and represent big social and economic importance for the region
69

Conservação genética e reposição de estoques nativos na bacia do rio Sapucaí-Mirim (SP)

Mendonça, Bruna Bueno [UNESP] 27 February 2014 (has links) (PDF)
Made available in DSpace on 2014-08-13T14:50:56Z (GMT). No. of bitstreams: 0 Previous issue date: 2014-02-27Bitstream added on 2014-08-13T17:59:58Z : No. of bitstreams: 1 000768387_20150110.pdf: 1793356 bytes, checksum: dbf09fd8264a446f0bfb77f63e5c47d5 (MD5) Bitstreams deleted on 2015-01-16T10:37:53Z: 000768387_20150110.pdf,Bitstream added on 2015-01-16T10:38:36Z : No. of bitstreams: 1 000768387.pdf: 5604441 bytes, checksum: 9c1d7d0e35ff13b00ad10d08b4b335f5 (MD5) / O rio Sapucaí-Mirim, tributário da bacia do Alto Paraná apresenta grande diversidade de peixes neotropicais, em termo de riqueza de espécies. Paradoxalmente, a região que compreende a bacia do rio Paraná e alto Paraná apresenta uma grande interferência antrópica devido principalmente a construção de centrais hidrelétricas. Centrais hidrelétricas podem ser classificadas em Usinas Hidrelétricas (UHE) e Pequenas Centrais Hidrelétricas (PCH), de acordo com a capacidade de gerar energia. As PCHs são colocadas por vários autores como uma das alternativas de menor interferência, por apresentarem um tamanho reduzido, sendo construídas para suprir a demanda energética de pequenos centros urbanos e rurais. No entanto, a construção de diversas PCHs somada a construções de UHE causam uma fragmentação ainda maior nos ambientes aquáticos, ocasionando a interrupção do fluxo dos rios, este evento tem se mostrado prejudicial para várias espécies de peixes, principalmente as espécies migradoras. Estas espécies têm a necessidade de movimentar-se rio acima para fins tróficos e reprodutivos uma vez ao ano, com a construção de barramentos estas encontram dificuldades para completar seu ciclo de vida. Diversos estudos apontam esse bloqueio como principal fator na redução populacional destas espécies, alertando para necessidade de ações conservacionistas, a fim de manter os estoques pesqueiros que além de apresentarem importância ecológica nos ambientes aquáticos são de grande importância na pesca comercial e de subsistência. Há diversas ações tomadas para mitigar a redução populacional destas espécies, no entanto, no Brasil, estas ações são realizadas sem informações científicas, ocorrendo de forma equivocada, especialmente em práticas de repovoamento, onde alevinos são liberados na natureza sem nenhum conhecimento prévio biológico e genético. Práticas mitigadoras realizadas sem respaldo .... / The Sapucaí-Mirim River, tributary of Alto Paraná basin presents great diversity of Neotropical fishes in terms of richness of species. Nevertheless, the region which encompasses the Paraná and Alto Paraná basins presents a great anthropic interference especially due to the construction of hydroelectric plants, these constructions can be classified as to its capacity to generate energy, in Hydroelectric plants and Small Hydroelectric Plants (SHP). The SHP are considered by several authors as one of the alternatives with less interference, due to its small size, this kind of hydroelectric are constructed to feed the energetic demand of small urban and rural centers. However, the constructions of SHPs together with hydroelectric plants constructions causes an even bigger fragmentation in the aquatic environments , which results in the interruption of rivers flow, this event has been shown as very harmful to fishes species specially the migratory species. Once a year these species move upstream to feed and reproduce, due to dams constructions migratory fishes species have difficulties to complete their life cycle. Several studies indicates the dams as a principal factor in the reduction of migratory species population , warning to necessity of conservationist actions, aiming to maintain the fisheries stocks that represent a fisheries and ecological importance in the aquatic environments. Many actions are employed aiming to minimize the reduction of migratory species population, however, in Brazil these actions are performed without scientific support, occurring in a wrongful manner, specially the restocking, where the fishes are released into the wild without any prior biological and genetic knowledge. Mitigation practices performed without scientific support may endanger the wild stocking. The development of genetics technologies has been proven of extremely importance to assist in the ecology and conservationist biology, through ...
70

Vegetação arbórea e sua relação com fatores ambientais e espaciais em florestas de terra firme no noroeste de Rondônia, Brasil

Moser, Pamela 05 1900 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Florestal, Programa de Pós-Graduação em Ciências Florestais, 2013. / Submitted by Alaíde Gonçalves dos Santos (alaide@unb.br) on 2013-08-05T12:30:17Z No. of bitstreams: 1 2013_PamelaMoser.pdf: 8094336 bytes, checksum: 6b2feadb4a403ce9a744eaca49133b62 (MD5) / Approved for entry into archive by Guimaraes Jacqueline(jacqueline.guimaraes@bce.unb.br) on 2013-08-05T13:38:26Z (GMT) No. of bitstreams: 1 2013_PamelaMoser.pdf: 8094336 bytes, checksum: 6b2feadb4a403ce9a744eaca49133b62 (MD5) / Made available in DSpace on 2013-08-05T13:38:26Z (GMT). No. of bitstreams: 1 2013_PamelaMoser.pdf: 8094336 bytes, checksum: 6b2feadb4a403ce9a744eaca49133b62 (MD5) / Foi caracterizada a vegetação arbórea e verificada a relação entre os padrões de composição e distribuição das espécies com os fatores ambientais e espaciais em mesoescala em florestas de terra firme na bacia do médio rio Madeira, no noroeste de Rondônia, Brasil. O estudo teve como objetivos: 1) descrever a composição florística e a estrutura da vegetação arbórea e comparar a diversidade de espécies na porção inicial (Caiçara), intermediária (Mutum) e final (Abunã) na área de influência do futuro reservatório da hidrelétrica de Jirau, no rio Madeira; 2) avaliar a distribuição de espécies arbóreas e seus determinantes ambientais e espaciais para melhor compreender a vegetação que será impactada pelo reservatório da hidrelétrica de Jirau. A vegetação arbórea foi amostrada em 20 parcelas de 250 x 40 m, distribuídas sistematicamente em transectos e módulos de amostragem. Foram inventariados indivíduos arbóreos em três classes de diâmetro, Classe 1: 1 cm ≤ DAP < 10 cm, Classe 2: 10 cm ≤ DAP < 30 cm e Classe 3: DAP ≥ 30 cm. A área total amostrada em cada classe foi de 1, 10 e 20 hectares, respectivamente. Foram coletadas as seguintes variáveis abióticas: coordenadas geográficas, altitude, distância em relação ao rio, declividade, número de troncos caídos e variáveis físico-químicas de solo. A vegetação foi analisada por meio de parâmetros fitossociológicos, curvas de rarefação, perfis de diversidade, análises de classificação e de ordenação e regressões múltiplas. O espaço foi devidamente considerado com a inserção de filtros espaciais quando necessário. Por fim, a partição de variância quantificou quanto o ambiente e o espaço explicaram da variação na vegetação. Abunã e Caiçara foram mais diversos que Mutum. A porção inicial do reservatório (Caiçara) apresentou composição florística e abundância diferente das porção intermediária (Mutum) e final (Abunã), e os principais preditores dessa separação foram a distância em relação ao rio e componentes físico-químicos do solo. Diferenças na diversidade e composição florística também foram encontradas entre as duas margens do rio Madeira, sendo o teor de potássio no solo o principal preditor dessa diferença, ainda com influência das transições para campinarana arbórea e florestas de várzea na margem direita. O ambiente foi o principal responsável pela distribuição de espécies, explicando entre 12 e 16% da variação. Entretanto, a maior parte da variação na vegetação, entre 72 e 78%, permaneceu sem explicação, indicando a importância de variáveis não mensuradas, processos evolutivos ou padrões de distúrbios na área. Analisados em conjunto, os resultados sugerem que o reservatório da Usina Hidrelétrica de Jirau impactará ambientes heterogêneos em relação à vegetação e a diversidade de ambientes, e essa heterogeneidade deve ser considerada em ações de mitigação ambiental. _______________________________________________________________________________________ ABSTRACT / The arboreal vegetation of non-flooded forests (terra firme forests) was characterized in order to evaluate the relationship between the patterns of species distribution and composition with the environmental and spatial factors in a spatial mesoscale in the Madeira river middle basin in northwestern Rondônia. The aims of the study were to: 1) describe the floristic composition and the structure of trees and compare the diversity of species in the initial portion (Caiçara), intermediate (Mutum) and final (Abunã) in the area of the future reservoir of the hydroelectric Jirau on the Madeira River; 2) to evaluate the distribution of species and their environmental and spatial determinants in this region in order to understand the forests that will be impacted by the reservoir of the hydroelectric Jirau. The arboreal vegetation was sampled in 20 plots of 250 x 40 m, systematically distributed in transects and sampling modules. The arboreal individuals were sampled in three diameter classes, Class 1: 1 cm ≤ DBH <10 cm, Class 2: 10 cm ≤ DBH <30 and Class 3: DBH ≥ 30 cm. The sampled area in each class was 1, 10 and 20 hectares, respectively. The vegetation was analyzed by means of phytosociological parameters, rarefaction curves, diversity profiles, classification and ordination analyzes and multiple regressions. The space was properly considered with the inclusion of spatial filters when it was needed. Finally the variance partition quantified how much the environment and the space explained the variation in vegetation. Abunã and Caiçara were more diverse than Mutum. The initial portion of the reservoir (Caiçara) presented different floristic composition and abundance of the intermediate portion (Mutum) and final (Abunã), the main predictors of this separation were the distance from the Madeira River and soil physical-chemical properties. The differences in diversity and floristic composition were also found between the opposite sides of the Madeira River, and the potassium content in the soil was the main predictor of these differences, besides the influence of transitions to arboreal campinarana and flooded forests on the right side. The environment was the main responsible for the species distribution pattern, explaining between 12 and 15% of the variation. However, most of the variation in vegetation, between 72 and 78%, remained unexplained, indicating the importance of unmeasured variables, evolutionary processes or disturbance patterns. Taken together the results suggest that the reservoir of the Jirau hydroelectric plant will impact heterogeneous environments regarding the vegetation and the diversity of environments. This heterogeneity should be considered in actions for environmental mitigation.

Page generated in 0.0501 seconds