• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 79
  • 78
  • 42
  • 41
  • 11
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 274
  • 274
  • 208
  • 196
  • 87
  • 84
  • 51
  • 51
  • 50
  • 49
  • 47
  • 43
  • 39
  • 35
  • 34
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
81

Mapeamento do fluxo de valor do processo de contratação de obras : o caso de uma universidade pública

Serra, Fernanda Neves Tavares January 2015 (has links)
As organizações do setor público são normalmente associadas a processos lentos, burocráticos e que geram resultados insuficientes. Em função disso, têm crescido as exigências relativas ao desempenho dos órgãos do setor público. A aplicação dos conceitos Lean é uma alternativa para reduzir as perdas do setor púbico e aumentar a eficiência no uso dos recursos. Nesse contexto, este estudo tem como objetivo analisar e propor melhorias no processo de contratação de obras de uma universidade pública, com foco na eliminação das perdas, através da utilização do Mapeamento do Fluxo de Valor (MFV), bem como identificar barreiras para a aplicação do MFV e das melhorias identificadas por meio dessa ferramenta. A estratégia de pesquisa adotada foi o estudo de caso aplicado ao processo de contratação de uma obra na Universidade Federal de Mato Grosso (UFMT). Com base no MFV, foram propostas melhorias no processo, sinalizando para uma possível redução do lead time de 1.242 dias para 380 dias. Através da aplicação do MFV, também foi possível identificar barreiras para implantação dos princípios lean, como a falta de padronização dos procedimentos, falta de visão sistêmica do fluxo do processo por parte dos gestores, deficiência na capacitação dos servidores, falta de foco no cliente final e dificuldades de adaptar conceitos a práticas. Pelos resultados obtidos, é possível afirmar que os procedimentos administrativos, no contexto de obras em uma universidade pública, podem ser melhorados com a aplicação do MFV. / Public organizations are usually associated to slow bureaucratic processes with little result. Therefore, there is a growing demand for higher performances in the public sector. Using lean concepts is an alternative to reduce the losses in the public sector and enhance the efficiency of recourse use. The research herein presented is aimed at analyzing and proposing improvements in the bidding process for construction works within a public university, focusing on loss elimination, through the use of Value Stream Mapping (VSM). Besides, we intend to identify obstacles to using VSM and the benefits that come from the use of such tool. We have done a case study about the bidding process for construction works within the Federal University of Mato Grosso (UFMT). Based on VSM, we suggested improvements to the process through a possible reduction of the lead time from 1242 days to 380 days. By using VSM, it was also possible to identify obstacles to the lean principles, such as the lack of procedural standardization, the fact that managers do not have a systemic view of the process stream, employees’ need for training, lack of focus on the end client and difficulties to adapt concepts into practices. From the results, we can affirm that administrative procedures in a public university can be improved by using VSM.
82

Avaliação da estabilidade, capacidade e implantação de práticas lean em obras de infraestrutura e pavimentação viária

Freitas, Saulo Joaquim de January 2015 (has links)
O setor da construção civil é conhecido pela grande incidência de perdas em seus processos, o que tem levado ao crescente uso de práticas baseadas nos sistemas de produção enxuta. Este trabalho apresenta a avaliação da estabilidade e capacidade dos processos, bem como o uso de práticas enxutas em uma obra de pavimentação viária. Inicialmente, a avaliação da estabilidade e capacidade foi realizada por meio do mapeamento do fluxo de valor do estado atual e do desenvolvimento e coleta de indicadores associados aos 4M (Material, Mão-deobra, Máquina e Método). Os resultados indicaram que todos os cinco indicadores avaliados foram estáveis, porém apenas um indicador demonstrou capacidade de atender os parâmetros do cliente. Com base nessa avaliação, foram adotadas ações para redução de perdas e melhora da estabilidade e capacidade dos processos, por meio do uso de práticas enxutas, aplicadas em uma segunda obra com características similares à anterior. As práticas usadas foram: i) Mudança e melhoria de alguns processos construtivos; ii) implantação de ferramenta 5S no canteiro de obras; iii) criação e implantação de dispositivos poka-yokes, iv) aplicação de dispositivo visual de comunicação do tipo andon; v) planejamento de entrega de materiais just-in-time. Nessa segunda obra, os indicadores se mantiveram estáveis, mas foi percebida uma melhora quanto à capacidade destes indicadores em atender os parâmetros exigidos. Apenas o indicador de mão-de-obra turn over não foi capaz de atender a meta definida pela empresa. / The Building Sector is known for high incidence of wastes in its process. This characteristic has been motivating the operators to use some practices based on Lean Production Systems. This paper presents an evaluation of the stability and capacity of Lean Construction concepts in a road construction work. The evaluation of the stability and capacity was realized mapping the current state value stream and the collection of indicators associated with the 4M (Material Hand labor, Machine and Method) The results indicated that all seven indicators measured were stable, but only an indicator of the seven evaluated was considered capable. Based on this evaluation, actions were taken to improve the stability and capacity through the use of lean practices, applied in a second work with similar characteristics to the previous. The practices used were: i) improving / changing some construction processes, ii) 5S tool deployment on construction of works iii) creation and implementation of poka-yokes devices, iv) application of visual tool of andon type communication, v) delivery planning materials within the just-in-time concept. In this second work the indicators remained stable, but a great improvement was perceived, related to the ability of the indicators to meet the required parameters. Only the hand labor turnover indicator was not able to meet the target set by the company.
83

Proposta de um modelo de desenvolvimento de produção enxuta com utilização da ferramenta Visioneering / Proposal of a model of development of lean production with Visioneering\'s use

Camila Sanchez Prado 28 March 2006 (has links)
A crescente competição mundial exige que as empresas sejam cada vez mais ágeis e enxutas. Por isso, a idéia de otimização de processos tem estado nas discussões e nas estratégias traçadas para a manutenção da competitividade destas empresas e para que as indústrias tenham seus diferenciais de mercado. A produção enxuta, originária da indústria japonesa, é uma filosofia que vem de encontro a atender esta necessidade. Este trabalho apresenta um modelo que visa auxiliar o desenvolvimento de produção enxuta em empresas, em especial na indústria aeroespacial onde as aplicações foram estudadas, apresentando as vantagens do uso compartilhado de duas ferramentas de auxílio na implementação de um processo produtivo enxuto: o Visioneering e o mapeamento de fluxo de valor, vistos sob a ótica da metodologia Transmeth. Para tal, partiu-se de uma introdução teórica dos principais conceitos em torno destes assuntos, passando pelo relato de algumas utilizações destas ferramentas isoladamente na Embraer e chegando à elaboração do modelo de aplicação propriamente dito. / The increasing worldwide competition demands companies to become lean and agile. Therefore, the idea of process organization has been present in most discussions and strategies traced for the competitive maintenance of these companies and the industries to promote market differentiation for industries. And lean manufacturing, original from Japanese industry, is a philosophy that intends to attend this worldwide need. This work presents a model that it aims at to assist the development of lean production in companies, specially in the aerospace industry where the applications had been studied, presenting the advantages of the shared use of two tools of aid in the implementation of a lean productive process: the Visioneering and the value stream mapping, visas under the optics of the Transmeth methodology. For such, it was broken of a theoretical introduction of the main concepts in lathe of these subjects, passing for the story of some uses of these tools separately in the Embraer and arriving in the elaboration of the model of application properly said.
84

Proposta de estudo de sistematização da implantação de sistemas Kanban no contexto da produção enxuta / Proposal systematization\'s study of the implantation of systems Kanban in the lean production context

Alessandro Lucas da Silva 27 August 2004 (has links)
\"Houve época em que as empresas podiam ser organizações focadas nos próprios processos produtivos e comerciais, pressionando o mercado a se adaptar a suas necessidades ou características, de acordo com o modelo de negócios por elas praticado. Na medida em que a sociedade e o mercado se alteraram em profundidade e complexidade, exigindo ao mesmo tempo melhores produtos, mais resultados e ganhos crescentes, as empresas passaram a sentir a necessidade de se envolver num processo contínuo de melhoria\", (PINEDO, 2003). Devido ao processo de globalização produtiva os concorrentes passaram a pressionar muito mais duramente, pelo fato espantoso de que o espaço de mercado passou a ser o mundo inteiro. Defeitos e atrasos na entrega dos produtos são mazelas não mais aceitas pelos consumidores. A crescente exigência destes por produtos customizados e entregas rápidas tem provocado um litígio entre as empresas e o tradicional sistema de produção em massa, que muitas vezes não consegue atingir as expectativas dos clientes. Para se adaptarem a esse ambiente competitivo, as empresas de manufatura, seguindo os passos da indústria automobilística, estão cada vez mais utilizando os conceitos e técnicas da Produção Enxuta, ou seja, produzindo em resposta a demandas específicas, somente quando necessário, controlando a qualidade do produto e do prazo de entrega, e ao mínimo custo. Nesse sentido, o objetivo desse trabalho é propor um método de implantação de sistema Kanban que possa auxiliar as organizações a utilizarem esta ferramenta da Produção Enxuta, retirando dessa os maiores benefícios possíveis, como redução do inventário, melhoria do sistema de gerenciamento, redução de atrasos em entregas, entre outros. Esse método deverá servir como base de orientação para os envolvidos num processo de implantação de Kanban. / \"There were time where the companies could be organizations directed in the proper productive and commercial processes, pressuring the market to adapt its necessities or characteristics, in accordance with the model business-oriented for them practised. In the measure where the society and the market have modified in depth and complexity, demanding at the same time better products, more increasing results and profits, the companies had started to feel the necessity of involving in a continuous process of improvement\" (PINEDO, 2003). In consequence of the process of globalization\'s productive the competitorshad started to pressure much more hardly, for the amazing fact that the market space started to be the entire world. Defects and delays in the delivery of the products are problems not more accepted for the consumers. The increasing requirement of these for specific products and special deliveries has provoked a litigation between the companies and the traditional system of mass production, that many times do not obtain to reach the expectations of the customers. To be detached to this competitive environment, the companies of manufacture, following the steps of the automobile industry, are each time more using the concepts and techniques of the Lean Production, or either, producing in reply the specific demands, only when necessary, controlling the stated period and product quality of delivery, and minimum cost. In this direction, the objective of this work isto consider a method of system implantation Kanban that it can assist the organizations to use this tool of the Lean Production, removing that the biggest possible benefits, as reduction of inventory, improvement of the management system, reduction of delays in deliveries, among others. This method will have to serve as base of orientation for the involved ones in a process of Kanban\'s implantation.
85

Avaliação da estabilidade, capacidade e implantação de práticas lean em obras de infraestrutura e pavimentação viária

Freitas, Saulo Joaquim de January 2015 (has links)
O setor da construção civil é conhecido pela grande incidência de perdas em seus processos, o que tem levado ao crescente uso de práticas baseadas nos sistemas de produção enxuta. Este trabalho apresenta a avaliação da estabilidade e capacidade dos processos, bem como o uso de práticas enxutas em uma obra de pavimentação viária. Inicialmente, a avaliação da estabilidade e capacidade foi realizada por meio do mapeamento do fluxo de valor do estado atual e do desenvolvimento e coleta de indicadores associados aos 4M (Material, Mão-deobra, Máquina e Método). Os resultados indicaram que todos os cinco indicadores avaliados foram estáveis, porém apenas um indicador demonstrou capacidade de atender os parâmetros do cliente. Com base nessa avaliação, foram adotadas ações para redução de perdas e melhora da estabilidade e capacidade dos processos, por meio do uso de práticas enxutas, aplicadas em uma segunda obra com características similares à anterior. As práticas usadas foram: i) Mudança e melhoria de alguns processos construtivos; ii) implantação de ferramenta 5S no canteiro de obras; iii) criação e implantação de dispositivos poka-yokes, iv) aplicação de dispositivo visual de comunicação do tipo andon; v) planejamento de entrega de materiais just-in-time. Nessa segunda obra, os indicadores se mantiveram estáveis, mas foi percebida uma melhora quanto à capacidade destes indicadores em atender os parâmetros exigidos. Apenas o indicador de mão-de-obra turn over não foi capaz de atender a meta definida pela empresa. / The Building Sector is known for high incidence of wastes in its process. This characteristic has been motivating the operators to use some practices based on Lean Production Systems. This paper presents an evaluation of the stability and capacity of Lean Construction concepts in a road construction work. The evaluation of the stability and capacity was realized mapping the current state value stream and the collection of indicators associated with the 4M (Material Hand labor, Machine and Method) The results indicated that all seven indicators measured were stable, but only an indicator of the seven evaluated was considered capable. Based on this evaluation, actions were taken to improve the stability and capacity through the use of lean practices, applied in a second work with similar characteristics to the previous. The practices used were: i) improving / changing some construction processes, ii) 5S tool deployment on construction of works iii) creation and implementation of poka-yokes devices, iv) application of visual tool of andon type communication, v) delivery planning materials within the just-in-time concept. In this second work the indicators remained stable, but a great improvement was perceived, related to the ability of the indicators to meet the required parameters. Only the hand labor turnover indicator was not able to meet the target set by the company.
86

Value Stream in the Reverse Supply Chain : Case Study of the Second-Hand Concept of a Swedish Multi-Brand Fashion Retailer

Costin-Weiterschan, Saskia, Matiou, Chrysoula January 2017 (has links)
Background It has become increasingly a problem that fashion products reach their end-of-life when they are still usable. Today, a fast-changing wardrobe has gained importance which is directly linked to overloaded landfills of textile waste and scarcity of natural resources. The pressure on companies to act upon this unsustainable consumption pattern is increasing. Different strategies are currently in the development. Within reverse supply chains, products are collected from the original user for value recovery. This study focuses is in particular on the reuse of clothing without additional treatments. Purpose The aim of this study is to investigate the value stream of a traditional fashion retailer entering the second-hand business. At the same time, possible challenges and potential areas of improvement should be identified. The reuse of garments should provide consumers a more sustainable alternative for consumption. To serve this purpose, a case study was conducted to describe key activities and formulate suggestions. Methodology The research was conducted as a qualitative case study. The data collection included personal communication, process observation and an in-depth semi-structured interview. The findings were analyzed using a value stream mapping method. Findings and Discussion The data collection offered a holistic insight into the processes and motivation that are involved in the second-hand concept of the studied retailer. The findings concerning the reverse logistics were depicted in the current-state value stream map. This was adjusted to a possible future-state map based on improvements which were elaborated with the reviewed literature. Additionally, a recommendation for a performance measurement framework was developed. Research limitations The studied retail concept was still at its start-up stage at the time of the research. Therefore, only a limited amount of empirical data was available to collect. Furthermore, the research was conducted over a short period of time and the impact of the recommended improvements for the value stream could not be observed and evaluated. A future research is suggested to focus on the monitoring of the implementation of the future-state map. The success can be assessed with the help of the proposed performance measurement framework and based on that a new future-state map should be created to ensure continuous improvement.
87

Úskalí aplikace štíhlé administrativy na procesy podléhající legislativní úpravě / Difficulties of applying lean administration to processes - subject to legislative regulation

Čebišová, Blanka January 2014 (has links)
The aim is to use Lean Administration metodology to improve custom clearance process steps that do not add value, but it is necessary to carry out them due to legislative reasons. The company has excellent results of applying the Lean principles in manufacturing and this thesis will bring to the company specific application of Lean Enterprise metodolgy outside manufacturing. The thesis is proof of the implementation of the company philosophy of continuous improvement, perfection does not exist, there is always the possibility of improvement.
88

Aplicação do mapeamento de fluxo de valor (VSM) para medição da sustentabilidade: um estudo de caso / Application of value stream mapping for sustainability measurement: a case study

Santos, Wanderley Sussai dos 24 February 2017 (has links)
Submitted by Nadir Basilio (nadirsb@uninove.br) on 2017-08-04T21:13:57Z No. of bitstreams: 1 Wanderley Sussai dos Santos.pdf: 5337961 bytes, checksum: e649b009252785c5448fb3301e737a88 (MD5) / Made available in DSpace on 2017-08-04T21:13:57Z (GMT). No. of bitstreams: 1 Wanderley Sussai dos Santos.pdf: 5337961 bytes, checksum: e649b009252785c5448fb3301e737a88 (MD5) Previous issue date: 2017-02-24 / The industrial plant floor is increasingly pressured by stakeholders (society, customers, government, etc.) to adopt a sustainable philosophy to achieve the reduction of environmental, social and economic impact in manufacturing processes; and it is the manufacturing phase that contributes most to the environmental impact. Therefore, the purpose of this paper is to analyze, through a case study, the applicability of lean manufacturing, mainly the practical value stream mapping of the flow of value to measure sustainability, that is, to measure environmental losses, social losses and economic losses from the manufacturing process of a specific product (in this case a water-cooled cable manufacturing process). As a result of the research, it was possible to identify and quantify the economic, environmental and social losses at each stage of the manufacturing process, such as lead time, excess and loss of water, energy and raw materials, and potential risks health and safety of employees. / O chão-de-fábrica industrial é cada vez mais pressionado pelas partes interessadas (sociedade, clientes, governo, etc.) para a adoção da filosofia sustentável para a obtenção da redução do impacto ambiental, social e econômico nos processos de fabricação; e é a fase de fabricação que mais contribui, principalmente, para o impacto ambiental. Portanto, este trabalho tem como proposta analisar, através de um estudo de caso, a aplicabilidade da manufatura enxuta, principalmente da prática de mapeamento de fluxo de valor para medir a sustentabilidade, ou seja, medir as perdas ambientais, as perdas sociais e as perdas econômicas do processo de fabricação de um produto específico (no caso, um processo de fabricação de cabos refrigerados a água). Como resultado de pesquisa, foi possível identificar e quantificar as perdas econômicas, ambientais e sociais em cada etapa do processo de fabricação, como, por exemplo, o lead time, excesso e perda de água, de energia e de matéria-prima, e os riscos potenciais à saúde e segurança dos colaboradores.
89

Návrh výrobního procesu s využitím nástrojů štíhlé výroby / Proposal of Production Process Using Lean Manufacturing Tools

Končický, Petr January 2018 (has links)
The diploma thesis is concerned with the implementation of lean components in the production process of selected company. Through the Value Stream Mapping method an analysis of the current state is performed that resulted several shortcomings of the current production process. Based on the outcomes of the analysis, proposal of new production line is made that contributes to increased customer value within a shorter production time, reduce waste and thus to streamlining the production process.
90

Štíhlá výroba a její implementace / Lean Manufacturing and its Implementation

Kolárovcová, Petra January 2019 (has links)
The diploma thesis is focused on the implementation of lean production con-ditions into the production process of the selected company, analyze and find bottleneck. Aim of thesis is to eliminate the downtime of the production pro-cess to provide lean conditions for the selected section when introducing a new product and new facilities at the worplace. First part of thesis is devoted to literature review and dealingwith teheoteri-calpreparation, understanding principles and methods of lean production. Second part is dealing with analyzing production processes of product and in-dividual production operations, application of lean production methods and proposals for a new organization of the workplace.

Page generated in 0.1408 seconds