• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 38
  • 26
  • 2
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 70
  • 70
  • 37
  • 37
  • 32
  • 32
  • 30
  • 30
  • 29
  • 29
  • 29
  • 28
  • 28
  • 28
  • 28
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

A participatory approach to eliminating Musculoskeletal disorder risk factors in a paper industry workflow : Developing an assisting tool for paper industry workers by exploring work tasks through participatory design activities

Lindqvist, Johan January 2024 (has links)
This project was implemented as a Master thesis project in Industrial design engineering (IDE). In collaboration with Billerud Karlsborg, the project was initiated to develop proposal for a technological solution for eliminating a manual handling work task in the production line for coated paper products. The design process was implemented  as a Participatory design approach, inviting the workers of the production unit to collaborate in design activites and workshops. The participatory approach was based on the Scandinavian perspective on Participatory design, with influences from the comtemporary views on collaborative design. The project included a holistic ergonomic analysis focused on the assessment of musculoskeletal disorder risk factors in the work task flagged by workers as a cause of work strain. The focused work task documented in detail and assessed through REBA and RULA assessment. The work task involves manual handling of a stack of residual paper that is rolled to a tube, by hand, and subsequently lifted and pushed to a grinder inlet for re-purposing. While the ergonomic analysis confirm that there are postural risk factors present, the pace of work suggests that adequate resting for preventing work stain related to the focused task is possible during work. However, the percieved work strained is suggested to originate from work task in close connection to the focused task. A proposal for a concept that sufficiently eliminates the risk factors found in the focused task is developed based on a human-centered design and anthropometric principles. The development concludes with the construction of a prototype, but time constraints denies evaluation of the prototype with end users. The concept is therefore presented as renders of a 3D-model. / Det här projektet har utförts som ett examensarbete inom Civilingenjör Teknisk design, på uppdrag av Billerud Karlsborg. Syftet med projektet var att utveckla ett tekniskt lösningsförslag till ett av Billerud utvalt arbetsmiljöproblem vid en av arbetstationerna i pappersbruket i Karlsborg. I samarbete med arbetarna i den berörda produktionslinjen genomfördes en participativ designprocess, innefattade planering och genomförande av participativa designaktiviteter och workshops baserade på de skandinaviska teorierna kring participativ design, med influens från nyare perspektiv kring co-design. Som en del i arbetet utfördes en övergipande ergonomisk analys avseende belastningsergonomiska riskkällor vid en fokuserad arbetsstation, med en detaljerad kartläggning av den arbetsuppgift som arbetarna upplever som problematisk. Den fokuserade arbetsuppgiften innefattar manuell hantering av en restprodukt som behöver rullas ihop för hand och därefter lyftas samt skjutas till en kvarn för återvinning. Den ergonomiska analysen utfördes med hjälp av REBA- och RULA-bedömningar, vilka bekräftade att en potentiell risk för belastningsergonomiska skador i det arbetssätt som utövas, men där produktionstakten och systemets styrning tyder på att tillräcklig vila är möjlig under arbetet för att motverka skador från lågintensivt muskelarbete. Arbetsmiljöproblemet bedöms däremot inte vara obefintligt då arbetarnas totala arbete innefattar ytterligare moment av fysisk belastning, och där arbetsmiljöproblemet eventuellt kan vara ett resultat av närliggande moment till den fokuserade arbetsuppgiften. Som lösningsförslag på problemet utvecklas ett koncept som eliminerar de funna riskkällorna i den avgränsade arbetsuppgiften, med utgångspunkt i användarcentrerad design och utefter antropometriska riktlinjer. Utvecklingen av en fysisk prototyp för utvärdering med arbetarna påbörjades, men hann inte slutföras innan projektet avslutades. Istället presenteras konceptet genom rendingar av en 3D-modell.
62

Stavebně technologický projekt polyfunkčního domu Sokolská 5 v Olomouci / Construction and technological project of polyfunctional building Sokolská 5 in Olomouc

Slováček, Ondřej January 2018 (has links)
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budget and a detailed schedule are prepared. Part of this work is also the calculation of the heat transfer through the envelope of the building.
63

Vybrané části stavebně technologického projektu psychiatrické kliniky Fakultní nemocnice Brno / Selected Parts of the Construction Technology Project of the Psychiatric Clinic of the University Hospital Brno

Drozd, Michal January 2020 (has links)
The subject of my diploma thesis are selected parts of the construction technology project of the psychiatric clinic of the University Hospital Brno based on the provided project documentation. It is an extension of a new six-storey building to the existing buildings. The thesis contains a technical report to the construction technology project, the coordination situation of the construction, the situation of wider transport routes, time and financial plan by objects, study of the realization of the main technological stages, a site equipment design, a design of a machine set, technological regulation for monolithic structures, quality control and testing plan of monolithic structures, noise study and selected documents for LEED certification.
64

Stavebně technologický projekt výstavby administrativní budovy s garážemi / Construction technological project of construction of an administrative building with garages

Hrabovský, Lukáš January 2022 (has links)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
65

Výstavba sportovní haly v Novém Městě na Moravě - stavebně technologický projekt / Construction of a sports hall in Nové Město na Moravě - construction technology project

Tomášek, Martin Unknown Date (has links)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
66

Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in Hodějice

Koudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
67

Sadová, Bytový dům M1 - stavebně technologický projekt / Sadova, Apartment building M1 - construction technology project

Štěrba, Marek January 2018 (has links)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
68

Skladová hala v Měříně, příprava a organizace stavby / Project

Malý, Martin January 2018 (has links)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
69

Stavebně technologický projekt bytového domu Meandr v Brně / Constructive technological project of block of flats Meandr in Brno

Schauer, Martin January 2015 (has links)
This diploma thesis deals with the construction technological project of block of flats residence Meandr in Brno - Komín. On the given topic are processed and all necessary supporting documents that enhances the clarity and orientation in matters large building for the preparation of the construction process. Given the scale, complexity and location of the building is structurally location technology project addresses the only earthworks and construction site of the main building object SO-01 only. Furthermore, nine small objects that are closely tied this main object within the premises of a residential building. Between integral part of this work include the project site facilities including a time of economic evaluation studies of major technological stages realization, design of main machinery and mechanisms itemized budgets volume of important buildings and budgets by THU volume, less important objects, further technological specification for the implementation of monolithic concrete construction as this topic linked inspection and test plan, risk and crisis measures. For the entire building housing residence is prepared detailed timetable and a lot of additional documents.
70

Stavebně technologický projekt objektů skládky Úholičky / Constructional technologic project of objects at dump Úholičky

Doubek, Rostislav January 2015 (has links)
In this diploma thesis two steel frame objects of a waste dump in Úholičky are solved. The aim is to resolve the chosen parts of a construction-technological project. The main topics for selected technological phases are transportation, bill of quantities, technological regulations, construction organization’s principles, time schedule, machinery, control and testing plan, work safety and worker’s health protection. These topics are prepared for the technological phases of ground works, fundamental contruction, upper load-bearing structure, construction of the floor and sheathing of the object. The thesis has also other parts which include static solution of a prestressed unit, budget by items, calculation of the object’s maintenance cost, handbook for bulding’s occupancy and proposal of construction contract.