• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Allt är möjligt hus i Gustavsberg

Lindell, Ulrika January 2012 (has links)
Hur hanterar vi gamla industrilokaler där industrierna gått ur tiden men byggnadsstrukturerna finns kvar? Projektet utforskar arkitektoniska strategier där enkla tygstrukturer ger stor rumslig effekt - mellanrummet mellan nytt och gammalt undersöks. Platsen är Gustavsberg och den gamla Hushållsporslinsfabriken med ett nytt program där Allt är möjligt-hus i Cirkus Cirkörs regi ingår. Kulturhuset innehåller också funktioner såsom museum, bibliotek, konstall och administration.
2

Energikartläggning och driftoptimering genom behovsstyrning i befintlig fastighet / Energy audit and operational optimization through demand control in existing building

Karlsson, Joakim January 2014 (has links)
Energy supply in Sweden year 2011 amounted to 577 TWh. The final energy consumption for industrial, residential and service was 379 TWh. Sweden has energy policy goals to reduce energy use in buildings. One of these goals is to reduce the energy use by 20 % in 2020 compared to the year 1995. An important step to achieve this goal is to target energy efficiency measures in existing buildings. There are also financial incentives to implement energy efficiency measures due to the fact that the cost of energy represents 30-40% of a buildings maintenance costs. In general, up to 20 % of the energy consumption can be reduced without major reconstruction. In this master thesis project presented here, an energy audit was performed and energy efficiency measures was proposed for an existing building located at Järfälla, Stockholm. The property belongs to SAAB - Defence and Security. They have an internal target to reduce energy use in their buildings with 50 % by 2015 compared to 2009. The work of this master thesis project was limited to a building locally termed hus A. This part of the property is the oldest and was built in 1968, but has expanded gradually to the year 1977. Hus A contains of offices, a production hall, laboratories and storage areas. The energy audit showed that the electricity use is far greater in hus A, compared to the an average office and administration building. This is mainly due to production processes. A breakdown of the highest electricity consumers are: Industrial processes – 61.9 kWh/m2/year Lighting – 35.7 kWh/m2/year Fans – 33.2 kWh/m2/year Refrigeration – 21.8 kWh/m2/year Compressed air – 18.9 kWh/m2/year Computer units – 7.8 kWh/m2/year Frequency converters – 4.4 kWh/m2/year Waste heat from industrial processes, primarily from the production hall leads to high cooling demand to maintain good thermal comfort. Limitations in operation control of the buildings HVAC (Heating, Cooling and Air-conditioning) systems causes high heating and cooling demand and hence the buildings thermal mass is not properly utilized. Energy saving measures was mainly focused on increasing the controlling capability of HVAC systems. By implementing the energy efficiency measures presented in this master thesis report, building thermal mass will be more efficiently utilized. In addition, end use of electricity, heat and cooling will be reduced. In total, seven energy-saving measures proposed.  One measure is implemented to prevent heating and cooling at the same time. A brief description of the energy efficiency measures and the expected result is found below. Adjust set point for TAFA301 Energy saving: 94.0 MWh/yearPayback time: 0 year Establish time schedule for compressed air systemEnergy saving: 110.8 MWh/yearPayback time: 2.5 months Demand controlled temperature set point to heating systemEnergy saving: 167.0 MWh/yearPayback time: 3.5 months Demand control of airflow in the production hallEnergy saving: 155,5 MWh/yearPayback time: 2 years and 10 months Establish time schedule for frequency invertersEnergy saving: 104.0 MWh/yearPayback time: 3 years and 2 months Radiator thermostats to the first part of the production hall Energy saving: 6.5 MWh/yearPayback time: 5 years and 2 months Demand control of airflow in conference roomsEnergy saving: 11.0 MWh/yearPayback time: 12 years and 2 months

Page generated in 0.0557 seconds