• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Causes of unspent municipal infrastructure grant in the Capricorn District Municipality :a case of two selected local municipalities

Maake, Khomotso Rahab January 2017 (has links)
Thesis (MPA.) -- University of Limpopo, 2017 / In 1994 the South African democratically elected government inherited one of the most inequitable access to basic service between rural and urban communities. Rural people used to live without access to basic services such as water, electricity, roads and sanitation facilities. South African government established the Municipal Infrastructure Investment Framework as the national Strategic Plan to outline the extent of basic infrastructure backlogs and to come up with strategies to improve basic service provision to the poor citizens. The Municipal Infrastructure Grant (MIG) is a municipal infrastructure funding which combines all the existing capital grants for municipal infrastructure into a single consolidated grant. MIG is aimed at assisting the poor to gain access to infrastructure. MIG funding can only be used for infrastructure for basic services. Polokwane local municipality and Blouberg local municipality are the beneficiaries of MIG. The purpose of the study was to investigate the causes of unspent Municipal Infrastructure Grants in Polokwane and Blouberg local municipalities. An extensive literature review has been undertaken to gather information regarding unspent Municipal Infrastructure Grants in the two municipalities in the Capricorn District; Polokwane and Blouberg local municipalities. The study provides an investigation on how Polokwane and Blouberg local municipalities monitor the Municipal Infrastructure funding. The study further investigate the capacity of the municipalities to implement MIG, and whether these municipalities have the capacity to effectively utilise the MIG for efficient and effective service delivery. The researcher utilised a qualitative approach to collect data through interview schedule. A satisfactory response rate of 98% was obtained. The results indicated that Polokwane and Blouberg local municipalities are capacitated to implement and to monitor MIG. However, the municipalities often spend less than the budgeted MIG, as a result progress in the access to basic services is hindered. The failure to adequately spend the MIG by these municipalities is due to the fact that there is poor planning and a lot of political interference in the Supply Chain Management processes. The study recommended that managers should do proper planning beforehand, avoid late appointment of service providers and make references on the service providers they appoint to avoid disputes from members of the community. The study further recommended that Polokwane and Blouberg local municipalities should do proper consultation of the project, budget accordingly, and appoint companies that will produce positive end results with value for money. The study recommended that political office bearers should not interfere in the supply chain management processes
2

Causes of unspent municipal infrastructure grant in the Capricorn District Municipality : case of two selected local municipalities

Maake, Khomotso Rahab January 2017 (has links)
Thesis (MPA.) -- University of Limpopo, 2017 / In 1994 the South African democratically elected government inherited one of the most inequitable access to basic service between rural and urban communities. Rural people used to live without access to basic services such as water, electricity, roads and sanitation facilities. South African government established the Municipal Infrastructure Investment Framework as the national Strategic Plan to outline the extent of basic infrastructure backlogs and to come up with strategies to improve basic service provision to the poor citizens. The Municipal Infrastructure Grant (MIG) is a municipal infrastructure funding which combines all the existing capital grants for municipal infrastructure into a single consolidated grant. MIG is aimed at assisting the poor to gain access to infrastructure. MIG funding can only be used for infrastructure for basic services. Polokwane local municipality and Blouberg local municipality are the beneficiaries of MIG. The purpose of the study was to investigate the causes of unspent Municipal Infrastructure Grants in Polokwane and Blouberg local municipalities. An extensive literature review has been undertaken to gather information regarding unspent Municipal Infrastructure Grants in the two municipalities in the Capricorn District; Polokwane and Blouberg local municipalities. The study provides an investigation on how Polokwane and Blouberg local municipalities monitor the Municipal Infrastructure funding. The study further investigate the capacity of the municipalities to implement MIG, and whether these municipalities have the capacity to effectively utilise the MIG for efficient and effective service delivery. The researcher utilised a qualitative approach to collect data through interview schedule. A satisfactory response rate of 98% was obtained. The results indicated that Polokwane and Blouberg local municipalities are capacitated to implement and to monitor MIG. However, the municipalities often spend less than the budgeted MIG, as a result progress in the access to basic services is hindered. The failure to adequately spend the MIG by these municipalities is due to the fact that there is poor planning and a lot of political interference in the Supply Chain Management processes. The study recommended that managers should do proper planning beforehand, avoid late appointment of service providers and make references on the service providers they appoint to avoid disputes from members of the community. The study further recommended that Polokwane and Blouberg local municipalities should do proper consultation of the project, budget accordingly, and appoint companies that will produce positive end results with value for money. The study recommended that political office bearers should not interfere in the supply chain management processes.
3

Límites constitucionales al contenido material de las leyes de presupuestos del Estado

Toscano Ortega, Joan A. 24 January 2003 (has links)
El trabajo está montado como un intencionado diálogo con los criterios esgrimidos por el Tribunal Constitucional sobre esta materia (desbordamiento material de las leyes de presupuestos) en su ya dilatada jurisprudencia. Su autor defiende una concepción amplia del ámbito material de las leyes de presupuestos. Según esta posición, este tipo de ley debe incluir la materia presupuestaria, pero, como ley que es, puede cobijar otras materias, salvo prohibición constitucional clara al respecto. Esta posición es superadora de la concepción de la ley de presupuestos como ley meramente formal, de suerte que la concibe como una ley plena, emanada de la potestad legislativa del Parlamento, con la fuerza propia de la ley, esto es, no vinculada a la legislación previa y capaz (aunque no siempre idónea, desde la perspectiva de la técnica legislativa) de emprender innovaciones legales.Desde esa postura "amplia" el autor formula propuesta de solución o de mejora frente al desbordamiento material de las leyes de presupuestos. Asimismo tras analizar su problemática específica, plantea posibles soluciones en relación a la práctica de las leyes de acompañamiento. / El treball està muntat com un intencionat diàleg amb els criteris esgrimits pel Tribunal Constitucional sobre aquesta matèria (desbordament material de les lleis de pressupostos) en la seva ja dilatada jurisprudència. El seu autor defensa una concepció àmplia de l'àmbit material de les lleis de pressupostos. Segons aquesta posició, aquest tipus de llei ha d'incloure la matèria pressupostària però, com a llei que és pot acolir altres matèries, excepte prohibició constitucional clara al respecte. Aquesta posició és superadora de la concepció de la llei de pressupostos com a llei merament formal, de manera que la concep com una llei plena, emanada de la potestat legislativa del Parlament, amb la força pròpia de la llei, és a dir, no vinculada a la legislació prèvia i capaç (encara que no sempre idònia, des de la perspectiva de la tècnica legislativa) d'emprendre innovacions legals.Des d'aquesta postura àmplia, l'autor formula proposta de solució o de millora davant del desbordament material de les lleis de pressupostos. Així mateix, després d'analitzar la seva problemàtica específica, planteja possibles solucions en realció a la pràctica de les lleis d'acompanyament. / The analysis is set out as an intentional dialogue with the criteria laid down by the Constitutional Court on this subject (material overflow of state budgets laws) in the course of its extended jurisprudence, In short, the work defends a broad concept of the material scpope of budget laws.

Page generated in 0.045 seconds