• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 55
  • 40
  • 23
  • 13
  • 9
  • 8
  • 7
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 201
  • 201
  • 201
  • 132
  • 73
  • 58
  • 53
  • 34
  • 34
  • 31
  • 23
  • 23
  • 23
  • 23
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Modelos de contrato colaborativo e projeto integrado para modelagem da informação da construção. / Collaborative contract and integrated project delivery models for building information modelling.

Mariana Wyse Abaurre 19 September 2013 (has links)
O setor da construção civil atualmente apresenta uma forte demanda por inovações nas tecnologias de informação e comunicação na construção. Nesse contexto, a modelagem da informação da construção vem se destacando como um dos principais temas em desenvolvimento no Brasil e no mundo. O foco das pesquisas e iniciativas relacionadas à implementação da modelagem da informação da construção apresenta uma lacuna quanto ao desenvolvimento de seus processos, além de empecilhos relacionados aos aspectos de colaboração entre os agentes. Diante deste quadro, o American Institute of Architects propôs um modelo contratual para projetos integrados, denominado Integrated Project Delivery, que fomenta a relação colaborativa dos agentes do empreendimento por meio do compartilhamento dos resultados entre os participantes. Esta dissertação tem como objetivo a análise da possibilidade de implantação desta dinâmica contratual no cenário da construção civil brasileira. Para tanto, foram avaliados os resultados de dois questionários estruturados e do estudo de caso de empresa de incorporação que vem investindo na implantação da modelagem da informação da construção em seu processo de projeto. Os questionários tiveram enfoque nos estágios de maturidade da implementação da modelagem da informação da construção como cenário para o uso do projeto integrado, e os resultados apresentaram um panorama geral de baixa maturidade. No estudo de caso, avaliaram-se os modelos contratuais utilizados em relação às práticas já implantadas do uso da modelagem da informação da construção. Como resultado, foram identificados diversos aspectos do processo de projeto com potencial para implementação de um contrato relacional, porém ainda limitados pela falta de adequação dos processos e modelo contratual às características de colaboração e integração típicas da modelagem da informação da construção. Este trabalho propõe diretrizes para a adequação dos processos observados na empresa-caso ao modelo de projeto integrado proposto pelo American Institute of Architects. / The civil construction sector has demanded innovations on its communication and information technologies. In this context, Building Information Modeling has been stressed as one of the most important developing themes in Brazil and worldwide. The focus of BIM researches and implementation initiatives has a shortage regarding the development of BIM processes, and restrictions related to the collaboration among actors. Due to this scenario, the American Institute of Architects (2007) proposed a contractual model for integrated projects, called Integrated Project Delivery that stimulates a collaborative relationship among actors through sharing project results with its participants. This Master Thesis aims to analyze the possibility of implementing this contractual dynamics on the Brazilian construction sector. As methodology, two structured surveys were analyzed and a case study was carried out on a real estate company which has invested on incorporating BIM in its design process. The surveys were addressed focusing on the BIM implementation stages as a scenario for the implementation of the integrated project approach. The results pointed to a very low stage of BIM implementation. The case study focused on the evaluation of the contractual models related to the implemented BIM practices. Several potential aspects appropriate for the implementation of a relational contract were identified, but still restricted by the inadequacy of the design processes and contracts to BIM collaboration and integration typical characteristics. This Master Thesis defines guidelines for the forthcoming of the observed processes to the integrated project delivery model proposed by the American Institute of Architects.
72

Proposta de traduÃÃo dos princÃpios da coordenaÃÃo modular em parÃmetros aplicÃveis ao building information modeling. / Study for the translation of the modular coordination principles for the building information modeling parameters

Neliza Maria e Silva Romcy 16 April 2012 (has links)
Conselho Nacional de Desenvolvimento CientÃfico e TecnolÃgico / No atual cenÃrio da construÃÃo civil, apresentam-se como desafio o atendimento da demanda por habitaÃÃes e a superaÃÃo das caracterÃsticas do setor que o tornam ineficiente em relaÃÃo à produtividade e confiabilidade dos produtos. Diante dessa problemÃtica, encontram-se como alternativas o resgate dos conceitos da CoordenaÃÃo Modular e a implementaÃÃo do Building Information Modeling (BIM). A escolha dos temas parte da percepÃÃo de que ambos atuam em objetivos comuns no que diz respeito à integraÃÃo e otimizaÃÃo de informaÃÃes, racionalizando os processos projetuais e construtivos, enquanto permitem uma flexibilidade de combinaÃÃo de elementos, facilitando a geraÃÃo de novas soluÃÃes. A partir de levantamento bibliogrÃfico, confirmou-se a existÃncia de lacunas de conhecimento, principalmente no que diz respeito à integraÃÃo dos assuntos abordados. Assim, o trabalho visa investigar o potencial de associaÃÃo entre BIM e CoordenaÃÃo Modular, atravÃs do desenvolvimento de uma aplicaÃÃo para fins demonstrativos, alÃm do registro da sua metodologia. Trata-se da interposiÃÃo de duas temÃticas com arcabouÃo teÃrico consolidado para a geraÃÃo de novos conhecimentos (metodologia) e um produto final que garanta sua aplicabilidade: um plug-in. O trabalho foi dividido em trÃs etapas: CompreensÃo, Desenvolvimento e ValidaÃÃo. A CompreensÃo incluiu a descoberta do problema inicial, considerando sua relevÃncia prÃtica e teÃrica; e um primeiro estudo dos principais temas envolvidos. O Desenvolvimento consistiu na investigaÃÃo de uma metodologia para a traduÃÃo dos princÃpios da CoordenaÃÃo Modular em parÃmetros aplicÃveis ao BIM, visando à representaÃÃo de um primeiro sistema construtivo: a alvenaria racionalizada em blocos cerÃmicos. A ValidaÃÃo incluiu a programaÃÃo do plug-in com os parÃmetros gerados na etapa anterior; sua aplicaÃÃo em situaÃÃo real e a aplicaÃÃo da metodologia desenvolvida em um segundo sistema construtivo (light steel framing). Os resultados incluem a criaÃÃo da versÃo inicial de um plug-in, com a funÃÃo de gerar automaticamente as paginaÃÃes de blocos cerÃmicos para a alvenaria racionalizada; a proposiÃÃo de uma metodologia para o reconhecimento de regras de construÃÃo para objetos modulados, no caso, sistemas construtivos; e a verificaÃÃo que BIM e CoordenaÃÃo Modular utilizados em conjunto podem potencializar aspectos jà positivos de cada uma separadamente. A referÃncia dimensional Ãnica da CoordenaÃÃo Modular facilita o processo de criaÃÃo de parÃmetros para a alimentaÃÃo do sistema BIM, possibilitando a geraÃÃo de novas funÃÃes, alÃm da melhoria na comunicaÃÃo entre profissionais de especialidades diferentes. Por outro lado, o BIM disponibiliza ferramentas associadas a novos conceitos que permitem um ambiente virtual integrado, uma melhor visualizaÃÃo de informaÃÃes e automatizaÃÃo de funÃÃes, onde os princÃpios da CoordenaÃÃo Modular podem ser aplicados e compreendidos. / Due to changes occurring in the Civil Construction scenario, it is important to emphasize the challenge to achieve the growing demand for housing and overcome deficiencies of the sector related to productivity and the reliability of the products, from design to construction. In this context, Modular Coordination and Building Information Modeling (BIM) emerge as potential strategies to improve communication and integration among the different professionals involved in the project, as rationalizes the processes and allows a flexible combination of elements, which facilitates the generation of new solutions. The literature review confirmed the existence of knowledge gaps, particularly concerning to the integration of both subjects. Thus, this study presents the customization of a BIM tool, according to Modular Coordination rules, in order to investigate possibilities of association between them. As a result, is proposed a methodology for translating the Modular Coordination rules in parameters that feed into a BIM application, developed over the creation of a plug-in. The study is divided into three stages: understanding, development and validation. The understanding stage included the discovery of the research problem, considering its practical and theoretical relevancies, and a first study about the major issues, in order to obtain the knowledge to begin the investigation. It also included the selection of the object to be represented through the plug-in application and the programming strategy for the customization of the tool. The development consists of an exploratory study that starts the proposed construction (plug-in) and generates the parameters to represent an object, previously chosen: rationalized ceramic blocks masonry. Finally, the validation includes programming an initial version of the plug-in with the parameters generated in the previous step, its application in a real situation and the methodology application in a second constructive system (light steel framing). The results include creating an early version of a plug-in, with the function to automatically generate layouts of ceramic blocks for rationalized masonry; proposing a methodology for the recognition of rules of construction for modulated objects, in this case, constructive systems; and verifying that BIM and Modular Coordination used together may enhance their positive individual aspects. The dimensional reference of Modular Coordination facilitates the process of creating parameters for BIM applications, which facilitates the generation of new functions, in addition to improving communication between professionals of different specialties. Furthermore, BIM has features related to new concepts that enhance the visualization of information, automates functions and allow an integrated virtual environment, where the principles of modular coordination may be better used and understood.
73

Regras de verificação e validação de modelos BIM para sistemas prediais hidráulicos e sanitários. / Rules of verification and validation of BIM models for sanitary hydraulic building installations.

Carolina Yumi Kubo Takagaki 10 June 2016 (has links)
A complexidade das atuais edificações e, consequentemente, a divisão dos projetos em especialidades e subsistemas evidenciam as dificuldades do coordenador de projetos em gerenciar todo o processo de projeto. Há necessidade de um fluxo contínuo de troca de informações e de comunicação entre os envolvidos. A prática do BIM (Building Information Modeling) e o emprego de suas ferramentas computacionais propiciam aos projetistas a agilidade e precisão no desenvolvimento do projeto, uma vez que possibilita, por exemplo, uma visualização da interação de todos os subsistemas do edifício. No entanto, o cenário atual da tecnologia não provê ferramentas para todos os fluxos de trabalho necessários, e quando fornece, nem sempre o software disponível segue as normas específicas para determinada aplicação em certo país. As normas técnicas estabelecem requisitos e recomendações relativos ao projeto e devem ser observadas por projetistas para a segurança e qualidade das edificações. Neste sentido, o objetivo desta pesquisa é desenvolver regras de verificação e validação de modelos BIM para sistemas prediais com base em normas técnicas brasileiras, tais como a de sistemas prediais de água, de esgoto sanitário e de águas pluviais. O método empregado considera o levantamento das recomendações normativas e suas respectivas transformações em regras que possam ser verificadas automaticamente por meio de programas de computador. O programa adotado foi o software Solibri Model Checker (SMC), que faz uso de modelos em Industry Foundation Classes (IFC). Os resultados mostram que regras simples de comparação e relacionadas a propriedades de cada elemento são possíveis de serem parametrizadas no SMC e têm resultados sólidos de fácil visualização, o que permite uma correção mais rápida e dinâmica por parte dos projetistas e coordenadores de projeto. Para regras mais complexas, necessitou-se da criação de ferramentas paralelas ao SMC. Constata-se que o SMC ainda é incompleto quando se trata da análise de projetos de sistemas prediais hidráulicos e sanitários, porém é possível desenvolvê-las uma vez que o modelo em IFC pode conter todas as informações necessárias às análises. Assim, verifica-se a necessidade de que os projetos BIM contenham as informações e obedeçam a padrões de modelagem para que possam ser utilizados na verificação de regras de modo eficiente. Por fim, os resultados desta pesquisa contribuem para o emprego do BIM no desenvolvimento e análise de projeto de sistemas prediais hidráulicos e sanitários com maior precisão, agilidade e qualidade. / The complexity of existing buildings and, consequently, the division of projects and sub-specialties highlight the difficulties the project coordinator to manage the entire design process. There is a need for a continuous flow of information exchange and communication among stakeholders. The practice of BIM (Building Information Modeling) and the use of their computational tools provide designers the speed and accuracy in the development of the project, as it enables, for example, a preview of the interaction of all building subsystems. However, the current technology landscape does not provide tools for all to workflows required, and when it does, they do not always follow standards a specific application in a given country. The technical standards contain requirements and recommendations relating to the project and must be observed by designers for the safety and quality of the buildings. In this sense, the objective of this research is to develop procedures for verification and validation of BIM models for building systems based on Brazilian technical standards, such as building systems for water, sanitary sewer and storm water. The employed method considers the collection of policy recommendations and their changes in rules that can be automatically checked using computer programs. The adopted program was Solibri Model Checker software (SMC), which makes use of models in Industry Foundation Classes (IFC). The results show that simple comparison rules and related properties of each element are able to be parameterized in the SMC and have solid results for easy viewing, allowing faster correction and dynamic on the part of designers and design engineers. For more complex rules the creation of parallel tools to SMC is needed. It appears that the SMC is still incomplete when it comes to the analysis of hydraulic and sanitary building systems projects, but you can develop them as the model in IFC can contain all the necessary information to the analysis. Thus, there is a need that the BIM projects contain the information and comply with standards for modeling which can be used to verify rules efficiently. Finally, the results of this research contribute to the use of BIM in the development and design analysis of hydraulic building systems and toilets with greater accuracy, speed and quality.
74

Integração de desempenho na avaliação de projeto : modelo de informação e simulação computacional na etapa de concepção / Performance integration in the design evaluation : information model and computer aided simulation at the conception stage

Brígitte, Giovanna Tomczinski Novellini, 1984- 23 August 2018 (has links)
Orientadores: Regina Coeli Ruschel, Evandro Ziggiatti Monteiro / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-23T11:54:21Z (GMT). No. of bitstreams: 1 Brigitte_GiovannaTomczinskiNovellini_M.pdf: 99669297 bytes, checksum: fabd6bb0967a44d6a81054a25bcd237d (MD5) Previous issue date: 2013 / Resumo: A preocupação com o desempenho das edificações tem ganhado destaque no Brasil e originado transformações significativas no setor de Arquitetura, Engenharia e Construção (AEC). A crescente demanda pelo desempenho favorece o contínuo desenvolvimento de estratégias e tecnologias em busca da máxima eficiência sem comprometer outras prerrogativas como o custo e o conforto dos usuários. A falta de conhecimento do desempenho de uma edificação no ato de se projetar transfere ao usuário e ao meio ambiente o ônus dos erros e custos da realização de correções, por vezes, paliativas. Pesquisas recentes propõem a integração das análises de desempenho às etapas iniciais do processo de projeto, a fim de obter o melhor desempenho final da edificação. Nesse sentido, escolher o conjunto de soluções adequadas e formas computacionais de desenvolvê-las é uma tarefa de alta complexidade e responsabilidade. Esta pesquisa investiga a compreensão da técnica e utilização de instrumentos de avaliação computacional de desempenho, durante as etapas iniciais do projeto. Inicialmente apresenta-se a importância das avaliações de desempenho no processo de projeto frente às inovações tecnológicas de suporte à simulação. Para isso, estabelece-se uma exploração preliminar do referencial teórico a partir da bibliografia estudada, compreendendo os conceitos de desempenho em edificações e da tecnologia da informação e computacional aplicada ao processo de projeto. Para uma melhor coerência entre a teoria e a prática da proposta aqui apresentada, a fundamentação metodológica apresenta características da pesquisa exploratória e características da pesquisa explicativa, buscando evidenciar relações entre requisitos de desempenho, avaliação computacional e a tomada de decisão na promoção de soluções em prol da melhoria da qualidade final do projeto. A coleta de dados foi realizada por meio de entrevistas, enquete eletrônica, dinâmica de jogo e discussões associadas com especialistas de desempenho, concentrando-se na identificação dos parâmetros, critérios e ferramentas de simulação que auxiliam a etapa cognitiva do projeto. Através do estudo de campo, foi possível elucidar o modelo de informação e identificar os parâmetros que entram em confronto direto por serem compartilhados por um ou mais desempenhos. Pode-se ainda analisar a influência entre os desempenhos, resultando na proposição de uma metodologia de sequenciamento das simulações. Os resultados de ordem experimental comprovaram, apesar das restrições e limitações deste universo, a existência de influências entre os desempenhos, além de um ganho compartilhado através do processo colaborativo, realizado com apoio da simulação na tomada de decisão. Apesar do seqüenciamento não ser confirmado, os resultados demonstram que o uso das simulações de modo integrado fazem diferença na qualidade final do projeto, por proporcionarem: a confirmação ou refutação de propostas; elucubração de novos cenários; compartilhamento de cenários nas discussões; e, valorização do desempenho ambiental sobre o desempenho específico na etapa de concepção / Abstract: The concern with the building performance has gained prominence in Brazil and generated meaningful changes at the Architecture, Engineering and Construction (AEC) sector. The growing demand for the performance favors the continuous strategies and technologies development, in the search for the maximum efficiency without prejudice of others prerogatives, like costs and users comfort. The lack of the performance knowledge of a building at the designing act transfers to the user and environmental the onus of the mistakes and its correction costs, sometimes, just palliatives. Recent researches propose the integration of the performance analysis to the early stages of the designing process, heading to obtain the best building final performance. Accordingly, choose the adequate solution group and computer aided ways to develop them is a high complex and responsibility task. This research investigates the comprehension of the technique and utilization of performance computational evaluation instruments, during the early stages of designing. Initially presents the performance evaluations importance at the designing process face of the simulation support technologic innovation. For this, establishes a preliminary exploration of the theorist referential from the studied bibliography, comprehending the concepts of building performance and computational and information technology applied to the designing process. For a better coherency between theory and practice of the propose presented here, the methodological foundation presents characteristics of both exploratory and explicative researches, attempting to make evident relationships between performances requirements, computer aided evaluation and the decision take at the solutions promotion heading to the project final quality. The data collection was performed by interviews, electronic polls, game dynamics and associated discussions with performance specialists, focusing in the identification of parameters, criteria and simulation tools that support the project cognitive stage. Through the field study was possible elucidate the information model and identify the parameters that come into direct confrontation by being shared by one or more performances. The influence between the performances can be also analyzed, resulting in the proposition of a simulation sequence methodology. The experimental order results proved, in spite of this universe restrictions and limitations, the existence of influences between the performances, and a gain shared through the collaborative process, performed with the simulation support at the decision take. Despite the non-confirmation of the sequencing, the results demonstrated that the simulation use on an integrated way makes difference on the project final quality, by provide: the proposals confirmation or refutation; new scenarios lucubration; scenes sharing at the discussions; and, environmental performance valorization over the specific performance at the conception stage / Mestrado / Arquitetura, Tecnologia e Cidade / Mestra em Arquitetura, Tecnologia e Cidade
75

Implementación y metodología para la elaboración de modelos BIM para su aplicación en proyectos industriales multidisciplinarios

Aliaga Melo, Gonzalo Daniel January 2012 (has links)
Ingeniero Civil / En todo proyecto de ingeniería, el proceso de cómo va evolucionando el trabajo condiciona en parte el éxito del proyecto. A lo largo de los años, la complejidad de los proyectos ha ido en aumento y por lo tanto la cantidad de personas participantes para poder desarrollarlos también ha crecido, fomentado, entre otras razones, por la tecnología existente para poder llevarlos a cabo. Durante el desarrollo del proyecto, la etapa de diseño tiene una mayor relevancia, ya que en ella se produce el mayor intercambio de ideas y modificaciones que condicionan la futura construcción del mismo. Gracias a la tecnología BIM, se puede tener un mejor control del proyecto completo en cada una de sus etapas, teniendo un buen acceso y manejo de la cantidad de información necesaria al nivel que se desee. Se trabaja en base a un modelo virtual con la información del proyecto de cada especialidad, logrando mejorar la manera en que se diseña. En este trabajo de título se proyecta una metodología adecuada para implementar BIM en una empresa de ingeniería de proyectos industriales que comprenda la integración de múltiples disciplinas, con el fin de crear el proyecto en base a un modelo virtual que lo represente y por lo tanto logrando mejorar la coordinación y comunicación de las distintas especialidades que participan, generando de esta manera un flujo de trabajo colaborativo del diseño del proyecto. Para lograrlo se realizó un estudio de documentación existente de diferentes entidades especializadas en esta tecnología, y en forma paralela se documentó el trabajo de una empresa especializada en el rubro especificado. Además, se evidenció el modo de implementación que ha habido en distintos casos nacionales y en diferentes rubros, con tal de identificar tanto buenas prácticas como similitud de errores entre ellos. Con esta información, se realizó una modificación el proceso actual acorde a la implementación y forma de trabajo en base a plataformas BIM, obteniéndose una metodología de trabajo para elaborar modelos en proyectos industriales, enfocado al trabajo conjunto y coordinación durante la etapa de diseño.
76

Beneficios de la coordinación de proyectos BIM en edificios habitacionales

González Guzmán, Fernanda Paz January 2014 (has links)
Ingeniera Civil / El presente trabajo busca cuantificar los beneficios del uso de la metodología BIM, acrónimo de Building Information Modeling, en la coordinación de edificios habitacionales. Para conseguirlo, se realiza, en primer lugar un análisis de la situación en Chile, aplicando una encuesta a distintos profesionales del área de la construcción y se compara con una encuesta realizada por CDT el año 2011. Para el cálculo de los beneficios monetarios se seleccionarán cinco proyectos: tres proyectos coordinados con BIM y dos no coordinados, buscando que tengan características similares con el objetivo de realizar una mejor comparación. La información de estos proyectos la suministrarán la Unidad de Coordinación de Proyectos BIM de IDIEM, para el caso de los proyectos coordinados y el Área de Inspección Técnica de IDIEM en el caso de los proyectos no coordinados. En los proyectos coordinados se tienen los Requisitos de Información (RDI) y en los no coordinados las Obras Extraordinarias (OO.EE.). Tanto RDI como OO.EE. se clasificarán de dos maneras, la primera clasificación corresponde a Interferencias e Inconsistencias y la segunda clasificación corresponde a 9 categorías según el problema presentado y su complejidad de resolución, definidas por IDIEM. Con el objetivo de que la diferencia en cantidad de proyectos coordinados con los no coordinados no afecte a los resultados, el ahorro se analiza cada 1000 m2 logrando que los resultados sean comparables. Luego se realiza un análisis de los resultados de los dos tipos de clasificación. En la evaluación de los beneficios se utiliza el indicador Retorno sobre la Inversión. Para el cálculo de éste se toman dos escenarios de costo de BIM; costo de implementación en empresa y costo de coordinación por consultora. Finalmente se realizarán las conclusiones correspondientes.
77

Využití informačního modelu budovy (BIM) v realitním inženýrství / Use of Building Information Model (BIM) in Real Estate Engineering

Homolová, Tereza January 2020 (has links)
The diploma thesis deals with Building Information Modeling (BIM) and its application in real estate engineering. The document is divided into three main parts. The first part introduces the Building Information Modeling mentioning historical development, basic principles, software tools and advantages of using BIM in particular parts of building life-cycle. At the end of the first chapter, there are presented the pros and cons of BIM method. The second part is focused on the analysis of the current status of BIM implementation in the Czech Republic as well as in foreign countries. The last part deals with possibilities of using BIM in real estate engineering; specifically, the main focus is on: facility management and property maintenance, real estate market and real estate agencies and real estate appraisal. The possibilities of practical using are showed on examples. The conclusion is based on the discussion and summarization of possible usage of BIM method in real estate engineering.
78

Využití mračna bodů v informačním modelování budov / Application of a point cloud in building information modelling

Tuhá, Silvia January 2020 (has links)
The main aim of this master thesis is utilization of the laser scanning technology in the field of information modelling of historical objects (HBIM). The optimal workflow of creating the information model in the Autodesk Revit has been demonstrated. The workflow deals with the historical value of the object. For the purposes of this work, the object of the mausoleum Fabara has been selected. Furthermore, the master thesis focuses on the possibilities of publishing the resulting model.
79

Environmental Information Modeling: An Integration of Building Information Modeling and Geographic Information Systems for Lean and Green Developments

Ezekwem, Kenechukwu Chigozie January 2016 (has links)
Building Information Modeling (BIM), used by many for building design and construction, and Geographic Information GIS System (GIS), used for city planning, contain large spatial and attribute data which could be used for Lean and green city planning and development. However, there exist a systematic gap and interoperability challenge between BIM and GIS that creates a disjointed workflow between city planning data in GIS and building data in BIM. This hinders the seamless analysis of data between BIM and GIS for lean and green developments. This study targets the creation of a system which integrates BIM and GIS system data. The methods involve the establishment of a novel Environmental Information Modeling (EIM) framework to bridge the gap using Microsoft Visual C#. The application of this framework shows the potential of this concept. The research results provide an opportunity for more analysis for lean and green construction planning, development and management.
80

Consequences of Implementing the buildingSMART Data Dictionary

Jönsson, Erik January 2015 (has links)
No description available.

Page generated in 0.2103 seconds