• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 119
  • 11
  • 6
  • 5
  • 4
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 173
  • 173
  • 47
  • 39
  • 34
  • 28
  • 28
  • 23
  • 19
  • 18
  • 18
  • 18
  • 18
  • 18
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
101

Competitive bidding strategy for construction projects.

January 1997 (has links)
by Asano Masashi. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1997. / Includes bibliographical references (leaves 97-98). / ABSTRACT --- p.ii / TABLE OFCONTENTS --- p.iii / LIST OF ILLUSTRATIONS --- p.iv / LIST OF TABLES --- p.v / ACKNOWLEDGEMENTS --- p.vi / Chapter / Chapter I. --- INTRODUCTION --- p.1 / Chapter II. --- METHODOLOGY --- p.7 / Chapter III. --- PROFIT MARGIN ANALYSIS --- p.22 / Chapter IV. --- SENSITIVITY ANALYSIS --- p.39 / Chapter V. --- COST ESTIMATE ANALYSIS --- p.48 / Chapter VI. --- INDUSTRY PROFITABILITY ANALYSIS --- p.76 / Chapter VII. --- CONCLUSION --- p.87 / APPENDIXES --- p.89 / BIBLIOGRAPHY --- p.97
102

A critical review of the possible reasons for construction cost overruns in light of cost estimating methodologies and models used in industry

Van Reede Van Oudtshoorn, Armand 12 1900 (has links)
Thesis (MBA)--Stellenbosch University, 2012. / ENGLISH ABSTRACT: This research report was conducted to critically review the methodologies and best practices prescribed by world class cost engineering experts and institutions, in order to develop a cost estimating model which organisations could use as a guideline for their cost estimates on large capital intensive projects. / AFRIKAANSE OPSOMMING: Hierdie navorsingsverslag is gedoen om ‘n kritiese oorsig te doen op die metodes en beste praktyke voorgeskryf deur wereldklas koste ingenieur deskundiges en instansies, om sodoende ‘n koste beramings model te ontwikkel wat gebruik kan word deur organisasies as handleiding gedurende die koste beraming van hulle kapitale intensiewe projekte.
103

Design & build in Hong Kong: an alternative procurement method

Lee, Cheuk Woon., 李焯垣. January 1994 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
104

The role of alternative dispute resolution methods in the constructionindustry and the application of these methods in Hong Kong

Lau, Kin-ho, Lewis, 劉健豪 January 1996 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
105

Competitive tendering in construction: a study of some theoretical bidding models and their application in thelocal construction industry

Ma, Ho-yin., 馬浩然. January 1987 (has links)
published_or_final_version / Surveying / Master / Master of Science
106

Business process model for process improvement: an investigation of the tendering process in aconstruction company

Cai, Qiying, Kiki., 蔡棋瑛. January 2007 (has links)
published_or_final_version / abstract / Real Estate and Construction / Doctoral / Doctor of Philosophy
107

Os contratos de EPC : entre tipicidade e atipicidade

Seibert, Guilherme January 2017 (has links)
O presente trabalho analisa a qualificação do tipo social do contrato de EPC (Engineering, Procurement and Construction) na ordem jurídica brasileira em face do tipo legal do contrato de empreitada. Investiga-se, portanto, a existência de identidade ou diferença entre ambos os tipos a fim de que se possa dar ao EPC a devida qualificação jurídica. Para isso, no Capítulo I, são apresentados os caracteres gerais dos contratos de construção, com foco na delimitação do espaço normativo específico ocupado pelo contrato de empreitada. No Capítulo II, apresenta-se o Contrato de EPC. São delineadas suas principais características gerais para que, em um segundo momento, possa-se aprofundar a análise a partir do emprego do método tipológico. Por fim, no Capítulo III, demonstra-se a forma como o regulamento dos contratos atípicos mistos em geral é construído para, posteriormente, analisar-se a formação do regulamento do EPC em seus principais pontos. / The present work analyzes the qualification of the social type of the EPC Contract (Engineering, Procurement and Construction) in the Brazilian legal order in consideration with the legal type of the works and supply contract. It is therefore investigated the existence of an identity or difference between the two contractual types in order to give the EPC the appropriate legal status. For this purpose, in Chapter I the general characteristics of construction contracts are presented, focusing on the delimitation of the specific normative space occupied by the works and supply contract. In Chapter II, the EPC Contract is presented. Its main general characteristics are presented so that, in a second moment, one can deepen the analysis using the typological method. Finally, Chapter III demonstrates the way in which the regulation of mixed atypical contracts in general is constructed, so that it can be analyzed the formation of the EPC regulation in its main points.
108

Bidding strategy: the consultants' perspective

Tang, Wing-hung, 鄧永雄 January 2004 (has links)
published_or_final_version / abstract / toc / Real Estate and Construction / Master / Master of Science in Construction Project Management
109

Conflict and disputes in the Hong Kong construction industry: a transaction cost economics perspective

Yates, David John. January 1998 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Philosophy
110

A contractual theory of the firm: a construction project case study

余嘉偉, Yu, Ka-wai, Marco. January 2001 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Philosophy

Page generated in 0.0959 seconds