• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Modelo para gestão de mão de obra subcontratada em construtoras

Beatrice, Mônica Cristina Ozório Pereira January 2011 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Engenharia Civil. / Made available in DSpace on 2013-07-16T04:16:50Z (GMT). No. of bitstreams: 1 305254.pdf: 40180110 bytes, checksum: d7aeca11c070cc8027fd643266ef9566 (MD5) / O objetivo desta pesquisa foi elaborar um modelo para gestão de contratos, sob o regime de empreitada de lavor que possa auxiliar as empresas construtoras na estruturação de seus processos de contratação. Para isso foram estudadas oito empresas construtoras do subsetor edificações comerciais e/ou residenciais, de porte médio e nível de avaliação A, de acordo com o Programa Brasileiro de Qualidade e Produtividade no Habitat (PBQP-H). A partir da pesquisa bibliográfica, foram identificados os principais autores sobre o tema subcontratação e adaptados os conceitos para a criação de um Modelo Preliminar de Gestão de Contratos, com abordagem por processos. A pesquisa documental também auxiliou na criação do Modelo Preliminar (MP) e os estudos de casos possibilitaram a compreensão do universo da subcontratação nas construtoras estudadas e a consolidação do Modelo Final. De maneira geral, os maiores problemas apontados pelas empresas construtoras pesquisadas em relação aos subcontratados foram: a dificuldade dos contratados em atender às normas de segurança do trabalho, a falta de cumprimento dos prazos contratuais e os aspectos da qualidade dos serviços. E os maiores problemas de gestão dos subcontratados nas empresas pesquisadas foram: a falta de integração entre as áreas que participam da contratação, a falta de apoio aos subcontratados, a simples transferência de responsabilidades, a falta de flexibilidade durante a negociação e a pouca utilização dos procedimentos de qualidade. A maior preocupação das construtoras no momento da contratação está associada aos custos dos serviços e rapidez na negociação, porem elas não costumam detalhar seus custos e nem planejar suas contratações. Nesse sentido, o modelo proposto buscou corroborar para melhoria deste cenário sendo considerado, por cinco empresas pesquisadas, bastante abrangente apresentando um moderado grau de dificuldade para implantação e passível de adaptação a realidade de cada construtora. / The objective of this research was develop a model for contract management, under the regime of contract for the workmanship that can help construction companies in structuring their hiring processes. For this purpose, it was evaluated eight companies from the sub-sector commercial buildings and/or residential, medium size and with A level of assessment, according to the Brazilian Program of Quality and Productivity in the Habitat (PBQP-H). As from the literature search, it was identified the main authors on the subject of outsourcing and adapted the concepts to prepare a Primary Model for Contract Management, with the process approach. The desk research also helped to prepare the Preliminary Model (MP) and the case studies provided an understanding of subcontracting universe within the analyzed construction companies and the consolidation of the Final Model. In general, the major problems highlighted by the surveyed construction companies regarding to contractors were: the difficulty for contractors to meet the safety standards of work, lack of compliance with contractual terms and aspects of service quality. And the major problems in the subcontractors management within the surveyed companies were: the lack of integration between departments that participate in the hiring process, lack of support to subcontractors, the simple transfer of responsibilities, lack of flexibility during the negotiation and little use of quality procedures. The main concern of the surveyed companies at the hiring time is associated with the costs of services and fast negotiation, but they usually do not detail their costs and even plan their hiring process. In that sense, the proposed model aimed corroborate this scenario for improvement, being considered by five companies researched, very comprehensive and showing a moderate degree of difficulty to implement and able to adapting to the reality of each company.
2

Os contratos de EPC : entre tipicidade e atipicidade

Seibert, Guilherme January 2017 (has links)
O presente trabalho analisa a qualificação do tipo social do contrato de EPC (Engineering, Procurement and Construction) na ordem jurídica brasileira em face do tipo legal do contrato de empreitada. Investiga-se, portanto, a existência de identidade ou diferença entre ambos os tipos a fim de que se possa dar ao EPC a devida qualificação jurídica. Para isso, no Capítulo I, são apresentados os caracteres gerais dos contratos de construção, com foco na delimitação do espaço normativo específico ocupado pelo contrato de empreitada. No Capítulo II, apresenta-se o Contrato de EPC. São delineadas suas principais características gerais para que, em um segundo momento, possa-se aprofundar a análise a partir do emprego do método tipológico. Por fim, no Capítulo III, demonstra-se a forma como o regulamento dos contratos atípicos mistos em geral é construído para, posteriormente, analisar-se a formação do regulamento do EPC em seus principais pontos. / The present work analyzes the qualification of the social type of the EPC Contract (Engineering, Procurement and Construction) in the Brazilian legal order in consideration with the legal type of the works and supply contract. It is therefore investigated the existence of an identity or difference between the two contractual types in order to give the EPC the appropriate legal status. For this purpose, in Chapter I the general characteristics of construction contracts are presented, focusing on the delimitation of the specific normative space occupied by the works and supply contract. In Chapter II, the EPC Contract is presented. Its main general characteristics are presented so that, in a second moment, one can deepen the analysis using the typological method. Finally, Chapter III demonstrates the way in which the regulation of mixed atypical contracts in general is constructed, so that it can be analyzed the formation of the EPC regulation in its main points.
3

Responsabilidade civil na empreitada

Ferriani, Carlos Alberto 25 February 2015 (has links)
Made available in DSpace on 2016-04-26T20:23:30Z (GMT). No. of bitstreams: 1 Carlos Alberto Ferriani.pdf: 1190065 bytes, checksum: 8249a834665b5203c46a0d18bcd5c40c (MD5) Previous issue date: 2015-02-25 / The paper was carried out as a Master Civil Law Degree conclusion and was compared with the civil liability from a contract job result. Therefore, it is not just a question of civil responsibility to the contractors, but also his. It is composed of 3 parts: the first one regarding the main features of a contract job, with reference to obligations originated from an agreement between the parties; the second regarding civil liability as a whole, either contractual or extracontractual, aiming at spotting, on the whole, aspects which might be related to any transaction of a contracting part at issue, as well as any casual aftermath that may reach third parties; the last one, aimed at highlighting the public works contractor civil liability who represents considerable proportions and what oftentimes happen; As an analysis, it was aimed at demonstrating that despite the fact that there are only few literal amendments occurred along with 2012 code edition, any contract must, nowadays, be finished and implemented in accordance with ethics, sociability and practicality principles. Instead of individualistic conceptions, the collaborationist one was applied, that means, instead of personal interest antagonism, this argues in favors of altruist spirit of cooperation, in order to obtain satisfactory results to the involved parties. Whether any change happened with the contracts, also related to civil liability, nowadays, some advances were seen and required, it is also important to mention the article 927 broad questions insertion, civil code sole paragraph. The contract job is not unfamiliar to this innovative influence. On the contrary, as any transaction, it must be celebrated, appreciated and implemented in the light of law general rules and principles which face north to pursue this process it is not an exaggeration to claim the common good and the neminem laedere. Some foreign degree texts were analyzed, pursuant to article 618 of the Brazilian Civil Code. It is also highlighted two ways of a contractor liability for a considerable work, one regarding the one who requests, and the other regarding third parties. Another concern is the analysis of each one s liability basics. At last, it was sought to show some reflexes in transactions not only between the contracting parts, but also among themselves and strangers, under changes focus have been taking place / O trabalho que está sendo apresentado como conclusão do curso de mestrado em direito civil comparado versa sobre a responsabilidade civil decorrente do contrato de empreitada. Logo, não trata apenas da responsabilidade civil do empreiteiro, mas também da dele. Está constituído de três partes: uma dedicada à análise das características principais do contrato de empreitada, com alusão às principais obrigações provenientes da convenção entre as partes; outra alusiva ao tema da responsabilidade civil em geral, tanto contratual quanto extracontratual, com vistas a localizar, neste contexto generalista, os aspectos que se relacionam com os contratantes do negócio jurídico em causa, bem como os efeitos que podem eventualmente alcançar terceiros; e a última, em que se procurou dar destaque especial para a responsabilidade civil do empreiteiro de obras de construção civil de proporções consideráveis, que é a que mais freqüentemente tem lugar no mundo dos fatos. Ao examinar a empreitada, visou-se a demonstrar que não obstante as poucas alterações literais que ocorreram com a edição do Código de 2002, qualquer contrato deve, na atualidade, ser concluído e executado em conformidade com os princípios da eticidade, da socialidade e da praticidade. No lugar da concepção individualista, instalou-se decididamente a colaboracionista, isto é, em vez do antagonismo dos interesses, impõe-se o espírito altruísta de cooperação, para que se alcance o resultado que mais plenamente satisfaça aos propósitos das partes envolvidas. Se com os contratos ocorreram mudanças, também com relação à responsabilidade civil, foram apontados avanços que os tempos atuais exigiram, bastando lembrar a inserção da regra de cunho geral do artigo 927, parágrafo único do Código Civil. O contrato de empreita não ficou alheio a esta influência inovadora. Ao contrário, como qualquer negócio jurídico, há de ser celebrado, apreciado e executado à luz destas regras gerais e dos princípios que servem de norte para esse processo que persegue, de modo obstinado --- não é exagero afirmar ---, o bem comum e o neminem laedere. Analisaram-se alguns textos de diplomas estrangeiros, correspondentes ao artigo 618 do Código Civil brasileiro. Destacaram-se também as duas espécies de responsabilidade do empreiteiro de obras consideráveis, uma com relação àquele que a encomenda, outra em relação a terceiros. Também constituiu preocupação a análise do fundamento de cada uma dessas espécies de responsabilidade. Enfim, procurou-se mostrar os reflexos desse negócio jurídico não só entre as partes contratantes, mas entre elas e estranhos, sob o foco das mudanças que estão acontecendo
4

Os contratos de EPC : entre tipicidade e atipicidade

Seibert, Guilherme January 2017 (has links)
O presente trabalho analisa a qualificação do tipo social do contrato de EPC (Engineering, Procurement and Construction) na ordem jurídica brasileira em face do tipo legal do contrato de empreitada. Investiga-se, portanto, a existência de identidade ou diferença entre ambos os tipos a fim de que se possa dar ao EPC a devida qualificação jurídica. Para isso, no Capítulo I, são apresentados os caracteres gerais dos contratos de construção, com foco na delimitação do espaço normativo específico ocupado pelo contrato de empreitada. No Capítulo II, apresenta-se o Contrato de EPC. São delineadas suas principais características gerais para que, em um segundo momento, possa-se aprofundar a análise a partir do emprego do método tipológico. Por fim, no Capítulo III, demonstra-se a forma como o regulamento dos contratos atípicos mistos em geral é construído para, posteriormente, analisar-se a formação do regulamento do EPC em seus principais pontos. / The present work analyzes the qualification of the social type of the EPC Contract (Engineering, Procurement and Construction) in the Brazilian legal order in consideration with the legal type of the works and supply contract. It is therefore investigated the existence of an identity or difference between the two contractual types in order to give the EPC the appropriate legal status. For this purpose, in Chapter I the general characteristics of construction contracts are presented, focusing on the delimitation of the specific normative space occupied by the works and supply contract. In Chapter II, the EPC Contract is presented. Its main general characteristics are presented so that, in a second moment, one can deepen the analysis using the typological method. Finally, Chapter III demonstrates the way in which the regulation of mixed atypical contracts in general is constructed, so that it can be analyzed the formation of the EPC regulation in its main points.
5

Os contratos de EPC : entre tipicidade e atipicidade

Seibert, Guilherme January 2017 (has links)
O presente trabalho analisa a qualificação do tipo social do contrato de EPC (Engineering, Procurement and Construction) na ordem jurídica brasileira em face do tipo legal do contrato de empreitada. Investiga-se, portanto, a existência de identidade ou diferença entre ambos os tipos a fim de que se possa dar ao EPC a devida qualificação jurídica. Para isso, no Capítulo I, são apresentados os caracteres gerais dos contratos de construção, com foco na delimitação do espaço normativo específico ocupado pelo contrato de empreitada. No Capítulo II, apresenta-se o Contrato de EPC. São delineadas suas principais características gerais para que, em um segundo momento, possa-se aprofundar a análise a partir do emprego do método tipológico. Por fim, no Capítulo III, demonstra-se a forma como o regulamento dos contratos atípicos mistos em geral é construído para, posteriormente, analisar-se a formação do regulamento do EPC em seus principais pontos. / The present work analyzes the qualification of the social type of the EPC Contract (Engineering, Procurement and Construction) in the Brazilian legal order in consideration with the legal type of the works and supply contract. It is therefore investigated the existence of an identity or difference between the two contractual types in order to give the EPC the appropriate legal status. For this purpose, in Chapter I the general characteristics of construction contracts are presented, focusing on the delimitation of the specific normative space occupied by the works and supply contract. In Chapter II, the EPC Contract is presented. Its main general characteristics are presented so that, in a second moment, one can deepen the analysis using the typological method. Finally, Chapter III demonstrates the way in which the regulation of mixed atypical contracts in general is constructed, so that it can be analyzed the formation of the EPC regulation in its main points.

Page generated in 0.0773 seconds