• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • 6
  • 4
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 44
  • 44
  • 23
  • 7
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Administrativní budova Brno-Bystrc / Office building Brno-Bystrc

Dokulil, Martin January 2014 (has links)
The master´s thesis deals with a project documentation of a office building with fitness center in Brno-Bystrc. The object is designed as a detached building with four floors and with one basement. Floor plan of the building is regular, staffed by sloping terrain. In basement is situated underground garage and technical rooms of building. In the first floor is fitness center and garage for a customers. In other floors are office spaces for private company. Above the roof is a engine rooms of ventilation. The structural system is reinforced concrete skeleton, facade is designed as a curtain walling. The object is covered with a flat roof.
42

Zdravotně technické instalace v polyfunkčním domě / Sanitation installation in a multifunctional building

Vaněrka, Zdenek January 2014 (has links)
The diploma thesis deals with the problems of sanitation installation in a multifunctional building in Kunstat. The theoretical part focuses on the analysis of the topic, with emphasis on the water demand. The experimental part focuses on drinking water consumption in real objects. The thesis also focuses on possible solutions given specialization. The project solves the sanitation installation of the multifunctional building in the selected variant. It is a multi-storey building where are a guesthouse for short-term accommodation, café, public toilets, commercial space and a fitness center.
43

Sportcenter i Västertorp / Sports Center in Västertorp

Gårdendal, Andreas January 2014 (has links)
Stockholm Stad behöver utöka kapaciteten på sina badhus samt idrottsanläggningar. Därtill är renoveringsbehovet stort på samtliga badhus. Badet i Västertorp täcker ett stort område och är populärt men behöver nu rivas pga. det dåliga skicket. Istället ska man bygga bostäder på platsen och flytta ner det nya badet till Mellanbergsparkens södra spets för att samtidigt bli en bullerbarriär mellan motorvägen (E4/E20) och parken som man vill börja programmera. Det nya badhuset blir ett fint avslut på parken och ska även innehålla två fullstora idrottshallar, gym och gruppträningslokaler varför jag har kommit att benämna det Sportcenter. Sportcentret är således indelat i tre volymer bestående av en idrottsdel, en gymdel och en baddel. Sportcentrets placering får en ökad tillgänglighet via motorvägen och undviker att belasta områdets befintliga trafik, till skillnad från om badhuset hade stått kvar. Jag har ritat en ny rondell som kommer lösa dagens svåra situation samt sänka farten in till stadsdelen. Därtill kommer två nya busshållplatser i båda riktningarna att få plats. Platsens befintliga utebad ska inte integreras i anläggningen då det bara används tre månader under hela året samt ska fortsätta förbli gratis. I övrigt bygger förslaget på riktlinjer från idrottsförvaltningen. Programmets funktion har fått forma den yttre volymen. Jag började låta analyser från platsen forma projektet och grunda konceptet med meshfasaden som ska representera vatten och fart. Den utanpåliggande fasaden har fyra grundtankar i sin formgivning: att ge ett spännande inre ljusspel, skydda från solens direkta strålar, absorbera bullret samt bli ett skådespel för bilarna på motorvägen natt som dag. Fokus var att lösa programmet logistiskt samt utan nivåskillnader och samtidigt få spännande estetiska lösningar vad gäller material och ljus. Därtill finns lösningar på hur badhuset kan hållas rent på ett enklare sätt. Att lösa programmet på den lilla tomten är dock grundutmaningen. Projektet har varit en övning i nya program för hur man projekterar arkitektur, samt loggar sin arbetsprocess. / Stockholm City needs to expand the capacity of their public baths and sports facilities. In addition, the renovation need is great for all bathhouses. The popular bath in Västertorp covers a large area but needs to be demolished due to its poor condition. Instead appartments will be built on the site and the bath will move to the southern tip of the park Mellanbergsparken to become a noise barrier between the highway (E4/E20) and the park that the city wants to start programming. The new bathhouse will be a nice end to the park and will also include two full-sized sport halls, fitness center and group training rooms hence the name "Sports Center". The sports center is thus divided into three volumes, consisting of the sport halls, a fitness part and the bath-house. The location of the center will have an increased availability through the highway and thus avoiding burdening the area's existing traffic. I have designed a new roundabout that will solve today's difficult traffic situation and reduce speed in the neighborhood. There are also two new bus stops in both directions. The site's existing swimming-pool should not be integrated into the plan as it is only used for three months during the year and should continue to remain with free entrance. Otherwise, the proposal is based on guidelines from the Sport Management department of the municipality. The function of the program has been shaping the outer volume. Analyses from the area has defined the project and the concept of the mesh facade is to represent water and speed. The facade has four basic ideas: to provide an exciting internal play of light, protect from the sun's direct rays, absorb the noise and become a spectacle for the cars on the highway day and night. The focus was to solve the program logistically while getting exciting aesthetic solutions in materials and light. In addition, there are solutions to how the bath house can be kept clean through easy design methods. The challenge was to fit all the functions on the relatively small plot. The project has been an exercise in new programs on how to project architecture, and logging the work process.
44

Garni hotel pod Javorinou / Garni hotel below Javorina hill

Letková, Viktória Unknown Date (has links)
This diploma thesis deals with the design of a hotel with a restaurant at the base the highest peak of the White Carpathians, Veľká Javorina. The area is located near the White Carpathians Protected Landscape Area and the Cetuna Natural Monument. The location has the possibility of using year-long and seasonal activities such as downhill and cross - country skiing or ice skating on frozen ponds, cycling in the new built-up cycle paths, hiking or walking on educational trails, horse riding, swimming in nature or visiting a family mini-zoo with the possibility of personal contact with animals. The potential of the concerned area is still used mainly by domestic, persons with the possibility of accommodation by acquaintances or owners of seasonal cottages and houses due to insufficient short-term accommodation. It was the main imulse for the design of accommodation. A piece of land on the border of the cadastral area of Dolné Bzince and Hrubá Strana of the village of Bzince pod Javorinou was selected for the building construction, due to its satisfactory position, orientation and also for the possibility of its evaluation. The building is designed as a separate-standing object onto an undeveloped territory of the municipality, which was used for agricultural purposes. It's been a long time it lies on ice, decays and its value decreases with expanding overgrown trees. The land is slightly sloping, oriented to southwest. The building has three main entrances and secondary entrances for smooth operation of the hotel. There is a day (leisure) part placed on the 1st floor, also a part for accommodation employees and immobile clients, parts for hotel management, cleaning zone and restaurant. On the 2nd floor there is an accommodation part with 19 rooms and a library. Into basement is a sport and relaxation part, which consist of fitness center and wellness center. Furthermore, in this floor is a bicycle shed and rooms of technical equipment of the hotel. On t

Page generated in 0.2126 seconds