• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2070
  • 54
  • 50
  • 27
  • 24
  • 24
  • 22
  • 15
  • 9
  • 6
  • 6
  • 6
  • 3
  • 1
  • 1
  • Tagged with
  • 2203
  • 1370
  • 311
  • 309
  • 289
  • 264
  • 252
  • 236
  • 235
  • 224
  • 222
  • 197
  • 193
  • 188
  • 187
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Uma metodologia para melhoria de processos baseada em Design Thinking

PICANÇO, Caroline Tavares 04 August 2017 (has links)
LIMA, Simone Cristiane dos Santos, também é conhecida em citações bibliográficas por: SANTOS, Simone Cristiane dos / Submitted by Pedro Barros (pedro.silvabarros@ufpe.br) on 2018-09-14T21:10:12Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Caroline Tavares Picanço.pdf: 5193588 bytes, checksum: 183c7ea2d865905bb4213d1a21a9527c (MD5) / Approved for entry into archive by Alice Araujo (alice.caraujo@ufpe.br) on 2018-09-18T15:38:21Z (GMT) No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Caroline Tavares Picanço.pdf: 5193588 bytes, checksum: 183c7ea2d865905bb4213d1a21a9527c (MD5) / Made available in DSpace on 2018-09-18T15:38:21Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Caroline Tavares Picanço.pdf: 5193588 bytes, checksum: 183c7ea2d865905bb4213d1a21a9527c (MD5) Previous issue date: 2017-08-04 / Diante da alta competitividade do mercado e da necessidade de inovação constante para alcançar objetivos de negócios, as empresas buscam por alternativas que melhorem continuamente seus processos. Neste cenário, o gerenciamento de processos de negócio (do inglês, Business Process Management ou BPM) permite que as organizações consigam acompanhar suas atividades do início ao fim, a partir da definição de objetivos, mapeamento, análise, melhorias, execução e mensuração de seus processos de negócios. Em particular, a fase de melhoria de processos de negócios é essencial para que mudanças sejam realizadas de modo a alcançar resultados mais positivos, evitando erros, cortando custos, entregando valor ao cliente, entre outros. Nesse contexto, as organizações necessitam realizar atividades que identifiquem os problemas de negócio, bem como determinar o que deve ser melhorado e estabeleçam cenários concretos de mudanças, levando em consideração o entendimento das pessoas envolvidas no negócio. A proposta desta pesquisa é, primeiramente, motivada pela experiência profissional da pesquisadora que observou na organização onde trabalha, a deficiência no alinhamento entre a viabilidade do negócio, a disponibilidade da tecnologia e o desejo das pessoas envolvidas. Numa investigação ad hoc da literatura, foi constatada uma grande carência de soluções efetivas para este problema, principalmente, que motivasse a participação de pessoas neste processo. Diante disso, como forma de garantir a melhoria de processos de negócio por uma abordagem centrada no ser humano, este trabalho propõe uma metodologia para a melhoria de processos utilizando a abordagem Design Thinking (DT). Essa metodologia possui atividades que servem para analisar e solucionar desafios de forma colaborativa e coletiva, numa perspectiva de empatia máxima entre as pessoas envolvidas. Além disso, para proporcionar maior engajamento entre pessoas e o negócio, utilizou-se técnicas de gamificação dentro da metodologia. Para avaliar a metodologia proposta, um estudo de caso foi realizado numa organização pública, mostrando resultados positivos e benefícios da utilização da metodologia para o cenário apresentado, contribuindo, assim, para a fase de melhoria de processos de negócios. / Faced with the high competitiveness of the market and the need for constant innovation to achieve business objectives, companies look for alternatives to continuously improve their processes. In this scenario, the business process management (BPM) enables organizations to track their activities from start to finish, from the definition of objectives, mapping, analysis, improvement, implementation and measurement of its business processes. In particular, the phase of improvement of business processes is essential for changes to be made in the pursue to achieve more positive results, avoiding mistakes, cutting costs, delivering value to the customer, among others. In this context, organizations need to carry out activities to identify business problems and determine what should be improved and establish concrete scenarios of changes, taking into account the savviness of the people involved in the business. The proposal of this research is primarily motivated by the professional experience of the researcher who observed the deficiency in the alignment between the viability of the business, the availability of the technology and the desire of the people involved, in the organization where it works. In an ad hoc investigation of the literature, we observed a great need for effective solutions to this problem mainly to motivate the participation of people in this process. Therefore, in order to ensure improvement of business processes through a focused approach in humans, this work proposes a methodology for process improvement using the approach of Design Thinking (DT). This methodology has activities that serve to analyze and solve challenges collaboratively and collectively, in a maximum empathy perspective of the people involved. Moreover, to provide greater engagement between the people and the business, gamification techniques are used within the method. To evaluate the proposed methodology, a case study was conducted in a public organization, showing positive results and benefits of the use of the methodology for the presented scenario, thus contributing to the phase of improvement of business processes.
72

Uma Extensão do RUP para o Gerenciamento das Comunicações

Renê Carneiro, Marcelo 31 January 2008 (has links)
Made available in DSpace on 2014-06-12T15:52:03Z (GMT). No. of bitstreams: 1 license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2008 / No século que se inicia, o gerenciamento das comunicações em projetos deverá se igualar, em importância, como fator de sucesso no desenvolvimento de projetos, aos gerenciamentos de escopo, tempo, custo e qualidade. Essa é a visão de Adrian Lammi, Presidente do Northeast Ohio Chapter do Project Management Institute (PMI). Esse crescimento, em importância, da gestão das comunicações em projetos tem como aliados, a globalização, o Gerenciamento da Qualidade Total (TQM), os padrões definidos pela International Organization for Standardization (ISO) e o Guia PMBOK. O gerenciamento dos projetos de desenvolvimento de software também deverá dar maior ênfase aos processos de comunicação, fator crucial em projetos intensivos em tecnologia e conhecimento e dependentes da identificação das reais necessidades dos clientes. O Rational Unified Process-RUP, por exemplo, é um framework bastante completo, adota boas práticas de gerenciamento de projetos e é largamente utilizado. Entretanto, apresenta lacunas no que concerne ao processo de gerenciamento das comunicações: esse processo não está sistematizado, é incompleto e fragmentado. Embora a estrutura do RUP já sirva como um canal de comunicação, através da produção, distribuição, atualização, armazenamento e controle de artefatos, há a necessidade, em um processo de desenvolvimento de software, de um melhor gerenciamento dos outros meios de comunicações formais. A comunicação, em projetos pequenos, pode ter como característica mais forte a informalidade, mas em projetos de portes médio e grande necessita ser planejada, coordenada, avaliada e ser objeto de um processo de melhoria contínua, através das lições aprendidas. Além do que, necessita-se, para um gerenciamento eficaz, de uma visão sistêmica dessa área de conhecimento do Guia PMBOK, que pode ser suprida, através da identificação de seus processos e de suas interfaces. Acrescenta-se a essas questões o fato de que a comunicação, como ferramenta estratégica do gerente, está sendo subutilizada no RUP. A ênfase é na sua função informativa. As demais funções da comunicação, identificadas por Lee Thayer: comandar, instruir, influenciar (indireta e encobertamente), persuadir (direta e manifestamente) e integrar, não são tratadas com a relevância que merecem, pois o RUP é muito voltado à área técnica. Nesse contexto, esta dissertação, propõe-se a sistematizar e complementar o processo de gerenciamento das comunicações no RUP, com base no tripé formado pela norma ISO 10006 (diretrizes), pelo Guia PMBOK (definição dos processos, conceitos e procedimentos) e pelo método alemão Metaplan, desenvolvido para a condução de workshops, diminuindo-lhes o custo, através de aumento de produtividade. A idéia central é estender o fluxo de trabalho da disciplina de gerenciamento do projeto do RUP, inserindo o subfluxo gerenciar comunicações do projeto, com atividades de planejamento, como a elaboração de um plano de gerenciamento das comunicações, e de gerenciamento de rotina
73

Implantando gerenciamento de projetos em empresas de TI, em estágios iniciais de maturidade organizacional

OLIVEIRA, Alexandre Alves de 31 January 2009 (has links)
Made available in DSpace on 2014-06-12T15:52:29Z (GMT). No. of bitstreams: 1 license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2009 / Diante de uma configuração empresarial, caracterizada por organizações que se encontram em estágios iniciais de maturidade organizacional, e diante de um conjunto de técnicas, modelos e guidelines para suportar a gerência de projetos, onde um grande número de sub-processos, em certos momentos, não se aplicam a qualquer tipo de organização, este trabalho de pesquisa busca compreender qual a estratégia adequada para implantar gerenciamento de projetos, em empresas de TI, em estágios iniciais de maturidade organizacional. Para tanto, foi realizado um estudo de múltiplos casos, de caráter instrumental, e de natureza qualitativa, onde os dados a serem analisados foram coletados através de um questionário autoaplicável, destinado aos gerentes de projetos das empresas selecionadas. Como principais resultados, foram obtidos os condicionantes que influenciaram positivamente e negativamente no processo de implantação de gerenciamento de projetos. Em seguida, foi elaborado um conjunto estruturado de diretrizes estratégicas que visa auxiliar as empresas que se encontram nos estágios de existência e sobrevivência, conforme o modelo de Churchill e Lewis, no processo de implantação de gerenciamento de projetos, de acordo com o Guia PMBOK. Com base nos resultados obtidos, foi concluído que as empresas de TI nos estágios de existência e sobrevivência possuem necessidades específicas no processo de implantação de gerenciamento de projetos. Este modelo pode ser útil, pois define o processo de implantação segmentado em etapas seqüenciais, e atividades distintas por estágios de maturidade organizacional, possibilitando uma melhor aderência ao PMBOK
74

Softwares de apoio ao gerenciamento ágil de projetos colaborativos de novos produtos: análise teórica e identificação de requisitos / Software to support the agile collaborative project management of new products: theoretical analysis and requirements identification

Araujo, Camila de 07 July 2008 (has links)
A competência em gerenciamento de projetos (GP) é reconhecida como um fator crítico para o desenvolvimento de novos produtos e possuir sistemas de informação adequados é um quesito fundamental para apoiá-la. Há uma disponibilidade de ferramentas e em contrapartida, um número significativo de críticas à sua utilização, especialmente no caso de produtos inovadores e complexos. O trabalho tem por objetivo identificar os desafios a serem enfrentados para o desenvolvimento de ferramentas de software para apoiar práticas com esse enfoque. Empregou-se a revisão bibliográfica combinada com o estudo de caso múltiplo. Compilou-se os desafios apontados na literatura, revisando os temas: colaboração, gerenciamento ágil de projetos e softwares para gerenciamento de projetos. O resultado, organizado segundo as áreas de processo do PMI, foi comparado com problemas reais, coletados por meio do método de estudo de caso. O setor de bens de capital foi escolhido para garantir a complexidade dos projetos (número de peças do produto e presença de colaboração). A unidade de análise é o sistema de informação para gerenciamento dos projetos (SIGP) de cada empresa. Descreveu-se o SIGP e o papel dos softwares de GP, de forma a identificar os desafios e classificá-los segundo áreas de conhecimento de GP. Os instrumentos utilizados foram roteiros de entrevistas, observações e análise de documentos. Os desafios foram confrontados com o esforço da comunidade científica, identificado por meio de uma revisão bibliográfica, classificada segundo as mesmas áreas de GP. Ao final, comparam-se os desafios das empresas com a teoria e identifica-se uma lista de requisitos para o desenvolvimento de softwares na área. A análise indica também que as ferramentas de GP são utilizadas de forma restrita na indústria de bens de capital e que há discordâncias entre o esforço dos pesquisadores e necessidades dos profissionais da área. Por fim, esta pesquisa identifica como temas relevantes: a integração de dados, o desenvolvimento de funcionalidades de aquisição e de gerenciamento de interfaces, riscos, recursos e multiprojetos. / The project management competence has been recognized as a critical factor to develop new products. Information systems are a fundamental factor to support it. There is an exceptional amount of tools. In opposition there are a significant number of critics about its utilization, in special in projects like innovative and collaborative product projects. The critics pointed needs for new methods and practices to support the agile project management. This research aims to identify challenges of developing project management tool to support this approach. The method used combines a bibliographical review with a multiple case study. The literature challenges were compiled, reviewing the themes: collaboration, agile project management and project management software. The result, organized by PMI process areas, was compared with case study real problems. The capital goods (BK) sector was chosen to ensure the projects complexity (by the product and collaboration presence). The analysis unit is the project management information system (PMIS) of each company. The PMIS and the role of the project management software were described to identify the challenges and classify them according to project management areas. The data collection instruments are plan interview, non-participant observations and document analysis. The challenges were faced with the scientific community effort, identified through a literature review and classified according to the same areas of PM. Following, the challenges of companies was compared with the literature and a requirement list is identified to develop PM software. The analysis indicates that the PM tools used in the BK industry are restricted. There is a mismatch between the researcher efforts and necessities of professionals in the area. Finally, this research identifies as relevant themes: data integration, development of acquisition features, interfaces, risks, resources and multi-projects management.
75

Uma abordagem para determinação do grau de exposição a riscos em portfolio de projetos. / An aproach to the project portfolio risk exposure assessment.

Harmuch, Claudia Tuma 18 November 2009 (has links)
A composição de um portfolio de projetos é realizada de acordo com um conjunto de critérios de seleção e avaliação de projetos, que permite identificar quais projetos trazem maior valor, benefícios e alinhamento com as estratégias definidas pela organização, para um determinado horizonte de tempo. O grau de exposição a riscos do portfolio de projetos é um dos critérios mais importantes a ser considerado na composição e no balanceamento do portfolio, uma vez que indica a magnitude dos desvios a que o portfolio está sujeito em relação ao atendimento de seus objetivos. Este trabalho apresenta um procedimento para a avaliação do grau de exposição a riscos do portfolio de projetos, que parte dos riscos de cada projeto, e considera seus inter-relacionamentos, bem como outros riscos inerentes ao portfolio como um todo. O procedimento abrange a identificação, análise e tratamento dos riscos do portfolio e a determinação do grau de exposição a riscos no atendimento de cada objetivo e do portfolio com um todo. Através de um estudo de caso, realizado numa empresa multinacional do setor de máquinas e equipamentos, o procedimento foi testado num portfolio composto por nove dos maiores projetos de sua maior unidade de negócio. Foi possível determinar o grau de exposição a riscos do portfolio de projetos frente aos objetivos estratégicos a que se propunha atender valores determinados de margem bruta média e faturamento para o ano fiscal corrente. O estudo de caso permitiu validar a aplicabilidade do procedimento. A identificação dos riscos em comum, das interdependências e de outros riscos abrangentes permitiu identificar causas comuns e proliferações entre os riscos dos projetos e, principalmente, racionalizar recursos no tratamento dos riscos. / When building a project portfolio, evaluation and selection criteria are used to recognize which projects bring greater value, benefits and alignment with the organization strategies defined for a given period of time. One of the most relevant criteria in project portfolio composition and balancing is the risk exposure, as it indicates the magnitude of slippages to which the organization objectives are susceptible. This work presents a procedure for the evaluation of the overall project portfolio risk exposure, considering the risks of each project, the inter-relationships among them, and also other risks inherent to the portfolio as a whole. The procedure encloses portfolio risks identification, analysis and treatment and the assessment of the risk exposure in the attendance of each objective as well as for the complete portfolio. Through a case study, carried through in a world class multinational company of the capital goods sector, the risk analysis procedure has been tested in a portfolio encompassing nine major projects from its main business unit. It has been possible to define the risk exposure related to the strategic objectives this portfolio should fulfill average gross margin and revenues for the current fiscal year. The case study has allowed validating the applicability of the proposed procedure. The identification of common risks, interdependences and other overall portfolio risks has also allowed to recognize common causes, proliferation among projects and, mainly, to rationalize resources in treating these risks.
76

A certificação em gerenciamento de projetos à luz da teoria institucional: um estudo de caso

Kuwamoto, Paula Emiko 11 March 2008 (has links)
Made available in DSpace on 2010-04-20T20:51:46Z (GMT). No. of bitstreams: 3 61060100594.pdf.jpg: 24010 bytes, checksum: 333839d2a514c61c424aafb69a006439 (MD5) 61060100594.pdf: 814810 bytes, checksum: b75725d08edd75e3fbb618860590a508 (MD5) 61060100594.pdf.txt: 302425 bytes, checksum: 6f2d4f0102b905bb63f0707bd9ca23f8 (MD5) Previous issue date: 2008-03-11T00:00:00Z / This dissertation gathers the main concepts in project management. It deals with the models of maturity in project management, mainly the derivations of model CMM (Capability Maturity Model), and its respective - when existing - certifications. As theoretical perspective for the reflection on the subject, the Institutional Theory was used with emphasis on the concepts of legitimacy, isomorphism and ceremonial behavior. An explanatory qualitative research was performed - through a case study - to attest the evidence of a pressuring environment which pushes organizations to conformity and legitimacy in their performance field rather than efficiency. This study analyzed the process of project management maturity certification which is a fertile and still unexplored field, especially when considering the Brazil’s situation. / Esta dissertação reúne os principais conceitos em gerenciamento de projetos. Em destaque, trata dos modelos de maturidade em gerenciamento de projetos, principalmente os derivados do modelo CMM (Capability Maturity Model), e suas respectivas certificações quando existentes. Como perspectiva teórica para a reflexão sobre o tema, foi utilizada a Teoria Institucional, com ênfase nos conceitos de legitimidade, isomorfismo e comportamento cerimonial. Para buscar a comprovação de indícios das pressões do ambiente nas organizações em busca de conformidade e legitimidade frente a um campo de atuação, em detrimento da eficiência, foi usada uma pesquisa qualitativa explanatória, através de um estudo de caso que analisou o processo de certificação de maturidade em gerenciamento de projetos, um campo fértil e ainda inexplorado, principalmente ao analisarmos a situação brasileira.
77

Softwares de apoio ao gerenciamento ágil de projetos colaborativos de novos produtos: análise teórica e identificação de requisitos / Software to support the agile collaborative project management of new products: theoretical analysis and requirements identification

Camila de Araujo 07 July 2008 (has links)
A competência em gerenciamento de projetos (GP) é reconhecida como um fator crítico para o desenvolvimento de novos produtos e possuir sistemas de informação adequados é um quesito fundamental para apoiá-la. Há uma disponibilidade de ferramentas e em contrapartida, um número significativo de críticas à sua utilização, especialmente no caso de produtos inovadores e complexos. O trabalho tem por objetivo identificar os desafios a serem enfrentados para o desenvolvimento de ferramentas de software para apoiar práticas com esse enfoque. Empregou-se a revisão bibliográfica combinada com o estudo de caso múltiplo. Compilou-se os desafios apontados na literatura, revisando os temas: colaboração, gerenciamento ágil de projetos e softwares para gerenciamento de projetos. O resultado, organizado segundo as áreas de processo do PMI, foi comparado com problemas reais, coletados por meio do método de estudo de caso. O setor de bens de capital foi escolhido para garantir a complexidade dos projetos (número de peças do produto e presença de colaboração). A unidade de análise é o sistema de informação para gerenciamento dos projetos (SIGP) de cada empresa. Descreveu-se o SIGP e o papel dos softwares de GP, de forma a identificar os desafios e classificá-los segundo áreas de conhecimento de GP. Os instrumentos utilizados foram roteiros de entrevistas, observações e análise de documentos. Os desafios foram confrontados com o esforço da comunidade científica, identificado por meio de uma revisão bibliográfica, classificada segundo as mesmas áreas de GP. Ao final, comparam-se os desafios das empresas com a teoria e identifica-se uma lista de requisitos para o desenvolvimento de softwares na área. A análise indica também que as ferramentas de GP são utilizadas de forma restrita na indústria de bens de capital e que há discordâncias entre o esforço dos pesquisadores e necessidades dos profissionais da área. Por fim, esta pesquisa identifica como temas relevantes: a integração de dados, o desenvolvimento de funcionalidades de aquisição e de gerenciamento de interfaces, riscos, recursos e multiprojetos. / The project management competence has been recognized as a critical factor to develop new products. Information systems are a fundamental factor to support it. There is an exceptional amount of tools. In opposition there are a significant number of critics about its utilization, in special in projects like innovative and collaborative product projects. The critics pointed needs for new methods and practices to support the agile project management. This research aims to identify challenges of developing project management tool to support this approach. The method used combines a bibliographical review with a multiple case study. The literature challenges were compiled, reviewing the themes: collaboration, agile project management and project management software. The result, organized by PMI process areas, was compared with case study real problems. The capital goods (BK) sector was chosen to ensure the projects complexity (by the product and collaboration presence). The analysis unit is the project management information system (PMIS) of each company. The PMIS and the role of the project management software were described to identify the challenges and classify them according to project management areas. The data collection instruments are plan interview, non-participant observations and document analysis. The challenges were faced with the scientific community effort, identified through a literature review and classified according to the same areas of PM. Following, the challenges of companies was compared with the literature and a requirement list is identified to develop PM software. The analysis indicates that the PM tools used in the BK industry are restricted. There is a mismatch between the researcher efforts and necessities of professionals in the area. Finally, this research identifies as relevant themes: data integration, development of acquisition features, interfaces, risks, resources and multi-projects management.
78

Uma abordagem para determinação do grau de exposição a riscos em portfolio de projetos. / An aproach to the project portfolio risk exposure assessment.

Claudia Tuma Harmuch 18 November 2009 (has links)
A composição de um portfolio de projetos é realizada de acordo com um conjunto de critérios de seleção e avaliação de projetos, que permite identificar quais projetos trazem maior valor, benefícios e alinhamento com as estratégias definidas pela organização, para um determinado horizonte de tempo. O grau de exposição a riscos do portfolio de projetos é um dos critérios mais importantes a ser considerado na composição e no balanceamento do portfolio, uma vez que indica a magnitude dos desvios a que o portfolio está sujeito em relação ao atendimento de seus objetivos. Este trabalho apresenta um procedimento para a avaliação do grau de exposição a riscos do portfolio de projetos, que parte dos riscos de cada projeto, e considera seus inter-relacionamentos, bem como outros riscos inerentes ao portfolio como um todo. O procedimento abrange a identificação, análise e tratamento dos riscos do portfolio e a determinação do grau de exposição a riscos no atendimento de cada objetivo e do portfolio com um todo. Através de um estudo de caso, realizado numa empresa multinacional do setor de máquinas e equipamentos, o procedimento foi testado num portfolio composto por nove dos maiores projetos de sua maior unidade de negócio. Foi possível determinar o grau de exposição a riscos do portfolio de projetos frente aos objetivos estratégicos a que se propunha atender valores determinados de margem bruta média e faturamento para o ano fiscal corrente. O estudo de caso permitiu validar a aplicabilidade do procedimento. A identificação dos riscos em comum, das interdependências e de outros riscos abrangentes permitiu identificar causas comuns e proliferações entre os riscos dos projetos e, principalmente, racionalizar recursos no tratamento dos riscos. / When building a project portfolio, evaluation and selection criteria are used to recognize which projects bring greater value, benefits and alignment with the organization strategies defined for a given period of time. One of the most relevant criteria in project portfolio composition and balancing is the risk exposure, as it indicates the magnitude of slippages to which the organization objectives are susceptible. This work presents a procedure for the evaluation of the overall project portfolio risk exposure, considering the risks of each project, the inter-relationships among them, and also other risks inherent to the portfolio as a whole. The procedure encloses portfolio risks identification, analysis and treatment and the assessment of the risk exposure in the attendance of each objective as well as for the complete portfolio. Through a case study, carried through in a world class multinational company of the capital goods sector, the risk analysis procedure has been tested in a portfolio encompassing nine major projects from its main business unit. It has been possible to define the risk exposure related to the strategic objectives this portfolio should fulfill average gross margin and revenues for the current fiscal year. The case study has allowed validating the applicability of the proposed procedure. The identification of common risks, interdependences and other overall portfolio risks has also allowed to recognize common causes, proliferation among projects and, mainly, to rationalize resources in treating these risks.
79

Gerenciamento da coleta de resíduos sólidos urbanos: estruturação e aplicação de modelo não-linear de programação por metas / Management of solid urban waste collection: structuring and application of a non-linear goal programming model

Cunha, Valeriana 22 October 2001 (has links)
Neste trabalho é desenvolvida e aplicada metodologia para auxiliar a tomada de decisões, nos níveis tático e operacional, do gerenciamento da coleta de resíduos sólidos urbanos. Tal metodologia, baseada em modelo matemático de otimização de Programação Não-Linear por Metas, foi aplicada à cidade de Piracicaba, SP. Pôde-se constatar alguns problemas no gerenciamento tático e operacional na coleta de resíduos sólidos urbanos em Piracicaba, tais como falta de coleta convencional de todos os resíduos gerados em alguns setores, não otimização da frota de veículos existente, produtividades acima das estabelecidas como ótimas na maioria dos setores, densidades abaixo ou acima da média, entre outros. Além disso, verificou-se a necessidade de reestruturação dos setores de coleta para que o gerenciamento se tome mais eficaz. Através da aplicação do modelo, pôde-se concluir que tal ferramenta é útil na tomada de decisão nos níveis tático e operacional, podendo, inclusive, auxiliar na redefinição de estratégias a serem seguidas pelos tomadores de decisão. / This work presents a methodology that has been developed and applied to help the decision-making process, at both tactical and operational levels, in solid urban waste management. This methodology, based on an optimization mathematical model of Non-Linear Goal Programming, has been applied to Piracicaba, a city in the state of São Paulo. Some problems in tactical and operational management of solid urban waste collection have been found there, such as lack of standard collection of all the waste generated in some areas, non-optimization of fleet of vehicles available, productivity above that established as optimal in most areas, densities below or above average, among others. Furthermore, the need of restructuring collection areas has been noticed so that management can be more effective. Upon applying the model, it was concluded that such tool is useful in tactical and operational decision-making, as well as in helping redefining strategies to be followed by decision-makers.
80

Estratégias de uso e proteção das águas subterrâneas na Região Metropolitana do Recife - Estado de Pernambuco - Brasil / Not available.

Santos, Almany Costa 21 March 2000 (has links)
A área pesquisada compreende a Região Metropolitana do Recife (RMR), Estado de Pernambuco, entre os paralelos 7º 40\' 56\" e 8º 38\' 00\" latitude sul e os meridianos 34º 49\' 00\" e 35º 15\' 52\" de longitude oeste de Greenwich. Perfaz uma área de 2.777km2, correspondente a 2,81% da área do Estado de Pernambuco, onde se concentra 42% (3.087.967 habitantes) da população pernambucana. Esta tese faz parte da execução do \"Projeto HIDROREC\" convênio IDRC-Canadá/Universidade Federal de Pernambuco que abrangeu parte da área estudada, e tem como objetivo principal, fornecer um diagnóstico de uso dos recursos hídricos subterrâneos da RMR através de um zoneamento de uso e proteção das águas subterrâneas de áreas de características semelhantes, além de complementar, atualizar e interpretar o acervo hidrogeológico existente, dispondo os dados e o conhecimento científico aos gestores dos órgãos públicos e privados. A RMR abrange três compartimentos geológicos/estruturais distintos: a Bacia Sedimentar Pernambuco Paraíba ao norte; a Bacia Vulcano-Sedimentar Cabo ao sul; e o Complexo Gnáissico-Migmatítico que aflora a oeste da região e é o substrato das duas bacias. Devido à diversidade litológica nessa região e também às características hidrogeológicas intrínsecas a cada um desses compartimentos litológicos, subdividiu-se a RMR em 4 Domínios Hidrogeológicos Principais : o Domínio da Bacia Pernambuco-Paraíba (PE-PB), o Domínio da Bacia Cabo, o Domínio do Embasamento Cristalino e o Domínio da Planície do Recife. Este último Domínio foi separado por apresentar características geológicas, estruturais e hidrogeológicas distintas dos demais domínios, em virtude de situar-se no limite das duas bacias principais. A RMR é constituída por três sistemas aqüíferos intersticiais principais denominados de Aqüífero Beberibe (explotado no Domínio da Bacia PE-PB e no Domínio da Planície do Recife), Aqüífero Cabo (explotado no Domínio da Bacia Cabo e no Domínio da Planície do Recife) e o Aqüífero Boa Viagem (composto por sedimentos diversos do Quaternário e explotado em todos os Domínios), sendo o primeiro a unidade hidrogeológica mais importante da região. O Aqüífero Beberibe é composto por arenitos quartzosos continentais, de boas características hidrodinâmicas e de qualidade físico-química das águas subterrâneas. As superfícies potenciométricas dos principais aqüíferos explotados na RMR encontram-se muito rebaixadas, indicando a existência de áreas críticas, em virtude da intensa explotação de água subterrânea, agravada principalmente nas épocas de seca na região. Provocando, com isso, a diminuição das reservas permanentes e comprometendo a qualidade físico-química das águas, que seja por indução de fluxo de águas poluídas e/ou salinizadas de camadas aqüíferas superiores, ou pela contaminação através de corpos d\'águas de superfície (rios salinizados/poluídos e/ou sob influência da maré e do Oceano Atlântico), principalmente quando mantêm uma conexão hidráulica com os aqüíferos explotados. A partir dos dados hidrogeológicos compilados e obtidos para a presente tese, elaborou-se o Mapa de Uso e Proteção das águas subterrâneas da RMR, que constitui-se de Zonas com características de uso e proteção das águas subterrâneas semelhantes, definidas para cada Domínio Hidrogeológico, ressaltando os principais problemas decorrentes da explotação desordenada desses recursos. Espera-se que este zoneamento hidrogeológico da RMR propicie uma visão das potencialidades dos recursos hídricos subterrâneos, da sua importância como reserva estratégica e complementar para o abastecimento de água potável, além de servir como ferramenta para melhor gerir o aproveitamento destes recursos, compatibilizando-os com as atividade que sejam tecnicamente corretas, economicamente viáveis e socialmente justas para o desenvolvimento auto-sustentável da região. / The studied area comprises Recife Metropolitan Region (RMR), in the State of Pernambuco, located within the following coordinates 7° 40\' 56\" e 8° 38\' 00\" Latitude South and 34° 49\' 00\" e 35° 15\' 52\" West Greenwich Longitude, with a total of 2.777 km2. This area comprises 2,81% State of Pernambuco with 42% of its population. The \"Project HIDROREC\" (IDRC-Canada/Brazil (Pernambuco federal University) provided financial support for this work. The main objective of this work. The main objective of this work is to give a diagnostic report of use of groundwater recourses on the RMR including a Use and Protection Zones Map delimiting areas with similar characteristics, providing an additional hydrogeological data and making them accessible for publics administrators and privates organs. The RMR is subdivided in three Geological Compartments: Pernambuco-Paraíba (PE-PB) Sedimentary Basin, at north; Cabo Vulcan- Sedimentary Basin at south; and Migmatitic Complex (basins basement) which outcrops at west of the region. In this work the RMR is subdivided in four Hydrogeologic Domains as follows: (a) PE-PB Basin Domain; (b) Cabo Basin Domain; (c) Crystalline Basement Domain and (d) Recife Coastal Plain Domain. The last Domain was separated because it presents different geological, structural and hydrogeological characteristics, in consequence of its geographical location in limit of two principal basins. The RMR is constitute by three aquifers system porous media denominated Beberibe Aquifer (explored in PE-PB Basin Domain and Recife Coastal Plain Domain), Cabo Aquifer (explored in Domain of Cabo Basin and Recife Coastal Plain Domain) and the Boa Viagem Aquifer (constituted by variable sediments of Quaternary and explored in all domain). The first aquifer cited is the most important hydrogeologic unit of the region. The Beberibe Aquifer comprises continental sandstone of good hydrodinamical characteristics and excellent chemistry quality. Potenciometrical surfaces of the most explored aquifers in the RMR presents a lowering, indicative of the existence of critical areas, in consequence of the high exploration of the groundwater in this region and presents a reduction of the permanent reserves and modify the quality conditions of their water by flux induction of contaminated water of superior aquifers or by contamination of surface hydric resources or saline water encroachment that maintain hydraulic connection with explored aquifers. Based in a hydrogeological inventory made in a HIDROREC Project and in this work a Map of the Use and Protection of Groundwater was made defining Zones of similar characteristics in the RMR, identifying the main problems related to the extensive and disordered exploration regime. This work will give a general vision of the groundwater potentiality in RMR, and its importance strategical reserves for to complement the potable water supply, and also can be used as instrument for better utilization of this recourses, with the corrects activities for the sustained development of the region.

Page generated in 0.1237 seconds