• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • Tagged with
  • 5
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] OPTIMAL HYDROTHERMAL OPERATION: THE CASE WITH HYDRO PLANTS DISPOSED IN PARALLEL / [es] OPERACIÓN ÓPTIMA DE UN SISTEMA HIDROTÉRMICO EL CASO DE HIDROELÉCTRICAS EN PARALELO / [pt] OPERAÇÃO ÓTIMA DE UM SISTEMA HIDROTÉRMICO: O CASO DE HIDRELÉTRICAS EM PARALELO

PAULA VARELLA CALUX LOPES 29 October 2001 (has links)
[pt] Neste trabalho estudamos o problema de planejamento hidrotérmico para um sistema onde as hidrelétricas estão em paralelo, buscando estender os resultados obtidos por Bortolossi, Pereira e Tomei. Com uma conveniente formulação contínua, estabelecemos um teorema que garante a existência de solução para este problema, e caracterizamos os ótimos interiores. / [en] In this work we study the problem of hydrothermal scheduling for a system where the hydroelectric power stations are disposed in parallel, trying to extend the results obtained by Bortolossi, Pereira e Tomei. With a convenient continuous formulation, we establish a theorem that guarantees the existence of solution to this problem, and characterize the interior optimums. / [es] En este trabajo estudiamos el problema de planeamiento hidrotérmico para un sistema donde las hidroeléctricas están en paralelo, com el objetivo de extender los resultados obtenidos por Bortolosi, Pereira y Tomei. Con una formulación contínua conveniente, establecemos un teorema que garantiza la existencia de solución para este problema, y caracterizamos los óptimos interiores.
2

[en] HYBRID REPRESENTATION OF EQUIVALENTS AND INDIVIDUALIZED SYSTEMS FOR THE AVERAGE STATED PERIOD OPERATION PLANNING OF POWER SYSTEMS OF GREAT SIZE / [pt] REPRESENTAÇÃO HÍBRIDA DE SISTEMAS EQUIVALENTES E INDIVIDUALIZADOS PARA O PLANEJAMENTO DA OPERAÇÃO DE MÉDIO PRAZO DE SISTEMAS DE POTÊNCIA DE GRANDE PORTE

ANDRE LUIS MARQUES MARCATO 21 August 2002 (has links)
[pt] O sistema elétrico brasileiro apresenta características especiais que fazem com que ele se torne diferente dos outros encontrados nos demais países do mundo. Um território de largas dimensões abriga diversas bacias hidrográficas, as quais muitas vezes apresentam comportamentos complementares exigindo um grande intercâmbio energético entre elas, o que ocasionou a construção de uma malha de transmissão de grande porte e muito interligada. Com isto tornou-se necessária a construção de modelos específicos para gerenciar a operação elétrica e energética de todos os componentes do sistema distribuídos ao longo do país. O problema do planejamento da operação de sistemas elétricos é divido em diversas etapas separadas de acordo com o horizonte de estudo, do médio prazo até o despacho horário. Em cada etapa a representação da aleatoriedade das afluências às usinas hidrelétricas e o detalhamento do sistema elétrico é diferente. No planejamento de médio prazo é importante analisar o impacto das secas de longa duração na operação do sistema, a sua probabilidade de ocorrência e a capacidade de regularização plurianual do sistema brasileiro. Nesta fase as usinas hidrelétricas são representadas de forma simplificada através de sistemas equivalentes e existe uma representação detalhada da estocasticidade das afluências através da análise de diversos cenários hidrológicos. Na medida em que o horizonte de estudo diminui, a incerteza sobre as afluências futuras também diminui, porém aumenta a necessidade de uma representação mais detalhada das usinas hidrelétricas, térmicas, recebimentos, pequenas centrais hidrelétricas (PCHs) e rede de transmissão. Este trabalho concentra-se nos modelos de médio prazo que radicionalmente utilizam uma representação por sistemas equivalentes. O objetivo é permitir uma representação híbrida, onde parte do sistema será representado através de reservatórios equivalentes de energia e outra, representada à usinas individualizas o que possibilita um maior detalhamento dos estudos de médio prazo. O acoplamento hidráulico existente entre sistemas equivalentes é revisto e o acoplamento hidráulico de sistemas equivalentes com sistemas à usinas individualizadas originado pela representação híbrida é tratado com detalhe. / [en] The Brazilian electric system presents special characteristics which differs from those in other countries. A huge territory which contains several hydrographical basins with frequently complementary behaviors that demand great energy exchanges around all the geographical areas of the country. This has required the construction of a massive transmission network that is hardly interlinked. For this reason it has been necessary to construct specific models to generate the electric and energy operation for all the system`s components dispersed throughout the country. The operation planning of electrical systems problem is separated into several stages, in accord with the study outline, over a long term until the actual operational programming. At each stage the representational of hydraulic plant inflows and the peculiarities of the electric system are different. In the case of long-term planning it is important to analyze the impact of the long lasting droughts, their probability of occurrence and the multi-year reservoir regulation capacity for the Brazilian system. In this phase, hydroelectric plants are represented in a simplified manner and there are a detailed inflows representation. As the study horizon diminishes, the uncertainty about the future inflows also decreases, therefore increasing the need for a more detailed representation of the hydraulic and thermal plants, small hydraulic plants, interchanges and transmission network. This work concentrates on the long-term models which traditionally employ a representation using equivalen. We create here the possibility of a hybrid representation, where part of the hydraulic plants will be represented by equivalent reservoirs and part will be individually represented by total hydraulic coupling throughout all the systems components.
3

[en] BID-BASED STRATEGIES FOR HYDRO PLANTS IN A MULTI-STAGE AND STOCHASTIC FRAMEWORK / [pt] ESTRATÉGIA DE OFERTA DE AGENTES HIDROELÉTRICOS SOB INCERTEZA E MÚLTIPLOS ESTÁGIOS

BRUNO DA COSTA FLACH 10 June 2005 (has links)
[pt] O objetivo desta dissertação é desenvolver uma metodologia para oferta estratégia de uma empresa geradora em ambiente de mercado com múltiplas usinas hidrelétricas, levando em consideração múltiplos estágios e a incerteza nas afluências, e ilustrar a aplicação da mesma em sistemas realistas. Mostra-se inicialmente que o problema de oferta estratégica pode ser formulado como uma recursão de programação dinâmica estocástica (PDE), onde as variáveis de estado são os níveis de armazenamento dos reservatórios no início de cada estágio e as afluências observadas nos estágios anteriores. Entretanto, a dificuldade computacional dos algoritmos de PDE restringe sua aplicação a sistemas com poucos reservatórios, limitando bastante a aplicação da técnica a sistemas realistas. Assim, a abordagem proposta nesta dissertação é estender a metodologia de programação dinâmica dual estocástica (PDDE), até então aplicada a problemas de minimização de custos, ao problema de otimização da oferta. Isto é feito através de dois passos principais: (i) Uso de uma estratégia de oferta por quantidade somente (análogo a um modelo de Cournot em problemas de equilíbrio econômico) e (ii) a recursão de PDDE, que por ser baseada numa aproximação por hiperplanos requer que o problema seja convexo, o que não ocorre necessariamente no caso da oferta estratégica. A abordagem proposta consiste em aproximar a cada estágio a função de benefício futuro (FBF) por sua envoltória côncava (concave hull). Com isso, a técnica de PDDE pode ser aplicada para resolver o problema de ofertas multi- estágio e estocástico de uma empresa hidroelétrica com múltiplas usinas. Exemplos e estudos de caso serão ilustrados com os sistemas reais da Romênia e El Salvador, ilustrando a aplicabilidade da metodologia proposta em estudos e análises de poder de mercado. / [en] The objective of this work is to present a methodology for the strategic bidding (or bid-based) problem of a hydropower based company, taking into account multiple hydro plants, time-coupling, multiple inflow scenarios and illustrate its application for real case studies. It is initially show that the bid-based dispatch for a hydro plant can be formulated as a stochastic dynamic programming (SDP) recursion scheme, where the state variables are the storage levels and the past inflows. As widely known, the computational effort of the SDP algorithms restricts its applications for systems with just a few reservoirs, which is not the case of the real world systems. Therefore, the approach proposed in this thesis is to extend the stochastic dual dynamic programming (SDDP) scheme, usually applied to cost minimization problems, to the strategic bidding problem. This is done through two main steps: (i) use of a quantity-only bidding scheme (similar to the Cournot model of economic equilibria); (ii) SDDP recursion, which is based on a linear approximation by piecewise linear segments and thus requires that the underlying problem to be convex. This is not necessarily observed in the strategic bidding problem. Thus, the proposed approach consists in approximating, at each stage, the future benefit function (FBF) by its concave hull, which then assures that the SDDP scheme can be applied to solve the multi-stage and stochastic strategic bidding problem of a company with a portfolio of several hydro plants. The proposed approach is illustrated with examples and case studies from real hydro systems from Rumania and El Savador, where market power analysis will be presented.
4

[pt] INCORPORAÇÃO DA INCERTEZA DOS PARÂMETROS DO MODELO ESTOCÁSTICO DE VAZÕES NA POLÍTICA OPERATIVA DO DESPACHO HIDROTÉRMICO / [en] STOCHASTIC HYDROTHERMAL SCHEDULING WITH PARAMETER UNCERTAINTY IN THE STREAMFLOW MODELS

BERNARDO VIEIRA BEZERRA 26 October 2015 (has links)
[pt] O objetivo do planejamento da operação hidrotérmica de médio e longo prazo é definir as metas para geração de cada hidroelétrica e termelétrica, a fim de atender à carga ao menor custo esperado de operação e respeitando as restrições operacionais. Algoritmos de Programação Dinâmica Estocástica (PDE) e de Programação Dinâmica Dual Estocástica (PDDE) têm sido amplamente aplicados para determinar uma política operativa ideal o despacho hidrotérmico. Em ambas as abordagens a estocasticidade das afluências é comumente produzida por modelos periódicos autoregressivos de lag p - PAR(p), cuja estimativa dos parâmetros é baseada nos dados históricos disponíveis. Como os estimadores são funções de fenômenos aleatórios, além da incerteza sobre as vazões, também há incerteza sobre os parâmetros estatísticos, o que não é capturado no modelo PAR (p) padrão. A existência de incerteza nos parâmetros significa que há um risco de que a política da operação hidrotérmica planejada não será a ótima. O objetivo desta tese é apresentar uma metodologia para incorporar a incerteza dos parâmetros do modelo PAR (p) no problema de programação estocástica hidrotérmica. São apresentados estudos de caso ilustrando o impacto da incerteza dos parâmetros nos custos operativos do sistema e como uma política operativa que incorpore esta incerteza pode reduzir este impacto. / [en] The objective of the medium and long-term hydrothermal scheduling problem is to define operational target for each power plant in order to meet the load at the lowest expected cost and respecting the operational constraints. Stochastic Dynamic Programming (SDP) and Stochastic Dual Dynamic Programming (SDDP) algorithms have been widely applied to determine the optimal operating policy for the hydrothermal dispatch. In both approaches, the stochasticity of the inflows is usually produced by periodic auto-regressive models - PAR (p), whose parameters are estimated based on available historical data. As the estimators are a function of random phenomena, besides the inflows uncertainty there is statistical parameter uncertainty, which is not captured in the standard PAR (p) model. The existence of uncertainty in the parameters means that there is a risk that the hydrothermal operating policy will not be optimal. This thesis presents a methodology to incorporate the PAR(p) parameter uncertainty into stochastic hydrothermal scheduling and to assess the resulting impact on the computation of a hydro operations policy. Case studies are presented illustrating the impact of parameter uncertainty in the system operating costs and how an operating policy that incorporates this uncertainty can reduce this impact.
5

[en] A FRAMEWORK FOR ASSESSING THE IMPACTS OF NETWORK FORMULATIONS IN THE OPERATION OF HYDROTHERMAL POWER SYSTEMS / [pt] UM FRAMEWORK PARA AVALIAR OS IMPACTOS DAS FORMULAÇÕES DE REDE NA OPERAÇÃO DE SISTEMAS DE ENERGIA HIDROTÉRMICA

ANDREW DAVID WERNER ROSEMBERG 25 February 2021 (has links)
[pt] Um dos algoritmos mais eficientes para resolver problemas de planejamento de operações hidrotérmicas, que são modelos estocásticos multiestágio de larga escala, é o chamado algoritmo de programação dinâmica dupla estocástica (SDDP). O planejamento da operação dos sistemas de energia visa avaliar o valor dos recursos escassos (por exemplo, água) para alimentar os modelos de despacho de curto prazo usados na implementação real das decisões. Quando o modelo de planejamento se desvia significativamente da realidade da operação implementada, as políticas de decisão são consideradas inconsistentes no tempo. A literatura recente explorou diferentes fontes de inconsistência, como medidas de risco dinâmico inconsistentes no tempo, representação imprecisa do processo de informação e simplificações no modelo de planejamento de rede. Este trabalho aborda a inconsistência no tempo devido a simplificações na representação da rede no modelo de planejamento que estende a literatura existente. O objetivo deste trabalho é propor uma estrutura, composta por uma metodologia e um pacote computacional de código aberto, para testar o impacto operacional e econômico das simplificações da modelagem sobre o fluxo de energia da rede em sistemas de energia hidrotérmica. Entre as inúmeras formulações disponíveis no pacote, nos concentramos em avaliar o custo e o desempenho operacional das seguintes aproximações de modelos: o modelo de rede de transporte (NFA), atualmente em uso pelo operador de sistema brasileiro; o relaxamento de cone de segunda ordem (SOC); o relaxamento de programação semidefinida (SDP); a aproximação do fluxo de energia de corente continua (DC); e o DC com aproximação de fluxo de potência com perda de linha (DCLL). Todas as formulações mencionadas anteriormente são testadas como aproximações para o modelo de rede na fase de planejamento, onde é construída a função de custo futuro. Em seguida, avaliamos cada aproximação simulando a operação do sistema usando um modelo de implementação que minimiza o custo imediato sob as restrições de fluxo de energia AC e a respectiva função de custo futuro. A comparação é feita para dois sistemas, um composto por um ciclo e o outro aproximadamente radial. / [en] One of the most efficient algorithms for solving hydrothermal operation planning problems, which are large-scale multi-stage stochastic models, is the so-called stochastic dual dynamic programming (SDDP) algorithm. Operation planning of power systems aims to assess the value of the scarce resources (e.g. water) to feed short-term dispatch models used in the actual implementation of the decisions. When the planning model significantly deviates from the reality of the implemented operation, decision policies are said to be time-inconsistent. Recent literature has explored different sources of inconsistency such as time-inconsistent dynamic risk measures, inaccurate representation of the information process and simplifications in the network planning model. This work addresses the time-inconsistency due to simplifications in the network representation in the planning model extending the existing literature. The objective of this work is to propose a framework, comprised of a methodology and an open-source computational package, for testing the operative and economic impact of modeling simplifications over the network power-flow in hydrothermal power systems. Among the myriad of formulations available in the package, we focused on assessing the cost and operative performance of the following model approximations: the transportation network-flow model (NFA), currently in use by the Brazilian system operator; the second-order cone relaxation (SOC); the semidefinite programming relaxation (SDP); the DC power-flow approximation (DC); and the DC with line-loss power-flow approximation (DCLL). All the previously mentioned formulations are tested as approximations for the network model in the planning stage, where the cost-to-go function is built. Then, we evaluate each approximation by simulating the system s operation using an implementation model, which minimizes the immediate cost under AC power-flow constraints and the respective cost-to-go function. The comparison is made for two systems, one composed of a cycle and the other approximately radial.

Page generated in 0.5366 seconds