• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 173
  • Tagged with
  • 173
  • 140
  • 111
  • 108
  • 107
  • 98
  • 93
  • 92
  • 92
  • 89
  • 89
  • 62
  • 59
  • 57
  • 45
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

Polyfunkční dům / Multifunctional Building

Černý, Karel January 2015 (has links)
This diploma thesis deals with construction of new mixed-used building in Brno at Terezy Novákové street. The relevant estate lies on building plot number 49, which is purposed as building ground. There are existing buidings at relevant estate which will be removed. When the proposition for the building was being drafted, an extra focus was placed on use of public zone of building. The proposed capacity of building consists of 21 living units with its own internal and external parking places. The mixed-used building has five floors, there are one underground floor and four above-ground floors. There are parking zone and technical background of the building in the undergound floor. The first above-ground floor is used for commercial purposes with its own parking zone. Others above-ground floors are used for living purposses. Living area and public area are separated.
132

Administrativní budova firmy Esko-T v Třebíči - stavebně technologický projekt / The office building of the company Esko-T in Třebíč - construction technology project

Brym, Jan Václav January 2015 (has links)
The subject of this thesis is building and technological project of new office building of the company Esko-T in Trebic. This work technological prescription monolithic frame, inspection and test plans, design mechanical assembly with the deployment of the machines on site, photographs wider transport links nearby buildings, Occupational safety and health, environmental protection, design cell site equipment, contract work, documentation broader transport relations, building equipment, store site cells at the site, the crane card, schedule deployment of machine-schedule construction site, object work schedule, balance and repair workers drawing project documentation, itemized construction budget, energy consumption on site and price compared monolithic and prefabricated skeleton.
133

Poliklinika / Polyclinic

Bohunčák, Marek January 2016 (has links)
The theme of master´s thesis is treated newly built medical facility - polyclinics in Piestany. This work aims to develop project documentation for building construction. The building is partial basement four- storey. The building is designed as a monolithic reinforced concrete frame with infill exterior walls of ceramic blocks Porotherm. The ceiling structure consists of reinforced concrete slabs. The facility is designed flat and pitched roof with single-layer vegetation. In the building surgery for doctors, nurses, dressing room, pharmacy, cafe-bar, administrative part. In the basement there is a technical background as an engine room ventilation, boiler room, storage. Outside, next to the building is a terrace, which is for cafe-bar customers and also there is a playground.
134

Penzion Domažlice / Penzion Domažlice

Petráš, Vladimír January 2016 (has links)
The aim of this diploma thesis is a project of a new building of a penzion with four floors. Penzion is situated in cadastral area Domažlice, in the centre of the town Domažlice. The building of penzion is free standing and it´s partially with a basement. There is one basement floor and three floors in this building. There is a facilities for restaurant, 2 conference halls and facillities for penzion on the first floor of building. The second and third floor are used for the accommodation of guests. There are 14 double rooms and one room for two immobile persons on the second floor. On the third floor, there are 12 double rooms and two double apartment. The basement of the building is used for parking and technical facilities of penzion. Roof of the building is designed two types of roofs. Three floors part of the building is covered by warm flat roof and the one floor part of the building is covered by green roof. Structural system consists of the cast – in – place concrete frame which is reinforced by masonry walls. Building envelope is insulated with contact thermal insulation. Facade of the one – floor part of the building and the back part of the building is designed from facade panels. Documentation of the diploma thesis is prepared for the building contruction. The graphical part of documentation has been processed in the Autodesk Autocad software. Thermal assesment has been processed in Svoboda software.
135

Sportovní centrum Jihlava, stavebně technologická příprava stavby / Sports center Jihlava, civil technological project

Nevole, Jan January 2016 (has links)
The aim of this final thesis is to design selected parts of construction technology project for building used as an sports centrum in Jihlava. The attachments provide a solution of upper structural work, with focusing on floor structure forms and staircase. The thesis contains the technological procedures for constructing both variants of floor structure and staircase, principles according to which is the construction organised, safety and health measures taken on the construction site, design of the mechanical assembly, time plan, plan of inspections and testing, controlling and testing plans for both variants and construction details.
136

Bytový dům / Flat house

Staňová, Monika January 2016 (has links)
The aim of this master´s thesis is a project of a new building of a flat house situated in the cadastral area of Kunstat. The building site is sloping towards south and east. The building is sitting on the suburb of the village and contains three floors above ground level and it partitially includes basement. The purpose of this building is to accommodate foreign pensioners (German, Austrian) as there is demand on the market and in future when the trend changes it will be converted in to normal flat house for young families. The roof is constructed as a flat single skin roof. In the ground floor (basement) there is a surgery, food shop and newsagent, gym, swimming room and utility rooms. A restaurant, kitchen, social room, chapel, utility rooms and employees dressing rooms are situated in the first floor. The flats are accessible only for the flat owners through a door. The following other two storeys includes only flats. For the main wall structural system we have used a shuttered wall system. Documentation has been prepared for this building construction. The graphical part of this documentation has been processed in the AUTOCAD software.
137

Polyfunkční dům v Brně / Mixed-use building in Brno

Koždoň, Jakub January 2017 (has links)
The subject of this diploma thesis is a newly built mixed-use building in Brno. It is a four-storey building without cellar. The building is located on a corner plot in an urban part of Brno - Židenice. In the 1st floor there are three business units. On the other floors are a total of 11 apartments. One apartment is located in the courtyard. It is designed for people with limited mobility. The vertical structures are of the ceramic blocks Porotherm. Ceiling structures and staircases are cast-in-place reinforced concrete. The building is insulated with contact insulation system ETICS. The roof is warm flat. The project was processed by computer software AutoCAD 15.
138

Stavebně technologický projekt polyfunkčního objektu v Brně / Construction technology project of polyfunctional building in Brno

Hrabovský, Tomáš January 2017 (has links)
This thesis deals with construction technology project of polyfunctional building on the Štefánikova street in Brno. Building has five overground floors and basement. In relation to the construction technology project it deals with chronological and financial plan, a suggestion of main construction machinery and mechanisms, materiál resources and transport routes, the project of the construcion zone equipment, technological plan and inspection and test plan for monolithic constructions and schedule of work.
139

Stavebně technologický projekt wellness hotelu Vista v Dolní Moravě / Construction technological project of wellness hotel Vista in Dolní Morava

Hanyášová, Hana January 2017 (has links)
The subject of this thesis is the constructional technology project of Wellness Hotel Vista in Dolní Morava with focusing on selected technological stage. The main stage is the realization of supporting structure of the building – monolithic reinforced concrete skeleton. For this stage is prepared technological regulation, inspection and test plan and drawing of site equipment. In this work is solved timetable and financial plan for individual objects, health and safety at work, mechanical assemblies and project of site equipment. For the main object is processed itemized budget and a detailed timetable. The other part of this work includes the special technology of baffle panels – it means sound absorbers.
140

Polyfunkční dům u meandrů řeky Lučiny / The mixed-use building near meanders of the Lučina river

Bulawová, Šárka January 2017 (has links)
Subject of this final thesis is to develop project documents of a new mixed-use building in Havířov. The building has three floors and basement car park. On the first floor there is a café and shops. On the second and third floor there are office spaces. Structural sytem of building is cast-in-place concrete frame. Exterior building envelope is made of sand-lime bricks with ventilated facade with thermal insulation of mineral wool insulation. The roof of the building is designed as a non-walkable warm flat roof.

Page generated in 0.0479 seconds