• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 173
  • Tagged with
  • 173
  • 140
  • 111
  • 108
  • 107
  • 98
  • 93
  • 92
  • 92
  • 89
  • 89
  • 62
  • 59
  • 57
  • 45
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Wellness penzion / Wellness pension

Pokorný, David January 2022 (has links)
The subject of the diploma thesis is the processing of project documentation for the construction of wellness pension. This building is designed in a medium sloping terrain on the edge part of the Rajhrad city. The building has 3 floors and garage in the basement. Object is divided into 2 parts, the first part consists a restaurant and 2 floors for temporary accommodation in 14 rooms for 45 customers. The second part consists wellness for accommodated and also for other outside customers. The roof is designed single skin with vegetation area (extensive). The project includes a solution of paved areas and access to the underground garage, fencing, water connection, sewage connection, rainwater conection including a retention tank and overflow into the rainwater sewerage. The construction system of the building is based on reinforced concrete footings connected to foundation strips in the places of the cladding, follow up reinforced concrete columns. The ceiling structures, including hidden girders and stairs, are made of monolithic, reinforced concrete. Vertical load-bearing structures are designed from POROTHERM ceramic blocks. The vertical structures of the basement are designed from lost formwork. The building's ventilation system is divided into four parts, the first part is for wellness, the second part is for restaurant and pension, third part is for kitchen, last part is for fire protected escape route.
142

Administrativní budova / Office Building

Tručka, Jiří January 2022 (has links)
This master's thesis deals with project documentation of an office building with commercial premises, cafe, and canteen. The building is located in Žďár nad Sázavou, on plot 2197. The access road is from the north side. The building has 6 floors above ground and 2 underground floors. The building is designed as monolithic reinforced concrete frame with shear core. Basement consists of monolithic reinforced concrete walls. Whole building is based on reinforced concrete slab, which is supported by a system of piles. The external wall is designed from clay blocks. The facade is ventilated.
143

Kontrola provádění železobetonových konstrukcí / Inspection of the implementation of reinforced concrete structures

Juráň, David January 2022 (has links)
This diploma thesis deals with the control of the implementation of reinforced concrete structures. The theoretical part deals with the issues of this theme. There are presented individual work processes of the implementation of reinforced concrete structures, accesses of valid standards, used diagnostic methods and also inspection and test plans for cast-in-place reinforced concrete structure. The practical part is divided into three chapters. The first chapter applies with the most frequent defects in new reinforced concrete structures and two remaining chapters with the inspection of newly built structures for which arose misgivings about the quality of execution.
144

Příprava realizace Vysokoškolských kolejí VUT v Brně / Preparation of realization of University dormitory BUT

Götz, Libor Unknown Date (has links)
The aim of this diploma thesis is to prepare the realization of college dormitories for the Brno University of Technology. A technical docummentation for the construction-technological project, transport routes design, time and financial schedule, budget according to technical – economic indicators, main technological stages implementation study, construction project, main construction machines proposal, time plan, and an item budget of the main construction object is prepared. An integral part of this thesis are the technological regulations, including control and test plans. And at the end the LEED certification and the health and safety plan were prepared.
145

Příprava realizace výrobní haly Tescan / Preparation of realization of production hall Tescan

Hlávka, Jan Unknown Date (has links)
The topic of this diploma thesis is the preparation of the realization of the production hall of the company Tescan. The thesis contains a technical report on the construction technology project, the coordination situation, the time and financial plan of the construction. Furthermore, the project addresses the design of construction site equipment and machinery for each stage, the schedule of the main building, the plan of its supply of materials for the rough construction and technological regulations for the substructure of the building, to which the inspection and test plan applies. The next assignment deals with the budget of the main building, health and safety plan and the issue of formwork needed for implementation. The specialization in the area deals with the design and assessment of industrial floors and solutions for securing a construction pit.
146

Mateřská škola Kuřim - stavebně technologický projekt / Kindergarten Kuřim - construction technology project

Kurka, Jan Unknown Date (has links)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
147

Wellness Hotel / Wellness Hotel

Kašpárová, Darina Unknown Date (has links)
The subject of the diploma thesis is to elaborate the project documentation of a newbuilt wellness hotel located in the village of Lipno nad Vltavou. The building is designed as a non-basement one with three floors. It is visually divided into several parts. On the first floor there are two operational parts – a wellness and a restaurant. On the second and third floor there are small apartments for temporary guests' accommodation. The building foundations are made of concrete and reinforced concrete. The load-bearing structure is made of aerated concrete blocks and sand-lime blocks. The ceiling structures are made of cast-in-place reinforced concrete. The roof of the first floor is designed as a one-layer flat extensive green roof. The roofing of a main reception is designed by a sloping roof and the third floor as three adjoining sloping roofs. These roofs are formed by a system of aerated concrete roof panels and a water-dissipating layer of folded sheet metal. The building is insulated with an external thermal insulation composite system (ETICS). The part of the facade consist of facade cladding strips and part of the render of light color.
148

Obvodní oddělení policie ČR, Brno-Černovice / Police district department of the Czech Republic, Brno-Černovice

Vaníček, Marek Unknown Date (has links)
The subject of the master thesis is design of a new detached office building for public administration of Czech Republic Police as a district department in Brno-Černovice. It is presented as a form part of project documentation for a building construction. The building has a cellar and two above-ground floors. It is founded on a strip foundation and pads. The building is roofed by green roof. There are office rooms, sanitary facilities, archives, interrogation rooms, pre-trial detention cells, garages, storage rooms and dog cages in the above-ground part. In the basement, there are technical facilities and shooting range backround. Structural system of the building is wall longitudinal masonry system from clay blocks. The ceiling structure is from cast-in-place reinforced concrete. The part of the building is with ventilated facade a nd rest is insulated with contact thermal insulation.
149

Dům krátké cesty / 5-Minutes Neighbourhood

Deutschová, Martina January 2016 (has links)
The subject of the diploma thesis is the architectural study of the mix-used urban housing situated closed to the Brno city centre. The design will allow mixing of greater amount of different functions on a relatively small built-up area, which will reduce the requirements on transport and provide the inhabitant with various forms of housing, services and employment. The mass and spatial solution respects the surrounding city blocks on south and the mass increase to the north industrial zone. The mass defines the area and respect noise protection zone on housing development. The shape of object's ground plan is based on the area, which is divided by four axes of pedestrian paths. The basic matter of object is divided into four blocks linked by common internal square. The mass solution provides private, semi-private and public courtyards.
150

Stavebně technologický projekt objektu knihovny / The library building technological project

Brandtner, Michal January 2018 (has links)
The subject of this final thesis is the building technological project of the library on the street of Kravi hora in the Brno. The final thesis includes a technical report, a coordination situation, a situation of the construction with wider relations with transport route links, a time schedule and financial plan of the construction, a site equipment project, a design of the main machines and mechanisms, a time schedule of the main building object, a supply plan and a plan for transport routes, a technological regulation for cast-in-place floor structure, a control and test plan, a health and safety plan at work on a construction site binding for a carcass, an itemized budget for carcass, a comparison of the solutions for realization of the cast-in-place floor structure and the technological regulation for technology of capture of rainwater for further use.

Page generated in 0.077 seconds