Stavebně technologický projekt polyfunkčního domu / Constructive technological project of block of flats in BrnoSzmeková, Michaela January 2015 (has links)
Final thesis deals with the structural and technological project of block of flats in Brno. Deal with division building construction and engineering structures, machineries, project schedule and financial plan. It is further focused on the rough construction of the main building structure, where processing technological study of the construction, project schedule, the project site equipment, budget and other documents that are necessary for the correct realization of construction.
|
292 |
Nemocnice v Pardubicích - příprava a organizace přístavby pavilonu / Hospital in Pardubice - preparation and organization of extension PavilionZáleský, Martin January 2015 (has links)
This thesis discusses the preparation and organization of the extension construction of multi-purpose Pavilion in Pardubice hospital. The thesis contains a summary accompanying technical report, technical regulations for CFA piles and contact insulation system. Those 3 regulations have developed inspection and test plans. Next parts od the work are time schedule and an itemized budget of the pavilion, time and financial plan of the whole building, Occupational safety and health instructions, environmental issues during the construction, design of mechanical set, system of construction site project. There is also noise study made during the implementation of the construction of the pavilion. Finally there is also situation of construction, CFA pilot implementation scheme and contract.
|
293 |
Stavebně technologický projekt bytového domu v Brně / Architectural and technological project of a residential building in BrnoMalaník, Jan January 2015 (has links)
The thesis contains analysis earthworks, foundations, carcass substructure of residential house on the street Kopečná 9 in Brno. The work also includes gradual changes in site equipment, detailed schedule of work for selected works, rough schedule of the whole building, construction budget, site equipment budget and details of construction. Specialization in the work addresses the specific use of roads and traffic signs.
|
294 |
Chráněné bydlení Rajhrad - stavebně technologický projekt / Sheltered housing Rajhrad - construction technology projectKubišová, Jana January 2016 (has links)
The aim of thesis is construction-technology project of sheltered housing in Rajhrad. Parts of the thesis are technical report of site facilities, technological prescription for monolithic ceiling construction, inspection and test plan for monolithic ceiling construction, proposal of mechanical assemblies and transport relations, occupational safety and health, environmental plan, compared of monolithic and prefabricated staircases, the draft contract for work and binding rules for use of the building, financing construction cost, schedule.
|
295 |
Stavebně technologický projekt bytového domu v Boskovicích / Construction technological project of apartment block in BoskoviceProcházková, Šárka January 2016 (has links)
Content of this master‘s thesis is construction technological project of apartment block in Boskovice. The masters’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, further it solves wider relations of transport lines to construction site, budget and time schedule. Detailed procedure of assembly of the load-bearing roof truss and the roof sheathing is provided in specifications. Safety and health protection, control and test plans are elaborated for stage of the building roofing.
|
296 |
Stavebně technologický projekt obchodního centra LETMO v Brně / Construction technological project of the shopping center LETMO in BrnoKořínková, Iveta January 2016 (has links)
The dissertation deals with construction-technlogical project of Letmo commercial centre in Brno.The building is situated in the city centre. The main task of this thesis was to suggest and solve the question of the constructrion site equipment. That is applied in each construction phase – ground works, recontruction of the steel load-carrying arrangement, reconstruction of pipelines, roof and the ventilated facade. The ventilated facade is very specific in case of this building as that is aired out using air-conditioning system. Moreover, the thesis goes in for works timeline of the shopping centre Letmo, budget according to THU, technological code for ventilated fasade and inspecting and testing schedule.
|
297 |
Stavebně technologický projekt zdravotnické záchranné stanice v Brně / Construction Technology Project Medical Rescue station in BrnoŠmeidler, Jakub January 2017 (has links)
The thesis is focused on building and technological project of medical rescue station on the street Kamenice in Brno. The building and technological project includes technology report, study the implementation of major technological stages, coordination situation buildings with wider relationships roadways, object-oriented time and financial plan ,construction project site equipment, design of building machines and mechanisms, the timetable of the main building structure, balance resources, technological note for design of the outer building cladding, inspection and test plan for the exterior cladding of the building, environmental and safety risks, the draft contract for work and itemized budget.
|
298 |
Stavebně technologický projekt wellness hotelu Vista v Dolní Moravě / Construction technological project of wellness hotel Vista in Dolní MoravaHanyášová, Hana January 2017 (has links)
The subject of this thesis is the constructional technology project of Wellness Hotel Vista in Dolní Morava with focusing on selected technological stage. The main stage is the realization of supporting structure of the building – monolithic reinforced concrete skeleton. For this stage is prepared technological regulation, inspection and test plan and drawing of site equipment. In this work is solved timetable and financial plan for individual objects, health and safety at work, mechanical assemblies and project of site equipment. For the main object is processed itemized budget and a detailed timetable. The other part of this work includes the special technology of baffle panels – it means sound absorbers.
|
299 |
Príprava realizácie polyfunkčných domov v Bratislave / Preparation for the implementation of the multifunctional buildings in BratislavaJaníček, Peter January 2022 (has links)
This diploma thesis deals with the preparation of the implementation of multifunctional buildings in Bratislava. These are three detached multi-storey apartment buildings connected by a joint basement. The diploma thesis includes a technical report to the construction technological project, a study of the implementation of main technological phases, solving of broader relations of transport routes with the design of supply routes, a time schedule and a financial plan of the object, a detailed time plan for the rough substructure and rough superstructure, a building site equipment project, a machine assembly design and its assessment, a technological regulation for monolithic structures, a control plan and test plan for monolithic structures, a specification of the time period of the removal of the formwork of monolithic structures, an occupational safety and health plan and selected points of the LEED certification. The thesis also includes a plan for securing resources for the rough structure with added schedules of workers, machines and building materials, a cost estimation budget of selected technological processes, a noise study, and a financial analysis of the expected investment profit.
|
300 |
Řízení stavební zakázky ve stavebním podniku / Construction Order Management in the Construction CompanyAmbros, Daniel Unknown Date (has links)
This diploma thesis is focused on the management of a construction order in a construction company. The aim of the diploma thesis is to describe the process of preparation and implementation of a construction order and the processing of production preparation documentation. The theoretical part of this work describes the basic concepts related to construction and project management. The following practical part already deals with supplier preparation and also safety and health protection at work for the selected order. This contract is the construction of the Regional Office of the Vysočina Region, an administrative building E.
|