• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 197
  • 3
  • Tagged with
  • 201
  • 201
  • 201
  • 90
  • 89
  • 85
  • 72
  • 67
  • 40
  • 37
  • 29
  • 25
  • 25
  • 21
  • 19
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Planejamento e controle da produção na pequena empresa: estudo de caso de fatores intervenientes no desempenho de um empreendimento metalúrgico da cidade de São Carlos-SP / Production planning and control in small business: case study of intervening factors in the performance of a metallurgic company in the city of São Carlos-SP

Andrade, José Henrique de 02 October 2007 (has links)
O objetivo geral desta pesquisa foi identificar fatores relacionados ao planejamento operacional da produção que intervêm no desempenho de uma pequena empresa metalúrgica. Como objetivos específicos, pretendeu-se: identificar a existência de políticas e práticas de planejamento na empresa, bem como procedimentos de sua formalização; descrever as características e as atividades do planejamento operacional da produção e os fatores intervenientes em seu desempenho; identificar as características organizacionais específicas da pequena empresa que influenciam o funcionamento do planejamento operacional da produção. Diversos trabalhos da literatura destacam uma relação positiva entre as atividades de planejamento e o desempenho empresarial no âmbito das empresas de pequeno porte e isto motiva o estudo deste assunto. A pequena empresa, devido a suas características específicas tais como restrição de recursos (humanos, financeiros e materiais) e limitado poder de negociação diante de fornecedores, concorrentes e clientes, demonstra dificuldades na sua gestão, entre elas para planejar, controlar e programar a produção de modo a obter um bom desempenho. Para atingir o objetivo proposto, foi desenvolvido um estudo de caso em uma empresa metalúrgica de pequeno porte da cidade de São Carlos/SP, sendo o pesquisador um dos integrantes do quadro de funcionários da empresa, na função de supervisor de PCP, somado à revisão bibliográfica a cerca do tema. Isso, possibilitou o confronto entre a teoria e a prática e a obtenção de conclusões a respeito do tema estudado. Como principais resultados observou-se que: o planejamento operacional carece de informações e análises para a tomada de decisão; o desempenho de uma empresa é influenciado por diversos fatores, e não é possível isolar planejamento e desempenho desses demais fatores, foi verificado um ganho de desempenho expressivo registrado entre os anos de 2002 a 2006 na empresa, porém este trabalho não pôde afirmar que as mudanças realizadas e os fatores do planejamento operacional da produção, PCP, foram influentes no desempenho da empresa. O motivo que impossibilita esta afirmação é o fato de que outros fatores não analisados neste trabalho revelaram-se como de maior impacto sobre o desempenho, por exemplo, a ação da concorrência e a indisponibilidade de recursos de curto prazo em caixa. / The aim of this research was to identify related factors to the operational production planning that intervene in the performance of a small metallurgic company. As specific purposes, it was intended: to identify the existence of politics and practical planning in the company as well as procedures of its formalizing; to describe the characteristics and activities of the operational production planning and intervenient factors in its performance; to identify specific organizational characteristics of the small business that influence the functioning of the operational production planning. Several researches detach a positive relation between planning activities and enterprise performance in the scope of small businesses, which motivates the study of this subject. The small business, due to its specific characteristics such as restriction of resources (human, financial and material) and its limited negotiation approach over suppliers, competitors and customers, demonstrates difficulties in its management, such as to plan, control and program the production in order to get a good performance. To achieve the established goal, a case study was developed in a small metallurgic company in the city of São Carlos/SP, in which the researcher belongs to the employees board of the company as the supervisor of PPC, added up to a bibliographical review about the subject. This made possible the confrontation between the theory and practice and obtainment of conclusions regarding the subject studied. As main results it was observed that: the operational planning lacks information and analyses for decision making; a company\'s performance is influenced by many factors and it is not possible to separate planning and performance from these factors, a significant gain of performance was verified between the years 2002 and 2006 in the company, however this work could not assert that the carried through changes and the factors of the operational production planning, PPC, were influential in the performance of the company. The reason why this affirmation is disabled is the fact that other factors not analyzed in this study were brought out as the biggest impact in performance, for example, the action of the competitors and the unavailability of resources of short term in the company.
142

UM ESTUDO SOBRE ESTRATÉGIAS DE PCP E SCO E UMA APLICAÇÃO DE UM MODELO PARA O SEQUENCIAMENTO DE PRODUÇÃO.

Assis, Arinéia Nogueira de 27 February 2014 (has links)
Made available in DSpace on 2016-08-10T10:40:21Z (GMT). No. of bitstreams: 1 Arineia Nogueira de Assis.pdf: 693374 bytes, checksum: dad2ec792a9f740945465bdeeb7830db (MD5) Previous issue date: 2014-02-27 / The first objective of this study is to classify the production planning and control (PPC) strategy and the ordering system (OS) of a clothing company, and the second is to propose a theoretical model based on PPC strategies and production sequencing for consequent practical implementation in industries with repetitive production system and multiple products. A study case was conducted, identifying reduction and qualification in inventory, increasing productivity as results. / O primeiro objetivo deste trabalho é classificar a estratégia de planejamento e controle de produção (PCP) e o sistema de coordenação de ordens (SCO) de uma indústria de confecção. E, o segundo, é propor um modelo teórico baseado em estratégias de PCP e sequenciamento de produção, para sua consequente implantação prática em indústrias com sistema de produção repetitivo e com múltiplos produtos. Realizou-se um estudo de caso e apresentou-se os resultados, identificando redução e qualificação de estoque, e aumento da produtividade.
143

A fábrica de skates: um caso didático em planejamento e controle da produção. / The skateboard factory: a teaching case for manufacturing planning and control.

Girotti, Leonel José 26 June 2013 (has links)
As altas exigências que impõe o mercado globalizado, a complexidade dos sistemas produtivos de manufatura atuais e os avanços na Tecnologia da Informação são fatos que resgatam a importância da Programação Detalhada da Produção para as empresas. A pesar de bastante consolidada e difundida, a abordagem clássica MRP / ERP não atende plenamente as necessidades em ambientes de produção intermitente. A Programação Detalhada da Produção com capacidade finita dos recursos, atualmente contemplada nos sistemas APS (Advanced Planning & Scheduling), constitui uma alternativa interessante para melhor cumprir prazos de entrega em ambientes com roteiros de produção complexos e produção make-to-order (MTO). O problema de pesquisa ora estudado contempla o ensino de modelos de Planejamento e Controle da Produção (PCP) em um ambiente de produção intermitente, com foco na Programação Detalhada da Produção e nos sistemas MRP e APS. Propõe-se um plano de ensino que busca apresentar e diferenciar essas abordagens. O plano contempla o uso de um caso didático A Fábrica de Skates. De uma forma lúdica, porém realista, o caso apresenta, nas suas cinco etapas, duas situações hipotéticas de uso de sistemas de programação. O primeiro, um MRP para planejamento da fábrica de skates e, no segundo, um APS utilizado pelo fornecedor de eixos. O plano foi aplicado pela primeira vez em uma turma de graduação do curso de Engenharia de Produção. Nesta dissertação, é apresentada uma descrição detalhada do caso didático, junto ao plano de ensino. A pesquisa verificou, mediante análise das atividades do caso e de um questionário de avaliação, a utilidade dos recursos elaborados, como também que as estratégias aplicadas ajudaram na aprendizagem. Nesta primeira aplicação, constatou-se também que a alta carga de trabalho dos alunos no semestre e o pouco peso dado à nota final do caso didático foram fatores que inibiram melhores resultados. Para futuras aplicações, o caso didático pode ser aprimorado: novas etapas contemplando outros assuntos importantes para a disciplina PCP e análise de alternativas para substituição dos softwares empregados são exemplos de melhorias. / The high standard of competition in global market, the complexity of current manufacturing systems and the advances in Information Technology highlight the importance of the detailed production scheduling. Although classical approaches such as MRP perform this function quite well in different situations, these systems do not perform well in make-to-order (MTO) production systems. The finite capacity scheduling currently embedded within the software called APS (Advanced Planning & Scheduling) is a more interesting approach to achieve better performance in meeting due dates in production environments with complex routings and MTO strategy. Thus, the problem addressed in this study concerns the teaching of Production Planning and Control (PPC) models for intermittent production, with focus on the detailed production scheduling using MRP and APS approaches. In order to that, a teaching plan is proposed to present and differentiate these approaches. It includes the use of an educational case study named \"The Skateboard Factory\". In a playful but realistic way, the case presents, in its five stages, two hypothetical situations of use of scheduling systems. First, an MRP approach for planning in the skateboard factory, and second, one APS approach used by the truck supplier. The teaching plan was first applied to an undergraduate degree Production Engineering program. In this dissertation, a detailed description of the educational case study, along with the teaching plan, is provided. The results achieved in the case study and the students evaluation attest to the usefulness of the resources designed, and also that the strategies applied really improved the learning process. In this first application, it was also observed that high workload and the little weight in the final grade of the case study inhibit better results. In future applications, the case can be enhanced to include new stages on other important issues of the PPC discipline and the replacement of the software used.
144

Uma contribuição para a formalização do processo de gestão da demanda no âmbito do planejamento e controle da produção de empresas MTS (Make-To-Stock) / not available

Santa Eulalia, Luis Antonio de 21 December 2001 (has links)
No atual contexto do planejamento e controle da produção, existe uma necessidade de uma melhor utilização do processo de negócio que norteia o desenvolvimento de todos os seus planos, conhecido como gestão da demanda. Nesse assunto, a existência de literatura adequada e de modelos ou formalismos que visam facilitar a compreensão e utilização do processo em si, é rara, e por muitas vezes, insuficiente. Dessa forma, a gestão da demanda acaba por não ser amplamente conhecida, e, por conseqüência, torna-se sub-utilizada nas organizações. Assim, este trabalho visa colaborar para a solução dessa questão, contribuindo para a geração de um modelo formal que possa ser útil tanto à comunidade acadêmica quanto à empresarial interessada. / In current context of the Manufacturing Planning and Control Systems there is a need for a better use of the business process that address the development of alI its plans, the Demand Management process. The existence of appropriate literature and models or formalisms that aims to help a better understanding and usage of this business process is rare and insufficient. ln that way, the Demand Management process is not being known thoroughly and, for consequence, it is not properly used in some organizations. Thus, this work aims to collaborate for the solution of this problem, contributing to a formal model generation that can be useful for the academic and managerial community interested.
145

Um estudo sobre os relacionamentos entre formas de distribuição da capacidade produtiva e sistemas de programação e controle da produção / A study on the relationship between types of productive capacity distribution and production planning and control systems

Souza, Fernando Bernardi de 20 December 2001 (has links)
A maioria das pesquisas na área de alocação de capacidades entre recursos de uma linha de manufatura propõe as formas balanceadas e em bowl como as mais eficientes para o desempenho de linha como um todo. A maior parte destes estudos é baseada em sistemas simplificados de empurrar a produção, desconsiderando sistemas mais atuais de planejamento e controle da produção (PCP). Por outro lado, estudos referentes à eficiência de sistemas de planejamento e controle da produção não consideram o efeito que critérios distintos de alocação de capacidades podem ter seus desempenhos. Este trabalho tem como objetivo estudar o relacionamento entre as políticas de alocação de capacidades e os sistemas de PCP. O principal critério de desempenho adotado foi o throughput, obtido segundo níveis médios e máximos de estoque em processo em uma linha de produção com cinco recursos. Foram estudados oito tipos de critérios de alocação de capacidades e quatro tipos de sistemas PCP, segundo três níveis de desbalanceamento de cargas, três níveis de coeficiente de variabilidade dos tempos de processamento dos recursos e cinco níveis máximos de estoque em processo. Foi utilizada uma ferramenta de simulação para criar modelos e simular 1386 cenários distintos. Como resultado, percebeu-se uma estreita interdependência entre políticas de alocação e sistemas de PCP. A pesquisa identificou; ainda, que não há um critério de alocação de capacidades nem um sistema de PCP que se mostre melhorem todas as condições testadas, contrariando diversos estudos sobre o tema. / Most of the researches on production capacity allocation among resources, proposes the use of balanced and bowI allocation as the most efficient methods in terms of performance. Such studies were generally based on simplified push production systems, not considering other production pIanning and controI systems (PPC). On the other hand, studies about efficiency of PPC systems don\'t consider the effect of different criteria of capacity allocation on the performance of the PPC systems. The purpose of this research is to investigate how different capacity allocation criteria and different PPC systems interreIate among each other. The major performance criteria used to rank each combination was the resulting throughput, considering several average and maximum levels of work in process (WIP) in a production line with five resources. Eight different types of capacity allocation criteria and four types of PPC systems were studied, with three levels of unbalanced loads, three levels of variability coefficient for processing times and tive maximum WIP levels. A simulation tool was used in order to generate the models and run 1386 different scenarios. As a result, it could be noticed a strong interrelationship between the allocation criteria and the PPC systems. The research also showed, on the contrary of many studies on this subject, that for all the combination tested, none of capacity allocation criteria nor PPC systems stood out on the best option.
146

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
147

Um estudo sobre os relacionamentos entre formas de distribuição da capacidade produtiva e sistemas de programação e controle da produção / A study on the relationship between types of productive capacity distribution and production planning and control systems

Fernando Bernardi de Souza 20 December 2001 (has links)
A maioria das pesquisas na área de alocação de capacidades entre recursos de uma linha de manufatura propõe as formas balanceadas e em bowl como as mais eficientes para o desempenho de linha como um todo. A maior parte destes estudos é baseada em sistemas simplificados de empurrar a produção, desconsiderando sistemas mais atuais de planejamento e controle da produção (PCP). Por outro lado, estudos referentes à eficiência de sistemas de planejamento e controle da produção não consideram o efeito que critérios distintos de alocação de capacidades podem ter seus desempenhos. Este trabalho tem como objetivo estudar o relacionamento entre as políticas de alocação de capacidades e os sistemas de PCP. O principal critério de desempenho adotado foi o throughput, obtido segundo níveis médios e máximos de estoque em processo em uma linha de produção com cinco recursos. Foram estudados oito tipos de critérios de alocação de capacidades e quatro tipos de sistemas PCP, segundo três níveis de desbalanceamento de cargas, três níveis de coeficiente de variabilidade dos tempos de processamento dos recursos e cinco níveis máximos de estoque em processo. Foi utilizada uma ferramenta de simulação para criar modelos e simular 1386 cenários distintos. Como resultado, percebeu-se uma estreita interdependência entre políticas de alocação e sistemas de PCP. A pesquisa identificou; ainda, que não há um critério de alocação de capacidades nem um sistema de PCP que se mostre melhorem todas as condições testadas, contrariando diversos estudos sobre o tema. / Most of the researches on production capacity allocation among resources, proposes the use of balanced and bowI allocation as the most efficient methods in terms of performance. Such studies were generally based on simplified push production systems, not considering other production pIanning and controI systems (PPC). On the other hand, studies about efficiency of PPC systems don\'t consider the effect of different criteria of capacity allocation on the performance of the PPC systems. The purpose of this research is to investigate how different capacity allocation criteria and different PPC systems interreIate among each other. The major performance criteria used to rank each combination was the resulting throughput, considering several average and maximum levels of work in process (WIP) in a production line with five resources. Eight different types of capacity allocation criteria and four types of PPC systems were studied, with three levels of unbalanced loads, three levels of variability coefficient for processing times and tive maximum WIP levels. A simulation tool was used in order to generate the models and run 1386 different scenarios. As a result, it could be noticed a strong interrelationship between the allocation criteria and the PPC systems. The research also showed, on the contrary of many studies on this subject, that for all the combination tested, none of capacity allocation criteria nor PPC systems stood out on the best option.
148

Planejamento e controle da produção na pequena empresa: estudo de caso de fatores intervenientes no desempenho de um empreendimento metalúrgico da cidade de São Carlos-SP / Production planning and control in small business: case study of intervening factors in the performance of a metallurgic company in the city of São Carlos-SP

José Henrique de Andrade 02 October 2007 (has links)
O objetivo geral desta pesquisa foi identificar fatores relacionados ao planejamento operacional da produção que intervêm no desempenho de uma pequena empresa metalúrgica. Como objetivos específicos, pretendeu-se: identificar a existência de políticas e práticas de planejamento na empresa, bem como procedimentos de sua formalização; descrever as características e as atividades do planejamento operacional da produção e os fatores intervenientes em seu desempenho; identificar as características organizacionais específicas da pequena empresa que influenciam o funcionamento do planejamento operacional da produção. Diversos trabalhos da literatura destacam uma relação positiva entre as atividades de planejamento e o desempenho empresarial no âmbito das empresas de pequeno porte e isto motiva o estudo deste assunto. A pequena empresa, devido a suas características específicas tais como restrição de recursos (humanos, financeiros e materiais) e limitado poder de negociação diante de fornecedores, concorrentes e clientes, demonstra dificuldades na sua gestão, entre elas para planejar, controlar e programar a produção de modo a obter um bom desempenho. Para atingir o objetivo proposto, foi desenvolvido um estudo de caso em uma empresa metalúrgica de pequeno porte da cidade de São Carlos/SP, sendo o pesquisador um dos integrantes do quadro de funcionários da empresa, na função de supervisor de PCP, somado à revisão bibliográfica a cerca do tema. Isso, possibilitou o confronto entre a teoria e a prática e a obtenção de conclusões a respeito do tema estudado. Como principais resultados observou-se que: o planejamento operacional carece de informações e análises para a tomada de decisão; o desempenho de uma empresa é influenciado por diversos fatores, e não é possível isolar planejamento e desempenho desses demais fatores, foi verificado um ganho de desempenho expressivo registrado entre os anos de 2002 a 2006 na empresa, porém este trabalho não pôde afirmar que as mudanças realizadas e os fatores do planejamento operacional da produção, PCP, foram influentes no desempenho da empresa. O motivo que impossibilita esta afirmação é o fato de que outros fatores não analisados neste trabalho revelaram-se como de maior impacto sobre o desempenho, por exemplo, a ação da concorrência e a indisponibilidade de recursos de curto prazo em caixa. / The aim of this research was to identify related factors to the operational production planning that intervene in the performance of a small metallurgic company. As specific purposes, it was intended: to identify the existence of politics and practical planning in the company as well as procedures of its formalizing; to describe the characteristics and activities of the operational production planning and intervenient factors in its performance; to identify specific organizational characteristics of the small business that influence the functioning of the operational production planning. Several researches detach a positive relation between planning activities and enterprise performance in the scope of small businesses, which motivates the study of this subject. The small business, due to its specific characteristics such as restriction of resources (human, financial and material) and its limited negotiation approach over suppliers, competitors and customers, demonstrates difficulties in its management, such as to plan, control and program the production in order to get a good performance. To achieve the established goal, a case study was developed in a small metallurgic company in the city of São Carlos/SP, in which the researcher belongs to the employees board of the company as the supervisor of PPC, added up to a bibliographical review about the subject. This made possible the confrontation between the theory and practice and obtainment of conclusions regarding the subject studied. As main results it was observed that: the operational planning lacks information and analyses for decision making; a company\'s performance is influenced by many factors and it is not possible to separate planning and performance from these factors, a significant gain of performance was verified between the years 2002 and 2006 in the company, however this work could not assert that the carried through changes and the factors of the operational production planning, PPC, were influential in the performance of the company. The reason why this affirmation is disabled is the fact that other factors not analyzed in this study were brought out as the biggest impact in performance, for example, the action of the competitors and the unavailability of resources of short term in the company.
149

Contribuições para um método de identificação de perdas por improvisação em canteiros de obras

Sommer, Lucila January 2010 (has links)
Na gestão da produção, existe a necessidade de adotar medidas que contribuam para solucionar os problemas existentes nos canteiros de obras e dar continuidade à execução das atividades. Entretanto, falhas na identificação dos pré-requisitos necessários para a realização das atividades podem dificultar o cumprimento dos planos. Mesmo que o fluxo de trabalho não seja interrompido, a execução de atividades sem condições adequadas pode ter um impacto negativo na eficiência, na qualidade e nas condições de trabalho. Esta situação é apontada na bibliográfica como uma nova categoria de perda, denominada de making-do, a qual está fortemente relacionada à ocorrência de improvisações pelas equipes de trabalho. O estudo das perdas por improvisação pode contribuir para melhor compreensão das falhas que ocorrem durante o processo de planejamento. Embora esta categoria de perda tenha sido discutida sob um enfoque teórico, inexiste na bibliografia trabalhos que tenham investigado a utilização deste conceito no controle da produção. Assim, o objetivo principal deste trabalho é propor um método de identificação de perdas por improvisação que gere informação para orientar a equipe de gestão da produção, particularmente no planejamento de médio prazo, no qual devem ser identificadas e removidas as restrições. Foram realizados dois estudos de caso em empresas que tinham processos de planejamento e controle da produção fortemente baseados no sistema Last Planner®. Em cada estudo, buscou-se identificar a ocorrência, assim como as causas e impactos desta categoria de perdas na gestão da produção. O desenvolvimento deste trabalho seguiu as seguintes etapas: (a) compreensão das barreiras existentes para a realização do planejamento de médio prazo; (b) observação direta de perdas por improvisação em canteiros de obras; (c) análise cruzada dos dados de perdas por improvisação e planejamento e controle da produção; e (d) proposição do método de identificação de perdas por improvisação em canteiros de obra. Os resultados deste trabalho indicaram que a maioria das improvisações é relacionada ao acesso e a mobilidade das equipes durante a execução das atividades, e a deficiências na montagem das instalações de proteção contra acidentes. Ainda, a redução de segurança e a perda de materiais destacamse como os impactos mais importantes destes tipos de perdas. Embora os resultados não sejam representativos para o setor da construção civil, espera-se que este estudo possa contribuir para que sejam identificadas oportunidades de melhorias para os sistemas de planejamento e controle da produção, gestão da segurança e gestão da qualidade, a partir da compreensão das improvisações que podem ocorrer nos canteiros de obras. / In production management, it is necessary to adopt measures that contribute for the solution of existing problems, in order to give continuity in the execution of activities. However, failures in identifying the necessary requirements for carrying out activities may result in the non-completion of plans. Even if the workflow is not interrupted, carrying out activities without adequate conditions may have a negative impact in efficiency, quality, and work conditions. This situation is pointed out in the literature as a new category of waste, named making-do, which is strongly related to the occurrence of improvisations by the workforce. The study of improvisation as a waste can contribute to understand the failures that occur in planning process. Although this category of waste has been discussed at a theoretical level, the application of this concept in production control has not been reported in the literature. The main objective of this research work is to propose a method of identifying improvisation as a waste, which produces information for guiding production management teams, particularly at look-ahead planning level, when constraints should be identified and removed. Two case studies have been carried out in companies that had a production planning and control process strongly based in the Last Planner® system. In each case study, making-do events were identified, as well their main causes and impacts in production management. The development of the research was divided in the following stages: (a) understanding of existing barriers to the look-ahead planning; (b) direct observation of improvisations in construction sites; (c) cross analysis of improvisations and production planning and control data; (d) proposal for a method to identify the improvisation on a construction site. The results indicated that most of the improvisations is related to access or mobility of the workforce during the execution of the activities, and inadequate installation of protections against accidents. Besides, safety and materials waste stands out as the most important impacts of these improvisations. Although the results are not representative of the construction sector, it is expected that this study will contribute for the identification of improvement opportunities for production planning and control, safety management, and quality management systems, based on understanding of improvisations that may happen in construction sites.
150

Compreensão do sistema Last Planner de controle da produção segundo a Perspectiva da Linguagem-Ação

Viana, Daniela Dietz January 2011 (has links)
Desde o surgimento do sistema Last Planner de controle da produção (LPS), no início dos anos 90, vários estudos apontaram a necessidade de compreender a teoria fundamental na qual o sistema é baseado. A Perspectiva da Linguagem‐Ação (LAP) é sugerida na literatura como adequada para compreender o gerenciamento dos compromissos no LPS. Entretanto, os estudos que comparam estas abordagens discutem a relação em um âmbito teórico. Neste sentido, há uma falta de estudos empíricos que tenham investigado as vantagens de compreender um sistema de planejamento segundo a LAP. O objetivo deste trabalho é analisar os benefícios e limitações da utilização da Perspectiva da Linguagem‐ Ação para avaliar sistemas de planejamento e controle da produção, com ênfase nos níveis de médio e curto prazo. Foram realizados dois estudos de caso em empresas diferentes, ambas com um bom nível de maturidade na utilização do LPS, mas que apresentavam diferenças substanciais na forma de realizar o planejamento e controle da produção. Durante a condução dos estudos foram utilizadas entrevistas semiestruturadas com engenheiros, auxiliares e encarregados; observação direta ao canteiro de obras; análise de documentos; e participação nas reuniões de planejamento de médio e curto prazo como fontes de evidência. Em cada um dos casos foi realizado um mapeamento das redes de compromissos relativas ao planejamento, bem como uma análise aprofundada sobre como são realizadas as reuniões, como os compromissos são gerenciados e quem efetivamente participa da tomada de decisão. Em ambos os estudos foi possível rastrear como os compromissos são iniciados. Este rastreamento levou a uma análise sobre a integridade dos ciclos nas redes de compromissos, e as consequências dessas falhas para o sistema de planejamento. Finalizadas as análises individuais foi feita uma análise cruzada dos casos estudados, em que foi possível perceber as diferenças das abordagens de cada empresa na condução do planejamento. As análises dos casos indicaram que existem alguns problemas presentes no sistema de planejamento que são melhor compreendidos através da análise das redes de compromissos. Além disso, as análises das reuniões apontaram algumas limitações no método proposto na literatura para avaliar as discussões entre duas pessoas que levam a execução de uma ação. Desta forma, este estudo elaborou um método que tornou possível analisar os acordos estabelecidos nas reuniões de planejamento, de maneira a contornar as limitações encontradas. / Since the Last Planner™ System (LPS) was devised in the early Nineties, several studies have pointed out the need to understand the underlying theory in which it is based on. The Language‐Action Perspective (LAP) has been suggested as a suitable approach to understand the management of commitments in the LPS. However, there is a lack of empirical studies that have investigated the utility of LAP as a theoretical approach for explaining the LPS. This study aims to investigate the benefits and the limitations of the Language‐Action Perspective for evaluating the effectiveness of planning and control systems, emphasizing medium and short term planning. Two case studies were carried out in different construction companies, both of them highly experienced on the use of LPS. Interviews with the people involved in planning meetings, direct observation of the construction sites, participation in planning meetings, and documents analysis were the main sources of evidence. In each company, the production planning and control system of one project was assessed, based on the mapping of the network of commitments regarding the medium and short term planning levels. Besides, an in‐depth analysis of planning meetings was made, describing how they were carried out, who effectively participated in decision‐making, and how the commitments were managed. In both studies, it was possible to track how the commitments were initiated, and in some cases to analyse the integrity of the workflow loops in the network of commitments, and the consequences of the failures for the planning and control system. A cross‐case analysis was carried out, in order to compare the managerial approaches of the two companies. The results pointed out some problems in the planning and control processes that can be better understood through the mapping of the network of commitments. Moreover, the study indicated some limitations of the method proposed in the literature for analysing people’s speech. For that reason, this study devised a method to perform a detailed analysis of planning meetings, in order to overcome those limitations.

Page generated in 0.1805 seconds