• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 370
  • 6
  • 2
  • 1
  • Tagged with
  • 379
  • 308
  • 232
  • 200
  • 116
  • 113
  • 111
  • 88
  • 87
  • 59
  • 58
  • 54
  • 51
  • 48
  • 46
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Návrh dispozičního řešení cyklostezky v okolí obce Slavonice. / Layout proposal for the cycling trail in the vinicity of Slavonice town.

URBAN, Jiří January 2010 (has links)
The objektive of my thesis was to project the cycling trail in the vicinity of the town Slavonice.The cycling trail was projected around the village Maříž, which is the part of the town.The town Slavonice is located in Southern Bohemia, in region Jindřichův Hradec. At first, they were proposed two alternative. One of which was choise and her partial section was worked in the rang, which is submited for notification of constructions road, according to Decree 104/1997 Sb. Especially I went up from technical standards TP 179 - The Design of the cycle-way. I proposed a direction solution, vertical solution, constructional ordering and traffic signs. I situated in the proposed cycling trail picnick points, completed for notice board and bikes stand. In the framework of low possession relationships I wrote up lands, which can be touched of build-up the cycling trail. I have also done analyse existing cycling trails in surroundings. I refered in my thesis to diference between cycling trail and cyclo route too.
12

Řeka v městské krajině - modelové území Žďár nad Sázavou

Mokrá, Lucie January 2017 (has links)
The theme of diploma thesis is the River in urban space. It is divided into the lite-rary and practical part (results). The literary part of the thesis deals with the systems of systems of ecological stability, urban greenery and green infrastructure in relation to the rivers. The importance of rivers is evidenced by surveys aimed at describing and evaluating ecosystem services that we provide in an urbanized environment. The next themes is about possibilities of financing the riverbank projects. In the practical part of the thesis, the design of the waterfront Sázava river in Žďár nad Sázavou is elaborated in the project documentation for the execution of the construction. For the follow-up maintenance, a greenery plan of vegetation elements is compiled.
13

Vyhodnocení změny projektové metodiky v obchodní organizaci / The evaluation of a project methodology change in a retail organization

Boháčková, Klára January 2010 (has links)
The thesis is focused on analysis and comparison of the company's internal project methodology and official project methodology PRINCE2. This thesis aims to evaluate which of the methodologies is more suitable for management of projects in Ahold. A comparative qualitative analysis is used for the comparison of the project methodologies. The analysis is mainly focused on comparison of project phases, processes and documents. Furthermore concrete project is used to substantiate how each of these project methodologies would influence its realization. Comparing internal methodology and PRINCE2 methodology it was found that the internal project methodology that respects the specifics of Ahold is better for project management than official methodology PRINCE2.
14

Návrh dispozuičního řešení dvoupodlažního obecního úřadu se školkou a místností pro kancelář lékaře. / Proposal of a process layout of a two-floor building as a townhall with a kindergarten and a medical four territory.

ŘÍPOVÁ, Jana January 2011 (has links)
The goal of my thesis was to work out a proposal of a process layout of a two-floor building as a townhall with a kindergarten and a medical four territory. The project documentation corresponded with the project documentation for building license. It was a typified object, it means without particular placement in terrain, which is likely to be repeatedly used in the process of building-up. There were two versions of the process layout suggested in the first phase. One of them was chosen and finished up to its final form, with help of the supervisor of the thesis. The townhall and the medical four territory is to be found in the first ground in the final version. There are two separate kindergartens in the second floor. The project respected law Nr. 183/2006 Sb. about land-use planning and a building act, its notices and valid norms.
15

Projekt jako vyučovací metoda při výuce fyziky / Project as an education method in teaching of physics

VEVERKOVÁ, Klára January 2008 (has links)
This diploma thesis tries to give to the reader basic informations about project method. It´s possible to find here the history of project method, most distinguished personalities of this method, appurtenances of project and the way of processing the project. From this diploma thesis itˇs possible to draw both theoretical description and motivation to involvement teh projects into the education. In the end of the thesis there are additionally exemplifications of two concrete projects.
16

Návrh 5 km dlouhého úseku cyklostezky mezi Folmavou a Horšovským Týnem. / Make a design of 5 km long cycling road between Folmava a Hrošovský Týn

ŠLEISOVÁ, Martina January 2009 (has links)
The aim of this thesis was to project two versions of a five-kilometer-long cycle road between Folmava and Horšovský Týn. These roads have been delimited between the village Dolní Folmava and the holiday resort Babylon. The version 1 has been selected for a detailed elaboration. The cycle road has been projected along the existing field and forest lanes and tertiary roads in order to avoid aimless cutting down of trees and large construction works. In this project, I have mainly drawn on the technical conditions TP 179 {--} Projecting Communications for Cyclists and Other Relative Instructions. In the course and height solutions I have proceeded so as to make the route overlap as much as possible the course of the existing communications. I have left the width layout untouched; however, I have revised the construction layout because of the security and fluidity of cycling. In order to prepare an adecuate coverage, the company LesoPol´s technology with the usage of the blend Glorit has been selected for possessing a wide range of advantages in comparison with current technologies. On the basis of these facts, I have elaborated the project documentation for the declaration of ground communication construction. Picnick and stop points were suggestes along the route as well as traffic signs and possible connections to an existing cycle and foot paths. Moreover, current cycle traffic situation was analysed, including mapping of the targets and resources of the cycle traffic in the region. I have also evaluated the utility of individual technical objects {--} such as culverts and bridges {--} and have pointed out to the need of restoration of some. I have drawn on the national and regional cycling tourism conceptions while elaborating this thesis.
17

Návrh dispozičního řešení třípodlažního jednogeneračního rodinného domku v obci Příkosice, okres Rokycany. / Draft layout of large three-floor single-family house in the village Příkosice, Rokycany district

MICHÁLKOVÁ, Nikola January 2010 (has links)
The aim of this thesis was to draw up a draft layout of large three-floor single-family house in the village Příkosice. In this work, I proposed two alternative solutions of which I worked up one to the desired stage. Architectural and functional solution to the variant of the house correspond to modern requirements for living. This building is located at a specific site in the built-up area of Příkosice. In the work, basic legislative conditions for the design documentation and construction of the building are presented. There is a brief description of the construction materials and the reasons for its use. Drawing part was processed using Microstation.
18

METODIKA PRÁCE BUSINESS ANALYTIKA NA DLOUHODOBĚ TRVAJÍCÍCH PROJEKTECH

Pelc, Jiří January 2008 (has links)
Dlouhodobě trvající projekty patří do kategorie projektů majících zvláštní charakteristiky. Tato diplomová práce obsahuje mimo jiné studii situace příkladu existujícího dlouhodobě trvajícího projektu a poukazuje na důležité okolnosti, které ovlivňují práci role business analyst (byznys analytika). Na základě studia konkrétního případu je prezentován koncept nové metodologie pro roli byznys analytika, jehož cílem je práci této role zpřehlednit a zefektivnit. Byznys analytik jako role je zkoumán z hlediska postupu jeho činností, vztahu k ostatním projektovým rolím a také k zákazníkovi a ostatním rolím zainteresovaným na projektu. Nový návrh metodiky je zaměřen na minimalizaci problémů a rizik identifikovaných v rámci studia případového projektu. Definuje rozsah činností byznys analytika a techniky, jakými jsou tyto činnosti vykonávány. Celá metodika je podpořena specifikací dokumentů relevantních pro práci byznys analytika, což představuje zejména dokumenty pro samotnou správu požadavků, řízení toku nových požadavků, specifikaci řešení pokrývajících požadavky a hodnocení naplnění zákazníkových očekávání. Všechny části práce jsou zpracovány s ohledem na specifika prostředí dlouhodobě trvajících projektů, kde je zvýšená míra fluktuace členů projektového týmu a nemožnost dlouhodobě alokovat zkušené profesionály.
19

Projektová kancelář jako nástroj řízení projektů / Project Management Office as a Project Management tool

Hajduček, Vladimír January 2008 (has links)
The work deals with using Project Management Office when managing project portfolio. Theoretical part characterizes project from a perspective of project life cycle, staffing on project and project risks. Next it describes particular organizational levels of Project Management Office and activities that could be done by Project Management Office. Last but not least it provides overlook of maturity of project management in the Czech Republic. Practical part analysis on example of financial company the processes taking place in corresponding phases of a project. Next the processes of change management, risk management, project deliverables, quality assurance, reporting and budgeting are analyzed. At the end of this work the processes are evaluated and the steps for improvement are formulated.
20

Implementation of Project Management office / Implementace projektové organizace

Malegová, Emília January 2012 (has links)
The goal of my thesis is to describe Project management office, its functions; a structure and its place in an organization as well as assumptions for its right implementation in an orgnanization. A first and a second section of the thesis introduce project management and project management office as such. Basic functions and models are described. A third section deals with each stages of implementatation of the office with a particular focus on main analysis and documents. Trends in implementation of the office, main challenges and variables influencing project management office performance are described in fourth section. The informantion was assembled based on studies carried out in the last 7 years. The last section consists of research, analysis and documentation for the first stage of implementation process designed for a specific organization which is the main outcome of the thesis.

Page generated in 0.0483 seconds