• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • 3
  • 2
  • Tagged with
  • 10
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Vysokorychlostní přepínač dat / High-speed data switch

Toman, Jakub January 2012 (has links)
The master’s thesis is focused on desing high-speed ethernet switch based on circuit FPGA. The switch is able to divide one data stream, created from ethernet frames to the two data streams with half data flow.
2

Functions of <i>Ne</i> and its uses by learners

Onoe, Atsushi January 1997 (has links)
No description available.
3

Development and assessment of CFD models including a supplemental program code for analyzing buoyancy-driven flows through BWR fuel assemblies in SFP complete LOCA scenarios

Artnak, Edward Joseph 31 January 2013 (has links)
This work seeks to illustrate the potential benefits afforded by implementing aspects of fluid dynamics, especially the latest computational fluid dynamics (CFD) modeling approach, through numerical experimentation and the traditional discipline of physical experimentation to improve the calibration of the severe reactor accident analysis code, MELCOR, in one of several spent fuel pool (SFP) complete loss-of-coolant accident (LOCA) scenarios. While the scope of experimental work performed by Sandia National Laboratories (SNL) extends well beyond that which is reasonably addressed by our allotted resources and computational time in accordance with initial project allocations to complete the report, these simulated case trials produced a significant array of supplementary high-fidelity solutions and hydraulic flow-field data in support of SNL research objectives. Results contained herein show FLUENT CFD model representations of a 9x9 BWR fuel assembly in conditions corresponding to a complete loss-of-coolant accident scenario. In addition to the CFD model developments, a MATLAB based control-volume model was constructed to independently assess the 9x9 BWR fuel assembly under similar accident scenarios. The data produced from this work show that FLUENT CFD models are capable of resolving complex flow fields within a BWR fuel assembly in the realm of buoyancy-induced mass flow rates and that characteristic hydraulic parameters from such CFD simulations (or physical experiments) are reasonably employed in corresponding constitutive correlations for developing simplified numerical models of comparable solution accuracy. / text
4

Energieffektivisering av luftbehandlingsaggregat : En kartläggning och energieffektivisering av luftbehandlingsaggregat

Mooshtak, Mohsen, Ekström, Fredrik January 2015 (has links)
Denna rapport kommer att undersöka elanvändningen på ventilationsaggregaten i R-huset på Mälardalens högskola och även undersöka om byte av fläkt och motor i ventilationsaggregat vid eventuellt hög elanvändning är ekonomisk lönsamt. R-husets byggår är 1993 och har de mest uråldriga ventilationsaggregaten av skolans fastigheter. Ett ventilationsaggregats livslängd kan uppskattas mellan 20-30 år. Enligt undersökningar finns det stora möjligheter till energieffektiviseringsåtgärder i sektorn bostäder och service där ventilationsaggregat med föråldrad teknik och komponenter kan vara miljöbovar med hög elanvändning. En avgränsning i arbetet är att ventilationsaggregatet med högst specifik fläkt effekt (SFP) ska undersökas noggrant i form av energieffektivisering. Energieffektiviseringen kommer att begränsas till luftbehandlingsaggregatets fläktar och motorer. Kartläggning genomfördes med tryckmätningar på ventilationsaggregaten i R-huset och även el mätningar. El mätningarna behövdes för att beräkna den aktuella elanvändningen för fläktarna. Resultatet av den beräknade elanvändningen för vardera fläkt visade sig vara hög. Tryck mätningarna utfördes för att få fram tryckuppsättningen för fläktarna i aggregaten och vid beräkning av till- och frånluftsflöde. Tryckuppsättningen och flöde över fläktar behövdes vid val av ny fläkt och motor. Resultatet av kartläggningen visar att det totala SFP-värdet som står för den specifika fläkteffekten är höga i jämförelse vid nyproduktion där boverkets byggregler har krav på SFP-värde under 2,0 kW/(m3,s). Högsta SFP-värdet ligger på 4,4 kW/(m3/s) och en livscykelkostnad (LCC) utfördes för detta ventilationsaggregat. LCC-kalkylen baseras på en kalkylperiod på 10 år då på befintliga fläktar och motorer bedöms ha den livslängden. Kalkylräntan är satt till 9 %, energiprisökningen 5 % och detta ger en real kalkylränta på 4 %. Elpriset är valt till det aktuella på 0,80 kr/kWh. LCC-kalkylen visar att det inte är lönsamt att byta till nya fläktar och motorer. Payback metoden gav 12 års återbetalningstid vilket är länge i jämförelse med studerad litteraturstudie. En känslighetsanalys utfördes med ett fördubblat elpris och då blev det ekonomiskt lönsamt att byta befintliga fläktar och motorer till nya. / This report will examine the electricity consumption of the ventilation units in the R building at Mälardalen University and also investigate whether replacing the fan and motor in the ventilation unit with new combined fan and engine units in the event of high electricity consumption is economic profitable. The building was built in 1993 and has the oldest ventilation units of all properties at the university. A ventilation unit’s life can be estimated to last for 20-30 years. According to studies, there are major opportunities for energy efficiency measures in the residential and service sector, where ventilation systems with outdated technology and components can be energy wasters with high electricity consumption. A limitation of this work is that the ventilation unit with the highest Specific Fan Power (SFP) should be examined carefully in terms of energy efficiency. Energy efficiency will be limited to the air handling fans and motors. Mapping was conducted with pressure measurements in the ventilation units and also electrical measurements were done. Electricity measurements are needed to calculate the current electricity consumption of the fans. The result of the estimated power consumption of each fan was found to be high. Pressure measurements were performed to obtain the pressure of the fans in the units and to calculate supply and exhaust air flow. The pressure rise and flow of the fans are needed in order to select a new fan and motor. The result of the survey shows that the total SFP value is high in comparison with the new construction where Boverkets regulations requirements for SFP value is below 2.0. The highest SFP-value is 4.4 kW / (m3 / s) and a Life Cycle Cost (LCC) calculation was performed for that ventilation unit. The LCC calculation is based on a calculation time period of 10 years, where the existing fans and motors are predicted to last for 10 years. The discount rate is set at 9%, energy with a price increase of 5% and this gives a total discount rate of 4%. Electricity prices are up to date and are 0.80 SEK / kWh. LCC calculation shows that it is not profitable to switch to new fans and motors and as payback method gave a 12-year repayment period. A sensitivity analysis was performed with a redoubled electricity price and it then became economically viable to replace existing fans and motors with new ones.
5

Systemlösningar för ventilation på en förskola : Energi- samt ekonomiutvärdering för CAV- och VAV-ventilation för olika luftbehandlingsaggregat

Rundblad, Mattias, Walid, Nasim January 2017 (has links)
Energieffektiviseringar behövs för att klara klimatmålen. Syftet med detta arbete har därför varit att undersöka ventilationen i förskolebyggnaden Rymden i Eskilstuna kommun. Fokus i arbetet har legat på att göra en analys på energibesparingar där variabelt luftflöde, VAV-system och konstant luftflöde, CAV-system jämförs i tre olika scenarier. Metodiken för att lösa arbetets frågeställningar har varit genom informationsinsamling, beräkningsprogram, intervju samt platsbesök. Informationsinsamling har varit i form av vetenskapliga tidskrifter samt arbeten som behandlar det aktuella problemområdet. Olika programvaror har använts, dessa är MagiCAD, IDA ICE, Sektionsdata 4.21 samt Microsoft Excel. För ökad förståelse för den aktuella byggnaden har platsbesök gjorts på förskolebyggnaden samt en intervju med den projektöransvarige för ventilationen i förskolan. Resultatet visar att den mest energieffektiva systemlösningen är en roterande värmeväxlare med VAV-styrning i kombination med en korsströmsvärmeväxlare för köksavdelningen. VAV-styrning med en sådan systemlösning har en total årlig energianvändning på 20 684 kWh, medan CAV-systemet med samma systemlösning använder 30 900 kWh. Ekonomisk analys visar däremot att CAV-systemet med samma systemlösning är mest lönsam. Den totala livscykelkostnaden, LCC ligger på 2 386 857 kr för CAV-systemet vid en kalkyltid på 30 år, i jämförelse med 2 420 117 kr för VAV-systemet. För att VAV-systemet skall vara lönsam, visar känslighetsanalysen att kalkylräntan måste sjunka från 5 % till 2,56 % eller energiprisutvecklingen öka med 2,44 % årligen eller en sänkning av den årliga underhållskostnaden för VAV-styrning med 2 164 kr. Övrig känslighetsanalys visar att vid nederbörd då personer stannar inomhus är det fördel för VAV-systemet, då skillnaden i total LCC-kostnad sjunker med 1 758 kr. Vid 74 % av personnärvaro minskar LCC-skillnaden mellan systemen från 39 240 kr till 26 371 kr, alltså utgör detta även en fördel för VAV-systemet. Slutsatsen som dras för förskolebyggnaden Framtiden är att större energibesparingar kan göras med ett VAV-system, men ett CAV-system är bättre ur en ekonomisk synpunkt. Känslighetsanalysen visar dock att små förändringar behövs för att VAV-systemet skall bli ekonomiskt lönsamt. Andra faktorer som påverkar valet mellan VAV- och CAV-system är exempelvis en minskning av personnärvaron relativt till det dimensionerade. En sådan minskning utgör en fördel för VAV-systemet. Detta på grund av att med ett CAV-system överventileras byggnaden. Även högre specifik fläkteffekt har en stor betydelse i valet, då mer energiåtgång till fläktarna leder till större energibesparing för VAV-system. En högre temperaturverkningsgrad för luftbehandlingsaggregat medför däremot en fördel för CAV-system. / This thesis work has been done in collaboration with Sweco Systems in Eskilstuna, Sweden. The purpose with this work is to investigate the ventilation in a preschool in Eskilstuna. The focus of the work is to analyze the potential energy savings of using a variable air volume system instead of a constant air volume system. An analysis is also made to investigate the economical profitability of three different scenarios. The method used to solve the problem formulation has been through gathering information, in form of scientific journals in the current problem area. Information has also been gathered through an interview and a site visit. Various software has been used in this thesis work for calculations, such as MagiCAD, IDA ICE, Sektionsdata 4.21 and Microsoft Excel. The result shows that the most energy efficient solution is a rotary heat exchanger with variable air volume control in combination with a cross-flow heat exchanger for the kitchen section. However, the most profitable solution from an economical point of view is the same system, but with constant air volume control. Sensitivity analysis shows that for a profitable variable air volume system, either the interest rate has to be lowered from 5 % to 2,56 %, the energy price needs to increase by 2,44 % yearly. Or maintenance cost for the variable air volume system needs to be lowered by 2 164 kr. The conclusion of this thesis work is that energy savings can be done with a variable air volume system. However from an economical point of view, the constant air volume is better than variable air volume for the investigated preschool. The sensitivity analysis shows that small changes are needed to make a variable air volume system profitable. The choice between the systems are influenced by certain factors. A decrease of the attendance than the dimensioned are an advantage for variable air volume systems. This is due to the fact that a constant air volume system ventilates more than needed. A higher specific fan power number are also of great importance in the choice, as more energy consumption by the fans leads to greater energy savings for variable air volume systems.
6

Energianvändning för driftsatta ventilationsaggregat med värmeåtervinning / Enerygy use of operational air assemblies with heat recovery

Nordbåge, Peter, Engwall, Anton January 2018 (has links)
I dagens samhälle ligger stort fokus på energianvändningen för bostäder och kommersiella fastigheter. Energianvändningen beskriver inte bara en byggnads energibehov, utan också miljö- och ekonomiska aspekter. Flerbostadshus är en del av Sveriges bostad- och servicesektor, som utgör 40 % av Sveriges totala energianvändning (Henning, 2017). Ventilationssystem i flerbostadshus utgör således en betydande del av fastighetens energianvändning och måste därför ständigt effektiviseras för att tjäna ett hållbart samhälle. I nuläget är den verkliga energianvändningen för ett flertal av JM:s driftsatta FTX-aggregat (till- och frånluftssystem med värmeåtervinning) okänd. Detta på grund av att tillgängliga energiberäkningar och deklarationer redovisar byggnadens totala energianvändning uppdelat i fyra huvudkategorier; uppvärmning, komfortkyla, tappvatten och byggnadens fastighetsenergi. Energianvändningen för ventilationssystemet framgår inte specifikt från dessa beräkningar, utan delas in i kategorierna uppvärmning och byggnadens fastighetsenergi. Rapporten undersöker, under perioden mars – juni 2018, energianvändningen för totalt elva stycken FTX-aggregat i två av JM:s projekt i Stockholm, Kista Torn och Nya Kvarnen 2. Undersökningens syfte är att försöka beräkna den verkliga energianvändningen för dessa FTX-aggregat. Energiberäkningar har genomförts med värden hämtade från egna samt tidigare utförda mätningar, som jämförts med projekterade värden. Resultatet indikerar att den genomsnittliga energianvändningen för FTX-aggregaten i Kista Torn är ca 120 000 kWh/år. Den större delen av energianvändningen går åt till att värma tilluften. Undersökningen visar på att den genomsnittliga temperaturverkningsgraden är ca 7 % lägre än den projekterade verkningsgraden. De beräkningar som genomförts visar även att uppvärmningskostnaden har ökat med ca 150 000 kr/år, i jämförelse med de projekterade värdena. Det beror till stor del på den minskade temperaturverkningsgraden, men också på grund av förändrade luftflöden i aggregaten. Undersökningen i Nya Kvarnen 2 har inte kunnat göras lika omfattande. Beräkningarna som genomförts här tyder på att energianvändningen uppgår till ca 61 000 kWh/år och aggregat. Tillförlitligheten av beräkningarna störs dock av att inga egna mätningar kunde utföras, att dokumentationen var bristfällig, samt att övervakningssystemet SCADA redovisade orimliga värden. Slutsatsen för rapporten indikerar att den verkliga energianvändningen för FTX-aggregaten generellt är högre än vad som tidigare projekterats. Energianvändningen varierar markant beroende på luftflöden och temperaturverkningsgrad. Störst påverkan på energianvändningen har dock temperaturverkningsgraden. Det visade sig att temperaturverkningsgraden vara svår att bestämma, då många felkällor och faktorer påverkar framtagningen, samt att resultatet varierar beroende på vald mätmetod. För bättre kontroll på energianvändning rekommenderas fler och mer kontinuerligt genomförda mätningar. Alternativt skulle övervakningsprogrammet SCADA kunna användas i större utsträckning för beräkning av energianvändning, förutsatt att precisionen och placering av temperaturgivare förbättras. / In today's society the energy use within residential and commercial real estate is of great importance. Energy use does not only describe a building's energy needs, but also its environmental and economic aspects. Apartment buildings are a part the Swedish residential and service sector, which constitutes 40 % of Sweden's total energy use (Henning, 2017). The ventilation system in apartment buildings makes up a significant part of the property's energy use, it must therefore continuously be improved to work towards a more sustainable society. The actual energy use for several of JM's powered air assemblies is unknown today. Energy calculations and declarations show that the building's total energy use is divided into four main categories; heating, comfort cooling, tap water and property energy. The energy use of the ventilation system is not made apparent in these aforementioned calculations since it is distrubuted into two of the main categories, heating and property energy. The report examines the energy use for a total of eleven air assemblies within two of JM's projects in Stockholm, Kista Torn and Nya Kvarnen 2. The purpose of the study is to find the actual energy use of these air assemblies. Energy calculations will be carried out using values ​​taken from our own and previously performed measurements, which will be compared to expected projected data. The result indicate that the average energy use of the air assemblies in Kista Tower is approximately 120 000 kWh/year. The majority of the energy use goes to heating the supply air. The study shows that the average heat recovery efficiency is circa 7 % lower than the projected efficiency. The calculations show that the cost of heating has increased by approximately 150 000 SEK/year compared to projected data. This is largely due to the reduced heat recovery efficiency but partly due to changes in the airflow within the air assemblies. The study made in Nya Kvarnen 2 was not as extensive, although calculations of energy use have been carried out. These calculations show an energy use of approximately 61 000 kWh/year for each separate air assembly. The reliability of these numbers is considered low because no control measurements could be made. The documentation was inadequate along with the monitoring system, SCADA, which reported unrealistic values. The conclusion of the report shows that the actual energy use of the air assemblies is in general higher than expected. The energy use varies depending on the airflow and heat recovery efficiency, however the greatest impact comes from the heat recovery efficiency in the air assemblies. Heat recovery efficiency was proven difficult to determine because of the multiple sources and factors affecting the measurement. This made the results fluctuate greatly depending on the method chosen of calculating the heat recovery efficiency. To oversee the actual energy use in these air assemblies, more frequent measurements are recommended. Alternatively, the SCADA monitoring program could be used to calculate the energy use, but to do so the accuracy and placement of temperature sensors needs to be improved.
7

FSO vysílač/přijímač pro měření kvality spoje / FSO transceiver for link quality estimation

Novák, Marek January 2016 (has links)
Tato diplomová práce pojednává o zmírnění bitové chybovosti bezkabelového optického spoje s užitím principu reciprocity aplikovaného na komunikační kanál, spolu s možností kódování přenášených dat. V této práci je implementováno LDPC a Reed-Solomonovo kódování pro jejich vyhovující vlastnosti. Zbytková rámcová chybovost je vypočtena a k dispozici jako výstup systému, který je implementovaný v hradlovém poli (FPGA).
8

Boundary-Condition-Independent Reduced-Order Modeling for Thermal Analysis of Complex Electronics Packages

Raghupathy, Arun Prakash 14 July 2009 (has links)
No description available.
9

Do repeated judgments of learning lead to improved memory?

Larsson Sundqvist, Max January 2011 (has links)
Judgments of Learning (JOL) that are made after a delay, instead of immediately after study, are more accurate in terms of predicting later recall (the delayed JOL effect). The Self-Fulfilling Prophecy (SFP) theory explains the delayed JOL effect as the result of a testing effect. In the current study we tested the prediction that performing delayed JOLs leads to a memory improvement. During learning, 79 participants studied Swahili-Swedish word pairs, immediately followed by a cued recall test, and then made either one single or three repeated, spaced JOLs. A final cued recall test was given after either 5 minutes or 1 week. Making repeated JOLs did not increase memory performance compared to the single JOL condition, hence lending no support to the SFP theory. However, making repeated JOLs did improve their relative accuracy, which suggests that the delayed JOL effect mainly concerns memory monitoring and not performance.
10

Media konvertory a optické switche / Media Converters and Optical Switches

Branč, Martin January 2011 (has links)
This Master´s thesis provides an overview of wired networks, its parameters, used standards and the deployment possibilities. Moreover, it includes the overall overview about optical networks, its parameters, maximum bandwidth, reachable distances as well as the advantages and disadvantages in comparition with wired networks. The project describes network elements which are used in the optical access network such as media convertors, optical switches etc. The practical part includes results of testing of the network devices in various scenarios. To get a comparable result, the real throughput, the power of each device and compatibility of devices from different producers were measured. At the end I have suggested few scenarios with the usage of optical switches and media convertors for extension of the current optical network. The calculation of costs for building and operation of the network is also included.

Page generated in 0.0492 seconds