• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 120
  • 29
  • Tagged with
  • 149
  • 48
  • 47
  • 26
  • 26
  • 21
  • 20
  • 16
  • 16
  • 16
  • 14
  • 14
  • 14
  • 13
  • 12
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Klimatets påverkan på dammar : -En litteraturstudie

Savilahti, Frida, Schmidt, Josefina January 2024 (has links)
Greenhouse gas emissions from society have already had a major impact on the climate and will continue to have an impact in the future. These changes will affect the safety of dams and require adaptation measures in the future.This report focuses on investigating the impact of climate change on dams in Sweden, what would happen if a dam were to fail and how to work preventively to prevent this. Sweco is Sweden's largest engineering and architectural company and in the report we will discuss how Sweco works with dam safety.The report also addresses questions about how Sweco works to secure dams, what happens if a dam should fail and how it would affect the residents in the neighborhood.We have chosen to focus on hydropower dams in Sweden and limit ourselves to how Sweco as a company works to secure the dams. The method includes interviews with managers at Sweco and literature studies / Utsläppen av växthusgaser från samhället har redan haft stor inverkan på klimatet och kommer ha fortsatt påverkan framöver. Dessa förändringar kommer att påverka säkerheten hos dammar och kräver anpassningsåtgärder framöver.Denna rapport fokuserar på att utreda hur klimatförändringarna påverkar dammarna i Sverige samt vad som skulle ske om en damm brister och hur man arbetar i förebyggande syfte att förhindra detta. Sweco är Sveriges största teknik- och arkitektföretag och vi kommer i rapporten att behandla hur dem arbetar kring dammsäkerheten.Rapporten behandlar även frågeställningar kring att utreda hur Sweco arbetar för att säkra dammar, vad som sker om en damm skulle brista och på vilket sätt det skulle påverka invånarna i närområdet.Vi har valt att lägga vårt fokus på vattenkraftsdammar i Sverige och avgränsar oss till hur företaget arbetar med att säkra dammarna. Metoden inkluderar intervjuer med ansvariga på Sweco samt litteraturstudier.
32

Norgemodellen : En fallstudie av vattenkraftens hållbarhet på lokal nivå i Storfjord kommun

Valdemarsson, Joel, Jonsson, Lisa January 2019 (has links)
Denna kvalitativa studie undersöker den så kallade Norgemodellen i en norsk vattenkraftskommun, Storfjord, för att diskutera vattenkraftens lokala påverkan och förstå mer om inställningen till och konflikter kring vattenkraft. Teori kring konflikter inom hållbar utveckling diskuteras och analyseras med empirin erhållen från fem intervjuer med totalt sju personer. Studien visar att vattenkraften har haft stor betydelse för Storfjord kommun ekonomiskt och socialt genom en utökad infrastruktur, ekonomiska möjligheter och nya arbetstillfällen. Men det finns även de som ser vattenkraften som något negativt då den ekonomiska kompensationen inte är tillräcklig för miljöeffekterna samt att det inte kan kompenseras. Något som framgår är att den ekonomiska aspekten av hållbarhet har en avgörande betydelse för inställningen kring vattenkraft och att detta är viktigt för en känsla av social rättvisa. Studien visar också att relationen till naturen skiljer sig hos olika individer och att det påverkar synen på hur den ska användas som resurs. Det framkommer att det är svårt att uppnå fullständig hållbarhet då det alltid finns olika intressen och prioriteringar.
33

Analys av tryckmätningar i Kaplanturbiner / Analysis of pressure measurements in Kaplan turbines

Särnblad, Andreas January 2019 (has links)
In a risk situation the flow through a hydropower turbine must be reduced under a short amount of time. The reduction in flow causes low pressures in the region called draft tube under the runner in the turbine. If the pressure drops below vapor pressure the water in the turbine may evaporate and form large cavities. The phenomenon called water column separation describes the situation when these cavities of vapor forms and eventually collapses which may damage the unit and canbe a danger to personnel at site. Different types of flow reducing maneuvers are tested before commissioning turbines in order to detect dangerously low pressures but these measurements can be difficult to interpret. The measured draft tube pressure can be filtered numerous ways and in addition other measured or calculated parameters must be studied to fully understand the consequence of a measured emergency stop. In this paper the different ways of filtering and interpreting the measurements from stops in Kaplan turbines were analyzed. The results show that the choice of filtering method can significantly impact the interpretation of a stop and that the filter parameters often used do not result in equivalent results. The standard way to filter draft tube pressure with moving average filters is shown to result in much higher draft tube pressures than low-pass filters and the filter parameter used needs to be further investigated to correctly isolate pressures caused by water column separation. The main difference between different companies when it comes to these measurements are the used cutoff frequency when using low-pass filters and the sampling frequency of measurements.
34

Upprustning och modernisering av kraftstation vid Årbols såg och kvarn

Axelsson, Per, Hedlund, Christoffer January 2003 (has links)
No description available.
35

Produktionsplanering och vattenvärden : En studie av produktionsplanering för regleringsbar vattenkraft vid Skellefteå Kraft AB / Production scheduling and water values : A study of hydropower production scheduling at Skellefteå Kraft AB

Olofsson, Peter January 2010 (has links)
<p>Syftet med detta examensarbete var att på uppdrag av Skellefteå Kraft AB studera produktionsplanering för regleringsbar vattenkraft och avgöra hur vatten i ett magasin kan värderas. Vidare skulle även en applikation skapas för att kunna beräkna dessa vattenvärden.</p><p> </p><p>Produktionsplanering för vattenkraft visade sig oftast delas upp i tre nivåer, i en lång-, säsong- och korttidsplaneringsdel, där detaljrikedomen i modellbeskrivningarna ökar med minskande tidshorisont. Anledningen till uppdelningen är en följd av att både noggrannhet och långsiktighet önskas, tanken är därmed att låta den högre nivån ge den lägre en långsiktighet den annars saknat. Möjliga kopplingar mellan nivåerna diskuterades, där en priskoppling genom vattenvärden argumenterades för att vara den bästa.</p><p> </p><p>Därefter studerades metoder för vattenvärdeberäkningar och matematiska villkor för optimal produktion, varvid ett eget program i Matlab kunde skrivas. Programmet beräknar vattenvärden vid en enmagasinmodell utifrån tillrinnings- och prisprognoser, där prognoserna tillåts att delas upp i ett valfritt antal scenarion.</p><p> </p><p>Testkörningar av programmet visar att vattenvärdena går ned inför en prognostiserad vårflod, för att på så vis skapa plats åt det inkommande vattnet. Det visas även att vattenvärdenas ISO-kurvor, som markerar var i tid och magasinsnivå ett visst vattenvärde gäller, blir flackare vid större magasin och djupare vid mindre inför den kommande vårfloden. Men även att ISO-kurvorna påverkas av produktionskapaciteten.</p><p> </p><p>Vidare visar testkörningarna att vattenvärdena är starkt kopplade till både tillrinningarnas- och prisprognosernas form och nivå, eftersom att spill vill undvikas samtidigt som produktionen önskas styras till perioder av höga priser.</p><p> </p><p>Innan vattenvärdena från programmet används i praktiken bör ytterligare testkörningar göras för att jämföra ekonomiskt utfall i förhållande till nuvarande arbetssätt. Därför är detta också ett förslag på vidare arbete, tillsammans med en eventuell utvidgning av programmet till en flermagasinsmodell.</p> / <p>The purpose of this master's thesis was to study hydropower production scheduling on behalf of Skellefteå Kraft AB and to determine how water in a reservoir could be priced. Furthermore an application for calculating these water values was to be made.</p><p> </p><p>Hydropower production scheduling was found most often divided into three levels, into a long-, medium- and short-term scheduling part, where the degree of detail increases with decreasing time horizon. The reason for this breakdown into levels are that a high detail in the model descriptions is desired, while still maintaining a good long-term planning. The idea is thus to let the higher level give the lower one an insight for future events it would otherwise lack. Possible couplings between the levels was discussed, where a coupling through price and water values was argued to be the best.</p><p> </p><p>Subsequently methods for water value calculations and mathematical conditions for optimal production was studied, in which an own program in Matlab could be written. The program calculates water values at a single reservoir model by the help of forecasts of future inflow and price, where the forecasts are allowed to be divided into any number of scenarios.</p><p> </p><p>Test runs of the program shows that water levels are reduced before the spring flood, thus to make room for the incoming water. It is also shown that the ISO-curves for the water values, which indicates where in time and reservoir level a certain water value is located, becomes flatter at larger reservoirs and steeper at smaller reservoirs before the incoming spring flood. But also that the ISO-curves are affected by the production capacity.</p><p> </p><p>The test runs further shows that the water values are strongly linked to both the shape and level of the inflow and price forecasts, since it is desired to avoid spill while directing the production to periods of high prices.</p><p> </p><p>Additional runs to compare the economic outcomes relative to current practice should be made before using the water values of the program in practice. Therefore this is also a proposal for further work, along with a possible extension of the program into a multi-reservoir model.</p>
36

Vibrationsövervakning av Fortums maskinparker / Vibration Monitoring of Fortum’s Hydroelectric Power Plants

Storm, Henrik, Lundell, Simon January 2012 (has links)
Vibrationsmätning är inget nytt fenomen men många företag anser sig ändå skeptiskatill den abstrakta metoden. Samma skepticism finns inte vid ett läkarbesök där doktornlyssnar efter oljud med sitt stetoskop, ändå är likheterna slående. Med dagens teknikär det möjligt att diagnostisera en maskins olika beståndsdelar efter skador genom attanalysera det unika vibrationsmönster de bidrar med. Detta arbete syftar att minska denna barriär med hjälp av en introduktion till de olikabegrepp och val som finns inom vibrationsteknisk analys som hjälpmedel för underhåll.Slutligen presenteras en implementeringsmall där ekonomi och tillgänglighet anses varamest vitala inför framtida beslut. / Even though vibration measurement is not a new phenomenon, many businesses stillremain sceptical towards the somewhat abstract method. Same scepticism does not existwhen you visit the doctor and he uses his stethoscope to listen after abnormalities inthe sound pattern, even though the similarities are striking. With todays technology it ispossible to diagnose a machine’s different parts in search for damages by analysing theunique vibrationpatterns they provide. This study aims to close this gap with the help off an introduction to the different termsand choices that exist in vibration analysis as a tool in preventive maintenance and finallyto present guidelines for implementation where economy and availability is consideredmost pivotal for future decisions.
37

Upprustning och modernisering av kraftstation vid Årbols såg och kvarn

Axelsson, Per, Hedlund, Christoffer January 2003 (has links)
No description available.
38

Simulations of Rotating Brushless AC Excitation System with Controlled Thyristor Bridge Rectifier for Hydropower Generators

Butros, Peter January 2011 (has links)
This thesis aims to simulate and find out more about the electrical dynamics of a six-phase exciter for hydropower generators. Because ordinary electric circuit-based simulation software only simulate three-phase electrical systems, a FEM-based software is used for the electrical dynamics simulations of the six-phase system. The objective is to analyse the pulsation behaviour of the rectified electrical output on the six-phase system and compare it to the three-phase system. The three-phase system is also simulated with filters with the aim of decreasing the amplitude of the pulsations on the electrical output. It is expected that an upgraded system from a three-phase system to a six-phase system should double the pulsation frequency on the rectified electrical output. However, the result shows that the rectified electrical output of the six-phase system consists of pulsations with unexpected frequencies. The simulated RL-filter on the three-phase system shows only insignificantly small changes on the rectified electrical pulsation amplitude.
39

Simulations of Rotating Brushless AC Excitation System with Controlled Thyristor Bridge Rectifier for Hydropower Generators

Butros, Peter January 2011 (has links)
This thesis aims to simulate and find out more about the electrical dynamics of asix-phase exciter for hydropower generators. Because ordinary electric circuit-basedsimulation software only simulate three-phase electrical systems, a FEM-basedsoftware is used for the electrical dynamics simulations of the six-phase system. Theobjective is to analyse the pulsation behaviour of the rectified electrical output on thesix-phase system and compare it to the three-phase system. The three-phase systemis also simulated with filters with the aim of decreasing the amplitude of the pulsationson the electrical output.It is expected that an upgraded system from a three-phase system to a six-phasesystem should double the pulsation frequency on the rectified electrical output.However, the result shows that the rectified electrical output of the six-phase systemconsists of pulsations with unexpected frequencies. The simulated RL-filter on thethree-phase system shows only insignificantly small changes on the rectified electricalpulsation amplitude.
40

Produktionsplanering och vattenvärden : En studie av produktionsplanering för regleringsbar vattenkraft vid Skellefteå Kraft AB / Production scheduling and water values : A study of hydropower production scheduling at Skellefteå Kraft AB

Olofsson, Peter January 2010 (has links)
Syftet med detta examensarbete var att på uppdrag av Skellefteå Kraft AB studera produktionsplanering för regleringsbar vattenkraft och avgöra hur vatten i ett magasin kan värderas. Vidare skulle även en applikation skapas för att kunna beräkna dessa vattenvärden.   Produktionsplanering för vattenkraft visade sig oftast delas upp i tre nivåer, i en lång-, säsong- och korttidsplaneringsdel, där detaljrikedomen i modellbeskrivningarna ökar med minskande tidshorisont. Anledningen till uppdelningen är en följd av att både noggrannhet och långsiktighet önskas, tanken är därmed att låta den högre nivån ge den lägre en långsiktighet den annars saknat. Möjliga kopplingar mellan nivåerna diskuterades, där en priskoppling genom vattenvärden argumenterades för att vara den bästa.   Därefter studerades metoder för vattenvärdeberäkningar och matematiska villkor för optimal produktion, varvid ett eget program i Matlab kunde skrivas. Programmet beräknar vattenvärden vid en enmagasinmodell utifrån tillrinnings- och prisprognoser, där prognoserna tillåts att delas upp i ett valfritt antal scenarion.   Testkörningar av programmet visar att vattenvärdena går ned inför en prognostiserad vårflod, för att på så vis skapa plats åt det inkommande vattnet. Det visas även att vattenvärdenas ISO-kurvor, som markerar var i tid och magasinsnivå ett visst vattenvärde gäller, blir flackare vid större magasin och djupare vid mindre inför den kommande vårfloden. Men även att ISO-kurvorna påverkas av produktionskapaciteten.   Vidare visar testkörningarna att vattenvärdena är starkt kopplade till både tillrinningarnas- och prisprognosernas form och nivå, eftersom att spill vill undvikas samtidigt som produktionen önskas styras till perioder av höga priser.   Innan vattenvärdena från programmet används i praktiken bör ytterligare testkörningar göras för att jämföra ekonomiskt utfall i förhållande till nuvarande arbetssätt. Därför är detta också ett förslag på vidare arbete, tillsammans med en eventuell utvidgning av programmet till en flermagasinsmodell. / The purpose of this master's thesis was to study hydropower production scheduling on behalf of Skellefteå Kraft AB and to determine how water in a reservoir could be priced. Furthermore an application for calculating these water values was to be made.   Hydropower production scheduling was found most often divided into three levels, into a long-, medium- and short-term scheduling part, where the degree of detail increases with decreasing time horizon. The reason for this breakdown into levels are that a high detail in the model descriptions is desired, while still maintaining a good long-term planning. The idea is thus to let the higher level give the lower one an insight for future events it would otherwise lack. Possible couplings between the levels was discussed, where a coupling through price and water values was argued to be the best.   Subsequently methods for water value calculations and mathematical conditions for optimal production was studied, in which an own program in Matlab could be written. The program calculates water values at a single reservoir model by the help of forecasts of future inflow and price, where the forecasts are allowed to be divided into any number of scenarios.   Test runs of the program shows that water levels are reduced before the spring flood, thus to make room for the incoming water. It is also shown that the ISO-curves for the water values, which indicates where in time and reservoir level a certain water value is located, becomes flatter at larger reservoirs and steeper at smaller reservoirs before the incoming spring flood. But also that the ISO-curves are affected by the production capacity.   The test runs further shows that the water values are strongly linked to both the shape and level of the inflow and price forecasts, since it is desired to avoid spill while directing the production to periods of high prices.   Additional runs to compare the economic outcomes relative to current practice should be made before using the water values of the program in practice. Therefore this is also a proposal for further work, along with a possible extension of the program into a multi-reservoir model.

Page generated in 0.0694 seconds