Planning of material handling in limited spaces has become more relevant in the construction industry and since material cannot always be delivered at the right time in the right place, a delay in the flow chain is created. Each construction site has unique conditions and thus different solutions.In this thesis, four workplaces at Peab have been visited and inspected. The purpose of the thesis was to explore the problems that arise with the logistics in a limited space and find solutions that can be implemented on future construction projects.The aim of the study was to find the common factors that exist for the workplaces within a small area and find ways of working that can change the planning and execution of logistics.Surveys to professional workers and interviews with site managers and supervisors contributed with information to the report.After compiling the thesis work, the result shows that there are opportunities to change the working method of the work management to increase efficiency and productivity.In the study, it appears that there is a lack of communication in the workplaces as a large number of workers do not know when the next delivery of material takes place. In addition, the professional workers admit that they did not have a great influence over the business. Recommended solutions that were developed in the study were experience feedback and further development of the APD plan.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-260421 |
Date | January 2019 |
Creators | Chyad, Yousif, Ali, Khadija |
Publisher | KTH, Byggteknik och design |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | TRITA-ABE-MBT ; 19234 |
Page generated in 0.0024 seconds