• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 38
  • 3
  • 2
  • Tagged with
  • 43
  • 43
  • 38
  • 37
  • 34
  • 34
  • 33
  • 27
  • 26
  • 26
  • 25
  • 24
  • 22
  • 22
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Využití projektového managementu při výstavbě výrobní haly / Use of Project Management in the Construction of Production Hall

Skokanová, Martina January 2011 (has links)
This master’s thesis is focused on the use of project management in the construction of production hall. The theoretical part deals with methodics of project management that was applied for the project pre-study to be drawn up. The output of this paper is a set of concepts for the individual parts of the project plan describing the process and managing activities involved in the project.
2

Utveckling av samarbetet mellan beställare, huvudentreprenör och underentreprenör / Development of the collaboration between the client, the contractor and the subcontractor

Österman, Stefanie, Alsawadi, Nour January 2015 (has links)
I byggbranschen arbetar man ofta i projekt där ett flertal olika parter samarbetar. Det är viktigt att samarbetet fungerar väl för att uppnå ett sådant positivt resultat som möjligt. Syftet med detta examensarbete är att studera hur samarbetet fungerar, kan förbättras och utvecklas mellan beställare, huvudentreprenör och underentreprenör på ett byggföretag. För att kunna utveckla det gemensamma arbetet är det viktigt att undersöka de vanligaste problemen och bristerna som kan uppstå. Genomförandet har skett genom intervjuer med utvalda parter i de projekten som studerats för att få en så klar och rättvis bild som möjligt av hur det fungerar, samt var styrkorna och svagheterna ligger. Tre projekt med stor variation har studerats i detta arbete för att kunna lokalisera och verifiera de vanligast förekommande problemen då man arbetar tillsammans. Några av de viktigaste aspekterna för ett positivt samarbete är att ha en god kommunikation, en genomtänkt planering inför projektstarten och en välgjord tidplan. Det är även mycket viktigt att samtliga parter vet innebörden av sin roll och håller sig till sitt ansvarsområde. Det är viktigt att Byggtech vårdar om sitt förtroende de har byggt upp hos sina beställare då deras affärsidé är beroende av fasta samarbeten med avtalade uppdragsgivare. Slutsatser som kan dras i detta examensarbete är att tydlighet, gemensamma riktlinjer och en god kommunikation är viktigt för att samarbetet mellan alla parter ska kunna utvecklas i positiv riktning. / In the construction branch you often work with projects where multiple parties cooperate. It’s important that the collaboration between the parties works well to achieve a positive result. Our aim with this thesis is to study how cooperation works, can be improved and developed between client, contractors and subcontractors on a construction company. In order to develop the joint work, you have to examine the common problems and deficiencies that may arise.   The implementation has been done through interviews with selected partners in the projects studied in order to obtain as complete and accurate as possible of what works and where the strengths and weaknesses are. The projects with wide variation have been studied in this thesis in order to locate and verify the most common problems when collaborating.   Some of the most important aspects of positive cooperation is to have a good communication, smart planning before the project begin and a well-managed schedule. It’s also very important that all the parties know the meaning of their role and stick to their responsibility. It’s fundamental that Byggtech cares for the trust they have build with their clients as their business depends on a solid partnership with the contracted clients.   The conclusions that have been drawn from this thesis are that clarity, common guidelines and a good communication are important to have a good collaboration between all the parties in order to develop the collaboration in a positive course.
3

Logistik vid begränsat utrymme : Jämförelsestudie mellan fyra byggarbetsplatser

Chyad, Yousif, Ali, Khadija January 2019 (has links)
Planning of material handling in limited spaces has become more relevant in the construction industry and since material cannot always be delivered at the right time in the right place, a delay in the flow chain is created. Each construction site has unique conditions and thus different solutions.In this thesis, four workplaces at Peab have been visited and inspected. The purpose of the thesis was to explore the problems that arise with the logistics in a limited space and find solutions that can be implemented on future construction projects.The aim of the study was to find the common factors that exist for the workplaces within a small area and find ways of working that can change the planning and execution of logistics.Surveys to professional workers and interviews with site managers and supervisors contributed with information to the report.After compiling the thesis work, the result shows that there are opportunities to change the working method of the work management to increase efficiency and productivity.In the study, it appears that there is a lack of communication in the workplaces as a large number of workers do not know when the next delivery of material takes place. In addition, the professional workers admit that they did not have a great influence over the business. Recommended solutions that were developed in the study were experience feedback and further development of the APD plan.
4

Apartmánový hotel - stavebně technologický projekt / Apartment hotel - construction-technological project

Srna, Michal January 2013 (has links)
This master thesis deals with construction-technological project of apartment hotel Tatranská Štrba. Project solves preparation of time, financial, material and other resources. Part of this work is the budget, general budget, time plan, principal mechanisms design, inspection and testing plans, technological prescription, building site equipment, realization study of major technological phases and comparision of masonary systems.
5

Stavebně technologický projekt oční kliniky / Construction Technology Project Eye Clinic

Kašpar, Radek January 2017 (has links)
Diploma thesis with construction technological project Eye Clinic. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, technological regulation scaffolding and technological regulation insulation, inspection and test plan
6

Příprava realizace bytové výškové budovy v Bratislavě / Preparation for the implementation of a high-rise apartment building in Bratislava

Krajčovič, Matúš January 2022 (has links)
The subject of this diploma thesis is processing of a construction technological project for the preparation of the realization of a high-rise residential building in Bratislava. The thesis is based on construction technology solution. The content of thesis is a technical report, coordination situation with broader transport relations, time and financial plan, study of realization of technological stages, solution of construction organization including drawing of construction site, design of main construction machines and mechanisms, technological regulation for upsite monolithic construction, control and testing plan, item budget, detail of relief elements of the ceiling structure, drawing of the formwork of the ceiling structural floor, specific research in the field of tower cranes.
7

Stavebně technologický projekt přípravy a realizace polyfunkčního domu / Construction Project for Implementation of Multifunctional Building

Mičjaňová, Lívia Unknown Date (has links)
The subject of the diploma thesis is the elaboration of the technological project of the multifunctional building DASS in Martin. It is a two-storey building that will serve for the needs of DASS company. The diploma thesis assesses the building as a whole and focuses on selected technological processes. The work consists of the technical report, study of the implementation of the main technological stages of the main building, technological regulations for monolithic reinforced concrete horizontal structures and for vegetation flat roof, design of main construction machines and mechanisms, design and assessment of lifting mechanism and control-test plans for structures from technological regulations. Furthermore, a time and financial plan is developed. Than staff balance and a schedule of selected technological processes of the main building is processed. At the same time a construction site project, a health and safety plan, a noise study and LEED 2009 CORE & SHELL are prepared for the construction of a multifunctional building. The work is further supplemented by a specialization focused on the analysis of the contribution of green roofs on energy efficiency of buildings.
8

BIM i produktionsplanering : Förutsättningar och ledarskap / BIM in production planning : Prerequisites and leadership

Martinsson, Mattias, Wennberg, Anders January 2018 (has links)
Som en följd av att byggbranschen implementerar och använder sig av BIM har nya yrkesroller skapats för att hantera och leda arbetet. Forskning har visat att det råder en osäkerhet gällande dessa yrkesroller, vilka arbetsuppgifter och vilka faser de ska vara delaktig i. BIM används generellt sett i större utsträckning i projekteringsfasen än produktionsfasen, samtidigt visar forskning att det finns fördelar om BIM används genom alla faser. Denna studie har undersökt hur det i planeringen inför produktion skulle kunna gå att använda sig av BIM, vilka förutsättningar som finns och vilken roll som ska leda arbetet. Baserat på en intervjustudie presenteras fyra arbetsgångar gällande några av produktionsplaneringens områden: Arbetsmiljö, APD-plan, Tidsplan, Kalkyl och hur dessa skulle kunna genomföras med stöd av BIM. I en enkätstudie har sedan platschefer, arbetsledare och kalkylatorer fått svara på frågor angående inställning, förutsättningar och ledarskap kopplat till arbetsgångarna. Fallstudien visar att det finns goda förutsättningar att använda BIM i produktionsplanering då de anställda ser en stor nytta och är positiva till att arbeta med stöd av BIM. Samtidigt konstateras att kunskapsnivå är blandad och skiljer mellan områdena vilket kan skapa ett hinder i implementeringen. För att arbeta med stöd av BIM anses den nya rollen, i studien kallad BIM-ledare, som viktig. I arbetet med kalkyl, där de anställda visar en högre erfarenhet och kunskap om BIM än övriga områden, anses BIM-ledaren framförallt behövas som tekniskt stöd. I övriga områden anses BIM-ledaren istället ha en mer närvarande roll och vara delaktig i framtagandet. BIM-ledaren anses behöva ha stor erfarenhet av byggprocessen. På vilken yrkesroll ansvaret för modellen skall ligga på i produktionsplanering finns en osäkerhet där BIM-ledare, platschef och projekteringsledare är tänkbara kandidater. Baserat på personalens bedömda engagemang och kompetens har studien utifrån teorin om situationsanpassat ledarskap presenterat olika ledarstilar som kan ses som vägledning för BIM-ledaren. För arbetet med kalkyl rekommenderas en delegerande ledarstil, för arbetet med arbetsmiljö och APD-planeringen en coachande och stödjande ledarstil medan arbetet med tidplan en mer instruerande ledarstil. / As a result of the AEC industry implementing and using BIM, new roles have been created to manage and lead the work. Research has shown that there are uncertainties regarding these roles, which tasks they should perform and which phases they will be involved in. BIM is generally used more during the design phase than the production phase, even though research shows that there are advantages if BIM is used throughout all phases. This study has investigated how the planning for production could make use of BIM, the conditions for implementation and the role that will manage the work. Based on an interview study, four areas of production planning: safety planning, site planning, time scheduling and calculation are examined. A scenario for each area and how these could be implemented with BIM is presented followed by a survey of the employees working on the matters and their thoughts and their attitude towards it. The case study shows that there are good conditions for using BIM in production planning as employees see great benefits and are positive about working with BIM. At the same time, it is noted that knowledge levels differentiate between the employees and between the areas, which can create an obstacle to the implementation. The BIM manager is considered important in all four areas. In the work with calculations, where employees show a higher experience and knowledge level of BIM than other areas, the role is considered to be needed as mostly technical support. In other areas, BIM managers are considered to take more part of the work process. They show that the BIM manager is considered to have extensive experience in construction. There is an uncertainty about the responsibility for the model in production planning where the BIM manager, site manager and design manager are all considered for the task. Based on the employees estimated commitment and competence, the study has presented different leadership styles with respect to the theory of situational leadership. This could be seen as guidance for the BIM manager. For the work with calculations, a delegating leadership style is recommended, for safety and site planning a coaching and supporting leadership style is recommended. For the work with time scheduling a more directing leadership style is recommended.
9

Stavebně technologický projekt hotelu Chopin v Bratislavě / Construction - technological project of Chopin Hotel in Bratislava

Bajerová, Marie January 2018 (has links)
This final thesis is focused on technological project Hotel Chopin in Bratislava. The technological project deals with the planning of the entire construction and focuses on the design of the site equipment, time plan of the building development and the detailed time plan of the building structure. Further focuses on the construction cast-in-place reinforced concrete structures. It prepares the technological prescription for cast-in place reinforced structures, inspection and test plan and the plan of safety risks and measures. Part of the project is also the construction budget and the mechanical assembly plan.
10

Hasičská zbrojnice - stavebně technologický projekt / Fire Station - Construction-technological project

Pospíšil, Tomáš January 2019 (has links)
This diploma thesis solves the construction and technological project of the Fire Brigade and the municipal office. The building is located in Martinique near Velké Meziříčí. The thesis deals with the study of the realization of the building, the technical report on the construction technological project, the time and financial plan of the building objects. The design of the building site equipment, the design of the machine assembly, the time machine deployment on the given technological stage and the balance of the workers are elaborated. This diploma thesis also focuses on the technological regulation of the roof structure design, the control and test plan and the risk assessment and the implementation of roofs. Part of the work is an item budget of the building and a detailed timetable.

Page generated in 0.0562 seconds