• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 202
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 210
  • 210
  • 172
  • 64
  • 58
  • 40
  • 33
  • 26
  • 26
  • 24
  • 22
  • 22
  • 20
  • 19
  • 19
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Gestão e gerenciamento de resíduos da construção civil em obras de grande porte: estudos de caso / Civil construction waste management in large construction works: case studies

Flávia Gadelha Martins 15 June 2012 (has links)
O crescimento da economia brasileira proporcionou uma intensificação na quantidade de obras de infraestrutura iniciadas no país nos últimos anos. A adoção e ampliação de estratégias utilizadas pelo governo para combater os efeitos da crise internacional sobre a economia e as obras necessárias ao país, em razão de eventos internacionais que acontecerão, como a Copa do Mundo de Futebol em 2014, e de programas como o Programa de Aceleração do Crescimento (PAC), foram uma resposta às atuais necessidades do Brasil. Com essas inúmeras obras, houve um crescimento na geração dos resíduos da construção civil (RCC), o que fez com que autoridades, pesquisadores e a sociedade voltassem seus esforços para enfrentar as dificuldades de manejo e disposição final adequada desses resíduos. A ausência de políticas públicas que promovessem a fiscalização do gerenciamento desses resíduos, em relação aos geradores, provocava diversos impactos como, por exemplo, o surgimento de vários depósitos clandestinos nas áreas mais afastadas do perímetro urbano e gastos por parte da administração pública com modelos de gestão corretiva. Contudo, com a elaboração da Resolução CONAMA nº 307/2002 e da Política Nacional de Resíduos Sólidos, Decreto nº 7.404/2010 que regulamenta a Lei nº 12.305, ficou instituído que os geradores devem ser responsáveis pelos resíduos das atividades voltadas à construção civil, contemplando, assim, a minimização dos impactos causados ao meio ambiente e à saúde humana. Dessa forma, esse quadro de descaso com a situação dos resíduos começou a mudar. Com a intenção de contribuir com essa área de conhecimento, esta pesquisa teve como finalidade estudar a situação do sistema de gerenciamento de RCC de obras de grande porte, após a regulamentação da Resolução CONAMA nº 307/2002 e do Decreto nº 7.404/2010, que regulamenta a Lei nº 12.305, referente à Política Nacional de Resíduos Sólidos. Para tanto, foi realizado um estudo da situação da gestão e do gerenciamento dos RCC na demolição e construção da Arena Fonte Nova, em Salvador - BA, e na construção da Arena Pernambuco, em São Lourenço da Mata - PE, realizadas para a Copa do Mundo de Futebol de 2014, por meio de três etapas de estudo: análise das variáveis e indicadores locais; caracterização qualitativa dos resíduos; e, por fim, comparação do gerenciamento da obra com o preconizado em ambas as leis. Esta pesquisa utilizou metodologia de classificação qualitativa do RCC, por meio de observações e entrevistas de campo, com o objetivo de identificar e analisar sua gestão e seu gerenciamento nessas obras, e teve como principal importância ajudar as empresas construtoras de obras de grande porte a fazerem uma autoavaliação de sua gestão e gerenciamento dos resíduos sólidos. Portanto, concluiu-se que as obras pesquisadas atendem às exigências das leis e que, para que haja um efetivo sistema de gestão e gerenciamento dos resíduos da construção civil, deve-se influenciar a mudança cultural das pessoas, visando a efetiva compreensão e concordância das necessidades ambientais. / The Brazilian economy has provided an enhancement in the amount of infrastructure works initiated in the country in recent years. The adoption and expansion of strategies used by the government to combat the effects of global crisis on the economy and the works necessary for the country due to international events that will happen as the FIFA World Cup in 2014 and programs such as PAC (Program Growth Acceleration), were a response to the current needs of Brazil. With these numerous works, there was an increase in the generation of civil construction waste (CCW), which meant that the authorities, researchers and society return their efforts to face the difficulties of handling and final disposal of such waste. The absence of public policies that promote the monitoring of waste management in relation to generators, caused many impacts, for example, the emergence of several underground deposits in the areas furthest from the urban perimeter and spending by the public administration models corrective management. However, the drafting of the CONAMA Resolution 307/2002 and the National Policy on Solid Waste Decree 7.404/2010 which regulates Law 12,305, it was established that the generators should be responsible for waste from activities related to construction, encompassing thus minimizing the impacts to the environment and human health. Thus, this picture of neglect with the waste situation began to change. Intending to contribute to this area of knowledge, the present study was aimed to study the situation of the CCW management system for large works, after the implementation of Resolution CONAMA 307/2002 and Decree regulating 7.404/2010 Law 12,305, on the National Policy on Solid Waste. To that end, a study of the CCW management situation was conducted in the demolition and construction of the Arena Fonte Nova in Salvador - Bahia, and in the construction of the Arena Pernambuco in São Lourenço da Mata - PE, performed for the FIFA World Cup 2014, through three stages of study: analysis of variables and local indicators, qualitative characterization of the waste and, finally, comparing the CCW management as recommended in both laws. This research used the qualitative methodology of the CCW, through field observations and interviews, in order to identify and analyze the management of these same works and its main importance to help manufacturers of major works to make a self- evaluation of its management and solid waste management. Therefore,it was concluded that the works researched met the requirements of laws and that to have an effective management system of civil construction waste, must influence cultural change in the people, in order to enhance comprehension and compliance of environmental needs.
12

Modelo de integração entre o projeto executivo e o planejamento operacional em empreendimentos de edificações comerciais. / Integration model between the design and the operational planning in enterprises of commercial constructions.

Ferreira, Fernanda Maria Pinto Freitas Ramos 10 July 2008 (has links)
Esta pesquisa apresenta um modelo de integração entre o projeto executivo e o planejamento operacional de empreendimentos comerciais, aplicado em 8 empresas (2 construtoras, 1 incorporadora, 3 consultorias de gerenciamentos de projetos, 1 empreiteiro e 1 empresa de projetos). A contribuição do modelo beneficia o processo de integração em 6 processos do planejamento de um projeto, a saber: (a) na criação da EAP (estrutura analítica do projeto); (b) na definição de atividade; (c) no seqüenciamento de atividades; (d) na estimativa de recursos da atividade; (e) na estimativa de duração da atividade e (f) no desenvolvimento do cronograma. Entre as principais conclusões, percebemos que a aplicação do modelo é possível pelo aumento da rapidez na preparação do cronograma do projeto e na simulação de tomada de decisões operacionais, mas desde que às empresas do setor consolidem as práticas de coordenar, projetar e gerenciar de forma simultânea e consistente; criando seu próprio banco de dados de tecnologias construtivas, integrado aos sistemas informatizados de projetos e de gerenciamento. / This research presents an integration model between the design and the operational planning of commercial enterprises, applied in 8 companies (2 builders, 1 company of incorporation, 3 consultancies of project management, 1 contractor and 1 company of projects). The contribution of the model benefits the integration in 6 processes of the planning of an enterprise, to know: (a) create WBS (work breakdown structure); (b) activity definition; (c) activity sequencing; (d) activity resource estimating; (e) activity duration estimating and (f) schedule development. Among the main conclusions, we noticed that the application of the model is possible for the increase of the speed in the preparation of the shedule of the enterprise and in the simulation of operational decisions, but since to the companies of the section consolidate the practices of coordinating, to design and to manage in a simultaneous and solid way; creating the own database of constructive technologies, integrated into the computerized systems of design and of management.
13

Produtividade de mão-de-obra no serviço de alvenaria. / Masonry labor productivity.

Carraro, Fausto 11 December 1998 (has links)
O trabalho analisa a produtividade da mão-de-obra no serviço de alvenaria, através da identificação e entendimento dos fatores que a fazem variar. Coletou-se dados em nove obras, utilizando-se de uma metodologia padronizada, que possui as seguintes características: é confiável, de fácil aplicação e de baixo custo de operação. Esta metodologia mostrou-se eficiente como um instrumento para a gestão do uso da mão-de-obra no serviço de alvenaria, ainda durante a sua execução. / This work evaluates masonry labor productivity by identifying and understanding the factors which make it vary. Data has been colected on nine construction sites using a methodology that has three main characteristics: reliability, easy to apllyand low operational costs. Such methodology proved to be helpful as a tool for masonry labor management when this task is still on execution.
14

Diretrizes para elaboração de planos da qualidade em empreendimentos da construção civil. / Guidelines for the development of quality plans in building-product of civil construction.

Santos, Luiz Augusto dos 10 September 2003 (has links)
Os diferentes programas e sistemas de gestão de qualidade, como o QUALIHAB, o PBQP-H e a ISO série 9000, vêm sendo disseminados no mercado da construção civil como meio das empresas obterem qualidade nos empreendimentos. Contudo, a implantação dos programas e sistemas de gestão não conseguiu dar garantias à qualidade dos empreendimentos, principalmente quando há superposição dos sistemas de gestão dos participantes envolvidos. Como forma de transpor estes obstáculos, buscou-se caracterizar e analisar, criticamente, a implementação de sistemas de gestão de qualidade com o intuito de obter subsídios à elaboração de planos de qualidade aplicáveis ao modo específico da construção civil. O desenvolvimento do trabalho foi feito a partir da revisão bibliográfica e estudos de caso realizados em empreendimentos de construção civil, privados e públicos, envolvendo empresas construtoras, empresas gerenciadoras, uma empresa de consultoria e profissionais autônomos na área de qualidade. O trabalho propõe diretrizes para a elaboração de planos de qualidade em empreendimentos da construção civil, principalmente no que se refere à evolução dos sistemas de gestão da qualidade, que passariam a ser aplicados ao empreendimento e não à estrutura interna das organizações. / The programs and systems of quality management, such as the QUALIHAB, PBQPH, and ISO 9000 series, have been spread through the Brazilian civil construction market so that building companies can achieve building-projects quality. However, the implementation of management systems has not guaranteed quality in construction projects mainly when there is a superposition of stakeholders management systems. This research critically characterizes and analyses the implementation of quality management systems in order to subsidize the development of quality plans applied to construction projects. In the development of this work, a bibliographical review was conducted and case studies were carried out on private and public construction projects involving construction companies, management companies, a consultancy enterprise and quality management professionals. This work proposes guidelines to develop quality plans in construction projects, mainly concerning the evolution of quality management systems that would be applied to projects and not to companies.
15

Ferramenta computacional para apoio ao planejamento e elaboração do leiaute de canteiro de obras. / Computacional tool for support planning and elaboration of construction site layout.

Freitas, Márcia Regina de 17 December 2008 (has links)
Esta pesquisa visa contribuir com o planejamento do arranjo físico (leiaute) de canteiro de obras através da utilização de recursos computacionais aplicados ao processo de tomada de decisões e na visualização da distribuição dos elementos necessários às atividades de construção. O planejamento do arranjo físico de canteiros, em muitos casos, é feito por profissionais que contam essencialmente com a experiência obtida ao longo de sua vida profissional, sem o auxílio de recursos de TI, amplamente utilizados em outras indústrias. Com esta pesquisa almeja-se evidenciar que o uso de recursos computacionais para monitoramento de dados referentes aos estoques e consumo de materiais e a visualização dos espaços disponíveis ao longo do tempo para os elementos de obra, conduzirá a um processo de projeto de canteiros que exija menor grau de abstração do planejador, assim como facilitará a atualização no decorrer da execução. Dessa forma, partiu-se para a concepção de uma ferramenta buscando juntar as informações necessárias ao planejamento em um único ambiente, dispondo de suporte visual para tomada de decisões conscientes a respeito do canteiro. Ao mesmo tempo, procurou-se evitar mudanças bruscas na forma de projetar do engenheiro, por acreditar-se que qualquer ferramenta que altere significativamente seu processo cognitivo habitual de resolver problemas pode ser rejeitada. As informações obtidas com o planejamento feito em software popular no país, o MS Project, são usadas para alimentar inicialmente a ferramenta. Outras inovações trazidas pela ferramenta desenvolvida são: possibilidade de divisão do período da obra em fases de acordo com as atividades desenvolvidas (preconizado em bibliografia pertinente); a integração das informações necessárias ao planejamento em um mesmo ambiente com suporte em forma de gráficos para controle de estoque/compras de materiais e apoio visual interativo para arranjo de elementos na área do canteiro. Como resultado obteve-se uma ferramenta simplificada e de uso direto, disponível na Internet, para apoio aos profissionais que fazem o planejamento de canteiros de obras, contribuindo para melhores resultados para o processo de construção e facilitando a análise das informações envolvidas nele. As inovações foram testadas junto a profissionais de planejamento, onde se analisou a viabilidade de inserção do sistema nas construtoras visitadas e o possível interesse do mercado em um produto com as características demonstradas por facilitar o desenvolvimento do projeto de canteiros, bem como sua atualização ao longo da obra. / This research aims to contribute to construction site layout planning by the use of computer resources applied to the decision-making process and to the visualization of the spatial distribution of the elements needed for the construction activities. The planning of the construction site layout is very often done by professionals who rely only on their experience gained throughout professional life, without using IT resources, which are widely used in other industries. This research aims to show that the application of computer resources for tracking data on material storage and consumption, besides the visualization of spaces available for the elements of construction, will lead to a construction site design process that requires a lower abstraction level from the planner and will facilitate the layout update during the execution. Thus, the conception of a tool that could join all the necessary information in a single environment with visual support for making decisions about the site layout was started. A special concern was to avoid abrupt changes in the way engineers design because it is believed that new tools that change their usual cognitive process for solving problems could lead these professionals to not using them. The information obtained with planning made with MS Project popular planning software used in the country - is used as initial input data for the system. This tool brought other innovations like: possibility of splitting the period of the construction in phases in accordance with the developed activities (as recommended in relevant literature), integration of the information necessary for planning in a single environment with graphics to support stock control and purchasing of materials; interactive visual support for allocating elements in the construction site area. As a result, it was obtained a simplified tool with straightforward use, available on the Internet, to support the professionals who plan the construction site, contributing to improve the results of the building process and facilitating the analysis of the information involved in it. The innovations were tested with planning professionals when was evaluated the feasibility of the adoption of the system by the visited construction companies and a possible interest of the construction market in a product with the demonstrated characteristics which facilitate the development and update of the site layout during construction.
16

Inovação em logística de canteiro de obras na construção de edifícios. / Logistics innovation in construction sites for building construction.

Aguiar, Gustavo dos Santos Guimarães de 20 April 2016 (has links)
A indústria da construção civil tem uma importância significativa para a economia do País. Em um mercado cada vez mais competitivo uma estratégia para aumentar o desempenho na construção de edificações é melhorar a produtividade e reduzir as perdas através da otimização da logística de canteiro de obras. O presente trabalho tem como objetivo propor diretrizes para elaboração de um plano de gerenciamento de logística de canteiro de obras, com foco em materiais, para a construção de edificações verticais. Foram utilizados como métodos a revisão bibliográfica, uma pesquisa quantitativa e uma pesquisa de campo que aborda uma grande empresa de engenharia e a análise dos aspectos logísticos de um de suas obras, a construção de um hospital, que contou com a participação do autor. Apesar do mercado enxergar valor em ações que contribuam para a logística da obra, são pouco evidentes processos ou planos efetivamente implantados, dedicados ao tema, que auxiliem no processo de tomada de decisões. Como contribuição, o trabalho reúne experiências e orientações para auxiliar o planejamento e o controle da logística de canteiro, promovendo inovação no processo de gestão. / The construction industry has a significant importance for the economy of the country. In a more and more competitive market a strategy to increase performance in the construction of buildings is to improve productivity and reduce losses by optimizing the construction site logistics. This research aims to propose guidelines for the development of a logistics management plan of the construction site, focusing on materials, for the construction of vertical buildings. The research methods comprises a literature review, a quantitative survey and a field\'s research that studies a large engineering company and the logistics of one of his projects, the construction of a hospital, which had the participation of the author. Despite the market see value in actions that contribute to the logistics work, are little evident processes or plans effectively implemented, dedicated to the topic, to assist in the decision making process. As a contribution, the research brings together experiences and guidelines to assist the planning and control of construction site logistics, promoting innovation in the management process.
17

Modelo para estimar a geração de resíduos na construção de obras comerciais verticais

lima, Giseli barbosa de 12 January 2017 (has links)
Submitted by JOSIANE SANTOS DE OLIVEIRA (josianeso) on 2017-06-06T17:03:04Z No. of bitstreams: 1 Giseli Barbosa de Lima_.pdf: 1516784 bytes, checksum: b62cf6126e2c71668ad61f65afdfbc82 (MD5) / Made available in DSpace on 2017-06-06T17:03:04Z (GMT). No. of bitstreams: 1 Giseli Barbosa de Lima_.pdf: 1516784 bytes, checksum: b62cf6126e2c71668ad61f65afdfbc82 (MD5) Previous issue date: 2017-01-12 / Nenhuma / A indústria da construção civil tem um papel fundamental em termos econômicos e sociais para o país. Mas do ponto de vista ambiental, é um dos setores que mais se destaca em relação ao consumo de matérias-primas, além de gerar um grande volume de resíduos de construção e demolição. Para evitar ou reduzir a geração destes resíduos é necessário investigar a sua origem, que pode ser desde a fase do projeto até a de produção, e quantificar a geração para o estabelecimento de parâmetros e controle. Neste contexto, este estudo propõe um modelo para estimar a geração de resíduos na construção de obras comerciais verticais, considerando características específicas das construtoras que atuam na região metropolitana de Porto Alegre/RS. O método de pesquisa consiste num estudo de múltiplos casos, utilizando ferramenta de análise estatística. A pesquisa foi realizada em três etapas: 1) levantamento de dados através de variável dependente (geração de resíduos por área construída – m³/m²) e as variáveis independentes (características de projeto arquitetônico e sistema construtivo); 2) tratamento dos dados utilizando regressão linear múltipla; e 3) aplicação do modelo estatístico e análise com ampliação da amostra. Inicialmente a amostra é constituída por dados de 6 obras comerciais verticais de 5 empresas da região metropolitana de Porto Alegre/RS, gerando um modelo estatístico com R² ajustado = 0,967, permitindo explicar 97% da geração de resíduos por área construída em obras com características semelhantes. As variáveis que formam o modelo consistem em: variável dependente “geração de resíduos por área construída” e as variáveis independentes “tipo/total”; “área total construída”; “índice econômico de compacidade” e “sistema construtivo”. A amostra ampliada é formada por 12 obras, incluindo 6 obras residenciais verticais que atuam na região metropolitana de Porto Alegre/RS. Como resultado foi testado um modelo estatístico, formado pela variável dependente e as variáveis independentes. Ao comparar os valores estimados de geração de resíduos (m³/m²) utilizando este modelo é possível observar que o modelo gerado a partir das obras somente do segmento comercial mostra maior aproximação aos valores de geração de resíduos informados pelas empresas construtoras. / The construction industry plays a key role in economic and social terms for the country. But from the environmental point of view, it is one of the sectors that stands out more in relation to the consumption of raw materials, besides generating a large volume of construction and demolition waste. To avoid or reduce the generation of these wastes, it is necessary to investigate their origin, which can be from the project to the production phase, and quantify the generation for the establishment of parameters and control. In this context, this study proposes a model to estimate the generation of residues in the construction of vertical commercial works, considering specific characteristics of the constructors that operate in the metropolitan region of Porto Alegre/RS. The research method consists of a multiple case study using a statistical analysis tool. The research was performed in three stages: 1) data collection through a dependent variable (generation of waste by constructed area - m³/m²) and independent variables (characteristics of architectural design and construction system); 2) data treatment using multiple linear regression; and 3) application of the statistical model and analysis with amplification of the sample. Initially the sample consists of 6 vertical commercial works of 5 companies from the metropolitan region of Porto Alegre/RS, generating a statistical model with adjusted R² = 0.967, allowing to explain 97% of the waste generation by area constructed in works with similar characteristics . The variables that form the model consist of: dependent variable "generation of residues per constructed area" and independent variables "type/total"; "Total built area"; "Economic index of compactness" and "constructive system". The expanded sample consists of 12 works, including 6 vertical residential works that operate in the metropolitan region of Porto Alegre/RS. As a result was tested a statistical model, formed by the dependent variable and the independent variables. When comparing the estimated values of waste generation (m³/m²) using this model it is possible to observe that the model generated from the works only of the commercial segment shows a greater approximation to the values of generation of waste reported by the construction companies.
18

Formação de redes de cooperação na construção civil: avaliação da aplicabilidade do comércio eletrônico na redução dos níveis de assimetrias de informação / Formation of interorganizational cooperation network in civil construction: evaluation of e-commerce applicability to reduce the levels of asymetric information

Morinishi, Marcio Toyoki 05 August 2005 (has links)
Este trabalho investiga como os modelos de comunicação e informação podem contribuir para analisar o relacionamento entre empresas pertencentes à rede de cooperação e seus fornecedores. O foco da pesquisa limita-se aos modelos de assimetria de informação, tais como: teoria do agente e principal, seleção adversa e risco moral. Esses conceitos são importantes para mostrar os problemas que podem vir a ocorrer nas transações entre compradores e vendedores. Com o intuito de minimizar esses problemas, este trabalho se propõe a analisar o impacto da tecnologia de informação (TI) na redução das assimetrias de informação. O enfoque será na análise do comércio eletrônico entre empresas (B2B), especificamente, os e-marketplaces verticais. Por fim, é apresentado um estudo de caso no setor da construção civil em que algumas das maiores construtoras brasileiras têm como proposta compartilhar custos e riscos para o desenvolvimento de um e-marketplace. A conclusão da pesquisa é de que a abordagem de redes de cooperação, incorporada ao uso adequado de ferramentas de TI permite diminuir as assimetrias de informação e conseqüentemente fortalecem o poder de compra das empresas que compõem à rede / This work investigates how the information and communication models can contribute to analyze the relationship among enterprises from cooperation network and their suppliers. The focus of research is limited to asymmetric information models, such as: principal-agent theory, adverse selection and moral hazard. These concepts are important to show the problems that can occur in transactions between buyers and sellers. Considering ways to minimize that problems, this work proposes analyze the impact of information technology (IT) to reduce asymmetric information. The study will focus in analyze e-commerce B2B, specially, the vertical e-marketplaces. Latter, a case study is presented in civil construction sector which some huge brazilian building construction have proposed to share costs and risks for the development of an e-marketplace. The conclusion of this research is that interorganizational cooperation network approach, incorporated with proper use of IT tools allows the decrease of asymmetric information and consequently strenghtens the purchase of enterprise that belongs to the network
19

O método de melhorias PDCA. / The PDCA Cycle.

Andrade, Fabio Felippe de 11 July 2003 (has links)
Esta dissertação apresenta o Método de Melhorias conhecido como PDCA, e seu potencial de aplicação no setor da construção civil. Para a realização desta pesquisa, foi avaliado, em um primeiro plano, o próprio Método de Melhorias, sua estrutura básica de funcionamento, para, em um segundo plano, paralelo a essa avaliação, discorrer sobre as suas aplicações na construção civil. Essa primeira avaliação abrange desde a origem do método em questão, seus princípios, seu idealizador, e as pessoas que mais se destacaram na sua disseminação no meio gerencial, até a descrição completa do método, detalhando cada módulo de aplicação, os envolvidos em cada etapa, e seus possíveis resultados alcançados ao final do ciclo. Ao final desse estudo, é discutida a aplicação prática desse método, assim como seu potencial de aplicação com alguns sistemas de gestão da qualidade adotados pelo setor da construção civil (QUALIHAB, SiQ-C, e outros), bem como os resultados avaliados em empresas que utilizam o método PDCA em seu sistema de gestão. Concluindo, é apresentada uma análise crítica das dificuldades e das vantagens da implementação, propondo estratégias de implementação do método de melhorias PDCA nos sistemas de gestão das empresas e empreendimentos. / This dissertation presents the well-known method of improvements PDCA, and its potential application in the civil construction. For the accomplishment of that research, it has been evaluated, in a first plan, the own Method of Improvements, its basic structure of operation, for, in a second plan, together with this evaluation, describe its applications in the civil construction. That first evaluation embraces from the origin of the method, its beginnings, its creator, and the people that more stood out in its disseminação in the managerial field, until the complete description of the method, detailing each application module, involved them in each stage, and its possible results reached at the end of the cycle. Finally, the practical application of that method is discussed, as well as its potential application with other quality management systems adopted by the civil construction (QUALIHAB, SiQ-C, and other), as well as the results evaluated in companies that use this method in its management system.
20

Diagnóstico do gerenciamento dos resíduos da construção civil da região metropolitana de São Paulo /

Ribeiro, Simone. January 2008 (has links)
Orientador: Rosane Aparecida Gomes Battistelle / Banca: Adilson Renofio / Banca: Adriana Antunes Lopes / Resumo: O crescimento dos resíduos sólidos vem se transformando em um dos grandes desafios para os órgãos municipais, especialmente dos resíduos sólidos urbanos, decorrentes da indústria da construção civil. Este trabalho teve como objetivo realizar um diagnóstico do gerencimento deste tipo de resíduos na região metropolitana de São Paulo, baseando-se em informações fornecidas pelos órgãos envolvidos e em visitas a locais de armazenamento, triagem, reciclagem e disposição final. Esta investigação decorreu da necessidade de se avaliar estratégias para minimizar os impactos socioambientais negativos, acarretados por esses resíduos. Seu objetivo geral foi coletar dados que delineassem a realidade do descarte de resíduos da construção civil no município de São Paulo e gerar subsídios que pudessem servir de apoio aos agentes envolvidos. Teve também por objetivos específicos: identificar os pontos de descarte na região metropolitana de São Paulo e realizar, por meio de dados e informações obtidas junto a órgãos públicos e empresas privadas, uma estimativa da geração dos resíduos de construção civil nesses pontos. Como resultado, contabilizou-se valores na ordem de 1.366.460,17 t/mês. Conclui-se que há necessidade de uma maior valorização de todos os materiais que constituem as peças de uma construção , no sentido de que não ocorram sobras, nem desperdícios de matéria-prima. Recomenda-se a preservação das áreas de jazidas de materiais e minimização do uso desses locais para destinação final dos resíduos. / Abstract: The growth of solid waste has become one of the greatest challenges for the public authorities, in particular the management of solid urban waste resulting from the construction industry. The purpose of this work is to perfom a diagnosis of the management of this type of waste in the greater São Paulo. This study is based on information supplied by the involved agencies, as well as visits to storage, separation, recycling and final disposition sites. Such investigation results from the need to evaluate strategies to minimize negative social and environmental impacts caused by such waste. The goal was to raise general data to draw the reality of disposal of waste from construction in the municipality of São Paulo and generate subsidies that could serve as a support for the agents involved. He had also by specific objectives: to identify the points of disposal in the greater São Paulo and carry through data and information from the public agencies and private companies, an estimate of the generation of waste from construction at such points. The data totalize a generation of Construction and Demolition Waste (CDW) of 1.366.460,17 metric tons/month in the city of São Paulo. In conclusion, one can mention the need to increase the value of all materials used as construction elements so that no unused materials remain nor raw materials are wasted. It is recommended to preserve the extraction sites of the materials and limit the use of these sites as final waste destination. / Mestre

Page generated in 0.06 seconds