地方政府辦理非都市土地分區變更審議作業之研究

賴品劭 Unknown Date (has links)
摘 要 民國60、70年代,台灣經濟起飛、工商業蓬勃發展,因此帶動土地開發案件增加,政府為合理管制非都市土地之開發利用型態,二十多年來訂定許多相關法令規定及行政規則,作為非都市土地之執行依據。民國78年,為管制非都市土地之開發利用,規定進行使用地變更需經過各該區域計畫原擬定機關同意,將審議權收歸中央。 精省之後,將一定規模之非都市土地開發案件審議流程縮短為二級,並以內政部為單一辦理機關,因此,內政部除了需辦理北部及南部區域計畫範圍內開發審議外,還需辦理原由省政府所辦理的開發審議工作,而在原有的人力、資源下,增加開發審議之工作量,造成內政部承辦單位很大的負擔。又由於開發型態的不同,地方政府受理窗口不一,中央主管機關與地方政府常常受到刁難與誤解等因素,是以,基於簡化流程、避免地方政府受理非都市土地變更作業之推諉,於90年7月,擇要協助部分縣市政府,試行推動示範單一辦理窗口,並將一定面積以下之非都市土地內之土地變更,逐步授權地方政府辦理(內政部營建署,2003)。依據行政院所核定之「土地使用變更審議機制改進方案」指示,內政部於民國90年3月20日由內政部函頒「非都市土地使用分區及使用地變更申請案件委託直轄市縣(市)政府辦理審查作業要點」,訂定地方政府辦理分區變更審議工作所應遵從之規定。民國90年5月4日區域計畫法施行細則增訂第16條之4,將分區變更審議權力以委託的方式,將原屬地方自治事項之土地事務,交還由地方政府辦理。 非都市土地分區變更審議工作,乃由土地使用系統、水土保持系統、環境保護系統與目的事業主管系統負責審議,然而,目前四大系統委託地方政府審議權限不一,影響審議品質與時效,造成地方政府審議作業上之困擾。因此,本研究以地方自治與組織理論作為理論陳述之基礎,並以探討分區變更之相關法令規定、審議組織與審議機制,綜合剖析地方政府執行分區變更作業上之課題,並根據其課題提出具體之建議,此為本研究之目的所在。 從機制、問卷及訪談分析中,發現地方政府分區變更審查機制大多已經建立,各相關單位也已逐漸有審查經驗,中央主管機關已盡到提供輔導諮詢之責,因此本研究認為地方政府已有辦理分區變更審查之能力。但此作業在各面向上仍存在許多待解決的課題,包括:地方自治面向上,地方政府未能訂定相關規定以適應地方特殊性、中央主管機關之監督工作應加強、民眾參與機制不足;組織面向上,目的事業主管機關與環境保護主管機關所授予地方政府審議之權限不足、專責審議小組受政治力影響程度高及地方政府各單位溝通上有問題;在法規與政策面向上,相關法規繁雜、政策不明確且無優先順序及缺乏成長管理與總量管制之概念;執行面上,地方政府審查效率不高及經費與人力不足等問題。 地方政府辦理分區變更審議機制上,本研究認為有以下數點重要的政策意涵,分別為:1.地方政府由消極的配合演變為積極的主導,藉此增加地方自治權力;2.建立中央與地方政府分權之功能,符合憲法因地制宜的精神;3.簡化審議流程,提升審議效能;3.建立顧客導向的公共服務體系,達到便民及增加行政效率之功能;4.不同審議組織分掌開發審議工作,依相關法令及審議規範進行審查,兼顧開發及環境品質之均衡。 此外,本研究研擬出地方政府辦理分區變更審議架構,包括中央政府及地方政府二大部分,包括:1.中央政府應擬定國土分區變更之政策、確立變更審議工作之原則,以及提供地方政府技術指導與執行監督工作;2.地方政府應儘速建立審議機制並成立單一窗口,透過土地使用系統、環境保護系統、水土保持系統及目的事業主管系統併行審查與提供意見後,交由地方政府專責審議小組審議,考量各土地開發因素與民眾之意見,並進行實質審查後,做出開發許可之決策,以及進行開發許可後之督導執行等工作。未來在地方自治的理念下,透過中央與地方政府職能分工,簡化審議流程,與兼顧開發與環境品質下,使非都市土地分區變更審議可以兼顧審議品質與效率,增加國家與地方政府之競爭力。 關鍵字:地方政府、非都市土地、分區變更、變更審議、地方自治
2

非都市土地農牧用地變更審議制度之研究-以竹科宜蘭城南基地與清華大學宜蘭園區為例 / Study on examination institution in agricultural land conversion of non-urban land – cases of Yilan Science Park's Chengnan base and National Tsing Hua University's I-Lan campus

李漢煒 Unknown Date (has links)
近年來為配合重大建設之開發如設置科學園區、國立大學分部設校計畫等土地開發,政府機關多按區域計畫法第15條之2規定以申請開發許可方式辦理農地之變更使用。於是大批農地變更為建築用地、工業用地或特定目的事業用地使用之情形屢見不鮮。如此大型之開發案雖經整體規劃,但規劃過程中僅考量開發案基地內本身之條件,卻忽視對週遭之環境或相關計畫之協調與整合,以致於不僅造成農地大量流失外,亦對整體環境品質之維護造成嚴重影響。 目前非都市土地開發管理在實務操作的面向上,似呈現開發許可制度並未考慮區域計畫精神、制度設計未考慮層級、各層級計畫之間的指導或承接關係普遍存在欠缺適當的聯繫機制、個案變更審議過程中未與國土規劃相連結且易受到政治影響、涉及變更農地使用時僅針對個案審議未考量是否影響周邊環境、農業主管機關對於優良農地保護及審查機制不足、開發方式太縱容個案開發許可、僅有量之需求但無質之要求、民眾事先參與之管道欠缺等之缺點,均有待探討謀求解決之道。 本文以土地使用計畫審議之合理性為主軸,應用永續發展中環境、經濟和公平(environment, economy, and equity)三個E之概念與區域計畫法第15條之2於國土利用係屬適當而合理之原則,探討開發許可中,農牧用地變更審議之規範與執行情形及民眾參與之方式,並藉由對專家學者、當地居民、公部門與相關組織之深入訪談及個案綜合分析結果,加以檢視與研討,確認目前非都市土地農牧用地變更審議執行上遭遇之課題,最後針對各課題研提改善策略與配套措施,以供政府未來執行非都市土地農牧用地變更審議政策之參考,期能達到農地環境資源合理利用之目標。 / In recent years, for co-operating the development of significant construction, like establishment of science parks, the national university branch and so on, the Government applies for the development permission to change the farmland use according to article 15-2 in Regional Plan Act. Large quantities of farmland are often changed to construction land, industry land or special-purpose land. So large-scale land development cases are planned comprehensively, and conditions of developed land base are considered in the planning process. Actually, the coordination and conformity to the environment or related plan are neglected. This not only causes the massive lost farmland, but also influences maintenance of the overall environment quality seriously. At present, in the non-urban land development management in the practice operation, the spirit of regional plan is not considered in the development permission institution. The Government do not considered the levels in the institution design. It is short of the suitable link mechanism in the instruction or continuation between plans in various levels. In the examination process of land-change cases, the cases are not linked to the national land planning, and easily influenced by the political power. When involving the farmland conversion, only the case itself is examined, but the effects on the peripheral environment are not considered. The agricultural agency lacks the superior farmland protection and examination mechanism. In the development way, the Government too tolerates the case development permission, and only has demand of the quantity without request for the quality. Besides, public participation prior to examination process is lacked. Above shortcomings should be discussed and solved. This article takes the rationality of land use plan examination as the main axle. It applies the concepts of three Es including environment, economy, and equity in the sustainable development, and adopts the principle of suitable and reasonable national land use in article 15-2 in Regional Plan Act. It discusses the standards and the situations of examination in agricultural land conversion, and the way of public participation in development permission. According to the in-depth Interviews of experts, local residents, the government agency and related organization and the results of cases study, it inspects and confirms present layout problems of examination in agricultural land conversion of non-urban land. Finally, it proposes the improvement strategies and the coordinated measures for various problems to offer references to the governmental policy in the future for achieving the goal of the reasonable use of farmland environment resources.