• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 55
  • 40
  • 23
  • 13
  • 9
  • 8
  • 7
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 201
  • 201
  • 201
  • 132
  • 73
  • 58
  • 53
  • 34
  • 34
  • 31
  • 23
  • 23
  • 23
  • 23
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Exploring the Role of Building Modeling and Drones in Construction.

Efosa, Alohan January 2019 (has links)
No description available.
52

Modellering av befintliga byggnader / Modeling of existing buildings

Andersson, Victor, Visekruna, Sanjin, Jasarevic, Haris January 2013 (has links)
Rapporten avhandlar modelleringen av en befintlig industribyggnad och dess tillvägagångssätt. I rapporten har även utredningar och studier granskats kring neutrala filformat, laserscanning och byggprocessen i allmänhet då dessa omnämnda ämnen går hand i hand och utgör fundamenten i modellerings-projekt. Projektet som författarna modellerade var det befintliga renseriet på Södra Cell i Mönsterås. Intervjuer som kontinuerligt utförts med berörda personer framgår under genomförande delen.
53

Study of Possible Applications of Currently Available Building Information Modeling Tools for the Analysis of Initial Costs and Energy Costs for Performing Life Cycle Cost Analysis

Mukherji, Payal Tapandev 2010 December 1900 (has links)
The cost of design, construction and maintenance of facilities is on continual rise. The demand is to construct facilities which have been designed by apply life cycle costing principles. These principles have already given strong decision making power to the manufacturing industry. The need to satisfy the environmental sustainability requirements, improve operational effectiveness of buildings and apply value engineering principles has increased the dependency on life cycle costing analysis. The objective is to obtain economically viable solutions by analyzing the alternatives during the design of a building. Though the LCCA process is able to give the desired results, it does have some problems which have stood as hindrances to the more widespread use of the LCCA concept and method. The literature study has highlighted that the problem areas are the lack of frameworks or mechanisms for collecting and storing data and the complexity of LCCA exercise, which involves the analysis of a thousand of building elements and a number of construction-type options and maintenance activities for each building element at detailed design stages. Building Information Modeling has been able to repeatedly answer the questions raised by the AEC industry. The aim of this study is to identify the areas where BIM can be effectively applied to the LCCA process and become a part of the workflow. In this study, initially four LCCA case studies are read and evaluated from the point of view of understanding the method in which the life cycle costing principles have been applied. The purpose, the type alternatives examined, the process of analysis, the type of software used and the results are understood. An attempt has been carried out to understand the workflow of the LCCA process. There is a confidence that Building Information Modeling is capable of handling changes during the design, construction and maintenance phases of the project. Since applying changes to any kind of information of the building during LCC analysis forms the core, it has become necessary to use computer building models for examining these changes. The building modeling softwares are enumerated. The case studies have highlighted that the evaluation of the alternatives are primarily to achieve energy efficient solutions for the buildings. Applying these solutions involves high initial costs. The return on investment is the means by which these solutions become viable to the owners of the facilities. This is where the LCCA has been applied. Two of the important cost elements of the LCC analysis are initial costs and the operating costs of the building. The collaboration of these modeling tools with other estimating software where the initial costs of the building can be generated is studied. The functions of the quantity take-off tools and estimating tools along with the interoperability between these tools are analyzed. The operating costs are generated from the software that focuses on sustainability. And the currently used tools for performing the calculations of the life cycle costing analysis are also observed. The objective is to identify if the currently available BIM tools and software can help in obtaining LCCA results and are able to offset the hindrances of the process. Therefore, the software are studied from the point of view of ease of handling data and the type of data that can be generated. Possible BIM workflows are suggested depending on the functions of the software and the relationship between them. The study has aimed at taking a snapshot the current tools available which can aid the LCCA process. The research is of significance to the construction industry as it forms a precursor to the application of Building Information Modeling to the LCCA process as it shows that it has the capacity of overcoming the obstacles for life cycle costing. This opens a window to the possibility of applying BIM to LCCA and furthering this study.
54

Empirical Study of MacroBIM and Conceptual Estimation

Gajbhiye, Anand Dhanraj 2010 May 1900 (has links)
Building Information Modeling (BIM) has set up a mark in the construction industry over a decade. In order to gain benefit of BIM in estimating the project cost at the early stage of construction with the limited data available, a new concept of MacroBIM has been introduced in the industry. However, limited amount of research has been implemented to determine how MacroBIM has been accepted in the construction industry. Most research was focused on the accuracy of the conceptual estimation. This research attempted to determine the effectiveness of MacroBIM process applied at early stages of construction for conceptual cost estimation. Experts from the discipline of architecture, contractor and owners were interviewed and their professional opinions on MacroBIM were analyzed using grounded theory. The results show that, compared to the traditional conceptual estimating process, MacroBIM is an effective method for 1) saving labor hours, 2) conveying assumptions with the help of its visualization capabilities, 3) enhancing the collaboration among the project participants, and 4) evaluating multiple design scenarios. However, fear of using MacroBIM and trust in its outcome existed among some contractors, architects, and owners because this technology has not matured yet. Moreover, the need of interoperability between the MacroBIM tools and MicroBIM tools, such as Revit, has also surfaced in the study.
55

BIM Principles to Practice: Using BIM to Create a New Model for Producing Animation

Naugle, Nicholas D. 2011 December 1900 (has links)
Computer animation projects, specifically feature film productions, require large teams of artists to manage and coordinate the use of enormous amounts of data containing both aesthetic and technical information within a specific time frame and while using finite resources. Mismanagement through information loss or inefficiency can result in both a compromised artistic vision and a financial loss. This thesis presents the conceptualization of a work management system based upon a successful system used in architecture and construction called Building Information Modeling, or BIM. BIM principles are adapted for use in animation production through the use of images as containers of information. The thesis does not include implementation of the management system described but does predict, based upon comparisons with architecture and construction, that a significant level of information carry-through can be achieved from concept art to final frames and we expect a positive gains in the efficient use of production resources. Adoption of this proposed project management structure could reduce production budgets, improve the communication flow between directors and artists, and develop an empirical based record for predicting the resource usage requirements for proposed projects in the future.
56

Immersive Representation of Building Information Model

Nseir, Hussam 2011 May 1900 (has links)
Building Information Modeling (BIM) is an emerging technology that utilizes 3D graphical representations to improve communication, collaboration, and data exchange. Immersive Visualization Environment (IVE) is another promising technology that enhances the 3D graphical representation to achieve a higher level of a sense of presence. The connection between the BIM technology that utilizes the 3D graphical representation and the IVE technology that enhances the 3D graphical representation has led many professionals to visualize BIM in immersive environments. This study is an attempt to overcome a systematic issue presented by available immersive visualization systems. The problem is that in order to visualize an information-rich BIM model from a commercial BIM application in an immersive visualization environment, the BIM model needs to pass through a tough conversion process and loss a large amount of its information. This research study utilizes the Application Programming Interface (API) of a commercially available BIM application to develop an immersive visualization environment. This approach was applied on Autodesk Navisworks software by developing a software program that utilizes Navisworks' API to control Navisworks' camera angle and generate an immersive visualization environment. A prototype of the approach was built in the Department of Construction Science at Texas A & M University and named BIM CAVE Prototype. The overall goal of this research was to prove that it is possible to transform a commercial BIM application into an immersive visualization system. A phenomenological study was utilized by interviewing subject matter experts from the construction industry. The intent of this effort was to explore and develop a phenomenological understanding of how research participants perceived the BIM CAVE system. The results show that the BIM CAVE can be considered an immersive visualization environment because it contains a majority of the immersive visualization environment features. However, a variety of technical limitations must be overcome before it can be called a fully immersive and functional visualization environment. Moreover, even though this investigation was to some extent successful, this research approach needs to be tested on other commercially available BIM applications before generalizations are made.
57

The impact of delivery methods on the profitibility of commercial construction

Herndon, Michael Brett 08 February 2012 (has links)
According to September 2011 information from the U.S. Census Bureau, the construction industry in the United States is valued at nearly eight hundred billion dollars annually. A 2004 collaborative study by Construction Industry Institute and Lean Construction Institute suggests that as much as fifty seven percent of time, effort, and material investment in construction projects do not add value to the final product. When compared with twenty six percent wastes in the manufacturing industry, it becomes obvious that the construction industry has a problem. Construction projects that come in over budget and behind schedule have become the rule rather than the exception, leading to contentious business relationships and costly litigation. This study will strive to identify and analyze the primary sources of these problems. Research and industry experience point to a lack of communication and cooperation among the various entities required to complete a construction project as the leading causes of waste in the industry. Further analysis suggests that traditional forms of construction contracts encourage adversarial and non-cooperative behavior between parties. Additionally, poor communication between various contributors opens the door for additional wasted cost. Fortunately, the development of tools such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM) present new options to construction professionals that are proving to help address some of the challenges the industry faces today. IPD as a project delivery method creates a culture of collaboration and teamwork, where a culture of risk avoidance and conflict once stood, while BIM provides a platform for better communication among parties. When used together, these tools can reduce or eliminate many of the major sources of waste within the industry. This thesis will provide descriptions, analysis, and case studies that demonstrate the use of these tools and the potential they have to make a positive impact on the construction industry. / text
58

Mechanisms for the implementation of building information modeling (BIM) for construction safety management in Hong Kong

Li, Jingkai, 李敬锴 January 2013 (has links)
Building Information Modeling (BIM) with other associated Information Technologies(IT) is reshaping the construction industry worldwide, and is viewed as a systematic solution targeting at the industry’s nature as traditional, fragmented, document-centric and dangerous. In general, the industry is receptive to the change and becoming more Occupational Health and Safety (OHS) conscious, but the adoption of such implementation lags far behind. There have been a number of technology oriented studies aimed at inventing some BIM software functional modules to facilitate the construction safety management, but the philosophy behind that type of studies remains questionable –the applicability of those inventions for the safety management practice, the acceptability of those functional modules by the industrial practitioners, the non-holistic view on the construction safety management, as well as the equivalence of obeying the safety regulations and the safety performance on site. Essentially, the implementation of BIM is a certain Information System (IS) implementation in an industrial discipline, but BIM implementation is always treated as a static, objective and mechanical phenomenon, and the industrial practitioner’s participation during the implementation course have been subsequently not attained enough attention. Therefore, it is justifiable to take a view of management and/or process change on BIM adoption and implementation issues. In this perspective, how to integrate BIM into the construction safety management technologically, organizationally and institutionally becomes the problem for the Hong Kong construction industry, in which context the research is conducted. Driven by the aim of this study – to understand the mechanism for the adoption and implementation of Building Information Modeling (BIM) and other associated Information Technologies (IT) for the construction safety management in Hong Kong–the qualitative method approach is adopted. More specifically, the narrative approach as the strategy of inquiry is formulated given the consideration of the available time and resource for the study. In so doing, the researcher, himself as the most important research instrument, conducts ten open-ended face-to-face interviews with the industrial practitioners as the first-hand data, and a number of in-depth literature studies on the construction safety management in Hong Kong as the second-hand data. To characterize the qualitative study paradigm, all the procedures from drafting the interview questions to validating the research findings occur in an iterative and inductive manner, and a Computer Assisted Qualitative Data AnalysiS(CAQDAS) program, the QSR NVivo 10 is also employed to smooth the data analysis process. Assisted by the program –the Word Frequency Query and the detailed coding analysis –the comparison of the results between the partial and the whole interview texts is made to confirm the sample size of the ten interviews has reached the theoretical saturation. Based on this point, all the sub-categories and child-codes under three top parent categories –Attitudes towards BIM in Hong Kong, BIM Acceptance by the Industry, and BIM and Construction Safety –are grouped into visual models for illustration. By comparing and contrasting with the existing knowledge, the research findings are further validated in terms of how to promote BIM implementation for construction safety management in Hong Kong. Beyond those in line with the previous literatures, the machine readable data format for the construction safety management needs to be further explored on its content and the quantification method. Whereas, how BIM implementation will promote the frank auditing as well as the relational contracting approaches are also worth further studied. By examining the current contextual situations and through narrative inquiry on BIM implementation for construction safety management in Hong Kong, this study provides understandings, which are elaborated in a trajectory of the sociology of technology, on the implementation of a specific information technology BIM for construction safety management in the Hong Kong construction industry. The research also comes to an open conclusion ready to integrate any continuous emerging evidence, for both the expectation of the qualitative research and the nature of the issue to be addressed –BIM implementation as an emerging phenomenon. The thesis finally presents its recommendations for BIM implementation for the construction safety management in Hong Kong for administrators, policy makers and other decision makers. / published_or_final_version / Real Estate and Construction / Master / Master of Philosophy
59

Išorės ir vidaus apdailos darbų automatizuotų sąmatinių skaičiavimų ir ekonominių resursų poreikio analizė / The analysis of automated estimate calculations and resources requerements for works of internal and external finishing

Sodeika, Mantas 13 June 2005 (has links)
This work deals with the computer aided design technology based on the concept of static graphical – information modeling, which has the following goal: to ensure the succession of the building design, its construction process and project maintenance management; to ensure the integrated management of graphical and information data flows under a unified software environment; to perform life cycle operations of a construction project better, cheaper, and faster. State-of-the-art automated design, to be more specific, computer aided design is based on Object Modeling Technique (OM): “from idea to a real object”. One of the fundamental innovations of this technology includes component modeling. While implementing this design the concept of the relation between a graphical – information model of a building and estimate calculations has been formulated; technique for classifying design elements and materials has been generated; necessary programming tools and data structures have been developed; integration of CAD OM and EP systems has been performed; technique for computer aided evaluation of economic indicators of a construction project has been composed, enabling to price a project interactively. For effective design, technological and organizational variants of construction finishing the proposed TOPSIS method has been selected.
60

Contemporary Strategies for Sustainable Design

Farias, Francisco 03 October 2013 (has links)
This exploratory research examined the degree of adoption and impact of the concepts of Building Information Model (BIM), Integrated Project Delivery (IPD), Integrated Design Process (IDP) and Building Energy Simulation (BES) on the design processes of advanced architectural firms when executing sustainable design. Six offices identified by the press for a strong commitment to sustainable design and influence in the design of high performance buildings were selected as cases. In semi-standardized interviews, these firms presented their perceptions of the influence of BIM, BES, and IPD/IDP. The results show that a generalization of sustainable design processes is possible. A design process for sustainability (DEPROSU) model was created by collecting best practices from data gathered from the interviews and the critical literature review. Secondary contributions show that BIM, IDP/IPD and BES have a synergistic effect in sustainable design methods, and that the human resource profile from these firms has evolved towards multi-skilled professionals knowledgeable in BES, BIM, parametric design, sustainability and construction processes. This research provides evidence of commonalities found in the design processes of the selected firms. These commonalities, which have been represented in the DEPROSU model, can potentially be validated as protocols or standards for sustainable design, providing architectural design practices with concrete patterns for improvement and or validation of their design methods.

Page generated in 0.4885 seconds