• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus

Boström, Jenny, Danielsson, Maria January 2009 (has links)
<p>When a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL  chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.<strong></strong></p><p> </p><p>The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction.</p><p>This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.</p>
2

En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus

Boström, Jenny, Danielsson, Maria January 2009 (has links)
When a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL  chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.   The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction. This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.
3

Attefallshus som komplementbostadshus : Drömhus eller mardröm? / Attefallshus a complementary residential building : Dream house or nightmare?

Abdula, Sham, Oksman, Dan January 2015 (has links)
Den 2 juli 2014 blev det enligt lag tillåtet för en- och tvåbostadshusägare att uppföra en bygglovsbefriad komplementbyggnad på max 25 kvadratmeter på den egna fastigheten. Rapporten undersöker vilket genomslag lagändringen har haft i Stor-Stockholm, Stor-Göteborg och Stor-Malmö. Undersökningen visar att lagändringen ännu inte har haft något stort genomslag. I rapporten undersöks även en utvald del av marknadsaktörers utbud av attefallshus avsett som komplementbostadshus.  Ett attefallshus utformas med miljövänligt hållbara material och inspireras av Vitruvius tre principer för god arkitektur. Huset konstrueras med avsikt att uppfylla kraven som ställs i PBL, PBF, BBR och EKS. Målet med de framtagna bygghandlingarna är att få startbesked från byggnadsnämnden i Växjö.

Page generated in 0.029 seconds