Spelling suggestions: "subject:"5construction industry.most"" "subject:"5construction industry:trust""
1 |
Evaluation of the cost estimating systemsChoi, Ming-hang, Edmund., 蔡銘鏗. January 2001 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
|
2 |
Alternative to low bid selection in Air Force reserve military constructionGarner, Birtice A. January 2009 (has links)
Thesis (M. S.)--Building Construction, Georgia Institute of Technology, 2010. / Committee Chair: Castro-Lacouture, Daniel; Committee Member: McElroy, James H.; Committee Member: Roper, Kathy. Part of the SMARTech Electronic Thesis and Dissertation Collection.
|
3 |
The treatment of uncertainty in construction price modellingStrez, Henryk Andrzej Leon January 1991 (has links)
The purpose of this thesis was to acquaint the reader on the nature of the uncertainty present in construction price forecasting and to introduce an environment that has the ability to integrate these uncertainties with greater consistency than that possessed by available price models. The objective of this thesis was to establish that uncertainty can be explicitly treated in price forecasting models. This would have two benefits to concerned parties. Firstly, the effectiveness of price forecasts could be improved as provision could be made for any uncertain variable. This will be of great benefit to the client, as a more accurate assessment of the building process could be established at an earlier stage of the design process. Secondly, the price forecast will be more useful to quantity surveyors, architects and clients, as it would 'quantify' the extent of the uncertainty which could be provided for in a more meaningful manner. In order to establish that existing price models do not deal with the uncertainty present at the time of forecasting, the price models used by practitioners were evaluated against the different types of uncertainty found at the different stages of the price forecasting process. Once this had been established, eight techniques that have the ability to treat various forms of uncertainty, were presented. After analysing the techniques abilities to cope with the uncertainties associated with price forecasting, it was established that certain of these techniques do have the ability, and are suitable, to be incorporated into the price forecasting process. From the results of a questionnaire survey conducted on quantity surveying offices in South Africa, it was found that the price models used by practitioners do not take uncertainty into account, and have in fact, the potential for uncertainty inducement. Some of the uncertainty found to be present in the preparation of a construction price forecast include the lack or incompleteness of design information, the uncertainty in the communication of design information, the variability in the data used by quantity surveyors and, the uncertainty in the choice of price model during the different stages of the design process. As a possible solution to the problem of uncertainty, an expert system environment, utilising a three-dimensional classification of uncertainty, has been proposed. It has been proved that this environment has the ability to cater for the uncertainty associated with the price forecasting process, as well as having the attribute of providing the user with the reasoning behind the logic that the expert system has followed, a characteristic not possible with the traditional forms of price models. From the findings of this thesis, it can be concluded that the methods of price modelling used by quantity surveying practitioners, are unable to take uncertainty into account effectively. It can also be concluded that an expert system environment has the ability to handle the different forms of uncertainty found at the various stages of construction design. The proposed model is conceptual in nature and has not been tested in practice. It is therefore recommended that further research be carried out in this field, with the aim of producing a construction price forecasting expert system which utilises the proposed three-dimensional classification of uncertainty.
|
4 |
A critical review of the possible reasons for construction cost overruns in light of cost estimating methodologies and models used in industryVan Reede Van Oudtshoorn, Armand 12 1900 (has links)
Thesis (MBA)--Stellenbosch University, 2012. / ENGLISH ABSTRACT: This research report was conducted to critically review the methodologies and best
practices prescribed by world class cost engineering experts and institutions, in order to
develop a cost estimating model which organisations could use as a guideline for their cost
estimates on large capital intensive projects. / AFRIKAANSE OPSOMMING: Hierdie navorsingsverslag is gedoen om ‘n kritiese oorsig te doen op die metodes en beste
praktyke voorgeskryf deur wereldklas koste ingenieur deskundiges en instansies, om
sodoende ‘n koste beramings model te ontwikkel wat gebruik kan word deur organisasies
as handleiding gedurende die koste beraming van hulle kapitale intensiewe projekte.
|
5 |
Analyzing the Factors that Lead to Housing and Construction Cost Escalation: A Case Study Focused on Riyadh, Saudi ArabiaAlfouzan, Abdulaziz Saleh 01 May 2013 (has links)
Riyadh city suffers from high housing and construction costs, which have increased by more than 200% over the last 7 years. This problem led to a significant interest from the government and the citizens of the city in understanding the causes of housing and construction cost escalation and the best strategies to address this problem in the short and long-terms, in order to find solutions for affordable housing.
In response to the absence of research regarding this problem, the researcher has decided to conduct a scientific survey about the factors that might have led to this problem in Riyadh. While conducting the literature review, the researcher identified 16 possible factors that were mentioned as possible causes for this problem. Thus, the main objective of this study is to identify the main factors that affect housing cost escalation.
All of the survey samples were collected from construction industry professionals and experts working in Riyadh. The sample size required was calculated using the statistical equation mentioned in Chapter 4, and based on an estimated level of confidence of 90%, standard error of 10%, and a standard deviation calculated from 30 random samples collected initially. The required sample size was estimated to be at least 215 surveys, and the researcher was able to collect a total of 237 surveys. After collecting the data, the researcher analyzed the data through Microsoft Excel software by applying descriptive statistics, means, modes, and standard deviations. Tables and figures have been used to show the results of the survey. After analyzing the data, the researcher identified the main factors based on the mode and mean averages. The researcher has identified four major impacting factors that affected housing and construction costs.
The most impacting factors on housing and construction cost are the corruption in selling land, speculative purchases of land, high demand for housing, and the high population growth rate in Riyadh. The main recommendations that should help the government to solve this problem are: to apply an annual tax on large plots, prevent speculative purchases in housing areas, monitor the prices of consruction materials, and revive small cities around Riyadh to reduce congestion and crowding.
|
6 |
Breaking Through the First Cost Barriers to Sustainable Planning, Design and ConstructionMogge, John W., Jr. 27 October 2004 (has links)
Breaking Through the First Cost Barriers
of Sustainable Planning, Design, and Construction
John W. Mogge Jr.
377 Pages
Directed by Dr. Rita Oberle
The research integrates elements of the bodies of knowledge for sustainability, planning, design, and construction to create an understanding of green project first cost drivers. It extends conceptual models for sustainable infrastructure and the built environment process by creating a framework based linkage to analyze first cost impacts of sustainable project planning, design, and construction decisions. The framework functions as an analytical bridge between the built environment process and sustainability and is the principal contribution of this research. Through a preliminary analysis of fourteen projects, the work draws out relevant planning, materials and methods, and estimating and scheduling best practices and guiding principles. The work then proposes a first cost impact framework derived from the preliminary analysis as a decision support tool and tests the framework using an expert system derived linguistic database. The test results support the functionality of the framework. The test linguistic database was developed through an interdisciplinary professional expert practitioner interview process using common green project planning, design and construction strategies. The qualitative, interpretative, multi-criteria analysis of the data used fuzzy set theory and presents findings helpful in understanding green project first cost drivers. The work concludes with an assessment and a discussion of parallel research, and ten recommended areas for further research.
|
7 |
Alternative to low bid selection in Air Force reserve military construction: approach to best value procurementGarner, Birtice A. 01 July 2009 (has links)
Best value is becoming one of the most commonly used procurement methods in the facility construction industry. The Federal Government and the Air Force Reserve predominant project delivery approach has been via the low-bid award. This process has not been successful, documented by large numbers of construction modifications, as well as project cost and schedule growth over the past sixteen years. Recently, federal procurement agencies have attempted to move toward construction awards based upon best value principles relative to performance and price. The United States Army Corps of Engineers best value procurement vehicle known as Military Transformation fails to deliver true best value. This pseudo best value delivery process: (1) fails to objectively rate and apply contractor past performance; (2) lacks the means to monetarily quantify contractor proposal risks; and (3) provides no means of transferring control and responsibility for risks and risk minimization to the contractor. Only a true best value project delivery system can provide the urgently required increased efficiency necessary for Air Force Reserve Command to remain a dependable military institution capable of erecting facilities contributory to our nation's defense by perpetually adding value to the project delivery process.
|
8 |
An investigation into the time and cost factors for a decision between in-situ and hybrid concrete constructionPiek, Philippus Jacobus 12 1900 (has links)
Thesis (MEng)--Stellenbosch University, 2014. / ENGLISH ABSTRACT: The construction industry is a competitive market and contractors need to keep up-to-date with new
construction methods and technologies. Project teams in South Africa are required to make decisions
during the early stages of construction projects. These decisions often need to be made in a short time
period, and include the decision between various construction methods, such as the decision between
in-situ concrete construction and hybrid concrete construction.
Hybrid concrete construction is a combination of pre-fabricated concrete and cast in-situ concrete to
obtain the supreme benefits of their different construction qualities. This method of construction is
ultimately used to achieve faster, and occasionally, more cost effective construction. Hybrid concrete
construction, today, is a well-known term in the construction industry and is widely used in the UK
and other developed countries. However, the use thereof is limited in South Africa, and in-situ
concrete construction remains the conventional method of construction. Possible reasons for the
limited use of hybrid concrete construction are investigated in this study. With the intent of improving
the construction industry of South Africa, guidelines are provided to assist project teams in a decision
between in-situ concrete construction and hybrid concrete construction.
The decision between construction methods is based on many factors, such as project time, cost,
quality, safety, environmental performance, socio-economic aspects (labour) and client satisfaction.
Project time and cost are, however, the most important of these factors. It is stated that the structure of
a building represents typically only 10 % of the construction cost, however, the choice of construction
method and material can have significant effects on the cost of other elements throughout the life cycle
of construction projects. It is therefore important to measure the whole life cycle cost when deciding
between construction methods, such as in-situ concrete construction and hybrid concrete construction.
The aim of this study is to identify and investigate the factors that influence project time and cost,
throughout the life cycle of construction projects, and to provide a framework that can assist project
teams in their decision between in-situ concrete construction and hybrid concrete construction in
South Africa. The decision between these two construction methods is influenced by a vast number of
variables that may be difficult to quantify. The framework therefore consists of qualitative information
that can assist project teams in their decision.
The framework provided in this study includes the factors that have an influence on the time and cost
for a decision between in-situ concrete construction and hybrid concrete construction. These factors
are identified for the three primary phases in the life cycle of construction projects. These phases are
the design phase, the construction phase and the maintenance phase. / AFRIKAANSE OPSOMMING: Die konstruksiebedryf is 'n kompiterende mark en kontrakteurs moet op datum bly met nuwe
konstruksie metodes en tegnologieë. In Suid-Afrika word daar van projek spanne vereis om vinnige
besluite gedurende vroeë stadiums van 'n projek te neem. Hierdie besluite moet dikwels in 'n kort
tydperk geneem word, en sluit die besluit tussen verskillende konstruksie metodes in, byvoorbeeld die
besluit tussen in-situ en hibriede beton konstruksie.
Hibriede beton konstruksie (HBK) is 'n kombinasie van in-situ en voorafvervaardigde beton elemente.
HBK word in die algemeen gebruik om te baat uit 'n vinniger konstruksie tydperk, en kan soms ook ‘n
meer koste-effektiewe metode van konstruksie wees. HBK word gesien as 'n bekende term in die
konstruksiebedryf en word veral toegepas in ontwikkelde lande soos die VSA, Japan en Engeland. Die
toepassing daarvan in Suid-Afrika is egter beperk. In Suid-Afrika word in-situ beton konstruksie nog
steeds die meeste gebruik en staan dus bekend as die mees algemene metode van konstruksie. Hierdie
studie ondersoek moontlike redes vir die beperkte gebruik van HBK in Suid-Afrika. Met die oog op 'n
verbeterde konstruksiebedryf in Suid-Afrika, word rigylyne voorsien, wat projek spanne kan gebruik
vir 'n besluit tussen in-situ en hibriede beton konstruksie.
Daar is verskeie faktore wat 'n rol speel in die besluit tussen twee konstruksie metodes. Hierdie faktore
sluit in, die tyd, koste, kwaliteit, veilighed, omgewings impak, sosio-ekonomiese aspekte (soos arbeid)
en kliënt tevredenheid, van 'n projek. Tyd en koste is egter die belangrikste van hierdie faktore. Die
metode waarvolgens 'n struktuur gebou word kan 'n beduidende uitwerking op die koste van ander
elemente in die lewensiklus van 'n konstruksie projek hê. Dit is gevolglik belangrik om die hele
lewensiklus koste in ag te neem wanneer daar besluit moet word tussen verskeie konstruksie metodes,
soos in-situ en hibriede beton konstruksie.
Die doel van hierdie studie is gevolglik om die faktore wat 'n invloed het op die tyd en lewensiklus
koste van konstruksie projekte te identifiesieer. Hierdie faktore word dan gebruik om 'n raamwerk
voor te stel. Projek spanne kan hierdie raamwerk gebruik as 'n riglyn om te besluit tussen in-situ en
hibriede beton konstruksie. Die besluit tussen hierdie twee konstruksie metodes is afhanklik van 'n
groot aantal veranderlikes, wat moeilik is om te kwantifiseer. Die raamwerk bestaan dus uit
kwalitatiewe inligting wat projek spanne kan gebruik om 'n ingeligte besluit te neem oor in-situ en
hibriede beton konstruksie.
Die raamwerk wat in hierdie studie voorgestel word sluit dus die faktore in wat 'n invloed het op die
tyd en koste vir 'n besluit tussen in-situ en hibriede beton konstruksie. Hierdie faktore is geïdentifiseer
vir die drie primêre fases in die lewensiklus van 'n konstruksie projek. Hierdie fases is die ontwerp
fase, die konstruksie fase en die onderhoud fase.
|
Page generated in 0.0758 seconds