• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 32
  • Tagged with
  • 32
  • 18
  • 15
  • 14
  • 10
  • 9
  • 8
  • 8
  • 8
  • 7
  • 6
  • 5
  • 5
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Utilização de bens de capital em hospitais: uma abordagem a partir do Índice de Rendimento Operacional Global dos Equipamentos – IROG

Brand, Jose Paulinho 21 March 2014 (has links)
Submitted by Fabricia Fialho Reginato (fabriciar) on 2015-07-23T00:11:26Z No. of bitstreams: 1 JoséBrand.pdf: 4280891 bytes, checksum: 8771dc60ac901bbaf6ba4ddfec858e7a (MD5) / Made available in DSpace on 2015-07-23T00:11:26Z (GMT). No. of bitstreams: 1 JoséBrand.pdf: 4280891 bytes, checksum: 8771dc60ac901bbaf6ba4ddfec858e7a (MD5) Previous issue date: 2014-03-21 / Nenhuma / Este trabalho pretende contribuir para o desenvolvimento e o aperfeiçoamento da gestão das organizações hospitalares. Neste sentido, o presente trabalho trata do tema da melhoria da utilização de bens de capital dos hospitais, através da adoção do conceito de Índice de Rendimento Operacional Global (IROG). Objetiva, ainda, a proposição de um modelo de gestão econômica para a avaliação da eficiência dos equipamentos de alta tecnologia em hospitais que possibilite a maximização da utilização da capacidade instalada, no intuito de aumentar o Ganho da empresa, com os mesmos ativos fixos. Estruturou-se, portanto, através de um Estudo de Caso múltiplo, aplicado no Hospital Moinhos de Vento. Realizaram-se, para tanto, a análise e a medição do IROG de dois equipamentos, a fim de verificar a possibilidade de aumentar a produtividade, a capacidade de atendimento mais rápido da demanda e identificar as principais paradas e falhas ocorridas durante a realização de exames em duas áreas distintas do hospital, a saber: Unidades de Angiografia e Diagnóstico de Imagem. Os elementos utilizados para o desenvolvimento do método foram: a) consulta ao referencial teórico sobre o tema; b) definição e aplicação do método em duas áreas distintas de empresa; c) contribuições de gestores e de colaboradores das áreas; d) contribuições oriundas do próprio autor do trabalho. Os principais resultados obtidos através da aplicação do método foram: i) obtenção da medição e constatação do baixo índice do IROG em dois equipamentos de capital; ii) maior clareza e discernimento dos gestores das áreas em relação à eficiência da utilização dos equipamentos; iii) identificação dos principais motivos de paradas dos equipamentos; v) simulação de cenários de melhoria na eficiência dos equipamentos e apresentação de Ganhos financeiros; vi) introdução da medição do IROG na relação dos indicadores do hospital. Por fim, o tema estudado poderá evoluir, principalmente, em organizações focadas na melhoria dos seus processos operacionais e em planos de ação para estabelecer um processo sistemático de melhoria contínua da sua gestão. / This work aims to contribute for the development and improvement of the management of hospital organizations. In this sense, the present work deals with the issue of improving the utilization of capital assets of hospitals, by adopting the concept of Index Global Operating Income ( IROG ). It also aims to propose a model of economic management to assess the efficiency of high-tech equipment in hospitals which enables the maximization of capacity utilization in order to increase the gain of the company, with the same fixed assets. Thus, the work was structured through a multiple case study, applied in the Moinhos de Vento Hospital. There were, therefore, the analysis and measurement of the IROG of two devices in order to verify the possibility of increasing the productivit, the ability to quickly meet demand and identify key stops and failures during examinations in two distinct areas of the hospital namely: Angiography and Image Diagnostic Units. The elements used for the method development were: a) consulting the theoretical framework on the topic; b ) definition and application of the method in two distinct areas of business; c ) contributions of managers and employees from areas; d) Contributions from the author of the work. The main results obtained by applying the method were : i ) obtaining the measurement and verification of low IROG index in two capital equipment;, ii ) greater clarity and insight of managers of areas in relation to efficiency of use of equipment; iii ) identification of the main reasons for equipment downtime; v) simulation scenarios for improving the efficiency of equipment and presentation of financial gains; vi ) introduction of measurement indicators IROG in respect of the hospital. Finally, the subject studied may evolve, especially in organizations focused on improving its operational processes and action plans to establish a systematic process for continuous improvement of their management.
32

Análise de métodos e práticas lean manufacturing em uma linha de montagem de uma empresa do ramo de autopeças

Figueiredo, Oydil Cesar de 30 November 2015 (has links)
Submitted by Marcia Silva (marcia@latec.uff.br) on 2016-05-02T20:33:14Z No. of bitstreams: 2 dissert Oydil Cesar de Figueiredo.pdf: 4453669 bytes, checksum: e33d72aa1c70ea37d37ddcdc603b8c51 (MD5) dissert Oydil Cesar de Figueiredo.pdf: 4453669 bytes, checksum: e33d72aa1c70ea37d37ddcdc603b8c51 (MD5) / Made available in DSpace on 2016-05-02T20:33:14Z (GMT). No. of bitstreams: 2 dissert Oydil Cesar de Figueiredo.pdf: 4453669 bytes, checksum: e33d72aa1c70ea37d37ddcdc603b8c51 (MD5) dissert Oydil Cesar de Figueiredo.pdf: 4453669 bytes, checksum: e33d72aa1c70ea37d37ddcdc603b8c51 (MD5) Previous issue date: 2015-11-30 / O presente trabalho descreve o processo de gestão de melhoria das operações produtivas de fabricação, apresentando um caso prático de aplicação do conceito de produção com foco na eliminação dos desperdícios em uma indústria automotiva. O exemplo aludido relata o processo de planejamento, execução, manutenção e controle de uma sequência de três projetos de melhoria de uma célula de montagem de uma indústria de autopeças, situada na região Sul Fluminense no Rio de Janeiro, entre os anos de 2008 e 2014. A pesquisa teve o objetivo de estudar os métodos e ferramentas Lean Manufacturing na indústria de autopeças identificando os fatores restritivos e facilitadores no processo de aplicação dessa filosofia. Com os dados coletados foi possível verificar vantagens e desvantagens da utilização de diferentes conceitos logísticos, distintas configurações de trabalho padronizado e layout. Por meio de uma revisão documental e uma pesquisa-ação, verificaram-se ganhos significativos ao adotar os conceitos propostos, elevando a produtividade da linha estudada em 92%, quando comparado com o ano inicial, demonstrando-se que as técnicas propostas efetivam-se em vantagem estratégica competitiva em relação a outras empresas concorrentes que trabalham sob a ótica da produção em massa. Como resultados adicionais, a pesquisa fornece informações sobre a sequência de uso das ferramentas oferecendo um auxílio para empresas que buscam a implantação dessa filosofia, disseminando, assim, o conhecimento sobre a filosofia Lean Manufacturing / This study describes the continuum improvement process of productive manufacturing operations, showing an applying case of the concept of production with a focus on eliminating waste in an automotive industry. The example used describes the process of planning, execution, maintenance and control of a sequence of three improvement projects in one assembly line of an automotive parts industry, located in the Rio de Janeiro, between 2008 and 2014. The research aimed to study the methods and Lean Manufacturing tools in the automotive industry by identifying the blocks and facilitators factors in this philosophy application. With the collected data were verified advantages and disadvantages of using different logistics concepts, different standardized work settings and layout. Through a documentary review and action research, have been checked significant gains by adopting the proposed concepts, increasing line productivity by 92%, when compared with the initial year, showing that the applied technical become more effective than the companies that work as pushed production. As additional results, the survey provides information on the use sequence of tools offering support to companies that are implementing this philosophy

Page generated in 0.0418 seconds