• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • Tagged with
  • 4
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Driftstörningar i produktion : Platsledningens arbete för att säkerställa en driftsäker framfart

Hjortsberg, Emil, Unér, Robert January 2022 (has links)
För att en byggnadsentreprenad ska kunna genomföras måste det finnas ekonomisk täckning för alla kostnader som kommer att innefattas i projektet från start till slut. Underprojekteringsfasen identifieras och budgeteras det därför för alla kostnadsposter involverade i projektet. En viktig del att ha koll på för projektledning under produktion är att tidplaner hålls då ett försenat arbetsmoment kan resultera i att andra planerade arbeten behöver flyttas. Det kan i sin tur leda till ökade kostnader och eventuella viten om man inte håller sig inom den tidsram som man skrivit kontrakt på. Produktionsplaneringen har en viktig roll i ett byggnadsprojekt och är en post som man jobbar aktivt med att utveckla. I en organisation är det de produktionsledande tjänstemännen som har stor del av det dagliga ansvaret och möjligheten att fånga upp och åtgärda eventuella störningar och hinder som uppstår. Denna studie är utförd utifrån produktionsledningens perspektiv med syftet att öka förutsättningarna för fallföretaget att säkerställa att driftsäker framfart för framtida projekt genom att ta vara på de erfarenheter som arbetsplatsledning på fallföretaget har samlat på sig när det kommer till störningar, förseningar och hur man bäst jobbar för att förebygga och åtgärda dem. Studien bestod utav en litteraturstudie som i kombination med samtal med personer på fallföretaget lade en grund för utformningen utav studiens teori. En avgränsning för studien gjordes med fokus på arbetsmomentet innerväggar. För att få svar på studiens frågeställningar genomfördes intervjuer med tjänstemän på fallföretaget med erfarenhet utav arbetsplatsledning. Resultatet av studien visar att man genom löpande kontroller och kontinuerliga avstämningar mot tidplan tidigt kan upptäcka och förebygga förseningar. Det är främst produktionschefen som med en hög involveringsgrad i uppförandet av huvudtidplanerna kan införskaffa sig en klar helhetsbild över projektet och på så vis tidigt kunna identifiera hur och när extra resurser behöver sättas in för att stötta upp ordinarie arbetsstyrka. Den mest betydande anledningen till störningar och förseningar är när det uppstår oförutsett bortfall av yrkesarbetare på grund av sjukdom och vård av sjukt barn. För att stötta upp arbetsstyrkan kan man flytta över resurser inom företaget eller köpa in arbetskraft utifrån vilket kan bidra med nya utmaningar. När rapporten utfördes under våren 2022 var det just det stora sjukbortfallet av personal som Covid-19 fört med sig och det faktum att byggnadsmaterial har en förlängd leveranstid som sågs som anledningar till att arbetsmoment blivit försenat. Potentiella åtgärder vars effekt skulle kunna ge en förbättrad effektivitet och hjälpa till att säkerställa att driftsäker framfart i produktionen är bland annat att man skulle kunna utöka den platsledande personalens involvering i arbetet med tidsplanerna i det tidiga skedet av ett projekt samt att genom utbildning utöka deras kompetens runt uppförandet av tidplaner och dess användningsområde som styrningsverktyg under genomförandet av projektet. Det upplevs också eftersträvansvärt att i planeringen jobba mer för att skapa jämna låsta takter i den mån som det är möjligt för att åstadkomma en upprepningseffekt. / For a building contract to be carried out, financial coverage for all expenses included in the project must be in place. During the early stages of the project, all costs are identified and budgeted for. An important segment to keep track of for the project management team during production is that the construction work is getting done within the timeframe determined in the schedule as delayed work can lead to unwanted postponing of the work to be done next. This, in turn, can lead to increased costs and possible fines if all work is not done within the timeframe agreed upon in the contract. Production planning is an important part of a construction project and is a concept continuously under development and improvement. In an organization, it is the site managers who have a large part of the responsibility for day-to-day work carried out on the worksite and the have opportunity to see and remedy any disruptions and obstacles that arise. This study is carried out from the perspective of the site management to increase the possibilities to ensure good progress for future projects. This is done by taking advantage of the knowledge and experiences their engineers out in the field have accumulated when it comes to disruptions, delays, and how best to prevent and remedy it. The study consisted of a literature study which in combination with conversations with people at the case company set a foundation for the design of the study's theory. A delimitation for the study was made with a focus on the work to construct inner walls. To get qualitative answers to the study's questions interviews were conducted with engineers with experience in site management employed at the company. The results of the study show that through ongoing inspections and continuous reconciliations with schedules, one can detect and prevent delays caused by disruptions at an early stage. It is primarily the production manager who, with a high degree of involvement in the construction of the main schedules can gain a clear overall picture of the project and thus be able to identify early on how and when extra resources need to be deployed to support the regular workforce. The most significant reason for disruptions and delays in projects is when unforeseen loss of professionals occurs because of illness and care of a sick child. To support the workforce, you can shift resources within the company or buy in labor from other companies, which can contribute to new challenges in itself. When the report was carried out in the spring of 2022, it was the considerable loss of staff that Covid-19 caused and the fact that construction materials have extended delivery time that was seen as reasons for disruptions for work being delayed. Potential measures whose effect could provide improved efficiency and help ensure progress is made according to plan in production include increased involvement of site management staff in the work with the making of schedules in the early stages of a project and through further education increase their knowledge of the upbringing of schedules and its use as a tool during the execution of the project. It is also seen as desirable in planning to create consistent locked rotations to the extent that it is possible to achieve a repetition effect of the work getting done.
2

Prioritering av förnyelseområden VA-nät : Värderingsmodell för optimering av långsiktig kundservice baserad på driftstörningsstatistik, öppen programvara och anläggningsdata / Prioritization of renewal areas VA networks : Valuation model for optimization of long-term customer service based on malfunction reports, open source software and construction data

Nilsson, Andreas, Stoltz, Fredrik January 2018 (has links)
The water and sewage system is classified as a necessary social function in Sweden. In order to obtain a functional system with acceptable amounts of malfunctions, continuous maintenance and renewal by replacing existing pipes where life expectancy is considered exhausted. The rate of change can be defined as the renewal. The majority of Sweden's pipeline networks were built in the 60s and 70s, and the renewal pace has remained low since then, in relation to the service life of the pipeline. If the renewal pace is too low for a long period of time, future difficulties can arise because pipes ages faster than the renewal pace. Many municipalities in Sweden have maintenance and renewal plans to achieve goals such as increasing/maintaining customer service for water and sewage system. At the renewal planning for each municipality, a tool published by Svenskt Vatten can be used to estimate the general renewal need for the entire municipality. The tool is for instance based on year of installation, pipe material and length of the pipe length in the system. A general renewal need provides a good overall measure of the municipality's need, but it does not make it easier to prioritize internal renewal. The purpose of this thesis was to provide a method for determining where the resources in a municipality should be placed in order to maintain or increase customer service regarding water services connected to wiring networks. The method is based on a prioritization that was carried out by combining customer service and the water management system's condition. In this study, the method of prioritization was applied in a case study at the municipality of Boden. To identify the condition of the pipe network, several different influencing factors have been analysed to identify critical areas. An area-based valuation model has been developed based on a Swedish valuation model from 2007. The results showed correlation between leakage frequency on the water pipeline network and various influencing factors such as soil types, pipe materials and construction year. A method has been developed to help municipalities to compile the influencing factors that are critical to that particular municipality based on the information available in the municipality. A methodology for how municipalities can compile operational disturbances and illustrate these with a map-based independent database have also been developed. An area-based valuation model was developed to enable assessment of customer service independent municipality and its resources. In this tool, the municipality itself is able to determine the importance of parameters. The valuation of customer service was based on the number of customers affected, building, length of the pipes and malfunctions reports. However, these parameters are not linked to synergy or critical wires based on a social perspective. The valuation model should therefore be supplemented with an assessment of the consequences of interference. A conclusion from the case study was that the entire municipality's main management network showed increased trends in leakage rates. Trends also showed that customer satisfaction in the majority of areas is falling over time, based on results from site evaluation. A recommendation was made to the municipality in the case study in which areas renewal should be prioritized over the coming five years based on the valuation of customer service and management condition. / Vatten- och avloppssystemet klassas som en nödvändig samhällsfunktion i Sverige. För att erhålla ett funktionellt system med acceptabla mängder driftstörningar krävs kontinuerligt underhåll och förnyelse i form av utskiftning av befintliga ledningar där livslängden anses förbrukad. Takten utskiftning kan definieras som förnyelsetakten. Majoriteten av Sveriges ledningsnät byggdes under 60–70 -talet och förnyelsetakten har förblivit låg sedan dess, i förhållande till ledningsnätets livslängd. Om förnyelsetakten är för låg under en för lång tid kan framtida svårigheter uppstå eftersom ledningar åldras snabbare än förnyelsetakten. Många kommuner i Sverige har underhåll- och förnyelseplaner för att uppnå mål som exempelvis att öka/bibehålla kundservice för vatten och avloppsledningsnätet. Vid förnyelseplaneringen för respektive kommun kan ett verktyg användas som publicerats av branschorganisationen Svenskt Vatten för att uppskatta behovet av generell förnyelsetakt för hela kommunen. Verktyget är bland annat baserat på anläggningsår, ledningsmaterial och längd på ledningarna i systemet. En generell förnyelsetakt ger ett bra helhetsmått över kommunens behov av insatser men det underlättar inte hur den interna förnyelsen skall prioriteras. Syftet med detta examensarbete var att ta fram en metod för hur man kan bestämma var resurserna i en kommun ska placeras för att bibehålla eller öka kundservice rörande vattentjänster kopplade till ledningsnät. Metoden baseras på en prioritering som utfördes genom att kombinera kundservice och vattenledningsnätets kondition. I denna studie tillämpades prioriteringsmetoden i en fallstudie på Boden kommun. För att identifiera ledningsnätets kondition har flera olika påverkande faktorer analyserats för att identifiera kritiska områden. En områdesvis värderingsmodell har utvecklats baserad på en svensk värderingsmodell från 2007. Resultaten visade korrelation mellan läckfrekvens på vattenledningsnätet och olika påverkande faktorer såsom jordart, ledningsmaterial samt anläggningsår. En metod har framtagits för att hjälpa kommuner att sammanställa vilka påverkande faktorer som är kritiska för just den kommunen baserat på den informationen kommunen kan tillgå. En metodik för hur kommuner kan sammanställa driftstörningar och illustrera dessa med ett kartverktyg oberoende databas har även framtagits. En områdesvis värderingsmodell utvecklades för att möjliggöra bedömning av kundservice oberoende kommun och dess resurser. I detta verktyg har kommunen själv möjlighet att bestämma parametrars vikt. Värderingen av kundservice baserades på antal kunder som påverkas, fastigheter, ledningslängd och driftstörningsrapporter. Dessa parametrar är dock inte kopplade till samordningsvinster eller kritiska ledningar utifrån ett samhällsperspektiv. Värderingsmodellen bör därför kompletteras med bedömning av konsekvens av störningar. En slutsats från fallstudien var att hela kommunens huvudledningsnät visade på ökande trender avseende läckfrekvens. Trenderna visade även att kundnöjdheten i majoriteten av områdena sjunker över tid, baserat på resultat från områdesvärderingen. En rekommendation togs fram för kommunen i fallstudien för i vilka områden förnyelse bör prioriteras de kommande fem åren baserad på värderingen av kundservice samt ledningskonditionen.
3

Beräkningsmetod för påverkan av driftstörningar i produktionssystem med serie-parallella flöden / Calculation method for the impact of downtime in series-parallel production systems

Simonsson, Anton, Åberg, Viktor January 2020 (has links)
I det här arbetet eftersökte Scania IM en metod för att beräkna maskiners påverkan på output för en produktionslina vid driftstörningar. Metoden skulle kunna appliceras på en produktionslina med ett serie-parallellt flöde och arbetet utgick från en utvald lina där man bearbetar cylinderhuvuden. Vid framtagandet av beräkningsmetoden skapades det som i arbetet kallas för påverkansfaktor som tar fram vilken påverkan ett bortfall av en maskin i flödet har på flaskhalsutrustningen, som i sin tur står för den yttersta begränsningen för systemet. På seriella stationer erhålls en påverkansfaktor på 100 % men på stationer med parallell utrustning så finns det en kvarvarande kapacitet vid driftstopp av enstaka maskiner vilket är beroende av hur många maskiner samt vilken utnyttjandegrad de hade i ursprungsläget. Vid framtagandet av beräkningsmetoden togs inspiration från tidigare arbeten inom detta område men anpassades eller förenklades för att möta behoven från underhållsavdelningen. En utveckling av metoden gjordes även för att kunna analysera historiska data där information omproducerad variant saknas och då används ett viktat genomsnitt för påverkansfaktorn. Påverkansfaktorn bortser från buffertars påverkan på systemet men hur de ska inkorporeras undersöktes och därav togs ett förslag fram där kritisk driftstoppstid (critical downtime) används tillsammans med påverkansfaktorn för att ta hänsyn till såväl buffertar som parallell utrustning. Ett verktyg skapades för Scania IM för att underlätta användandet av framtagna beräkningsmetoder. Det som kvarstår efter avslutat arbete är att över tid testa de framtagna metoderna för att undersöka hur väl de överensstämmer med verkligt produktionsutfall. Detta kunde ej genomföras under gällande situation då produktionen ej var i drift enligt normalläge under tidsperioden för arbetet. / For this thesis, Scania IM sought a method for calculating the impact of machine downtime on the output of a production line. The method was created to be applied on a production line with a seriesparallel flow and was constructed based on a selected line where cylinder heads are machined. To achieve this a variable called impact factor was created that produces the effect an individual machines downtime has on the bottleneck equipment for the production line, which in turn accounts for the utmost limitation of the system. At serial stations, an impact factor of 100% is obtained, but at stations with parallel equipment, there is a remaining capacity if at least one machine is functioning. The amount on remaining capacity is dependent on how many of the parallel machines that are malfunctioning and the degree of utilization they had in the original state. In developing the calculation method, inspiration was taken from previous work regarding similar subjects, but it was either adapted or simplified to meet the needs of the maintenance department for the production line. A further development of the method was also made to be able to analyze historical data where information on the produced variant of cylinder heads is missing which led to the use of a weighted average for the impact factor. The impact factor ignores the effects of buffers on the system output, but how they are to be incorporated was investigated and a proposal was therefore made where critical downtime is used together with the impact factor to take into account both buffers and parallel equipment. A tool was created for Scania IM where they can perform these calculations. What remains after completion of the thesis is to test the developed methods over time to examine how well they correspond to actual production data. This could not be done during the time of this thesis due to the current situation when production was not operating according to normal conditions.
4

Kartläggning av problem vid projektering, installation och drift av värmepumpar / Mapping of problems with the design, installation and operation of heat pumps

Åhlander Pettersson, Victoria, Mattsson, Anton January 2018 (has links)
För att kunna utföra energieffektiviserande åtgärder i en befintlig byggnad, och generera ett bra utfall, krävs goda kunskaper om projektet. Detta betyder att alla discipliner måste ha ett gott samarbete och att varje disciplin måste ta sitt ansvar för uppgiften. Det är inte alltid som utfallet blir det optimala. En sammanställning i tabellform kan tydligt påvisa de frekventa problemen. Detta har genom att belysa de problem som uppstår i samband med projektering, installation och drift av värmepumpar i tre olika fall genererat en sammanställd tabell. Resultatet visar att åtta olika problem förekommer och samtliga resultat förklaras och analyseras. Genom att påvisa svagheter, och ge förslag på möjliga åtgärder kan problem med projektering, installation och drift av värmepumpar minska. / In order to be able to perform energy efficiency measures in an existing building, and generate a good outcome, good knowledge of the project is required. This means that all disciplines must have a good cooperation and that each discipline must take responsibility for the task. It is not always that the outcome will be optimal. A summary in tabular form can clearly identify the frequent problems. This is done by highlighting the problems that arise in connection with the design, installation and operation of heat pumps in three different cases, generating a compiled table. The result shows that eight different problems occur and all results are explained and analyzed. By detecting weaknesses, and suggesting possible measures, problems with the design, installation and operation of heat pumps may decrease.

Page generated in 0.0709 seconds