• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 506
  • 10
  • 8
  • 8
  • 8
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • Tagged with
  • 529
  • 529
  • 529
  • 248
  • 221
  • 183
  • 181
  • 122
  • 91
  • 81
  • 75
  • 71
  • 62
  • 60
  • 59
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
431

A atratividade do negócio de transmissão de energia elétrica no novo modelo setorial brasileiro

Martorano, Juliano Cavini 15 January 2002 (has links)
Made available in DSpace on 2010-04-20T20:17:25Z (GMT). No. of bitstreams: 0 Previous issue date: 2002-01-15T00:00:00Z / Trata da reestruturação do setor elétrico brasileiro implementada na segunda metade dos anos 90, enfatizando o surgimento das empresas de transmissão de energia elétrica. Analisa os modelos de tarifação existentes e sua utilização no caso brasileiro. Examina a taxa de retorno e os riscos envolvidos no negócio de transmissão de energia, sugerindo uma proposta de remuneração para as empresas deste segmento.
432

Impactos da governança setorial: o caso da distribuição de energia elétrica no Brasil

Silva, Guilherme Miranda Pedroza da January 2017 (has links)
Submitted by Guilherme Miranda (guilhermemps@hotmail.com) on 2018-03-18T03:21:30Z No. of bitstreams: 1 Guilherme_Miranda_Dissertacao_MFEE.pdf: 1044270 bytes, checksum: 23976d2e64ae148ac47c9d8ccafa096c (MD5) / Approved for entry into archive by GILSON ROCHA MIRANDA (gilson.miranda@fgv.br) on 2018-04-04T16:58:00Z (GMT) No. of bitstreams: 1 Guilherme_Miranda_Dissertacao_MFEE.pdf: 1044270 bytes, checksum: 23976d2e64ae148ac47c9d8ccafa096c (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2018-04-12T12:28:02Z (GMT) No. of bitstreams: 1 Guilherme_Miranda_Dissertacao_MFEE.pdf: 1044270 bytes, checksum: 23976d2e64ae148ac47c9d8ccafa096c (MD5) / Made available in DSpace on 2018-04-12T12:28:29Z (GMT). No. of bitstreams: 1 Guilherme_Miranda_Dissertacao_MFEE.pdf: 1044270 bytes, checksum: 23976d2e64ae148ac47c9d8ccafa096c (MD5) Previous issue date: 2018-01-18 / Good institutional frameworks lead to the most solid and sustainable socio-economic development processes in the nations and, in this sense, the governance structures between the various institutions of state and government play a fundamental role. In this line, this study investigates the impacts of governmental interventions related to the institutional governance structure on the electricity distribution companies in Brazil. In order to do so, we used indicators of financial and operational performance of companies and events related to relevant changes in sector governance since 2000. The evidence found indicates that such events did affect the performance of the sector. / Bons arcabouços institucionais levam à processos de desenvolvimento socioeconômicos mais sólidos e sustentáveis nas nações e, neste sentido, as estruturas de governança entre as diversas instituições de estado e governo possuem papel fundamental. Nesta linha, este estudo investiga os impactos de intervenções governamentais relacionadas a estrutura de governança institucional sobre as companhias de distribuição de energia elétrica no Brasil. Para tal , foram utilizados indicadores de performance financeira e operacional das empresas e eventos relacionados a mudanças relevantes na governança do setor a partir de 2000. As evidências encontradas indicam que tais eventos de fato afetaram a performance do setor.
433

Metodologia multicritério para priorização de investimentos no planejamento da expansão de sistemas de distribuição de energia elétrica

Busatto, Tatiano January 2015 (has links)
Este documento apresenta o desenvolvimento de um modelo computacional para prover informações aos tomadores de decisão frente as alternativas de investimentos na expansão das redes de distribuição. Estas redes, por estarem localizadas em áreas urbanas e rurais, apresentam variadas topologias e número elevado de equipamentos na sua composição, dificultando a análise técnica e econômica diante do número elevado de variáveis envolvidas. O método proposto inclui a avaliação dos principais fatores que tem influência na qualidade da energia, incluindo os índices de confiabilidade. Adicionalmente, aspectos relacionados com os custos financeiros e eficiência são considerados para diferentes condições de operação. As decisões são feitas considerando o desempenho dos transformadores e requisitos exigidos em normas de confiabilidade da agência reguladora do sistema elétrico. Perda de vida em transformadores, perdas técnicas, níveis de tensão e fator de utilização são avaliados em conjunto com a confiabilidade no fornecimento de energia, a fim de combinar os resultados destes critérios com indicadores financeiros. O resultado é a obtenção de indicadores individuais e coletivos que facilitam a tomada de decisão no direcionamento de investimentos a curto e médio prazo, proporcionando de maneira prática e fácil a comparação entre alimentadores, subestações ou mesmo regiões que compõem um sistema de distribuição. Por fim, para verificação do método, realiza-se um estudo de caso num sistema de distribuição real onde são analisados e discutidos os resultados. / This document aims to present the development of a computational model to provide information for decision-making toward the alternatives of investments in distribution system planning. These networks, as they are located in urban and rural areas, can present varied topologies and large numbers of equipment in its arrangement, making it difficult in performing technical and economic analysis due to the large number of variables involved. The proposed method includes the evaluation of main factors that have influence on power quality, including the reliability indexes. Additionally, aspects related to economic costs and energy efficiency are considered for different operating conditions. The decision is made taking into account the performance of medium voltage transformers and distribution system reliability standards of Regulatory Agency requirements. Loss of life in transformers, technical losses, voltage levels, and utilization factor are assessment together with continuity and availability of power supply in order to combine the results of these criteria with financial indicators. The result is the achievement of individual and collective indicators that facilitate decision making in directing investments in the short and medium term, providing a practical and easy way to compare feeders, substations or even regions that comprise a distribution system. The methodology is applied in a real distribution system, and the result are analyzed and discussed.
434

Ferramenta de apoio à decisão para priorização de obras de manutenção em redes de distribuição de energia elétrica

Fernandes, Leandro January 2014 (has links)
O presente trabalho apresenta, primeiramente, o desenvolvimento e aplicação de uma Ferramenta de Apoio à Decisão (FAD), seguindo os conceitos de Sistemas de Informação (SI), para facilitar o acesso e visualização de informações técnicas estratégicas, e que possa compor um Sistema de Apoio à Decisão (SAD) que englobe o portfólio de informações necessárias para o planejamento da priorização de obras de investimento e expansão das redes de distribuição de energia. A FAD proposta realiza o tratamento de um grupo de dados relativos a incidência de interrupções de energia da rede de distribuição de uma concessionária do setor elétrico, de forma a disponibilizar as informações depuradas para auxílio na tomada assertiva de decisão para aplicação de recursos para execução de ações de manutenção em rede de distribuição. Em seguida, exibe a inclusão de uma função de análise, no aplicativo desenvolvido como Ferramenta de Apoio à Decisão (FAD), baseada na priorização multicriterial AHP (Analytic Hierarchy Process). A aplicação do método AHP indica as estações avançadas da concessionária que possuem prioridade para a aplicação de recursos que visam à execução de ações de manutenção em rede de distribuição para a melhoria nos indicadores de continuidades do fornecimento de energia. / This paper first introduces the development and application of a Decision Support Tool (FAD), following the concepts of Information Systems (IS), to facilitate the availability and visualization of strategic techniques information, and can compose a Decision Support System (DSS) that encompasses the entire portfolio of information needed for planning the prioritization of investment works and expansion of power distribution networks. The proposed FAD performs the treatment of a group of data on the incidence of power outages in the distribution of the electric utility industry network in order to provide information to aid in purified assertive decision making for application of resources for execution maintenance actions in the distribution network. Then displays the inclusion of an analysis function, the application developed as a Tool for Decision Support (FAD), multicriteria prioritization based on AHP (Analytic Hierarchy Process). The application of AHP method indicates the advanced utility stations that have priority for use of funds aimed at the implementation of maintenance actions in the distribution network to improve the indicators of continuity of power supply.
435

Localização de faltas de alta impedância em sistemas de distribuição de energia : uma abordagem baseada na estimação de parâmetros associados a modelos no domínio do tempo

Iurinic, Leonardo Ulises January 2016 (has links)
A detecção de um tipo particular de falta, denominado de alta impedância, tem sido há muito tempo um desafio para a engenharia de proteção. Por outro lado, se a detecção é realizada com sucesso, ações preventivas e de manutenção devem ser tomadas para evitar prejuízos potenciais. Nesse contexto, os métodos de localização de faltas assumem importante papel, pois contribuem para a rápida restauração do sistema. Entretanto, os métodos clássicos, em particular as formulações a um terminal, não consideram modelos realísticos de faltas de alta impedância na sua formulação. Este tipo de falta se caracteriza pelo contato de um condutor energizado com uma superfície de elevada resistência elétrica, em que o comportamento da tensão em função da corrente apresenta uma característica não linear. Desta forma, esta tese propõe uma nova formulação para a localização de faltas de alta impedância em sistemas de distribuição de energia elétrica, com medições a um terminal, que considere tal efeito. A formulação é proposta para estimar a distância da falta em linhas de distribuição utilizando o método de estimação por mínimos quadrados, desenvolvendo um modelo no domínio do tempo do sistema elétrico e um modelo de falta de alta impedância composto por diodos antiparalelos. Mediante o modelo do sistema elétrico, é possível estimar a distância da falta, juntamente com os parâmetros da falta de alta impedância, usando sinais provenientes de um terminal, como um problema de otimização. Primeiramente, não considerando o efeito capacitivo das linhas, um modelo linear no domínio do tempo é obtido e um estimador de mínimos quadrados linear é proposto. Posteriormente, considerando o efeito capacitivo das linhas, um modelo não linear no domínio do tempo é obtido e um algoritmo de descida é proposto para a estimação dos parâmetros. Os estudos de caso foram realizados no sistema de 13 barras da IEEE modelado no Alternative Transient Program. Em todas as condições simuladas, os resultados obtidos mostraram um desempenho similar da técnica proposta com ou sem a consideração da capacitância das linhas, sendo assim, por simplicidade, optou-se pela desconsideração da capacitância. Os resultados evidenciaram que a técnica de localização de faltas proposta não mostra diferença no seu desempenho com variações do ângulo de incidência da falta e melhora quando o carregamento do sistema diminui. O erro relacionado à estimativa da distância da falta mostra-se, em geral, superior ao erro cometido ao estimar os parâmetros da falta de alta impedância. Por outro lado, os estudos de caso mostram um grande potencial para aplicar a técnica proposta como um detector e classificador de faltas de alta impedância. / High impedance fault location has always been a challenge for protection engineering. On the other hand, if this task is successfully realized maintenance action could be performed in order to avoid potential injuries. For an effective protection scheme the high impedance fault location should be performed, but a lack of research on this area is noted. This thesis proposes a new analytical formulation for high impedance fault location in power systems. The approach is developed in time domain, considering a high impedance fault model composed by two antiparallel diodes. Using this model, the fault distance and fault parameters are estimated as a minimization problem, allowing the location of the fault using one terminal signals. Firstly, the line capacitance is not considered and a linear model in time domain is obtained. In this case, the linear least square estimator is used for parameter estimation. In a second moment, the line capacitance is considered and a non-linear model in time domain is obtained. Hence, a steepest descent based estimator is proposed in order to estimate the parameters. Studies were carried out with the IEEE 13 bus modeled in the Alternative Transient Program. In view of the test results, the non-consideration of line capacitance resulted in similar accuracy in relation to its consideration. The method also is insensitive to the fault inception instant and the reduction of system load reduces the errors related to the estimations. The error related to fault distance estimation is in general greater than the estimation of the high impedance fault parameters. On the other hand, case studies shows the great potential of the technique as a high impedance fault detector method.
436

Modelos matemáticos para otimização da confiabilidade de sistemas elétricos de distribuição com geração distribuída

Ferreira, Gustavo Dorneles January 2013 (has links)
sensíveis têm requerido elevados níveis de confiabilidade dos sistemas de distribuição de energia. Em meio a este cenário, a proliferação de geradores distribuídos conectados próximos às cargas evidencia o surgimento de um novo paradigma na produção e utilização da energia elétrica. No entanto, muitos problemas decorrem do fato de que os sistemas de distribuição não foram projetados para incorporar unidades geradoras de energia. A estratégia completa de controle e proteção é definida sob o pressuposto do fluxo unidirecional de potência nos alimentadores. Um dos conflitos mais imediatos que surgem com a penetração da geração distribuída é relacionado ao sistema de proteção, resultado da alteração na magnitude das correntes de falta. Algumas consequências são a perda da sensibilidade e da coordenação da proteção. Se contornados estes problemas, a geração distribuída tem potencial para exercer impacto positivo sobre a confiabilidade, em especial no suporte ao restabelecimento da carga em situações de contingência. Tendo em vista estes fatores, a metodologia proposta adota uma perspectiva multicriterial para otimizar o desempenho dos sistemas de distribuição na presença da geração distribuída. Os indicadores SAIDI, SAIFI e MAIFI são formulados como modelos de otimização que possibilitam a adequação do sistema de proteção às condições operacionais impostas pela geração distribuída. Dentre os aspectos considerados incluem-se a alocação, a seletividade e a coordenação dos dispositivos de proteção. A alocação de chaves de manobras para reconfiguração do alimentador é a estratégia adotada para maximizar o efeito positivo da geração distribuída sobre a confiabilidade. As soluções dos modelos definem os locais de instalação dos dispositivos de proteção e manobras, e os ajustes dos religadores de forma independente para as unidades de fase e terra. A minimização simultânea dos indicadores é formulada como um problema de Programação Linear Inteira Mista por Metas, visando o balanço ótimo entre a redução das interrupções momentâneas e sustentadas nos sistemas de distribuição. Os modelos analíticos dos indicadores são solucionados utilizando um pacote de otimização de uso geral, baseado no método de Branch-and-Bound. A metodologia é avaliada a partir de um estudo de caso, considerando níveis crescentes de penetração da geração distribuída em um alimentador de distribuição real. Os modelos matemáticos são aplicados em cenários distintos de operação do sistema, associados à diferentes restrições econômicas. Os resultados possibilitam a avaliação do impacto da geração distribuída no restabelecimento e na proteção do sistema de forma independente. / The increasing automation of industrial processes and the sensitivity of electronic loads have required high levels of power distribution system’s reliability. In this scenario, the widespread use of distributed generators connected near the loads shows the emergence of a new paradigm in electric energy production and application. However, many problems arise from the fact that the distribution systems were not designed to deal with power generating units. The complete control and protection strategy is defined under the assumption of radial power flow. One of the most immediate conflicts that arise with the penetration of distributed generation is related to the protection system, a result of the change in fault currents magnitude. Some consequences are loss of protection coordination and sensitivity. By addressing these problems, distributed generation has the potential to have a positive impact on distribution reliability, especially in supporting load restoration during system’s contingencies. Considering these factors, the proposed methodology uses a multi-criteria approach to optimize the overall performance of distribution systems in the presence of distributed generation. The reliability indices SAIDI, SAIFI and MAIFI are formulated as optimization models that allow adequacy of the protection system in relation to the operating conditions imposed by distributed generation. The aspects considered include the allocation, selectivity and coordination of protective devices. The allocation of sectionalizing switches for feeder restoration is the strategy to maximize the positive impact of distributed generation on the system reliability. The model solutions provide the protective devices and switches locations, as well as reclosers’ settings for phase and ground units, independently. Reliability indices minimization is formulated as a Mixed Integer Linear Goal Programming problem, in order to establish the optimal trade-off between reducing momentary and sustained interruptions in distribution systems. The analytical models are solved using a general-use optimization package based on the Branch-and-Bound method. The methodology is evaluated through a case study considering increasing levels of distributed generation penetration on a real distribution feeder. The proposed mathematical models are applied in different scenarios of system operation and under different economic constraints. The results allow the evaluation of the impact of distributed generation on restoration and protection of the test system.
437

Habilidades de resiliência em distribuidora de energia elétrica : recrutamento, seleção e treinamento de eletricistas e operadores do centro de operações da distribuição

Alves, Alexandre Eberle January 2016 (has links)
A convergência das habilidades técnicas com as de resiliência contribui para promover um ambiente que opere de maneira segura e eficiente. Nesta busca, pretende-se obter um sistema que mantenha o processo operante durante os infortúnios, em especial, os inesperados. Além disso, utiliza-se o conhecimento de engenharia de resiliência, tema deste estudo, que é a capacidade de um sistema ajustar o seu desempenho e, desta forma, lidar com situações críticas. O objetivo geral desta dissertação é a identificação de habilidades de resiliência utilizadas na execução de atividades de manutenção emergencial de problemas na rede elétrica de uma distribuidora de energia. Neste trabalho, são abordadas as atividades de eletricistas e operadores do Centro de Operações da Distribuição (COD) da empresa estudada. Os objetivos específicos são: (1) investigar a forma de aplicação dos filtros utilizados no processo de recrutamento e seleção da empresa para verificar se as habilidades de resiliência são contempladas e (2) propor melhorias no processo de treinamento, com base nas informações e nos resultados obtidos, bem como nos processos da empresa para facilitar e minimizar a necessidade do uso das habilidades de resiliência identificadas. Assim, sob o prisma da Engenharia de Resiliência, este estudo visa à melhor compreensão do processo de seleção e recrutamento, bem como ao treinamento destes profissionais para a sua melhoria. / The convergence of technical skills with resilience contributes to foster an environment that works safely and efficiently. The objective of this search is to obtain a system in which the functioning of the process is maintained during misfortunes, or unexpected events. Furthermore, the study approaches resilience engineering knowledge as its core subject, which is the capacity of a system to adjust its performance in order to be able to deal with critical situations. The main goal of this thesis is to identify resilience skills while performing emergency maintenance activities and diagnosing problems in the electrical network during events involving equipment failures at an energy distributor. This paper approaches the activities of the operators of the Distribution Operations Center (COD) of the company in the study. The specific objectives are: (1) to investigate the way the filters are used in the recruitment and selection process of the company to verify whether resilience skills are included, and (2) to propose improvements in the training process based on the data and results obtained, as well as on other processes of the company to facilitate and minimize the identified need for resilience skills. This way, under the Resilience Engineering perspective, this study aims at obtaining a better understanding of the recruitment and selection process, as well as improving professional training.
438

Alocação de dispositivos de proteção e manobras para otimização da confiabilidade de sistemas elátricos de distribuição de energia com restrições de restabelecimento

Campo, Sergio Daniel Martinez January 2014 (has links)
Uma das principais metas das empresas concessionárias é fornecer energia a seus clientes de forma continua, confiável e com baixo custo. A qualidade do serviço de distribuição de energia é fiscalizada por órgãos reguladores do setor elétrico, sendo quantificada por métricas como o indicador de confiabilidade SAIDI (System Average Interruption Duration Index). A melhoria da confiabilidade dos sistemas de distribuição de energia elétrica é um assunto em destaque atualmente, tendo em vista a necessidade de um suprimento de energia cada vez mais confiável, para evitar as perdas econômicas que ocorrem com as interrupções. Neste contexto, este trabalho apresenta uma contribuição para a solução do problema de restabelecimento de sistemas de distribuição. A abordagem consiste no desenvolvimento de um modelo analítico de otimização, cujo objetivo principal é determinar a localização das chaves de manobras na rede que possibilite o restabelecimento efetivo da carga no período pós-falta. A viabilidade do restabelecimento é considerada através de restrições que garantem níveis adequados das tensões nas cargas, bem como a limitação da sobrecarga das linhas e as capacidades de reserva dos alimentadores adjacentes. A modelagem destas restrições é efetuada através de uma versão linear do fluxo de potência em termos das injeções nodais de correntes. As equações que descrevem o fluxo de potência são formuladas como funções das localizações das chaves de manobras no alimentador. A confiabilidade é caracterizada em termos da duração média das interrupções sustentadas, mensurada pelo indicador SAIDI. Visando à maior precisão na representação do efeito das faltas sobre a confiabilidade do alimentador, a metodologia agrega um modelo existente na literatura para alocação dos dispositivos de proteção de forma simultânea às chaves de manobras. A alocação dos dispositivos de proteção e manobras é sujeita a restrições técnicas e econômicas. Para resolver o modelo de otimização não-linear inteira mista, é usada uma técnica de otimização de uso geral, baseada no algoritmo Branch-and-Bound. Assim, metodologia permite a otimização determinística da confiabilidade do alimentador, garantindo o nível ótimo de confiabilidade e a racionalização dos investimentos por parte das concessionárias. Um estudo de caso é apresentado para avaliar a efetividade da metodologia na otimização da confiabilidade de um alimentador de distribuição real. / One of the main goals of utility companies is to provide energy to its customers continuously, reliably and cost effectively. The quality of power distribution service is supervised by regulators of the electricity sector, being quantified by metrics such as the reliability index SAIDI (System Average Interruption Duration Index). Improving the reliability of electricity distribution systems is a key issue nowadays, in view of the need for an increasingly reliable power supply in order to avoid the economic losses due to interruptions. In this context, this work presents a contribution to solve the distribution systems restoration problem. An analytical model is developed to determine locations of the sectionalizing switches in order to restore the system loads in the post-fault period. Restoration feasibility is considered by constraints that ensure adequate voltage levels on the system loads, emergency capacity of support feeders as well as line overloads. Constraints modeling is performed by a linear power flow based on current injection approach. Power flow equations are formulated as functions of switches locations. Reliability is considered in terms of average interruption durations measured by the SAIDI index. Aiming to a greater precision in representing the reliability impact of faults, the methodology aggregates a model from the literature for simultaneous allocation of protective devices and switches. Protective devices and switches allocation is subject to technical and economical constraints. The proposed model is solved by a general-use optimization technique, based on the branch-and-bound method. The proposed methodology makes possible the deterministic optimization of distribution reliability, as well as to rationalize investments of electric utilities. A case study is presented to evaluate the effectiveness of reliability optimization of a real distribution feeder.
439

Ações de melhoria a partir da "voz" do cliente corporativo : um estudo em uma empresa de distribuição de energia elétrica

Batista, Paulo Cesar January 2007 (has links)
Esta dissertação tem como objetivo apresentar um plano de ação de melhoria para o atendimento dos clientes corporativos de energia elétrica, que utilizam alta tensão. O estudo aplicado foi realizado em uma empresa distribuidora de energia elétrica do Rio Grande do Sul, baseado em uma pesquisa quantitativa de mercado. Trata-se de uma empresa que trabalha com clientes cativos (atendidos exclusivamente pela concessionária), mas o cenário está mudando com a legislação vigente, trazendo a figura do cliente livre, que poderá escolher seu fornecedor de energia elétrica. Os principais resultados da pesquisa revelam que entre as ações prioritárias para a melhoria da satisfação dos clientes corporativos, destacam-se: a reestruturação organizacional da área de relacionamento com o mercado, buscando estreitar o relacionamento entre os empregados da empresa e os clientes; a revisão dos processos internos para melhoria no tempo de resposta aos clientes; e a melhoria na comunicação da empresa com seus clientes, principalmente em relação aos direitos e deveres, o uso adequado de energia e os riscos associados ao uso de energia elétrica. / The purpose of this paper is to present an action plan that leads to the improvement on the services intended for the electric energy clients supplied with high voltage. The study was applied in a company that distributes electric energy in Rio Grande do Sul, and it was based on a quantitative market research. The company works with captive customers (whose services are only provided by this concessionaire). However this scenario is changing with the current legislation, bringing out the figure of free clients who will be able to choose their supplier of electric energy. The main results of this search show that, among the most important actions for client satisfaction improvement, the following are distinguished: (i) company's reorganization, mainly in the customer relationship area, aiming to intensify the relationship between clients and company's employees, (ii) review of the internal process for improvements concerning response time, and (iii) improvement in the communication with its clients, mainly concerning rights and dues, the adequate use of energy, and risks associated to the use of electric energy.
440

Análise do processo de implementação das ações integradas do Programa Luz para Todos em uma comunidade rural : uma perspectiva de análise de desenvolvimento protagonizada pelos atores locais

Lovato, Siusiane January 2009 (has links)
Em um contexto de pobreza e exclusão elétrica, a comunidade rural de Linha Betânia composta por dezessete famílias de pequenos agricultores vivendo em condições de isolamento e com um baixo nível de desenvolvimento, localizada no município de Sananduva/RS, foi beneficiada por um projeto de desenvolvimento local promovido e apoiado pelas Ações Integradas do Programa Luz para Todos, o qual teve sua implementação iniciada em 2007, após essas famílias terem tido acesso à energia elétrica por meio do mesmo Programa. As Ações Integradas, como um incremento do Programa Luz para Todos, pretendiam com o projeto contribuir para a melhoria das condições de vida das famílias atendidas e outras do entorno, por meio da construção de uma microdestilaria de álcool combustível e uma agroindústria comunitária, visando também fortalecer a capacidade produtiva e organizativa dessas famílias. A ideia iniciada pelas Ações Integradas do Programa Luz para Todos se converteu em um processo de implementação que envolveu atores estatais e não-estatais, a saber, as famílias de pequenos agricultores beneficiadas; a Cooperativa Regional de Eletrificação Rural do Alto Uruguai Ltda. (Creral), organização social representante dessas famílias e parceira do Programa Luz para Todos; e os agentes das Ações Integradas do Programa, entre eles, dois consultores da parceira do Programa com o Programa das Nações Unidas para o Desenvolvimento (PNUD). Para analisar o processo de implementação desse projeto, em relação aos pressupostos do desenvolvimento local de participação e protagonismo dos atores locais a partir da perspectiva orientada ao ator, objetivo deste trabalho, utilizou-se da estratégia de pesquisa estudo de caso, de caráter descritivo, com uma abordagem qualitativa. Foram realizadas entrevistas semi-estruturadas com os principais atores envolvidos no processo de implementação, bem como foram utilizados documentos para o levantamento de dados. Constatou-se que os esforços integrados de atores estatais e não-estatais foi fundamental para o êxito da implementação do projeto de desenvolvimento local em Linha Betânia. Foi possível observar sinergias entre os atores envolvidos, tendo-se um processo caracterizado pela parceria, participação e solidariedade em direção a um movimento de mudança protagonizado pela ação dos principais atores envolvidos. Com destaque para a atuação da Creral que, juntamente com os agentes do Programa Luz para Todos e as famílias beneficiadas, agiram e defenderam, de forma geral, um novo paradigma societal, com uma postura crítica. Todavia, no que tange à rede de parceiros estabelecida para o processo, pode-se dizer que, com relação aos ideais das Ações Integradas do Programa Luz para Todos, de firmar ações intersetoriais e intergovernamentais, faltou uma maior articulação de modo a formar parcerias nos diferentes níveis de governo e diferentes setores. Ou seja, o projeto de desenvolvimento local implementado em Linha Betânia não encontrou respaldo na esfera municipal, principalmente na primeira etapa, o que leva a concluir que é necessária uma maior articulação dos atores já envolvidos, a fim de ampliar os esforços na implementação dos projetos das Ações Integradas do Programa Luz para Todos. / In a context of poverty and electrical exclusion, the rural community of Linha Betânia composed of seventeen families of small farmers living in isolation conditions and with a low level of development, located in Sananduva/RS, was benefited from a local development project sponsored and supported by the Integrated Actions of Energy for All Program, which had started its implementation in 2007, after these families had access to electricity through the same program. The Integrated Actions, as an increase in the Energy for All Program, had the intention with the project to contribute to improving the living conditions of the families attended through the construction of a small-scale distillation of ethanol from sugar-cane and community agro-industry, aiming to strengthen the productive and organizational capacity of these families. The idea initiated by the Integrated Actions of Energy for All Program has become a process of implementation that involved state and non-state actors, the families of small farmers benefited; the Rural Electrification Regional Co-operative of the High Uruguay Ltda. (Cooperativa Regional de Eletrificação Rural do Alto Uruguai - Creral), social organization representative of these families and partner of the Energy for All Program; and the agents of the Integrated Actions of the Program, among them, two consultants from the program partnership with United Nations Development Program (UNDP). To analyze the process of implementing this project in relation to the assumptions of the local development of participation and protagonism of local actors from the actor-oriented perspective, objective of this work, was used the strategy of research case study, descriptive in nature, with a qualitative approach. It were made semi-structured interviews with key actors involved in the implementation process, and documents were used for the data collection. It was found that the integrated efforts of state and non-state actors were crucial for the successful implementation of local development project in Linha Betânia. It was possible to observe synergys between the actors involved, and it was a process characterized by partnership, participation and solidarity toward a movement for change protagonized by the action of the main actors involved. With emphasis on the role of Creral which, together with the agents of the Energy For All Program and beneficiary families, acted and defended, in general, a new societal paradigm, with a critical posture. However, with regard to the established network of partners to the process, we can say that with respect to the ideals of the Integrated Actions of Energy for All Program, to enter into intergovernmental and intersectoral action, greater articulation failed to form partnerships in different levels of government and different sectors. That is, the local development project implemented in Linha Betânia has not found support in the municipal sphere, especially in the first stage, which leads to the conclusion that a greater articulation of actors now involved is necessary, in order to expand efforts in the implementation of projects of Integrated Actions of Enegy for All Program.

Page generated in 0.0776 seconds