• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 247
  • 8
  • 2
  • Tagged with
  • 259
  • 165
  • 62
  • 58
  • 56
  • 55
  • 53
  • 47
  • 46
  • 45
  • 43
  • 42
  • 42
  • 40
  • 39
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Estudo de metodologias de controle de qualidade do Mo-99 utilizado no preparo de geradores de Mo-99/Tc-99m / Study of methodologies for quality control of 99Mo used in 99Mo/99mTc generators

Said, Daphne de Souza 17 March 2016 (has links)
O 99mTc é o radionuclídeo mais utilizado em medicina nuclear. No Brasil os geradores de 99Mo/99mTc são produzidos exclusivamente pelo Centro de Radiofarmácia do IPEN-CNEN/SP, com 99Mo importado de diferentes fornecedores. O 99Mo (t1/2 = 66 h), por ser um produto de fissão do 235U, pode conter impurezas radionuclídicas prejudiciais à saúde humana. Dessa forma, para que o gerador seja utilizado de forma segura, é necessário que o 99Mo seja avaliado por ensaios de controle de qualidade e atenda à alguma especificação descrita em farmacopeia. A Farmacopeia Europeia (FE) apresenta monografia, com parâmetros (identificação, pureza radioquímica e pureza radionuclídica), métodos de análise, e limites, para avaliação da qualidade da solução de [99Mo] na forma de molibdato de sódio, que é utilizada como matéria-prima no preparo dos geradores de 99Mo/99mTc. No entanto, observa-se uma dificuldade na implementação e execução dos métodos por parte dos produtores de geradores, com pouca literatura sobre o assunto, provavelmente devido à falta de praticidade dos métodos propostos e à extensa lista de reagentes utilizados. Nesse trabalho foram avaliados vários parâmetros de qualidade do 99Mo descritos na monografia da FE. Foram estudados métodos de separação do 99Mo de suas impurezas radionuclídicas por extração em fase sólida (SPE) e por TLC. Após separação por SPE, foi proposta a quantificação de metais por ICP-OES para avaliar a porcentagem de retenção de Mo e a porcentagem de recuperação de Ru e Te e Sr em diversos tipos de cartuchos, em substituição ao uso de radiotraçadores. Observou-se que a marca de cartucho de SPE para separação do 99Mo recomendada pela FE apresentou baixa recuperação para Ru, quando comparado aos outros cartuchos de troca aniônica disponíveis no mercado. Amostras de 99Mo de diferentes fornecedores mundiais foram analisadas. Observou-se que é possível realizar a quantificação de 103Ru em amostras de 99Mo mesmo com tempos de decaimento acima de 4 semanas. Um método alternativo de separação do 99Mo do 131I por TLC apresentou resultados promissores. Não foi feita a quantificação das impurezas radionuclídicas emissoras beta e alfa. Todas as amostras analisadas apresentaram resultados dentro das especificações da FE para pureza radioquímica (>95%) e pureza radionuclídica. / 99mTc is the most used radionuclide in nuclear medicine. In Brazil, the 99Mo/99mTc generators are exclusively produced by Radiopharmacy Center at IPENCNEN/ SP, by importing 99Mo from different suppliers. 99Mo (t1/2 = 66 h) is a fission product of 235U and it can have radionuclidic impurities that are prejudicial for human health. For safe use of generators, it is necessary to perform the evaluation of 99Mo by quality control tests in order to assess if 99Mo complies with the specifications. The European Pharmacopoeia (EP) presents a monograph for evaluation of the quality of the [99Mo] solution as sodium molybdate,that is used as raw material for 99Mo/99mTc generators production, including specification parameters (identification, radiochemical purity and radionuclidic purity), analysis methods and limits. However, it has been observed difficulties on the execution and implementation of these methods by the generators producers, with a few literature about this subject, probably due to complexity of the proposed methods. In this work, many quality control parameters of 99Mo described in the EP monograph were evaluated. Separation methods for 99Mo from its radionuclidic impurities by solid phase extraction (SPE) and TLC were studied. After SPE separation, the quantification of metals by ICP-OES to evaluate the percentage of retention of Mo and the percentage of recovery of Ru, Te and Sr using different types of cartridges were proposed, replacing radiotracers use. It was observed that the specific type of SPE cartridge recommended by the EP for separation of 99Mo presented low recoveries for Ru, compared to other available anion exchange SPE cartridges. 99Mo samples from different worldwide suppliers were analyzed. It was observed that quantification of 103Ru in 99Mo samples with decay time higher than 4 weeks is possible. An alternative method for separation of 131I from 99Mo showed promising results by TLC. The quantification of beta and alpha emitters radionuclidic impurities was not performed. All analysed samples presented results that comply with EP specifications for radiochemical purity (>95%) and for radionuclidic purity.
142

Algoritmos de adaptação do padrão de marcha utilizando redes neurais / Gait-pattern adaptation algorithms using neural network

Gomes, Marciel Alberto 09 October 2009 (has links)
Este trabalho apresenta o desenvolvimento de algoritmos de adaptação do padrão de marcha com a utilização de redes neurais artificiais para uma órtese ativa para membros inferiores. Trajetórias estáveis são geradas durante o processo de otimização, considerando um gerador de trajetórias baseado no critério do ZMP (Zero Moment Point) e no modelo dinâmico do equipamento. Três redes neurais são usadas para diminuir o tempo de cálculo do modelo e da otimização do ZMP, e reproduzir o gerador de trajetórias analítico. A primeira rede aproxima a dinâmica do modelo fornecendo a variação de torque necessária para a realização do processo de otimização dos parâmetros de adaptação da marcha; a segunda rede trabalha no processo de otimização, fornecendo o parâmetro otimizado de acordo com a interação paciente-órtese; a terceira rede reproduz o gerador de trajetórias para um determinado intervalo de tempo do passo que pode ser repetido para qualquer quantidade de passos. Além disso, um controle do tipo torque calculado acrescido de um controle PD é usado para garantir que as trajetórias atuais estejam seguindo as trajetórias desejadas da órtese. O modelo dinâmico da órtese na sua configuração atual, com forças de interação incluídas, é usado para gerar resultados simulados. / This work deals with neural network-based gait-pattern adaptation algorithms for an active lower limbs orthosis. Stable trajectories are generated during the optimization process, considering a trajectory generator based on the Zero Moment Point criterion and on the dynamic model. Additionally, three neural network are used to decrease the time-consuming computation of the model and ZMP optimization and to reproduce the analitical trajectory generator. The first neural network approximates the dynamic model providing the necessary torque variation to gait adaptation parameters process; the second network works in the optimization procedure, giving the adapting parameter according to orthosis-patient interaction; and the third network replaces the trajectory generation for a stablished step time interval which can be reproduced any time during the walking. Also, a computed torque controller plus the PD controller is designed to guarantee the actual trajectories are following the orthosis desired trajectories. The dynamic model of the actual active orthosis, with interaction forces included, is used to generate simulation results.
143

Análise dos tempos máximos de chaveamento dos modos de operação de um grupo gerador diesel após ilhamento / Analysis of the maximum switching times of the operating modes for a diesel generator set after islanding

Agnoletto, Elian João 21 July 2015 (has links)
A produção de energia elétrica por fontes de geração distribuída (GD) vem se tornando cada vez mais presente no sistema elétrico de potência. De modo geral, os sistemas de GD conectados à rede de distribuição operam controlando potências ativa e reativa, enquanto que no modo isolado, a frequência e a tensão. Sendo assim, após a ocorrência de um ilhamento deve haver alteração no modo de operação da GD para garantir a estabilidade da frequência e da tensão no subsistema ilhado. Ainda, se o modo de operação não for alterado após o ilhamento, os dispositivos de proteção podem atuar desligando a GD. Portanto, o tempo decorrido até a alteração do modo de operação desempenha um papel importante na indicação se a GD permanecerá ou não em funcionamento após a ocorrência do ilhamento. Neste trabalho, são determinados os tempos máximos para chaveamento dos modos de operação de um grupo motor gerador diesel (GMG) operando como GD, utilizando controladores clássicos (CCs) e controladores fuzzy (CFs). Foram analisadas as influências do desbalanço entre as potências geradas e consumidas, do tipo de carga conectada ao subsistema ilhado e do comprimento do alimentador nos tempos máximos. Para evidenciar possíveis vantagens da estratégia de controle não linear, é utilizada uma metodologia na qual o ajuste dos ganhos dos CFs é realizado a partir dos ajustes de referência dos CCs. Devido ao ganho variável que a estratégia não linear adiciona às ações de controle, a utilização de CFs nas malhas do GMG permitiu maiores tempos de chaveamento para determinadas faixas de operação, quando comparado com a utilização de CCs. / Distributed generation (DG) is becoming more present in the electrical power system. In general, when a DG is connected to the grid, the DG works with the active and reactive power control loops. Therefore, after an islanding occurrence, the DG must change the operation control mode from power control to voltage and frequency control to maintain the system stability. If the operation mode is not changed after islanding, the protective devices are sensitized and the DG is disconnected. Therefore, the time elapsed until the operation mode changes has an important role in the indication if the DG remains in operation or not after islanding. In this work, the maximum times for switching the operating control mode of a diesel generator set, working as a DG, are analysed using a classical control strategy (CC) and a fuzzy control strategy (FC). The influence of the power imbalance, load types and the feeder distance on the maximum available time to switch the operation control mode is investigated. To highlight the advantages of a nonlinear control strategy, is used a methodology in which the tuning of the FCs gains is performed from the CCs which are used as reference. Due to the variable gain added by the nonlinear strategy, the FC allowed higher switching times than the CC.
144

Gestão e gerenciamento dos resíduos de serviços de saúde pela administração pública municipal na UGRHI do Pontal do Paranapanema - SP / Management and health care waste management in generators institutions under public administration at the division of water resources of Pontal do Paranapanema - SP

Ferreira, Eduardo Rodrigues 18 July 2012 (has links)
Esta tese de doutorado teve como foco principal das análises, as atividades de gestão e gerenciamento dos resíduos de serviços de saúde na Unidade de Gerenciamento de Recursos Hídricos 22, Pontal do Paranapanema - SP. A hipótese formulada foi de que não havia conhecimento técnico em manejo de resíduos de serviços de saúde. Nos municípios, foram analisados a gestão e o gerenciamento dos resíduos de serviços de saúde em 19 municípios bem como as atividades das vigilâncias sanitárias municipais e o gerenciamento interno e externo dos resíduos de serviços de saúde de 77 estabelecimentos geradores, distribuídos nesses municípios, a saber: unidades básicas de saúde, prontos socorros e laboratório de análises clínicas. O estudo abrangeu também as atividades da Companhia Ambiental do Estado de São Paulo e do Comitê de Bacia Hidrográfica. As técnicas empregadas para a realização desta pesquisa foram: coleta de dados (emprego de questionário, formulário e observação); pesquisa bibliográfica (teses, livros, artigos) e documental (leis, normas, contratos, planos municipais de saúde e plano de gerenciamento dos resíduos de serviços de saúde - PGRSS); caracterização gravimétrica e classificação dos resíduos de serviços de saúde gerados pelos estabelecimentos municipais, durante o período de oito dias, como preconiza a Organização Pan-Americana de Saúde, aliada à Resolução CONAMA nº. 358/05. A pesquisa demonstrou que todos os 19 municípios contrataram empresas especializadas, terceirizando a coleta, o transporte, o tratamento e a disposição final dos resíduos de serviços de saúde. Além disso, foram verificadas dificuldades das vigilâncias sanitárias municipais em relação, às atividades de fiscalização, monitoramento e controle de resíduos de serviços de saúde, principalmente devido à transferência da gestão plena às vigilâncias sanitárias municipais pelo governo do Estado de São Paulo. Quanto ao gerenciamento interno dos resíduos de serviços de saúde nos estabelecimentos geradores, constatou-se a dificuldade em segregar resíduos do grupo A (infectantes) dos integrantes do grupo D (comuns), tendo sido constatada uma média de 15% de resíduos considerados comuns junto aos infectantes. A pesquisa revelou ainda, em relação aos procedimentos adotados, um aspecto preocupante do ponto de vista do cumprimento da RDC ANVISA nº 306/04, uma vez que 97,4% dos estabelecimentos não possuíam o PGRSS. A infraestrutura para abrigar os resíduos de serviços de saúde dentro das normas técnicas nos estabelecimentos geradores é quase inexistente, considerando que tal instalação foi verificada em somente 6,49% dos 77 estabelecimentos geradores. Diante dos resultados, confirmou-se, por fim, a ausência de capacitação técnica voltada ao manejo dos resíduos de serviços de saúde, na área de estudo desta pesquisa, corroborando a hipótese inicialmente estabelecida. / This thesis had as main focus of the analysis, management activities and management of health care waste at the division of water resources unit 22, Pontal do Paranapanema - SP. The hypothesis was that there was not any technical knowledge about health care waste management. It was analyzed the management and health care waste of 19 municipalities as well as all the activity of sanitary surveillance and the internal and external management of health care waste from 77 generators institutions within these municipalities namely: basic health units, emergency rooms and clinical laboratories. The study also focused on the activities of the Environmental Company of S ão Paulo and Watershed Committee. Among the methodological procedures for the research were used: data collection, bibliographic and documental research, gravimetrical characterization and classification of the waste generated by municipal health facilities, for eight days, based on the Pan American Health Organization together with CONAMA Resolution 358/05.The research found that all counties had hired specialized companies, outsourcing the collection, transportation, treatment and disposal of health care waste. The survey also revealed difficulties in the municipal health surveillance regarding the fiscalization activities, health care waste monitoring and controlling, mainly due to the transition of the full management to municipal health surveillance of the State of Sao Paulo. Regarding internal the health care waste, the survey found that municipalities had difficulties in the procedure for waste segregation between group A and group D, since it was observed approximately 15% of common waste among infectious waste. Regarding the procedures adopted to carry out the internal management of health care waste, the study showed an worrying aspect from the standpoint of compliance with ANVISA RDC 306/04, since 97,4% of the health facilities had no waste management plan. The infrastructure to shelter the health care waste was almost nonexistent, visits to these facilities found the existence in only 6,49% of 77 waste generators. Considering the results, we concluded the absence of technical training focused on waste management of health facilities in the researched area, supporting the hypothesis initially established.
145

Projeto, construção, simulação, implementação e testes de um gerador a relutância chaveada monofásico / Design, construction, simulation, implementation and testing of a single-phase switched reluctance generator

Oliveira, Eduardo Sylvestre Lopes de 04 July 2011 (has links)
O objetivo do trabalho é apresentar o funcionamento de um gerador a relutância chaveado monofásico. Para isso, foi desenvolvido um modelo computacional em ambiente Matlab Simulink, fazendo-se a comunicação entre diferentes partes do sistema. O comportamento da dinâmica de geração é apresentado para diferentes pontos do sistema, e testes experimentais realizados em um pequeno protótipo confirmam as características funcionais desta máquina. Ensaios realizados comprovam sua funcionalidade e simplicidade de operação, tendo estabilidade de geração para ampla faixa de velocidade de funcionamento, caracterizando uma máquina promissora, robusta e eficiente para aplicações especiais. / This work presents a single-phase switched reluctance machine operating as a generator. For that purpose, a computational model was developed in Matlab Simulink environment, wherein all the system components, such as voltage source, drive and machine model, and load were integrated. The current and voltage behavior for several points of operations are presented. Furthermore, experimental tests were also carried out in a simple prototype to validate its functionality and simplicity of operation, providing a stable power generation over a wide range of speed. The results showed that the single-phase switched reluctance generator can be robust, efficient, and promising for especial applications.
146

Estudo do fluxo de potência de um gerador de indução de dupla alimentação atuando em um sistema de geração eólio-elétrica / Study of variation of power flow of a doubly-fed induction generator acting on a wind power generation system

Jacob, Natália Moreira 03 April 2013 (has links)
A captação de energia eólica tem sido alvo de estudos em todo o mundo nas últimas décadas devido aos incentivos pela busca por geração de energia por meio de fontes alternativas. A configuração mais utilizada atualmente são as turbinas de três pás com eixo horizontal, upwind, operando com velocidade variável com limitação de potência por variação de passo, e utilizando o gerador de indução de dupla alimentação. A operação em velocidade variável com atuação no ângulo de passo permite a máxima captação de energia para as diferentes velocidades de vento, enquanto evita que a turbina ultrapasse o seu valor nominal de potência. O uso de conversores permite o controle das correntes do rotor, variando sua velocidade, e o controle da potência reativa de estator, e a montagem do tipo back-to-back permite que o fluxo de energia do rotor flua para a rede ou da rede. A modelagem matemática do sistema foi toda referenciada no referencial síncrono com notação vetorial e orientação de fluxo de rede, simplificando os modelos matemáticos. Para a montagem dos controladores foi utilizado o método de Controle de Modelo Interno e de Resistência Ativa. A montagem de todo o sistema para simulação foi realizada no Matlab/Simulink, e seu desenvolvimento é mostrado no decorrer do trabalho. Este trabalho analisa o fluxo de energia do sistema, desde a energia captada pelo vento até a energia entregue à rede. Para isso, são feitas análise dos fluxos das potências ativa e reativa do sistema, para fator de potência unitário, indutivo e capacitivo e para os mais recorrentes comportamentos do vento. Também são feitas análises a respeito dos regimes de operação do sistema, definidos a partir da relação entre os fluxos de potência, concluindo que a máquina poderá operar como gerador ou motor, devido principalmente à intensidade da variação do vento. / The use of wind energy has been the subject of studies around the world in recent decades due to the incentives to search for power generation through alternative sources. The most widely used configuration has been the three blades with horizontal axis and upwind turbine, operating in variable speed with power limitation by varying the pitch angle, and using the doubly fed induction generator configuration. The variable speed operation with power limitation enable for maximum energy harvesting for different wind speeds and prevents the turbine exceeds its nominal power. The use of converters allows for control of the rotor currents, varying the speed, and stator reactive power, and assembling type back-to-back allows for the rotor energy flux to flow into and out of the grid. Mathematical modeling of the whole system was referenced in the synchronous reference frame with vector notation and oriented by the grid flux, simplifying the mathematical models. For installation of the drivers, were used the Internal Model Control and Active Damping methods. The assembly of the entire system for simulation was conducted on Matlab / Simulink, and its step to step is shown in this work. This study analyzes the energy flow of the system, from the energy harvest from de wind to the energy delivered to the grid. To reach this, flow analysis of active and reactive power of the system is done, using unity, inductive and capacitive power factor, for the most recurrent wind behaviors. Analysis are made about the operation regimes of the system, defined as the relationship between the power flows, concluding that the machine can operate as a generator or motor, mainly due to the variation of the wind intensity.
147

Aplicações de controle preventivo baseadas em árvore de decisão para aumentar a capacidade de sobrevivência a afundamentos de tensão dos geradores de indução duplamente excitados em sistemas de potência / Decision tree-based preventive control applications to increase the voltage sag survival capacity of dual-excited induction generators in power systems

VIEIRA, Dione Jose Abreu 21 September 2018 (has links)
Submitted by Luciclea Silva (luci@ufpa.br) on 2018-11-01T16:42:34Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_Aplicacoescontrolepreventivo.pdf: 2271497 bytes, checksum: 683f9cba5019d728a824a07a51f32b9a (MD5) / Approved for entry into archive by Luciclea Silva (luci@ufpa.br) on 2018-11-01T16:43:03Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_Aplicacoescontrolepreventivo.pdf: 2271497 bytes, checksum: 683f9cba5019d728a824a07a51f32b9a (MD5) / Made available in DSpace on 2018-11-01T16:43:03Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_Aplicacoescontrolepreventivo.pdf: 2271497 bytes, checksum: 683f9cba5019d728a824a07a51f32b9a (MD5) Previous issue date: 2018-09-21 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Esta tese apresenta o desenvolvimento de uma metodologia de controle preventivo com o objetivo de aumentar a capacidade de recuperação a afundamentos de tensão (FRTC) dos geradores de indução duplamente excitados (DFIG) integrados à rede elétrica. A metodologia, baseada em árvore de decisão (DT), auxilia na monitoração e no suporte à segurança e ao controle preventivo, garantindo que os sistemas eólicos permaneçam conectados após a ocorrência de perturbações na rede elétrica. Com base em estudos off-line, a DT é utilizada com o intuito de descobrir atributos inerentes ao sistema elétrico relacionado à FRTC, fornecendo um modelo de predição rápido para aplicações em tempo real. A partir dos resultados obtidos, é possível verificar que o DFIG contribui neste contexto para a segurança da operação através da disponibilidade de despacho de potência e participação no controle de tensão. Verifica-se também que o uso da DT, além de classificar com boa precisão o estado operacional do sistema, facilita de maneira significativa a tarefa do operador, uma vez que o mesmo vai estar direcionado ao acompanhamento das variáveis realmente críticas de operação para uma determinada configuração topológica do sistema elétrico. / The development of a preventive control methodology to increase the capacity of voltage sag recovery (Fault Ride Through Capability (FRTC)) of a doubly-fed induction generator (DFIG) connected in an electrical network is presented. This methodology, which is based on the decision trees (DT) technique, assists with monitoring and support for security and preventive control, ensuring that wind systems remain connected to the power system even after the occurrence of disturbances in the electric system. Based on offline studies, DT discovers inherent attributes of the FRTC scenario related to electrical system behavior and provides a quick prediction model for real-time applications. From the obtained results, it is possible to check that the DFIG is contributing to a system’s operation security from the availability of power dispatch and participation in the voltage control. It is also noted that the use of DT, in addition to classifying the system’s operational state with good accuracy, also significantly facilitates the operator´s task, by directing him to monitor the most critical variables of the monitored operation state for a given system’s topological configuration.
148

Contribuições à análise de pavimentos de edifícios em laje nervurada / Contributions for analysis of building floors in waffle slab

Barbirato, Carlos Braz Cordeiro 04 April 1997 (has links)
Este trabalho trata da análise elástico-linear de pavimentos de edifícios de concreto armado em laje nervurada e, em especial, lajes lisas com vigas nas bordas. Inicialmente desenvolve-se um pré-processador dedicado a esse sistema estrutural com todas as facilidades que permitem sua modelagem rápida e eficiente. Os dados de entrada são baseados quase que exclusivamente no fornecimento dos contornos dos capitéis e do pavimento, sendo que este último é discretizado em segmentos retilíneos que devem ser paralelos aos eixos do sistema cartesiano. Com um mínimo de informações, esse pré-processador executa a montagem do arquivo de dados, definindo automaticamente elementos de barra para as nervuras, elementos de placa para os capitéis e realizando todos os ajustes necessários para a modelagem do pavimento a ser analisado com a utilização de um sistema em Elementos Finitos. Com a utilização dessa ferramenta, desenvolve-se um estudo de alguns casos de pavimentos típicos, objetivando-se, em especial, uma comparação entre a análise através de elementos de barra e placa e o procedimento simplificado de se considerar apenas elementos finitos de placa com rigidez equivalente. Para facilitar a análise dos resultados apresenta-se um pós-processador que permite a visualização tridimensional dos esforços solicitantes e deslocamentos obtidos. / This work deals with the linearly elastic analysis of reinforced concrete building floors in waffle slab, emphasizing flat slabs with beams at the edges. lnitially it is developed a pre-processor dedicated to this structural system, with all facilities that allows a quick and efficient modeling. The input data are based on the supplying of the the drop-panels and the floor contours, and this last one is discretized in right segments that must be parallel with the axes of the Cartesian system. With few informations, this pre-processor performs the assemblage data files, defining automatically bar elements to the ribs, plate elements to the drop-panels and realizing all the necessary adjustments in the model to be analyzed by a Finite Element system. With the utilization of the mentioned tool, it is presented a study of some typical floors, enhancing a comparison between the analysis using bar and plate elements and the simplified process with equivalent rigidity plate elements. In order to facilitate the analysis of the results it is also presented a pos-processor that allows a tridimensional visualization of internal forces and displacements.
149

Desenvolvimento de um tomógrafo de ressonância magnética: integração e otimização. / Development of a magnetic resonance tomograph: integration and improvement.

Martins, Mateus Jose 07 February 1995 (has links)
O presente trabalho descreve o desenvolvimento de um sistema de tomografia por Ressonância Magnética, para uso em diagnósticos médicos. Ele foi baseado em subsistemas disponíveis comercialmente, tais como os utilizados em equipamentos de imagens de RM comerciais. As principais contribuições deste projeto foram: o desenvolvimento de circuitos eletrônicos complementares e \"software\", necessários para tomar o \"hardware\" adquirido em um Tomógrafo de Ressonância Magnética para diagnósticos médicos. Isso não inclui somente o projeto de complexos programas necessários para gerar os pulsos de RF, formas de onda dos gradientes, sistema de aquisição de dados e as seqüências de pulsos necessárias para o completo sincronismo, mas também o desenvolvimento de uma interface amigável para realizar: a entrada de informações do paciente; a seleção das técnicas de imagem e o \"software\" interativo para visualização e seleção de planos. Um novo algoritmo de compressão de dados, para reduzir o armazenamento necessário de dados de imagens de RM, sem perda de informação foi também apresentado e implementado. Uma comparação com outras implementações de compressão de uso geral foi apresentada para mostrar uma performance superior na taxa de compressão e tempo de execução. / The present work describes the development of a Magnetic Resonance Tomography system to be used for medical diagnostics. It is based on commercially available subsystems such as used as in commercial MRI equipments. The main contributions to the project were: the development of fill up electronics and software needed to turn the acquired hardware into a MR Tomography for medical diagnostics. This includes not only the design of complex software needed to generate the used RF pulses, gradient waveforms, data acquisition system and the desired pulse sequences to synchronize all, but also the development of a user friendly interface to do: the entrance of patient\'s information; the selection of MR imaging techniques and interactive software for image viewing and planes selection. A new data compression algorithm to reduce the storage requirement of raw MR image data without information losses is also presented and implemented. A comparison with others general purpose compression implementations is presented to show the superior performance in the compression rate and execution time.
150

Análise da influência de elevados níveis de geração fotovoltaica na operação das redes reticuladas de distribuição de energia elétrica / Analysis of the influence of high levels of photovoltaic generation in the operation of low-voltage secondary distribution networks

Dias, Leandro Rosa 22 June 2018 (has links)
As instalações de geradores distribuídos têm sido impulsionadas pela necessidade da diversificação da matriz energética nos países, por fatores ambientais e por revelar benefícios aos sistemas elétricos. No Brasil, estas conexões têm apresentado um crescimento bastante significativo nos últimos anos, devido às novas regulamentações estabelecidas pela ANEEL. Entretanto, alterações no sistema elétrico em grandes escalas acarretam consequências à operação segura, confiável e de qualidade do mesmo. Neste contexto, ainda há poucos trabalhos que analisam tais problemas em sistemas reticulados de distribuição de energia elétrica e, com base nisso, o presente trabalho visa avaliar os impactos que elevados níveis de geração fotovoltaica podem acarretar aos níveis de tensões nodais, às perdas técnicas e também à proteção destes sistemas, adotando como referência uma rede reticulada real de 81 barras e a rede do IEEE 390 barras. Uma vez que tais condições são avaliadas têm-se as análises de adição de funções de proteção (direcional de potência, direcional de sobrecorrente, subtensão e desbalanço de tensão) a fim de buscar alternativas para que os protetores de rede não se sensibilizem para fluxos reversos de potência provenientes dos geradores distribuídos e, assim, estes se limitem a atuarem para distúrbios no lado de média tensão. Para tanto, as simulações foram realizadas no programa OpenDSS e os resultados mostraram que a função de desbalanço de tensão é a que se apresenta com maior potencial para ser aplicada na prática, uma vez que foi possível minimizar o número de atuações dos protetores de rede devido aos geradores distribuídos. / The installation of distributed generators have been boosted by the need to diversify the energy matrix in the countries, by environmental issues and by revealing benefits to the electrical systems. In Brazil, these connections have shown a very significant growth in the last years, due to the new regulations established by the National Agency of Electric Energy. However, large-scale changes in the electrical system lead to consequences for its safe, reliable and well-qualified operation. In this context, there are still few studies that analyze such problems in low-voltage secondary distribution networks, and based on this, the present work aims to analyze the performance of these systems based an actual Brazilian 81-nodes low-voltage secondary network and on the IEEE 390-nodes system. The objective is to evaluate the impacts of high levels of distributed generation on the power quality and protection of the grid. Once such conditions are evaluated, some protection functions are considered (directional power, directional overcurrent, undervoltage and voltage unbalance) with the purpose of finding alternatives so that the network protectors are not sensitized to reverse power flows from the distributed generators and, thus, they only trip for disturbances an the medium voltage side. Therefore, the simulations were performed in the OpenDSS software and the results showed that the voltage unbalance protection function was the one with the highest potential to be applied in practice, since it was possible to minimize the reverse power flow due to distributed generators.

Page generated in 0.0717 seconds