• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • Tagged with
  • 6
  • 6
  • 6
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

O impacto da infraestrutura sobre o crescimento da produtividade do setor privado e do produto brasileiro: análise empírica e evolução histórica

Malliagros, Thomas Georges 30 June 1997 (has links)
Made available in DSpace on 2008-05-13T13:15:55Z (GMT). No. of bitstreams: 0 Previous issue date: 1997-06-30
2

Infra-estrutura e crescimento econômico

Afonso, Alexandre Guazzelli 18 December 2000 (has links)
Made available in DSpace on 2010-04-20T20:54:45Z (GMT). No. of bitstreams: 0 Previous issue date: 2000-12-18T00:00:00Z / Trata da análise do papel da infraestrutura no crescimento econômico. Criou-se um índice capaz de mensurar o desenvolvimento da infraestrutura, bem como permitir comparações do grau de desenvolvimento da infraestrutura entre países e ao longo do tempo. Ao final são apresentados modelos de crescimento econômico com infraestrutura e realizada a análise empírica. Essa análise possibilitou concluir sobre a forma e o grau do efeito que a infraestrutura na renda agregada.
3

O desafio na contratação e elaboração de projetos para execução de obras rodoviárias: 'o fator projeto'

Cordeiro, Alexandre Zananiri, Lima, Cláudia Castello Branco January 2014 (has links)
Submitted by Cristiane Oliveira (cristiane.oliveira@fgv.br) on 2014-12-19T16:41:45Z No. of bitstreams: 1 Dissertacao CORDEIRO LIMA vf (1).pdf: 982112 bytes, checksum: 8ca5dec9b88614a70ff1bb25a9259908 (MD5) / Approved for entry into archive by Fabiana da Silva Segura (fabiana.segura@fgv.br) on 2014-12-19T17:04:15Z (GMT) No. of bitstreams: 1 Dissertacao CORDEIRO LIMA vf (1).pdf: 982112 bytes, checksum: 8ca5dec9b88614a70ff1bb25a9259908 (MD5) / Made available in DSpace on 2014-12-19T17:05:59Z (GMT). No. of bitstreams: 1 Dissertacao CORDEIRO LIMA vf (1).pdf: 982112 bytes, checksum: 8ca5dec9b88614a70ff1bb25a9259908 (MD5) Previous issue date: 2014 / In 2007 the Brazilian Government established PAC – the growth acceleration program, a set of infrastructure projects in which the DNIT occupies a prominent position, with volume of resources over R$ 58 billion. Since the start of the program the main obstacle is the lack of quality projects. Engineering projects are a crucial step to launch bids for infrastructure works. This project bottleneck, associated with the bidding process, is called 'project factor'. In 2011 was instituted the RDC – Differentiated Contract Regime, in order to remove these obstacles. This work arises from the need of the Secretariat of monitoring the growth acceleration program, linked to the Ministry of Planning, and of the National Department of Transport Infrastructure, linked to the Ministry of Transport, to understand the challenges posed by the 'project factor' in the implementation of projects related to road work under PAC. To this end, we analyzed aspects of contracting by the public administration, emphasizing changes in the bidding process after the Differentiated Contract Regime (RDC) and the contemporary forms of pre-contractual relationships, addressing public private partnerships (PPP), expressions of interest of private initiative (PMI) and competitive dialogue. After a presentation of the DNIT and the process of institutionalization of RDC within the agency we concluded that three aspects have contributed to minimize the effects of 'project factor': the first, procedural in nature, is directly related to the effect of the implementation of the new tendering scheme. In complex projects, such as those in the area of infrastructure, the development of pre-contractual relations bring considerable gains. Procedures to promote the reduction of information asymmetries and the stoning of the object to be hired, as, for example, the Competitive dialogues, bring considerable gains for both public administration and private entity. The second aspect is related to the nature of the DNIT. It is a agency with accumulation of knowledge in engineering and project management. By adopting intensely RDC, showed installed capacity and advanced monitoring parameters and risk management and generated a current and appropriate regulatory set to face the challenges of the new regime of contractions. The third aspect is also related to the institutional aspect of the DNIT. This is its organizational structure, which influences the bidding processes and governance and combines two predicates: security in accountability amongst the Directors-members when they share a decision, and safeguarding of technical staff. These three aspects have led to greater efficiency and effectiveness of Autarchy and minimized the 'project factor'. DNIT management report of 2012 quotes that in RDC there is a reduction of up to 50% at the time of the bidding process in relation to competition and price-taking modes. The implementation of the Electronic RDC, which allows participation of companies from all over the country, increased competitiveness and helped to execute $ 10.2 billion in works and services in transport infrastructure. / O Governo brasileiro criou a partir de 2007 o PAC – Programa de Aceleração do Crescimento, um conjunto de projetos de infraestrutura no qual o DNIT ocupa posição de destaque com volume de recursos superior a R$ 58 bilhões. Desde o início do Programa o principal obstáculo é a insuficiência de projetos de qualidade. Projetos de engenharia são etapa crucial para o lançamento de licitações para obras de infraestrutura. Este gargalo de projeto, associado ao processo licitatório, é chamado de 'fator projeto'. Em 2011 foi instituído o RDC – Regime Diferenciado de Contratações com o objetivo de remover estes entraves. Este trabalho surge da necessidade da Secretaria do Programa de Aceleração do Crescimento, vinculada ao Ministério do Planejamento, e do Departamento Nacional de Infraestrutura de Transportes, vinculado ao Ministério dos Transportes, de entender os desafios impostos pelo 'fator projeto' na execução dos projetos relacionados às obras rodoviárias no âmbito do PAC. Para tanto, foram analisados os aspectos de contratação pela Administração Pública, enfatizando as mudanças ocorridas no processo licitatório corridas depois da vigência do Regime Diferenciado de Contratação (RDC) e as formas contemporâneas de relacionamentos pré-contratuais, abordando as parcerias publico-privadas (PPP), as manifestações de interesse da iniciativa privada (PMI) e os diálogos concorrenciais. Após uma apresentação do DNIT e do processo de institucionalização do RDC no âmbito da autarquia concluiu-se que três aspectos tem contribuído para minimizar os efeitos do 'fator projeto': O primeiro, de natureza procedimental, está diretamente relacionado com o efeito da implementação do novo regime licitatório. Em projetos complexos, como os da área de infraestrutura, o desenvolvimento de relações pré-contratuais trazem ganhos consideráveis, tanto para Administração Pública quanto para o ente privado, por promover a redução das assimetrias de informação e a lapidação do objeto a ser contratado. O segundo aspecto está relacionado com a natureza do DNIT. Trata-se de uma Autarquia com acúmulo de conhecimentos na área de engenharia e gestão de projetos. Ao adotar intensamente o RDC, mostrou capacidade instalada e avançou nos parâmetros de monitoramento e gestão de risco e gerou um conjunto normativo atual e adequado para enfrentar os desafios do novo regime de contrações. O terceiro aspecto também está relacionado com o aspecto institucional do DNIT. Trata-se de sua estrutura organizacional, que influencia a governança dos processos licitatórios e que agrega dois predicados: segurança na responsabilização entre os diretores-membros quando partilham uma decisão e salvaguarda do corpo técnico para uma postura mais republicana. Estes tres aspectos levaram a uma maior eficácia e efetividade da Autarquia, minimizaram o 'fator projeto'. O Relatório de Gestão do DNIT de 2012 cita que no RDC há a redução de até 50% no tempo do processo licitatório em relação às modalidades concorrência e Tomada de Preços. A implementação do RDC Eletrônico, que possibilita a participação de empresas de todo o país, aumentou a competitividade e ajudou a executar R$ 10,2 bilhões em obras e serviços em infraestrutura de transportes.
4

Infraestrutura e produtividade: uma análise empírica

Mussolini, Caio Cesar 02 March 2007 (has links)
Made available in DSpace on 2010-04-20T20:58:02Z (GMT). No. of bitstreams: 3 CaioCesarMussolini2007.pdf.jpg: 10367 bytes, checksum: 0a028a8806d87f1da7919fde42c3ffb2 (MD5) CaioCesarMussolini2007.pdf.txt: 108139 bytes, checksum: c7a1479072795ae568dc959b92209ef3 (MD5) CaioCesarMussolini2007.pdf: 325387 bytes, checksum: 2c1978eb132f241f3724776dc79e0ae9 (MD5) Previous issue date: 2007-03-02T00:00:00Z / The main goal of this dissertation is to analyze the relationship between infrastructure and total factor productivity (TFP) in Brazil and other Latin America countries — Argentina, Chile and Mexico. At first, it was estimated the impact of the ratio of public capital-private capital over the Brazilian’s productivity. In that sense, it was used a VECM to investigate the interaction between these variables, whether on the long run, or the short (medium) run. In fact, it was found that this complementary relation (public-private) helps in explainning TFP’s path from 1950 to 2000. Besides, the short (medium) run analysis has indicated that (positive) shocks in this relation have a significant effect over the TFP, but the opposite is not true. After that, the hypothesis of cointegration between physical infrastructure measures (electricity energy, roads and telecomunnication) and TFP regarding those countries was tested, using two methodologies — the Johansen test and the Saikkonen and Lütkepohl test (S&L). The estimated elasticities suggest that the energy and the road sector have a positive influence over TFP, therefore, on the long run economic growth. The telecomunnication sector has not presented robust results of cointegration, which could indicate a less expressive effect of this sector over the long run growth. / Esta dissertação tem como objetivo analisar a relação entre infra-estrutura e produtividade total dos fatores (PTF) no Brasil e em outros países da América Latina ¿ Argentina, Chile e México. Primeiramente, foi estimado o impacto da relação capital público-privado sobre a produtividade brasileira. Para tanto, utilizou-se um VECM de maneira a investigar a interação entre essas variáveis tanto no longo prazo como no curto (médio). De fato, comprovou-se que essa relação de complementaridade (capital público-privado) ajuda a explicar a trajetória da PTF de 1950 a 2000. Além disso, a análise de curto (médio) prazo indicou que choques (positivos) nesta relação têm um impacto significativo sobre a PTF, mas o contrário não ocorre. Posteriormente, foi testada a hipótese de cointegração entre as medidas físicas de estoques de infra-estrutura (energia elétrica, rodovias e telefonia) e PTF para os países mencionados, através de duas metodologias ¿ procedimento de Johansen e teste de Saikkonen e Lütkepohl (S&L). As elasticidades estimadas sugerem que os setores de energia e rodovias têm uma influência positiva sobre a PTF, portanto, sobre o crescimento econômico de longo prazo. O setor de telefonia não apresentou resultados robustos de cointegração com a produtividade, o que pode indicar um efeito menos expressivo deste setor sobre o crescimento econômico.
5

Por que as reformas permanecem? A trajetória gradualista de mudanças no setor de infraestrutura rodoviária no Brasil entre 1985-2010

Correia, Marcelo Bruto da Costa 25 February 2011 (has links)
Submitted by Cristiane Oliveira (cristiane.oliveira@fgv.br) on 2011-06-14T21:55:16Z No. of bitstreams: 1 72080100008.pdf: 3751506 bytes, checksum: 3c58eff71a387881ca9867a5ed0252eb (MD5) / Approved for entry into archive by Suzinei Teles Garcia Garcia(suzinei.garcia@fgv.br) on 2011-06-15T11:32:20Z (GMT) No. of bitstreams: 1 72080100008.pdf: 3751506 bytes, checksum: 3c58eff71a387881ca9867a5ed0252eb (MD5) / Approved for entry into archive by Suzinei Teles Garcia Garcia(suzinei.garcia@fgv.br) on 2011-06-15T11:33:11Z (GMT) No. of bitstreams: 1 72080100008.pdf: 3751506 bytes, checksum: 3c58eff71a387881ca9867a5ed0252eb (MD5) / Made available in DSpace on 2011-06-15T13:09:57Z (GMT). No. of bitstreams: 1 72080100008.pdf: 3751506 bytes, checksum: 3c58eff71a387881ca9867a5ed0252eb (MD5) Previous issue date: 2011-02-25 / This thesis offers an explanation for the existence of government policies that do not achieve stability after critical junctures that affect your equilibrium, focusing on the management of road infrastructure in Brazil. The policy of the sector has been in financial and institutional crisis since the mid-70s, which deepened in the 80's, pressuring the democratic Governments to pursue a reform agenda that involved the review of funding mechanisms and public investment, structural change of the sector´s bodies and competences and partnership with the market through policies of road concessions. Through case studies of the Governments of the New Republic between the years 1985 and 2010, the research answers why the reforms instituted in the sector made a string of failures and partial success, providing new imbalances and further attempts at reform. Through the theoretical framework of institutionalism, we demonstrate that the institutional changes that occurred in Brazil from the end of the 70 contributed to the shaping of a sector more pluralistic and under less autonomy of sectoral bodies, leading to institutional contradictions with which the successive governments coped under strategic dilemmas between keeping political support and pursue a good performance. This interaction between a competitive sector and political strategies resulted in a disjointed balance, which sacrifices performance and demand permanent reform. / Esta tese oferece uma explicação para a existência de políticas governamentais que não alcançam estabilidade após conjunturas críticas que afetam seu equilíbrio, enfocando a gestão da infraestrutura rodoviária no Brasil. A política do setor entrou em crise financeira e institucional em meados da década de 70, que se acentuou na década de 80, pressionando os Governos democráticos a perseguiram uma agenda de reformas que envolviam a revisão dos mecanismos de financiamento e investimento públicos, a mudança estrutural dos órgãos e competências do setor e a parceria com o mercado, através de políticas de concessões rodoviárias. Através de estudos de caso dos Governos da Nova República entre os anos de 1985 e 2010, a pesquisa responde o porquê de as reformas intentadas no setor apresentarem uma seqüência de falhas e sucesso parciais, proporcionando novos desequilíbrios e tentativas de reforma. Por intermédio do referencial teórico do institucionalismo, demonstramos que as transformações institucionais ocorridas no Brasil a partir do fim da década de 70 contribuíram para a configuração de um setor mais pluralista e sob menor autonomia dos órgãos setoriais, levando a contradições institucionais com as quais os sucessivos Governos lidaram sob dilemas estratégicos entre manter a governabilidade política e perseguir um bom desempenho. Esta interação entre um setor competitivo e estratégias políticas conduziu a um equilíbrio desarticulado, que sacrifica o desempenho setorial e demanda permanentes agendas de reformas.
6

As taxas de retorno dos projetos de concessão e PPP do setor de rodovias

Ito, Minoru January 2015 (has links)
Dissertação (mestrado) - Fundação Getúlio Vargas, Escola Brasileira de Administração pública e de Empresas, Rio de Janeiro, 2015. / Bibliografia: p. 106-116. / As concessões e as Parcerias Público-Privadas (PPP) são mecanismos cada vez mais utilizados pelo setor público para alavancar os investimentos em infraestrutura no país. Para que haja viabilidade econômica das mesmas, as suas taxas internas de retorno (TIR) apresentam- se como variáveis que precisam refletir os riscos e a realidade do negócio. O presente estudo busca analisar as taxas de retorno utilizadas para a modelagem das tarifas - teto do setor de rodovias federais frente às especificidades do seu mercado. Para tal, são seguidas três frentes: a primeira é analisar a metodologia da taxa de retorno utilizada para a modelagem das concessões mais recentes de rodovias; a segunda é estimar uma taxa de retorno a partir de pesquisa bibliográfica; e a terceira é, por meio de dados de rentabilidade de balanços de concessionárias do setor, observar se as taxas de retorno das primeiras concessões foram devidamente calculadas na época. Na dissertação, concluímos que a atual metodologia da taxa de retorno do Tesouro Nacional pode ser aprimorada, principalmente em relação aos parâmetros de grau de alavancagem e capital de terceiros, e observamos que a taxa de retorno tem se aproximado do custo de oportunidade do setor ao longo das últimas etapas de concessão. O estudo visa contribuir para o debate sobre a rentabilidade dos projetos de infraestrutura rodoviária, em meio a um período de intensos investimentos no setor. / Concessions and Public-Private Partner ships (PPP) are mechanisms increasingly used by the public sector to enhance the investments in infrastructure in Brazil. To achieve economic viability in these projects, their internal rates of return (IRR) are variables which must reflect the risks and reality of the business. The present study seeks to analyse the IRRs used for modeling the price-caps of the federal highways' sector, under the specificities of such market. For this purpose, three approaches are pursued: the first one analyses the methodology of IRR calculation applied for modelling the most recent highway concessions; the second estimates an IRR based on bibliographic research; and the third makes use of data acquired from the balance sheets from the sector's concessionaries, to observe if the IRR for the first concessions of federal highways were propelly calculated at the time. In this dissertation, we concluded that the current National Treasury's methodology of the rate of return can be improved, especially in relation to parameters like leverage and debt, and we observed that the rate of return has come closer to the opportunity cost for the sector throughout the last concession rounds. This study aims to contribute to the debate on the profitability of road infrastructure projects, a midst a period of intense investments in the sector.

Page generated in 0.0905 seconds