• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 31
  • 9
  • Tagged with
  • 47
  • 47
  • 47
  • 47
  • 23
  • 22
  • 16
  • 16
  • 12
  • 10
  • 9
  • 9
  • 8
  • 7
  • 7
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Policy programme feasibility study of the proposed OR Tambo Industrial Development Zone (ORTIAIDZ)

Kilolo, Gabriel Muaku 10 November 2015 (has links)
M.A. (Public Management and Governance) / This study focuses on the policy programme feasibility of the proposed OR Tambo Industrial Development Zone (ORTIAIDZ) programme to determine the viability of its implementation. This introductory chapter highlights the background and rationale in order to provide context to the problem statement and the chosen research approach. The research questions and research objectives are provided and the research investigation methodology (research approach, design, data collection and analysis methods) used in this study are clarified. The chapter also clarifies the explicit terminology used in the text. Finally, a synopsis of the chapters comprising the dissertation is provided.
32

Implementation of the Expanded Public Works Programme (EPWP) in South Africa, 2004-2014

Mkhatshwa-Ngwenya, Evelyn Nomvula Mapule 03 1900 (has links)
Most developing countries are faced with high levels of unemployment, poverty, underemployment and inadequate infrastructure. The causes of poverty and unemployment in South Africa are manifold and complex. South Africa is one of the developmental states which gained its independence in 1994. There is a high rate of unemployment, poverty, unskilled workforce, inequality and low quality service delivery in South Africa (SA). Communities across provinces are unhappy about the above mentioned issues and have, over the years, expressed their dissatisfaction through picketing, demonstrations and strikes. SA, as a developmental state, has to balance economic growth and social development. Post 1994, the African National Congress (ANC)-led government promised to address the triple challenges facing the SA economy, namely poverty, unemployment and inequality. The study pursues to identify and describe factors that necessitated the EPWP in SA. It further investigates the performance of provinces during the implementation of the EPWP inorder to understand the current implementation approach. Both qualitative and quantitative methods were used to obtain data. Published figures from the Department of Public Works (DPW) reports and on the websites of relevant organisations were analysed. The objective was to identify small-medium-micro enterprises (SMMEs) that were created, trainings supported, and work opportunities (WOs) as well as full time equivalents (FTEs) that were created. A questionnaire was disseminated to three officials per four sectors, totaling (twelve) across four provinces namely Mpumalanga, Limpopo, Gauteng and North West. The officials were from the EPWP implementing bodies and coordinating departments. The questionnaire sought information on how EPWP projects were implemented and reported in the two phases. The implementing bodies were expected to specify their roles, targets and work opportunities that they hoped to create. The correct sampling method and size were chosen based on the approved research proposal and its intention. Challenges experienced by the coordinating bodies, implementing bodies and data managers during the implementation of the EPWP were tabulated. Recommendations and remedial actions to identified challenges were also highlighted. This study proposes interventions with regard to the coordination of the EPWP, training, improved monitoring of projects, political buy-in and allocation of budget that will improve the daily wage rate. / Public Administration / D. Admin. (Public Administration)
33

An assessment of employment opportunities created by the Keiskamma Irrigation Scheme

Nightingale, Fiona Mary January 1983 (has links)
Preface: "The need for development as observed today is a problem peculiar to the 20th century. The current situation is characterised by the fact that there are no more empty places on the earth, while our use of dwindling resources is curbed by environmental constraint." (Mouly and Costa, 1974, 155). The need for development is not equally felt by all nations as disparities in income and standards of living on a national basis have dissected the world into developed and underdeveloped countries. Disparities also exist within nations. These divisions are not simply determined nor are the terms related to development clearly defined - a matter that will be discussed in Chapter Two. Impetus to developing underdeveloped countries may be provided by various means, such as a general injection of capital or by more specific development projects. The purpose of these projects is to initiate changes that are intended to promote rapid development of an area. An interest has been shown by Geographers in the ability of these projects to stimulate economic growth in surrounding areas (Silberfein, 1976). The resulting success of development projects is closely related, if not determined, in large measure, by the aims. In view of the need for the aims of development projects to be successfully fulfilled, research into what constitute constructive developmental aims would be beneficial. Previous studies have revealed problems encountered with conflicting aims and objectives (Mountjoy, 1971); poorly defined aims (de Wilde, 1967); and inadequate groundwork prior to initiating the project (Berry, 1976). It is the intention of the study to examine the impact made by a development project in an underdeveloped area, and thereby assess the extent to which the development aims have been carried out. In order to carry out an examination of a development project in an underdeveloped area, an area in need of development had to be selected; a project within the area chosen for study; and the particular aim of the project examined. The Ciskei, a Homeland in South Africa, was chosen as a suitable area for study. A number of factors contribute towards it being an area in need of development, particularly as the Ciskei is a small country and dependent on South Africa, which is explained in the overview of the Ciskei in Chapter One. Three characteristics of underdevelopment noted by Seers (1972) are poverty, inequality and underemployment. Of these three factors it was decided to focus on unemployment as the indication of the extent to which development has taken place. The reduction of unemployment was one of the aims of the Keiskammahoek Irrigation Scheme, the project chosen for study. The overview concludes with a presentation of the Keiskamma Irrigation Scheme.
34

Social enterprises, social value and job creation in Cape Town

Amm, Kathryn Leigh January 2009 (has links)
Social enterprises are organisations which seek to meet social needs whilst generating their own financial returns. They are becoming increasingly important in South Africa as their approach is not dependent on philanthropy and is therefore largely self-sustainable. Meeting social needs can happen in many ways, but bottom up approaches, which are driven by the poor through providing access to satisifers for fundamental needs are becoming increasingly important. The impact which social enterprises have is not clearly understood and is seldom measured. There is a need to develop tools which are able to portray the social value of these impacts. This study seeks to explore the impact of three social enterprises in Cape Town. The study focuses on the social value of job creation, a pressing need across South Africa, and a social return common to all three enterprises. The study found that a primary concern for staff was job security and earning a decent wage, and without this as a starting point other social returns are minimised. Camaraderie and a sense pride are two important social returns which are also produced. The study also showed that producing social returns must be an intentional activity, and involves a process of negotiation and understanding the needs and values of different stakeholders.
35

The impact of the expanded public works programme on poverty in Amathole district municipality

Nkonki, Pamela January 2013 (has links)
The study aimed at analysis the South African government’s attempt to reduce poverty through alleviation and reduction of unemployment. The study analyses this using Ngqushwa Local Municipality in the Eastern Cape. The introduction of labour intensive projects of government in infrastructural development, under auspices of the Department of Public Works, has brought a relief in addressing unemployment and poverty in the country. While the provision of these short-term based jobs is life-saving, the question is whether or not these projects (EPWP) will provide a sustainable solution to unemployment and poverty with the skills and information they provide to the employees. To achieve this aim the study used both qualitative and quantitative research methodology. First, a literature review on the Expanded Public Works Programme was done. Secondly, policy review on poverty and conservation was done. A small sample size of sixteen people was selected using purposive sampling, targeting ten beneficiaries of EPWP, three Municipal managers and three Departmental managers that were involved in EPWP. Firstly, I wanted to know how many people participated in the EPWP initiatives in the Amathole District Municipality between 2008 and 2012. Secondly, what training was provided to people that were temporarily employed on the EPWP projects and what recruitment tools were used to recruit EPWP employees. Thirdly, to find out how many were able to find permanent employment after the EPWP projects in Amathole District Municipality communities were completed. Fourthly, has the EPWP benefited the poorest of the targeted areas and redressing racial imbalances? It is clear that EPWP is appreciated by some of the beneficiaries who do not have better school qualifications as they make significant, short-term contribution to their livelihoods and, than those who have better qualifications especially the youth, who claimed that this programme is partly wasting their time as they were looking for permanent jobs, and in South Africa age restriction is one of the problems that the people were facing when looking for a job. The study proposes that the government should make a physical relief on poverty and employment reduction by making this programme a permanent job.
36

An investigation into the reasons for failure of community-based projects at Folovhodwe, Limpopo

Ndou, Dzivhulwani Norman 12 1900 (has links)
Community-based projects are established in most of the communities as a strategy to create jobs and alleviate poverty. In the area under investigation community-based projects were established by members of communities but some of them failed and others are not sustainable in economic terms. This study investigated the reasons for failure of community-based projects at Folovhodwe area. The objectives of the study were to determine the reasons for failure of community-based projects, to provide community development officials with a guideline of the role they must play in community projects and to provide strategies for the improvement and future development of community-based projects. The study was both qualitative and quantitative. Questionnaires and interviews were employed to collect information. The study revealed that lack of funds, poor project management, poor management of funds, lack of commitment and motivation, low level of education of project members, lack of youth involvement in community-based projects, lack of monitoring and evaluation by government officials and community leaders, lack of training and unavailability of workshops for project members and lack of government involvement in addressing project challenges were identified as the reasons for failure of community-based projects. / Business Management / M.Tech. (Business Administration)
37

Critical analysis of job strategies in the Makhado Local Municipality

Mbedzi, Langanani 20 September 2019 (has links)
MAdmin / Department of Public and Development Administration / This study focused on critical analysis of job creation strategies in the Makhado Local Municipality (MLM). Even though there are policies and strategies adopted by Local Economic Development (LED) in order to speed up the process of job creation, there are still many unemployed people with no potential job prospects in the area. There are quite a number of factors working against job creation which range from geographic and demographic dispositions, availability of industries within the area, and limited infrastructure that can help to fast track job creation. The researcher used descriptive research design for this study. The researcher followed a mixed methods approach in which quantitative and qualitative research approaches were used. The reason for using a mixed methods approach was to integrate both qualitative and quantitative research methods to enable them to complement each other, thereby adding value to the findings. The researcher used non-probability sampling and its sub-type purposive sampling to select the respondents for this study. Purposive sampling method provides a wide range of non-probability sampling techniques for the researcher to draw on. Data collection instruments which were used were interview questions and questionnaires. Statistical analysis and thematic analysis were used to analyse the data. The researcher followed the research ethics before conducting study. The following were the major findings of the study: • The study findings revealed that municipality fails to inform members of the public with regard to job creation strategies in any process of development. • The research study findings revealed that the municipalities should create positions instead of internships without getting employment after completion. • The study findings revealed that public participation encourages community members to be actively involved in the municipality projects and helps to create good relationship between communities and the municipality to improve basic service delivery. The following are the recommendations of the study: • The research study revealed that good working relationship between municipal officials and community members should be encouraged as it is vital in enhancing the provision of service in the communities. • The study recommended that the municipalities should create positions which are permanent. • The researcher recommends that openness between community structures and the municipality should be encouraged in order to bring development in the municipality. / NRF
38

The effects of globalisation on the South African automotive industry

Qobo, Mzukisi 03 1900 (has links)
Thesis (MA)--Stellenbosch University, 2000. / ENGLISH ABSTRACT: Since the late 80s and early 90s there has been a sustained debate on the concept of globalisation. This has been, to a larger extent, due to global industrial restructuring In most countries the effects have been felt mostly in the manufacturing sector, and these were evident in areas such as technology, employment pattern and composition of labour force. Globalisation introduces a tendency to create a division of labour between a core of relatively well paid, skilled and secured workers, and a large pool of workers doing non-regular forms of work e.g. 'casual' jobs or part-time contracts, and with much of the work sub-contracted to companies with less unionised and low paid workers. This research assignment explores the effects that changes in global production have on the South African automotive industry. As South Africa is becoming increasingly integrated into the world economy it certainly will not be unaffected by effects of globalisation. The auto industry, and Volkswagen in particular will be use as a case. The industry is one of the largest export industries in South Africa at the current moment, and is said to have embraced the realities of globalisation. It is also a fairly well developed industry, technologically. The auto industry has always epitomised 'Fordist' forms of production with inward-looking industrial activity. The waves of changes in the sphere of production globally have both positive and negative etfects on the automotive industry. They are spurring development and innovation in an ailing industry, and thrusting it on a path towards 'world-class' manufacturing. On the other hand festructuring trend which is an outflow of global isation poses a great threat on employment patterns, and in the long run may lead toil"'decline in formal employment and introduction of non-regular forms of work e g. part-time, casual employment, and subcontracting. This will happen as pressures mount on the industry in line with the logic of international competitiveness to rationalise and cut costs. / AFRIKAANSE OPSOMMING: Die konsep "globalisering" lok reeds sedert die laat tagtigerjare wydverspreid debat uit. Die kontensieuse aard van die begrip kan grootlike toegeskryf word aan die verskynsel van globale industriele herstrukturering. Wereldwyd is die impak van laasgenoemde veral gevoel in die vervaardigingsektor. Hierdie tendens het by uitstek in aspekte soos tegnologie, indiensnemingspatrone en die samestelling van die arbeidsmag gemanifesteer. Globalisering het die geneigdheid om 'n verdeling van arbeid te bewerkstellig in terme waarvan 'n kern van relatief goed besoldigde, geskoolde en beskermde werkers onderskei kan word van 'n relatief swak besoldigde groep wat stukwerk verrig. Die tweede groep verrig deeltydse werk, wat in baie gevalle uitgekontrakteer word aan maatskappye met lae vakbondverteenwoordiging. Die fokus van hierdie werkstuk val op die impak wat veranderinge in globale produksie op die Suid-Afrikaanse motornywerheid het. Namate Suid-Afrika toenemend deel word van die wereldekonomie, raak dit al hoe moeiliker om die negatiewe effekte van globalisering vry te spring. Die motornywerheid, en spesifiek die vervaardiger Volkswagen, word as gevallestudie gebruik. Die tegnologies ontwikkelde industrie is een van Suid-Afrika se vernaamste uitvoernywerhede, en volgens kenners het veral hierdie sektor die realiteite van globalisering ter harte geneem. Kenmerkend van die motornywerheid was nog altyd sy "Ford-agtige" vorm van produksie, gefokus op inwaartsgekeerde industriele aktiwiteit. Die golwe van verandering in wereldwye produksie hou sowel positiewe as negatiewe gevolge vir die motornywerheid in. Aan die positiewe kant moedig dit innovasie in 'n andersins stagnerende industrie aan. Die negatiewe sy hiervan is egter die bedreiging wat dit inhou vir indiensnemingspatrone. Dit mag op die langtermyn lei tot die agteruitgang van formele indiensneming en 'n toename in nie-algemene vorme van werk (bv. tydelike indiensneming en subkontraktering). Hierdie neiging sal posvat namate industriee deur die logika van internasionale mededingenheid gedwing word om te rasionaliseer.
39

An evaluation of the theory behind the South African Expanded Public Works Programme

Heradien, Elde Joy 03 1900 (has links)
Thesis (MA)--Stellenbosch University, 2013. / Bibliography / ENGLISH ABSTRACT: This thesis evaluated the theory behind the South African Expanded Public Works Programme (EPWP) during its first phase from 2004-2009. The research examined how sound the EPWP theory was which explains the logic that links programme objectives and programme activities and resources. The data for this study comprised of government departmental documents on the EPWP, the context of the EPWP and the policies that informed it. Evaluation of the EPWP theory revealed that the programme was based on a sound theory if focusing solely on projected objectives, activities and resources. However, the evaluation also revealed deficiencies in the programme theory with regard to the EPWP reaching its larger policy goals. The theory construction and evaluation framework by Rossi, Freeman and Lipsey (2004) is an evaluation tool that was used to evaluate the EPWP. More theory based approach evaluations would add value to the lack in theory based programme evaluations in South Africa. In brief, the problem of unemployment is structural in South Africa and requires long term solutions. The policies and policy programmes should thus be designed with permanent employment measures in mind. However, employment through one of the largest policy programmes in South Africa, the EPWP, was short term. It is therefore recommended that this method of programme evaluation be utilised in more studies prior to implementation of a programme, because if the logic behind a programme is sound, its chances to succeed could be improved. / AFRIKAANSE OPSOMMING: Hierdie tesis evalueer die teorie agter die Suid-Afrikaanse Uitgebreide Openbare Werke Program (UPWP) tydens die eerste fase van 2004-2009. Die navorsing ondersoek hoe grondig die teorie die logika tussen program doelwitte en program-aktiwiteite en hulpbronne verduidelik. Die data vir hierdie studie bestaan uit departementele dokumente oor die konteks van die UPWP en die beleid wat die program ingelig het. Evaluering van die UPWP-teorie het aan die lig gebring dat die program gebaseer is op 'n grondige teorie, met die fokus uitsluitlik op geprojekteerde doelwitte, aktiwiteite en hulpbronne. Die evaluering van die UPWP-teorie het ook die gebrek met betrekking tot die bereik van groter beleidsdoelwitte aan die lig gebring. Die teorie konstruksie-en evalueringsraamwerk deur Rossi, Freeman en Lipsey (2004) is 'n evaluering instrument wat gebruik was om die UPWP te evalueer. Meer teoreties-gebaseerde evaluerings sal waarde toevoeg tot die gebrek van teorie-gebaseerde program evaluering in Suid Afrika. Ter opsomming, werkloosheid is n strukturele probleem in Suid Afrika en vereis langtermyn oplossings. Die beleide en die beleid programme moet dus ontwerp word met permanente indiensneming geleenthede in gedagte. Indiensneming deur een van die grootste programme in Suid-Afrika, die UPWP bied egter kort termyn indiensneming. Dit word dus aanbeveel dat die teorie-gebaseerde benadering van programevaluering in meer studies gebruik word voor die implementering van 'n program, want as die logika agter 'n program grondig is, is die kanse van sukses verhoog.
40

Utility-scale renewable energy job creation : an investigation of the South African Renewable Energy Independent Power Producer Procurement Programme (REIPPPP)

Stands, Sarah Reed 04 1900 (has links)
Thesis (MPhil)--Stellenbosch University, 2015. / ENGLISH ABSTRACT: The South African Government developed the REIPPPP to ensure the implementation of Green Economy and job creation policies, while mitigating the current power crises with the short lead times of RE technologies. Current South African literature is ambiguous when discussing the legitimacy of the REIPPPP and the overall understanding of the programme and its associated outcomes in terms of job creation, are therefore, vague. A need therefore exists to unpack the quantitative job creation submissions of the REIPPPP and to carry out an investigation into the opportunities and challenges associated with meaningful job creation. Through a non-linear iterative exploratory design, hinging on the researcher’s position within industry, this empirical research comprises of two components. Firstly, a literature study informs the development of a meaningful job creation framework which is used to analyse the programme’s bid documentation and publicly available data. Secondly, mixed-methods are utilised to collect quantitative data from the DoE and qualitative data from job creation stakeholders. The result is an enriched understanding of the REIPPPP in terms of meaningful job creation, identifying trends, similarities and unexpected outcomes across methods. The study concludes that the programme does create meaningful jobs yet data is misaligned and currently unavailable to the public. Secondly, since job creation is a feature of South African Government development policy, a more robust emphasis is required in the REIPPPP weighting and auditing process, which includes further research of intended benefits and suggested improvements to align job creation data. / AFRIKAANSE OPSOMMING: Die Suid-Afrikaanse regering het die hernubare energie onafhanklike kragprodusent verkrygingsprogram ontwikkel om die voorsiening van die werksskeppingsbeleid en groen-ekonomiebelied te verseker. Huidige Suid-Afrikaanse letterkunde is dubbelsinnig wanneer die wettigheid van die program bespreek word. Die algehele begrip van die program en sy geassosieerde uitkoms is dus vaag. Daar is n behoefte om die kwantitatiewe werkskeppingvoorleggings te analiseer en om ondersoek in te stel in die geleenthede en uitdagings wat geassosieer word met betekenisvolle werkskepping. Deur n nie- lineêre iteratiewe ondersoekende ontwerp, wat gebaseer is op die navorser se posisie in die industrie, bestaan hieride empiriese navorsing, uit twee komponente. Eerstens, lig n literatuurstudie die ontwikkeling van n betekenisvolle werkskeppingsraamwerk in, en word gebruik om die program se boddokumentasie en publieke data te analiseer. Tweedens, word gemengde metodes gebruik om kwantitatiewe data van die departement van energie te versamel asook kwalitatiewe data van werkskeppingbelanghebbendes. Die resultaat is n meer verrykende verstandhouding van die hernubare energie onafhanklike kragprodusent verkrygingsprogram in terme van betekenisvolle werkskepping asook die identifisering van tendense en onverwagse uitkomste. Die studie kom tot die gevolgtrekking dat die program nie betekenisvolle werk skep nie en is tans onbeskikbaar vir die publiek. Tweedens, aangesien werkskepping 'n kenmerk is van die Suid-Afrikaanse regering se ontwikkelingsbeleid, word 'n meer robuuste klem vereis op die hernubare energie onafhanklike kragprodusent verkrygingsprogram se ouditeringsproses en verdere navorsing van die beoogde voordele word voorgestel.

Page generated in 0.1165 seconds