• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 908
  • 47
  • 42
  • 11
  • 10
  • 10
  • 10
  • 9
  • 7
  • 2
  • 1
  • 1
  • Tagged with
  • 1016
  • 440
  • 273
  • 148
  • 145
  • 134
  • 130
  • 130
  • 123
  • 113
  • 89
  • 88
  • 80
  • 78
  • 78
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
271

El efecto de la retroalimentación de los consumidores sobre la planificación del surtido

Carrasco Heine, Óscar Felipe January 2017 (has links)
Magíster en Gestión de Operaciones. Ingeniero Civil Industrial / Los principales antecedentes y la motivación del presente trabajo provienen de la teoría de Assortment, los modelos de elección discreta y los procesos de Social Learning. Se apunta a reunir parte de la vasta literatura en torno a estos temas, proponiendo un modelo matemático que incorpore el feedback de los consumidores en la elección del surtido de productos a ofrecer por parte de un vendedor. El modelo propuesto incluye un comerciante minorista quien se enfrenta a una secuencia finita de clientes, los que tienen la opción de escoger alguno de los productos ofrecidos por el vendedor. En caso de comprar alguno, descubren su calidad y la reportan de manera pública, siendo esta información utilizada por futuros consumidores en su proceso de decisión mediante actualización bayesiana de sus creencias. Estos reportes a la vez permiten al retailer - quien sólo puede ofrecer una cantidad limitada de productos - optimizar su oferta, escogiendo aquel conjunto de alternativas que le entregue un mayor beneficio esperado. La manera natural para abordar el problema de optimización de assortment enfrentado por el vendedor es mediante Programación Dinámica Estocástica, al tratarse de una situación en tiempo discreto donde período a período se debe tomar una decisión ante un determinado estado del sistema. Sin embargo, el número de estados posibles aumenta explosivamente en función de los parámetros considerados, volviéndose un problema virtualmente imposible de resolver en instancias realistas. Es por ello que se opta por Programación Dinámica Aproximada, proponiéndose 3 heurísticas que permiten obtener resultados en contextos en los cuales no es posible optimizar de manera exacta. A modo de referencia, se compara el rendimiento de las heurísticas con el de una estrategia bajo la cual el vendedor no considera las evaluaciones hechas por los clientes, ni la incidencia de sus decisiones en períodos futuros. La diferencia en los beneficios llega a ser enorme, observándose en los experimentos realizados aumentos superiores a 300% al utilizar alguno de los algoritmos sugeridos, en vez de obviar la información disponible. Esto no solo valida la calidad de los métodos heurísticos propuestos, sino que sobre todo ilustra la importancia de considerar el feedback de los consumidores. / Este trabajo ha sido parcialmente financiado por CONICYT
272

Qualidade, desempenho operacional e custos de plantios, manual e mecanizado, de Eucalyptus grandis, implantados com cultivo mínimo do solo / Quality, operational performance and cost of eucalyptus grandis hand and machine planting, implemented with minimal tillage.

Fessel, Vitor Augusto Graner 03 July 2003 (has links)
O método de plantio manual de mudas de árvores é predominante no Brasil. Para a redução dos custos com mão-de-obra, aumento de produtividade e qualidade operacional, o plantio manual deve ser substituído total ou parcialmente por operações mecanizadas. Com esse enfoque foram avaliadas as atividades de plantios manual e mecanizado de eucaliptos, bem como de preparo mecanizado do solo, em área pertencente a uma empresa florestal. O plantio manual foi feito por onze trabalhadores rurais, com o uso da transplantadora de acionamento manual. O plantio mecanizado foi realizado por uma máquina de transplantio de mudas, operada por um trabalhador rural e tracionada por um trator. Na área do estudo foram locadas duas parcelas amostrais, formando uma malha de setenta e cinco pontos amostrais para cada sistema de plantio. Os itens do preparo do solo avaliados foram a profundidade do sulco, o diâmetro dos torrões e o volume cilíndrico dos galhos de madeira sobre a faixa de sulcamento. O itens dos sistemas de plantio avaliados foram a presença de defeitos da operação, a distância entre plantas, a altura da parte aérea das mudas e a sobrevivência das plantas após um mês de idade. As ferramentas da qualidade total utilizadas foram os histogramas, o diagrama de causa e efeito, os gráficos de Pareto e de controle. As análises estatísticas dos resultados foram feitas pelo teste t e pelo teste de qui-quadrado Para avaliar o desempenho operacional do sistema manual estimou-se somente a capacidade de campo operacional. No sistema mecanizado foram estimadas as capacidades de campo efetiva e operacional. Nos dois sistemas de plantio foram estimados também os custos horários e operacionais das máquinas e da mão-de-obra. Entre os sistemas de plantio, a distância entre plantas foi diferente estatisticamente, com melhor distribuição das mudas no sistema manual. O número de defeitos por muda plantada foi semelhante estatisticamente entre os sistemas de plantio. Os principais defeitos do sistema manual foram as mudas plantadas com colo encoberto pelo solo e as mudas plantadas fora do centro do sulco, os quais representaram 72,8% do total. No sistema mecanizado, esses defeitos, somados às mudas não plantadas e mudas não firmes, representaram 76,7% do total. A altura da parte aérea foi diferente estatisticamente, tanto no plantio como um mês após. A sobrevivência das mudas efetivamente plantadas, após um mês de idade, foi semelhante estatisticamente. Concluiu-se, assim, que a qualidade em ambos os sistemas de plantio não variaram dentro de padrões aceitáveis pela empresa florestal. O tempo produtivo do sistema de plantio mecanizado foi igual a 48,2%, gerando uma capacidade de campo operacional 60,0% menor do que no sistema manual. Inferiu-se que o número médio de mudas plantadas por trabalhador por hora foi igual a 95 no sistema manual, enquanto que no sistema mecanizado foi igual a 205. O custo operacional estimado do sistema mecanizado foi 44,9% maior do que no sistema manual, fato devido a baixa capacidade de campo operacional observada no sistema mecanizado. / Hand planting of tree seedlings is the predominant method in Brazil. In order to reduce labor costs, increase productivity, and improve operational quality, hand planting should be totally or partially replaced by machine operations. Having this in mind, eucalyptus’ hand and machine planting activities were assessed, as well as those of mechanical tillage, in an area belonging to a forestation company. Hand planting had been carried out by 11 rural workers by using a planting tube. Machine planting had been carried out by using a seedling transplant machine, which was operated by a rural worker and pulled by a tractor. In the study area, two sampling parts were allocated, forming a web with 75 sampling points for each planting system. Tillage items that were assessed included furrow depth, stone diameter, and the cylindrical volume of wood branches on the furrow belt. Planting system items that were assessed included the presence of operation defects, distance between plants, height of the top portion of the seedlings, and plant survival after one month of age. Total quality tools included histograms, cause and effect diagram, control graphs, and Pareto's graphs. Statistical analyses of the results were performed by using test and qui-square test. To evaluate hand planting system’s operational performance, only the operational field capacity was estimated. As for the machine system, effective and operational field capacities were estimated. Labor and machine hourly costs, as well as the operational costs for both planting systems were assessed. When comparing planting systems, the distance between plants was statistically different, with hand planting system showing better seedling distribution. The number of defects per planted seedling was statistically similar for both planting systems. The major defects in the hand planting system were seedlings planted with soil-covered base and those planted out of the furrow center, which represented 72.8% of the total. With the machine system, these defects, in addition to non-planted and loose seedlings, represented 76.7% of the total. The height of the top portion was statistically different, both when planting and after one month. The survival of effectively planted seedlings after one month of age was statistically similar. Thus, we concluded that the quality of both planting systems did not vary within the standards that are acceptable for the forestation company. Machine planting system's productive time was 48.2%, and generated an estimated operational field capacity 60.0% less to that for the hand planting system. The average number of planted seedlings per worker by hour was inferred to be equal to 95 in the hand planting system, whereas it was equal to 205 in the machine system. The operational cost for the machine system was estimated to be 44.9% greater to that for the hand planting system, which is due to the low operational field capacity observed in the machine system.
273

Qualidade, desempenho operacional e custos de plantios, manual e mecanizado, de Eucalyptus grandis, implantados com cultivo mínimo do solo / Quality, operational performance and cost of eucalyptus grandis hand and machine planting, implemented with minimal tillage.

Vitor Augusto Graner Fessel 03 July 2003 (has links)
O método de plantio manual de mudas de árvores é predominante no Brasil. Para a redução dos custos com mão-de-obra, aumento de produtividade e qualidade operacional, o plantio manual deve ser substituído total ou parcialmente por operações mecanizadas. Com esse enfoque foram avaliadas as atividades de plantios manual e mecanizado de eucaliptos, bem como de preparo mecanizado do solo, em área pertencente a uma empresa florestal. O plantio manual foi feito por onze trabalhadores rurais, com o uso da transplantadora de acionamento manual. O plantio mecanizado foi realizado por uma máquina de transplantio de mudas, operada por um trabalhador rural e tracionada por um trator. Na área do estudo foram locadas duas parcelas amostrais, formando uma malha de setenta e cinco pontos amostrais para cada sistema de plantio. Os itens do preparo do solo avaliados foram a profundidade do sulco, o diâmetro dos torrões e o volume cilíndrico dos galhos de madeira sobre a faixa de sulcamento. O itens dos sistemas de plantio avaliados foram a presença de defeitos da operação, a distância entre plantas, a altura da parte aérea das mudas e a sobrevivência das plantas após um mês de idade. As ferramentas da qualidade total utilizadas foram os histogramas, o diagrama de causa e efeito, os gráficos de Pareto e de controle. As análises estatísticas dos resultados foram feitas pelo teste t e pelo teste de qui-quadrado Para avaliar o desempenho operacional do sistema manual estimou-se somente a capacidade de campo operacional. No sistema mecanizado foram estimadas as capacidades de campo efetiva e operacional. Nos dois sistemas de plantio foram estimados também os custos horários e operacionais das máquinas e da mão-de-obra. Entre os sistemas de plantio, a distância entre plantas foi diferente estatisticamente, com melhor distribuição das mudas no sistema manual. O número de defeitos por muda plantada foi semelhante estatisticamente entre os sistemas de plantio. Os principais defeitos do sistema manual foram as mudas plantadas com colo encoberto pelo solo e as mudas plantadas fora do centro do sulco, os quais representaram 72,8% do total. No sistema mecanizado, esses defeitos, somados às mudas não plantadas e mudas não firmes, representaram 76,7% do total. A altura da parte aérea foi diferente estatisticamente, tanto no plantio como um mês após. A sobrevivência das mudas efetivamente plantadas, após um mês de idade, foi semelhante estatisticamente. Concluiu-se, assim, que a qualidade em ambos os sistemas de plantio não variaram dentro de padrões aceitáveis pela empresa florestal. O tempo produtivo do sistema de plantio mecanizado foi igual a 48,2%, gerando uma capacidade de campo operacional 60,0% menor do que no sistema manual. Inferiu-se que o número médio de mudas plantadas por trabalhador por hora foi igual a 95 no sistema manual, enquanto que no sistema mecanizado foi igual a 205. O custo operacional estimado do sistema mecanizado foi 44,9% maior do que no sistema manual, fato devido a baixa capacidade de campo operacional observada no sistema mecanizado. / Hand planting of tree seedlings is the predominant method in Brazil. In order to reduce labor costs, increase productivity, and improve operational quality, hand planting should be totally or partially replaced by machine operations. Having this in mind, eucalyptus’ hand and machine planting activities were assessed, as well as those of mechanical tillage, in an area belonging to a forestation company. Hand planting had been carried out by 11 rural workers by using a planting tube. Machine planting had been carried out by using a seedling transplant machine, which was operated by a rural worker and pulled by a tractor. In the study area, two sampling parts were allocated, forming a web with 75 sampling points for each planting system. Tillage items that were assessed included furrow depth, stone diameter, and the cylindrical volume of wood branches on the furrow belt. Planting system items that were assessed included the presence of operation defects, distance between plants, height of the top portion of the seedlings, and plant survival after one month of age. Total quality tools included histograms, cause and effect diagram, control graphs, and Pareto's graphs. Statistical analyses of the results were performed by using test and qui-square test. To evaluate hand planting system’s operational performance, only the operational field capacity was estimated. As for the machine system, effective and operational field capacities were estimated. Labor and machine hourly costs, as well as the operational costs for both planting systems were assessed. When comparing planting systems, the distance between plants was statistically different, with hand planting system showing better seedling distribution. The number of defects per planted seedling was statistically similar for both planting systems. The major defects in the hand planting system were seedlings planted with soil-covered base and those planted out of the furrow center, which represented 72.8% of the total. With the machine system, these defects, in addition to non-planted and loose seedlings, represented 76.7% of the total. The height of the top portion was statistically different, both when planting and after one month. The survival of effectively planted seedlings after one month of age was statistically similar. Thus, we concluded that the quality of both planting systems did not vary within the standards that are acceptable for the forestation company. Machine planting system's productive time was 48.2%, and generated an estimated operational field capacity 60.0% less to that for the hand planting system. The average number of planted seedlings per worker by hour was inferred to be equal to 95 in the hand planting system, whereas it was equal to 205 in the machine system. The operational cost for the machine system was estimated to be 44.9% greater to that for the hand planting system, which is due to the low operational field capacity observed in the machine system.
274

Implementação do núcleo do sistema operacional distribuído A Crux

Budag, Karlos H. January 2002 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Ciência da Computação. / Made available in DSpace on 2012-10-20T06:51:16Z (GMT). No. of bitstreams: 1 189912.pdf: 580340 bytes, checksum: 18aaf5b811a427ce94e5561d51dba286 (MD5) / O presente trabalho está inserido no âmbito do
275

Análise econômica da produção de feijão, milho e soja com e sem irrigação no município de Itaí-SP /

Gomes, Amauri, 1956- January 2008 (has links)
Orientador: Silvio José Bicudo / Banca: Maura Seiko T. Esperancini / Banca: Ricardo Augusto Dias Kanthack / Resumo: Os custos de produção na agricultura determinam o nível de rentabilidade econômica das atividades agrícolas desenvolvidas na propriedade rural, o que permite avaliar a eficiência do sistema de produção adotado pelo produtor ou empresário rural. O objetivo deste trabalho foi analisar e comparar economicamente as culturas de feijão, soja e milho em sistemas de produção irrigados e não irrigados. Os dados foram coletados em quatro propriedades rurais localizadas no município de Itaí, pertencente ao EDR de Avaré, região sudoeste do Estado de São Paulo, na safra 2005/06, no período de agosto de 2005 à julho de 2006. A partir desses dados foram estimados o custo operacional efetivo e o custo operacional total. Para análise da rentabilidade foram determinados os indicadores econômicos denominados de receita bruta, margem bruta, ponto de nivelamento, preço de equilíbrio, lucro operacional e índice de lucratividade. Partiu-se do pressuposto que o sistema de produção irrigado deveria apresentar o maior nível de produtividade e rentabilidade, entretanto os dados demonstraram que nas culturas de feijão e milho no sistema irrigado os resultados foram inferiores ao sistema não irrigado. A produtividade média do feijão não irrigado foi 29% superior e o índice de lucratividade médio foram 26% superior ao sistema irrigado. A soja irrigada apresentou produtividade e receita bruta média 19% superior ao sistema não irrigado, porém a cultura apresentou prejuízo nos dois sistemas, devido ao baixo preço de venda obtido pelo produtor. Em relação à combinação das culturas de feijão das águas e soja de verão e feijão das águas e milho safrinha, a sucessão feijão e milho não 2 irrigados, apresentaram a maior rentabilidade com índice de lucratividade de 45,26%, em 2° lugar irrigados, apresentaram a maior rentabilidade com índice de lucratividade de 45,26%, em... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The costs of production in the agriculture determine the level of economical profitability of the agricultural activities developed in the rural property, which allows evaluating the efficiency of the system of production adopted by the producer or rural businessman. The objective of this work is to analyze and compare economically the cultures of bean, soy and corn in systems of production irrigated or not. The data were collected in four farms located in Itaí, pertaining to the EDR of Avaré, south-west region of the State of Sao Paulo, in the harvest 2005/06, in the period of August of 2005 to the July of 2006. From these data were estimated the effective operational cost and the total operational cost. For the analysis of the profitability were determined the economic indicators of gross revenue, gross margin, break even point, balance price, operational profit and profitability rate (IL). It proceeded from the assumption that the system of production irrigated should present nigher productivity and profitability. From data it was observed that the bean and corn cultures under irrigated system the results were lower than the not irrigated system. The average productivity of the not irrigated bean was 29 % superior and the average rate of profitability was 26% superior to the irrigated system. The irrigated soy presented productivity and gross average profit 19% superior to the not irrigated system, however the culture presented loss in two systems, due to the low obtained sale price. Regarding to combination of the cultures of water bean, summer soy and corn safrinha, the succession bean and corn not irrigated,presented the biggest profitability with rate of profitability of 45,26 %, folowed by the bean and corn irrigated with 18,93 %, in 3rd place the bean and soy not irrigated with 6,67 % and at last the bean and soy irrigated at a loss of 7,35 %... (Complete abstract, click electronic access below) / Mestre
276

Desempenho operacional e econômico do ensaio de uma plantadora tripla automatizada de mudas florestais /

Soler, Rafael Ribeiro January 2020 (has links)
Orientador: Saulo Philipe Sebastião Guerra / Resumo: O aumento da área plantada com florestas vem movimentando o setor de desenvolvimento de máquinas e equipamentos, que buscam inovar o mercado com novas soluções para a silvicultura. Sendo assim, novas alternativas surgem para a operação de plantio, com opções totalmente mecanizadas, a fim de aumentarem o rendimento e também agregarem funções em uma mesma operação. Com isso, avaliou-se uma plantadora tripla automatizada, que possui um sistema de georreferenciamento que controla sua movimentação e os locais a serem plantados. Foram mensurados os rendimentos operacionais em dois diferentes espaçamentos entre plantas, 3,5 x 1,8m e 3,5 x 2,3 m, sendo as mudas recém-plantadas avaliadas quanto à qualidade do plantio e seus espaçamentos aferidos como forma de avaliar o sistema de georreferenciamento. Após estas avaliações, realizou-se a análise econômica da operação, utilizando o modelo COST Action FP 0902. Os tratamentos adotados foram os espaçamentos entre plantas, adotando-se o delineamento inteiramente casualizado para análise dos rendimentos operacionais. Enquanto que para a análise qualitativa do plantio foram verificados a profundidade do plantio, a posição da muda em relação a cova e número de mudas por cova, bem como os espaçamentos entre plantas para cada tratamento. Considerando a análise dos rendimentos operacionais, houve diferença estatisticamente significativa entre os tratamentos para o mesmo rendimento, e também entre os rendimentos para o mesmo tratamento. Os valores... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The increase in the planted area with forests has been moving the sector for the development of machinery and equipment, which seeks to innovate the market with new solutions for forestry. Thus, new alternatives appear for the planting operation, with fully mechanized options, to accelerate the yield and also add functions in the same operation. Thereby, an automated triple planter was evaluated, which has a georeferencing system that controls its movement and the spots to be planted. Yields were measured in two different spacing between plants, 3.5 x 1.8 m and 3.5 x 2.3 m, with the newly planted seedlings were evaluated for planting quality and their spacing measured as a way to evaluate the georeferencing system. After these evaluations, an economic analysis of the operation was carried out, using the COST Action FP 0902 model. The treatments adopted were the spacing between plants, adopting a completely randomized design for the analysis of the yields. While for the qualitative analysis of the planting, the planting depth was verified, the position of the seedling in relation to the pitch and the number of seedlings per pitch, as well as the spacing between plants for each treatment. Considering the analysis of the yields, there was a statistically significant difference between treatments for the same yield, and also between yields for the same treatment. The average values calculated for the yield without refilling were 893 seedlings hour-1 and 703 seedlings hour-1 for t... (Complete abstract click electronic access below) / Doutor
277

Sustentabilidade e eficiência operacional de companhias abertas listadas na BM&FBovespa: um estudo a partir da análise envoltória de dados

Oliveira, Reginaldo Aparecido de 25 February 2016 (has links)
Submitted by Silvana Teresinha Dornelles Studzinski (sstudzinski) on 2016-04-26T16:43:55Z No. of bitstreams: 1 Reginaldo Aparecido de Oliveira_.pdf: 2714898 bytes, checksum: e46c3d3599dbe6801bf91ac25556faab (MD5) / Made available in DSpace on 2016-04-26T16:43:55Z (GMT). No. of bitstreams: 1 Reginaldo Aparecido de Oliveira_.pdf: 2714898 bytes, checksum: e46c3d3599dbe6801bf91ac25556faab (MD5) Previous issue date: 2016-02-25 / Nenhuma / A pesquisa teve como objetivo analisar a eficiência operacional de companhias pertencentes e não pertencentes à carteira teórica do Índice de Sustentabilidade Empresarial (ISE) da BM&FBOVESPA através da análise envoltória de dados. A amostra foi formada por 159 companhias, sendo 57 pertencentes e 102 não pertencentes à carteira ISE. O período de análise compreende os anos de 2005 a 2014, correspondendo o ano de 2005 à criação do ISE. A análise dos dados foi efetuada mediante a utilização da análise envoltória de dados (DEA - data envelopment analysis) pelo método BCC, definido por Banker, Charnes e Cooper (1984), também conhecido como retorno variável de escala (VRS - variable returns to scale) com orientação ao produto, ou seja, a maximização dos outputs. As variáveis utilizadas na análise como inputs foram o ativo circulante, ativo imobilizado e o custo dos produtos vendidos e como output o lucro operacional. Toda a análise foi desenvolvida observando os segmentos de cada grupo de empresa da amostra de forma isolada, visando evitar distorção nos dados. Os resultados obtidos revelam que as companhias da carteira ISE apresentam eficiência operacional inferior às demais companhias, à medida que não alcançaram eficiência operacional de 100% (DEA – BCC – VRS) ao longo dos anos, o que leva a se concluir que o fato dessas companhias serem consideradas como de conduta sustentável, isso necessariamente não se reflete em sua eficiência operacional. / The research aimed to analyze the operational efficiency of companies belonging and not belonging to the theoretical portfolio of the Corporate Sustainability Index (ISE) of BM&FBOVESPA through data envelopment analysis. The sample was comprised of 159 companies, of which 57 owned and 102 non-ISE. The analysis period covers the years 2005 to 2014, corresponding to 2005 to the ISE creation. Data analysis was performed by using the data envelopment analysis (DEA) by the BCC method defined by Banker, Charnes and Cooper (1984), also known as variable returns to scale (VRS) with the product orientation, that is, the maximization of output. The variables used in the analysis were as inputs current assets, fixed assets and the cost of sales and operating profit as output. All analysis was developed observing the segments of each company in the sample group in isolation, in order to avoid distortion in the data. The results show that the ISE portfolio companies have lower operating efficiency to other companies, as they have not achieved operating efficiency of 100% (DEA - BCC - VRS) over the years, which leads to the conclusion that the fact that these companies are considered sustainable conduct, not necessarily reflected in operational efficiency.
278

Estudo comparativo de metodologias aplicadas em análises de fibra em detergente neutro e fibra em detergente ácido com gerenciamento de resíduos químicos /

Lourenço, Maria do Socorro Nahuz. January 2010 (has links)
Resumo: Foram realizados dois experimentos, objetivando-se avaliar quantitativamente diferentes metodologias propostas em análises de fibra em detergente neutro (FDN) e fibra em detergente ácido (FDA), visando à precisão dos resultados analíticos, a redução nos custos e no tempo das análises, bem como a minimização no descarte de resíduos químicos. Foram utilizados seis alimentos de uso corrente na alimentação animal: feno de Tifton 85 (Cynodon spp.), cana-de-açúcar (Saccharum officinarum L.), silagem de milho (Zea mays L.), capim-xaraés (Brachiaria brizanta cv. Xaraés), capim-marandu (Brachiaria brizanta cv. Marandu) e um concentrado protéico, o farelo de babaçu (Orbignya phalerata). No primeiro experimento foram comparados os teores de FDN e FDA obtidos pelo método convencional com três métodos alternativos que utilizam a autoclave como sistema digestor e no segundo experimento foi avaliada a possibilidade de reutilizar, por uma vez, as soluções detergentes e a acetona recuperada, utilizadas no desenvolvimento das primeiras análises. O delineamento experimental utilizado na análise de cada alimento foi o inteiramente casualizado, em um esquema fatorial 4x2 (4 metodologias e 2 formas de análises), no primeiro experimento e 2x4x2 (2 utilizações, 4 metodologias e 2 formas de análises), no segundo experimento. Observou-se que a implantação das metodologias alternativas permitiu ganhos significativos com a redução dos custos operacionais e do tempo da análise, minimizando os impactos ambientais. A precisão analítica dos métodos alternativos variou entre os alimentos estudados, tendo sido recomendados nas determinações dos teores de FDN no feno de Tifton 85, farelo de babaçu e cana-de-açúcar e nas determinações dos teores de FDA apenas no farelo de babaçu pelo método alternativo que utiliza a autoclave e saquinhos... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: Two experiments were conducted, aiming to quantitatively evaluate different methods proposed for the analysis of neutral detergent fiber (NDF) and acid detergent fiber (ADF). This evaluation included the precision of analytical results, the reduces costs and time analysis and minimizes waste generation. Six typical foods in animal nutrition were used: Tifton 85 hay (Cynodon spp.), sugarcane (Saccharum officinarum L.), corn silage (Zea mays L.), grass xaraés (Brachiaria brizantha cv. Xaraés) grass marandu (Brachiaria brizantha cv. Marandu) and a proteic concentrated, the babassu meal (Orbignya phalerata). The first experiment compared the NDF and ADF results of the conventional method with three alternative methods that use autoclave as system digester and on the second experiment the possibility of reuse, for once, of detergent solutions and recovered acetone applied on the first experiment, were studied.The experimental design used in the analysis of each food was completely randomized in a 4x2 factorial scheme (four methods and two forms of analysis) in the first experiment and 2x4x2 (2 uses, four methods and two forms of analysis) in the second experiment .It was observed that alternative methodologies has allowed significant gains by reducing operating costs, time of analysis, minimizing environmental impacts. The analytical precision of alternative methods varied among studied foods. NDF alternative methods were recommended for Tifton 85, babassu meal and sugarcane samples. ADF determinations by alternative methods are not recommended for samples studied; except for babassu meal that can be analyzed by the alternative method using an autoclave and bags of ANKOM. All analytical results of the determinations of NDF and ADF showed the same behavior in both forms of analysis used (non-sequential and sequential), except the determination of ADF in corn silage... (Complete abstract click electronic access below) / Orientadora: Telma Teresinha Berchielli / Coorientadora: Ana Paula de Oliveira Sader / Banca: Ricardo Andrade Reis / Banca: Euclides Braga Malheiros / Banca: José Ricardo Soares Telles de Souza / Banca: Paulo Henrique Moura Dian / Doutor
279

A importância da rapidez de atendimento nos caixas de supermercados : um estudo de caso utilizando um modelo analítico de filas com trocas. / The importance of quick responsiveness in supermarket checkouts: a case study using an analytical queueing model with jockeying.

Rinaldi, José Gilberto Spasiani 29 June 2007 (has links)
Made available in DSpace on 2016-06-02T19:50:01Z (GMT). No. of bitstreams: 1 TeseJGSR.pdf: 2611645 bytes, checksum: 6dbd36dc8e39b96d32bfddfeef61b88a (MD5) Previous issue date: 2007-06-29 / Self-service companies have been concerned about improving their performance in face of competition, either to conquer new markets or to keep in business. It is essential for them to present good quality products and/or services. Thus, in this study, one of the aims was to show that the waiting time in supermarket checkout lines is very important for service speed and, therefore, for the service level of customers. Other aims include the reasons why the customer goes regularly to a specific supermarket and, among these reasons, the relevance of each one in contrast with the others, and its relative importance. As a result, it was possible to contextualize the scenario in which customers view the importance of queues and their waiting time. Also, the level of schooling of the customers was associated with the factors that lead them to go regularly to the place. This is an interesting contribution because in Brazil there is a relation between income and schooling. Besides, the queueing models that may satisfactorily represent the supermarket checkouts were studied and the one that best represents the system was identified. It was verified that the customers change lines when they notice another line with fewer customers, and the size of this difference was assessed. The queueing model with jockeying was the one to best represent the situation commonly found in supermarkets, and it can offer subsidies for service improvement. In order to carry out this research some companies in the city of São Carlos/SP were contacted, and one among the ones that allowed the data collection was selected. Therefore, this is a case study, thus presenting inferential limitations. / As empresas de auto-serviço, em geral, têm se preocupado em melhorar seu desempenho em relação à concorrência, seja para ganhar mercado ou mesmo para sobreviver. É essencial que apresentem boa qualidade nos produtos oferecidos e/ou serviços prestados. Assim, neste trabalho, entre outros, um dos objetivos, foi mostrar que o tempo de espera na fila de caixas de supermercados assume grande importância na rapidez de atendimento e, portanto, para o nível de serviço dos clientes. Outros objetivos também foram considerados. As causas pelas quais o cliente freqüenta aquele supermercado e, nestas, a relevância de cada uma em contraste com as outras, e sua importância relativa. Assim, pôde-se contextualizar o cenário no qual os clientes enxergam a importância da fila e de seu tempo de espera. Também, associou-se a escolaridade do cliente a fatores pelos quais este freqüenta o local, sendo esta uma contribuição interessante devido a existir, no Brasil, uma relação entre renda e escolaridade. Também, estudaram-se modelos de filas que podem representar satisfatoriamente o sistema de filas nos caixas de supermercados e identificouse, entre eles, o que melhor representou o sistema. Para o modelo de filas com trocas, foi verificado que os clientes trocam de fila quando percebem outra fila com menos clientes, sendo que o tamanho desta diferença foi avaliado. Este modelo foi o que melhor representou a situação comumente encontrada nos supermercados podendo fornecer subsídios para melhoria de atendimento. Para a viabilização da pesquisa foram contatadas algumas empresas da cidade de São Carlos/SP, sendo que, daquelas que permitiram a coleta de dados, uma foi selecionada. Desta forma, este trabalho se trata de um estudo de caso, tendo limitações inferenciais.
280

Análise da configuração de SAMU utilizando modelo hipercubo com prioridade na fila e múltiplas alternativas de localização de ambulâncias

Souza, Regiane Máximo de 23 August 2010 (has links)
Made available in DSpace on 2016-06-02T19:50:09Z (GMT). No. of bitstreams: 1 3210.pdf: 2722851 bytes, checksum: 0a55617205630631613002c3c20fb9e5 (MD5) Previous issue date: 2010-08-23 / In some emergency medical systems the service demand is high due to the treatment of patients in the range severe to mild, which increases the utilization level of the servers. In these systems, may be queues formation and so the need to explicitly consider priority in care is extremely important. In this study we extend the hypercube model to deal with this situation never explored in the literature. Besides that, the geographical and temporal demand of SAMU can change throughout the day due to their random nature. The goals of this study are: (a) to extend the model in order to consider hypercube priority queue, which as far as we know has never been done in the literature and (b) to propose an approach for multiple configurations of ambulances´ localization, exploring important variations in demand and service throughout the day. In this work, in order to verify the feasibility and applicability of this approach, we conducted a case study at Ribeirão Preto´s SAMU (SAMU-RP) that, apart from urgent care and emergency operates removing patients (transporting patients between hospitals, from hospital to home and vice versa). Besides the original configuration of SAMU-RP, we analyzed five alternatives scenarios to examine three important issues: the impact of the removals, the impact of increased demand at the busiest periods and the possibility of multiple configurations for the localization of ambulances in the three analyzed periods in important performance measures of the system, like: workloads, travel times, response times for users, etc. The results show that the hypercube model with priority in the queue can be used to analyze systems like SAMU-RP and it allows sufficiently rapid and accurate evaluation of the performance, of the system in several scenarios. / Em alguns Sistemas de Atendimento Emergenciais a demanda pelo serviço é alta devido ao atendimento a pacientes em estado grave a leve, fazendo aumentar o nível de utilização dos servidores. Nesses sistemas, pode haver formação de filas de espera e a necessidade de considerar explicitamente políticas de prioridade no atendimento é extremamente importante e requer extensões no modelo hipercubo que nunca foram exploradas na literatura. Ainda, a demanda geográfica e temporal dos SAMU s pode mudar ao longo do dia devido a sua natureza aleatória. Os objetivos do presente estudo são: (a) estender o modelo hipercubo para considerar fila com prioridade, o que até onde se tem conhecimento nunca foi feito na literatura e (b) propor uma abordagem para múltiplas configurações de localização das ambulâncias, explorando variações importantes da demanda e do serviço ao longo do dia. Para verificar a viabilidade e a aplicabilidade desta abordagem, é realizado um estudo de caso no SAMU de Ribeirão Preto-SP (SAMU-RP) que, além dos atendimentos de urgência e emergência, opera atendendo remoção de pacientes (transporte de pacientes entre hospitais, de domicílio para hospital ou vice-versa). Além da configuração original do SAMU-RP, foram analisados cinco cenários alternativos que consideram questões importantes: o impacto dos atendimentos de remoção; o impacto do aumento da demanda no período mais congestionado e a possibilidade de múltiplas configurações de localização das ambulâncias nos três períodos analisados em importantes medidas de desempenho do sistema, tais como workloads das ambulâncias, tempos de viagem das ambulâncias, tempos de resposta aos usuários, entre outros. Os resultados mostram que o modelo hipercubo, estendido para tratar prioridade na fila, pode ser utilizado para analisar satisfatoriamente sistemas como o SAMU-RP, permitindo uma avaliação suficientemente rápida e precisa do desempenho do sistema em diversos cenários.

Page generated in 0.0676 seconds