Spelling suggestions: "subject:"PERT (análise dde redes)"" "subject:"PERT (análise dee redes)""
1 |
Uma perspectiva multiparadigmatica para implementação de modelos conexionistasMariani, Antonio Carlos January 1995 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnologico / Made available in DSpace on 2012-10-16T09:36:32Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-08T19:34:55Z : No. of bitstreams: 1
99808.pdf: 2319551 bytes, checksum: 3272013c96630e9eae96467aaab06838 (MD5)
|
2 |
Uma metodologia para análise cognitiva de aplicativo para planejamento executivo na construção de projetos eletromecânicos off-shoreMateus, Fernando Joaquim January 2001 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Engenharia de Produção. / Made available in DSpace on 2012-10-19T08:08:46Z (GMT). No. of bitstreams: 1
186566.pdf: 301768 bytes, checksum: e8cf886c8e9285206fa6e3e3ae5b0326 (MD5)
|
3 |
Desenvolvimento de PCP para micro e pequenas empresas utilizando como base o PERT-CPMPaula, Oscar Luiz França de January 2001 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico / Made available in DSpace on 2012-10-19T12:10:24Z (GMT). No. of bitstreams: 0Bitstream added on 2013-07-16T18:45:59Z : No. of bitstreams: 1
178930.pdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
|
4 |
Programação do fluxo produtivo de máquinas e equipamentos para moinhos sob encomenda utilizando PERT/CPM e heurísticas /Quezado, Paulo Cesar Augustus Mendes January 1999 (has links)
Dissertação (Mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. / Made available in DSpace on 2012-10-18T19:30:38Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-09T03:55:30Z : No. of bitstreams: 1
144226.pdf: 8946909 bytes, checksum: 980d1fd4be0c2de969d561fd486d3d37 (MD5)
|
5 |
Procedimentos para o processo de planejamento da construção : estudo de caso, São Carlos, Estado de São Paulo. / Procedures in the planning process of the construction: case study.Moraes, Rosa Maria de Mattos 28 August 2007 (has links)
Made available in DSpace on 2016-06-02T20:09:07Z (GMT). No. of bitstreams: 1
DissRMMM.pdf: 3481494 bytes, checksum: d1c281a3729ed29faaab6a9215cf7088 (MD5)
Previous issue date: 2007-08-28 / Financiadora de Estudos e Projetos / The competitiveness at the civil construction companies segment depends on the management
efficient of its planning and execution control systems. The construction planning through
more efficient models it's leaving of being an ideal to be a reality in some companies, as a
strategy for quality improvement of its products and the competitiveness increase in their
market.
This research is focused on the building planning system improvement, with emphasis in
building programming and control, through the use of computational tools, aiming, in special,
the segment of multi-story buildings. The objective is to present systematic and usual
procedures in the planning process of the construction. The implementation of the planning
process is demonstrated through a case study, which considers since the stage of building
program conception up to the execution control, performed through the building follow-up.
The result of this research is the presentation of an easily implemented planning process for
the segment of multi-story building companies, which generate quick information to support
decisions. / A competitividade das empresas do setor da construção civil depende da gestão eficiente de
seus sistemas de programação e controle da produção. O planejamento de obras através de
modelos mais eficientes vem deixando de ser um ideal para transformar-se em realidade nas
empresas, como estratégia de melhoria da qualidade de seus produtos e do aumento de sua
competitividade frente ao mercado em que atua.
A pesquisa está voltada para a modernização do planejamento com enfoque na programação e
controle da obra, através do uso de ferramentas computacionais, visando, em especial, as
obras do subsetor de edificação vertical de múltiplos andares. O objetivo é apresentar
procedimentos sistematizados e usuais no processo de planejamento da construção. A
implantação do processo de planejamento é demonstrada através de um estudo de caso, que
considera desde a etapa de concepção do cronograma físico até o controle da execução,
realizado através de acompanhamento durante o desenvolvimento da obra.
O resultado do trabalho é a apresentação de um processo de planejamento de fácil
implantação para empresas do subsetor de edificações - a partir do qual, são geradas
informações rápidas para subsidiar as tomadas de decisões.
|
Page generated in 0.0471 seconds