• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 266
  • 227
  • 34
  • 18
  • 15
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 3
  • 3
  • Tagged with
  • 684
  • 684
  • 488
  • 262
  • 261
  • 233
  • 171
  • 115
  • 108
  • 87
  • 76
  • 67
  • 66
  • 65
  • 53
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Planejamento operacional integrado da rede de baixa e média tensão considerando geração distribuída. / Integrated operational planning of low and medium voltage network considering distributed generation.

Alexandre Augusto Angelo de Souza 23 February 2018 (has links)
O planejamento operacional de redes de média e baixa tensão consiste em determinar as melhores intervenções a serem aplicadas nas redes atuais de forma a otimizar os investimentos e atender aos critérios técnicos de operação. Na Média Tensão (MT) são usuais alterações como alocação de capacitores, alteração de cabos e remanejamento de cargas para obter uma melhoria para o sistema. Normalmente os objetivos são a minimização de perdas, melhora do nível de tensão e redução do custo das intervenções realizadas. Na Baixa Tensão (BT) são aplicadas intervenções relacionadas a substituição de cabos, alteração da posição do transformador e balanceamento de cargas. As alterações propostas visam melhorar os índices de equilíbrio de cargas, carregamento de transformadores e queda de tensão ao longo da rede MT e BT. Neste trabalho considera-se a minimização dos investimentos para a realização de alterações nos alimentadores e circuitos de BT, levando em conta a inserção de Geração Distribuída (GD) como solução alternativa. As dificuldades do problema de otimização resultam do tamanho dos sistemas reais e da possibilidade de alternativas que podem ser aplicadas durante o estudo. Para resolver o problema de explosão combinatória resultante das possíveis combinações de alternativas, os modelos propostos neste trabalho utilizam técnicas de computação evolutiva. Os modelos desenvolvidos respeitam aspectos técnicos e econômicos envolvidos em cada solução. A metodologia é aplicada em uma rede real partindo-se de uma base de dados georrefenciada. / The operational planning of medium and low voltage networks consists in determining the best interventions to be applied to existing networks in order to optimize investments and meet the technical criteria for operation. In the Medium Voltage (MV) capacitor allocation, recabling and relocation of loads are useful to achieve an improvement to the system. Usually the objectives are power losses minimization, voltage level improvement and cost reduction of the interventions carried out. In the Low Voltage (LV) interventions for replacing cables and transformer position and load relocation are commonly considered. The proposed changes are aimed at improving the load balance, transformer loading and voltage drops across LV network circuits. This work considers the investment minimization to intervene inMV and LV networks, considering Distributed Generation (DG) insertion as an alternative solution. The dificulties of optimization problem result from the size of the real systems and the possibility of alternatives that can be applied during the study. In order to solve the combinatorial explosion problem resulting from possible combinations of alternatives, the model proposed in this work uses evolutionary computational techniques. The developed models take into account technical and economical aspects involved in each solution. The methodology is applied in a real network starting from a georeferenced database.
212

Planejamento operacional integrado da rede de baixa e média tensão considerando geração distribuída. / Integrated operational planning of low and medium voltage network considering distributed generation.

Souza, Alexandre Augusto Angelo de 23 February 2018 (has links)
O planejamento operacional de redes de média e baixa tensão consiste em determinar as melhores intervenções a serem aplicadas nas redes atuais de forma a otimizar os investimentos e atender aos critérios técnicos de operação. Na Média Tensão (MT) são usuais alterações como alocação de capacitores, alteração de cabos e remanejamento de cargas para obter uma melhoria para o sistema. Normalmente os objetivos são a minimização de perdas, melhora do nível de tensão e redução do custo das intervenções realizadas. Na Baixa Tensão (BT) são aplicadas intervenções relacionadas a substituição de cabos, alteração da posição do transformador e balanceamento de cargas. As alterações propostas visam melhorar os índices de equilíbrio de cargas, carregamento de transformadores e queda de tensão ao longo da rede MT e BT. Neste trabalho considera-se a minimização dos investimentos para a realização de alterações nos alimentadores e circuitos de BT, levando em conta a inserção de Geração Distribuída (GD) como solução alternativa. As dificuldades do problema de otimização resultam do tamanho dos sistemas reais e da possibilidade de alternativas que podem ser aplicadas durante o estudo. Para resolver o problema de explosão combinatória resultante das possíveis combinações de alternativas, os modelos propostos neste trabalho utilizam técnicas de computação evolutiva. Os modelos desenvolvidos respeitam aspectos técnicos e econômicos envolvidos em cada solução. A metodologia é aplicada em uma rede real partindo-se de uma base de dados georrefenciada. / The operational planning of medium and low voltage networks consists in determining the best interventions to be applied to existing networks in order to optimize investments and meet the technical criteria for operation. In the Medium Voltage (MV) capacitor allocation, recabling and relocation of loads are useful to achieve an improvement to the system. Usually the objectives are power losses minimization, voltage level improvement and cost reduction of the interventions carried out. In the Low Voltage (LV) interventions for replacing cables and transformer position and load relocation are commonly considered. The proposed changes are aimed at improving the load balance, transformer loading and voltage drops across LV network circuits. This work considers the investment minimization to intervene inMV and LV networks, considering Distributed Generation (DG) insertion as an alternative solution. The dificulties of optimization problem result from the size of the real systems and the possibility of alternatives that can be applied during the study. In order to solve the combinatorial explosion problem resulting from possible combinations of alternatives, the model proposed in this work uses evolutionary computational techniques. The developed models take into account technical and economical aspects involved in each solution. The methodology is applied in a real network starting from a georeferenced database.
213

Método de coordenação e seletividade de fusíveis e religadores para redes de distribuição de energia

Rocha, Clarissa Argenti 31 August 2018 (has links)
Submitted by JOSIANE SANTOS DE OLIVEIRA (josianeso) on 2018-12-13T12:38:00Z No. of bitstreams: 1 Clarissa Argenti Rocha_.pdf: 2812629 bytes, checksum: 71ffc1d81a1b5a7e4e8e3d80481d872b (MD5) / Made available in DSpace on 2018-12-13T12:38:00Z (GMT). No. of bitstreams: 1 Clarissa Argenti Rocha_.pdf: 2812629 bytes, checksum: 71ffc1d81a1b5a7e4e8e3d80481d872b (MD5) Previous issue date: 2018-08-31 / Nenhuma / As redes atuais de distribuição são cada vez mais exigidas quanto a sua confiabilidade, as concessionárias precisam atender os critérios dos indicadores de qualidade individual. Para alcançar melhor a eficiência da rede aplica-se a ela os conceitos de coordenação e seletividade. Buscando este conceito o presente trabalho apresenta um método para determinação de fusíveis e religadores aplicados na rede de distribuição de forma a garantir sua capacidade de coordenação e seletividade. Através do estudo dos elementos de proteção e do conhecimento das características da rede, e de como devem ser estes elementos dimensionados a ponto de serem seletivos e coordenados apresenta-se uma metodologia para, por meio do uso de grafos determinar o valor de fusíveis e religadores em uma rede de distribuição. Ao final a metodologia possibilita a execução de manobras de rede e avalia se a coordenação e seletividade dos elementos ainda é válida. Para a aplicação deste método, a rede IEEE de 34 barras é adaptada adicionando fusíveis e religador para permitir validar o conceito aqui apresentado. / Existing power distribution networks are increasingly required as to their reliability, energy distribution companies need to meet the criteria of individual quality indicators. To achieve the efficiency of the network, apply to it the concepts of coordination and selectivity. Looking for this concept the present work presents a method for determination of fuses and automatic circuit reclosers applied in the power distribution network to guarantee its coordination and selectivity. Through the study of the elements of protection, and the knowledge of the characteristics of the network, and how these elements should be dimensioned to be selective and coordinated, a methodology is presented for, using graphs, to determine the value of fuses and automatic circuit reclosers in a power distribution network. In the end, the methodology allows the execution of network maneuvers, and evaluates if the coordination and selectivity of the elements is still valid. For the application of this method, the IEEE network of 34 bars is adapted by adding fuses and automatic circuit recloser to allow validating the concept presented here
214

Avaliação dos riscos de violações de conformidade de tensão em sistemas de distribuição, utilizando método probabilístico e conjuntos fuzzy. / Risk assessment of voltage levels violations in distribution systems using probabilistic approach and fuzzy sets.

Guimarães, Renato Oliveira 09 June 2008 (has links)
Nesta tese são apresentadas metodologias alternativas ao enfoque determinístico de avaliação de desempenho elétrico de sistemas de distribuição, especificamente na análise dos riscos de violações de conformidade de tensão em sistemas de distribuição, utilizando para isto, métodos probabilísticos e teoria de conjuntos fuzzy. A Agência Nacional de Energia Elétrica estabeleceu a resolução nº 505/2001 que especifica indicadores de variação de tensão de longa duração, contendo os indicadores individuais e coletivos a serem mensurados, assim como, as penalidades pelo não cumprimento dos prazos limites estabelecidos para regularização. A ENERSUL, Empresa Distribuidora do Grupo ENBR Energias do Brasil e o ENERQ Centro de Estudos em Regulação e Qualidade de Energia Elétrica desenvolveram um projeto de P&D para a obtenção de metodologia e software de simulação dos indicadores de variação de tensão de longa duração. No projeto de P&D foi especificado e desenvolvido um módulo computacional para calcular o fluxo de carga com uma abordagem probabilística, partindo-se das curvas de carga típicas de consumidores, que representam a variação temporal da carga (demanda máxima e desvio padrão), obtendo-se as curvas de distribuição de probabilidades da tensão, que permitiram calcular, para cada ponto da rede, os riscos de transgressão dos indicadores de variação de tensão de longa duração. Após o projeto de P&D, uma nova abordagem que utiliza a teoria de conjuntos difusos (fuzzy) foi desenvolvida e foi possível a comparação com o método probabilístico. Baseado em números fuzzy que representam a estimativa de níveis tensão para cada ponto na rede, e com métodos específicos de classificação fuzzy, calculam-se os indicadores de DRP e DRC. / In this thesis are presented alternatives methodologies for deterministic approach for evaluation of performance of electrical distribution systems, specifically in the risk assessment of voltage levels violations in distribution systems, using for this, probabilistic methods and theory of fuzzy sets. ANEELs Resolution 505/2001 specifies long-term voltage variation indicators, with the following items to be measured: individual and collective indicators, and the penalties for not complying with the established limits. ENERSUL, the distribution company of the ENBR Group Energias do Brasil and ENERQ Center for Regulation and Power Quality Studies carryied out an R&D project for the development of a methodology and simulation software that will enable the company to evaluate long-term voltage variation indicators. A computational module was specified and developed to calculate the load flow with a probabilistic approach. Based on typical daily load curves, representing the time variation of the load (average and standard deviation curves), distribution curves are obtained for voltage probability, so that the risk of violating indicators can be calculated, for each point in the network. After the R&D project, a new approach based on fuzzy sets theory was developed and make possible the comparison with the probabilistic approach. Based on fuzzy numbers that represents an estimative for voltage levels for each point in the network, and with specific fuzzy classification methods, the RDI and RDC indicators can be calculated.
215

Optimal acceptance solution for an electricity auction problem and a case study of a plastics company.

January 2004 (has links)
Lim Ka-Lai. / Thesis submitted in: December 2003. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2004. / Includes bibliographical references (leaves 76-78). / Abstracts in English and Chinese. / Abstract --- p.i / Acknowledgment --- p.iii / List of Figures --- p.vii / List of Tables --- p.viii / Chapter Part A --- Optimal Acceptance Solution for an Electricity Auction Problem / Chapter Chapter A1 --- Introduction --- p.1 / Chapter A1.1 --- Global Electricity Auction Market --- p.1 / Chapter A1.2 --- Electricity Buy-Back Program --- p.5 / Chapter A1.3 --- Motivation --- p.9 / Chapter A1.4 --- Literatures Review --- p.11 / Chapter A1.5 --- Organization of Thesis Part A --- p.14 / Chapter Chapter A2 --- Deterministic Models --- p.15 / Chapter A2.1 --- Models Descriptions and Notations --- p.15 / Chapter A2.2 --- Assumptions --- p.16 / Chapter A2.3 --- Mathematical Models --- p.16 / Chapter A2.4 --- Transforming and Re-writing the Models --- p.18 / Chapter A2.5 --- 0-1 Knapsack Problem --- p.20 / Chapter A2.6 --- Solving the Models by Dynamic Programming --- p.23 / Chapter A2.7 --- Numerical Results --- p.24 / Chapter Chapter A3 --- Stochastic Models --- p.31 / Chapter A3.1 --- Models with Uncertain Extra Demand Q --- p.31 / Chapter A3.2 --- Models with Uncertain Spot Market Price pa --- p.34 / Chapter A3.3 --- Models with Uncertain Extra Demand Q and Uncertain Spot Market Price pa --- p.36 / Chapter Chapter A4 --- Heuristics Algorithm --- p.45 / Chapter A4.1 --- Model Analysis --- p.45 / Chapter A4.2 --- Heuristics Algorithm --- p.47 / Chapter A4.3 --- Computational Complexity --- p.49 / Chapter Chapter A5 --- Conclusions --- p.50 / Chapter A5.1 --- Summary and Findings --- p.50 / Chapter A5.2 --- Future Research --- p.51 / Chapter Part B --- A Study on the Plastics Industry in Hong Kong / Chapter Chapter B1 --- Introduction --- p.53 / Chapter B1.1 --- Overview of the Plastics Industry in Hong Kong --- p.53 / Chapter B1.2 --- Literatures Review --- p.56 / Chapter B1.3 --- Scope and Limitation --- p.59 / Chapter B1.4 --- Motivation --- p.60 / Chapter B1.5 --- Organization of Thesis Part B --- p.60 / Chapter Chapter B2 --- Research Methodology --- p.61 / Chapter B2.1 --- Research Design --- p.61 / Chapter B2.2 --- Propositions --- p.62 / Chapter B2.3 --- Overview of the Plastics Raw Material Industry in Hong Kong --- p.63 / Chapter Chapter B3 --- Findings and Analysis --- p.66 / Chapter B3.1 --- Introduction of the Case Study --- p.66 / Chapter B3.2 --- Proposition B21 --- p.70 / Chapter B3.3 --- Proposition B22 --- p.71 / Chapter B3.4 --- Proposition B23 --- p.72 / Chapter Chapter B4 --- Conclusions --- p.74 / References --- p.75 / Appendix --- p.79
216

Capillary absorption as an audible noise reduction scheme for UHV transmission lines.

Tong, David Woo-Sang January 1975 (has links)
Thesis. 1975. Ph.D.--Massachusetts Institute of Technology. Dept. of Electrical Engineering and Computer Science. / Vita. / Includes bibliographical references. / Ph.D.
217

Simulação em tempo real de sistemas de distribuição de energia elétrica utilizando-se estruturas com descrição de hardware em software /

Ibarra Hernández, Frank Alberto. January 2015 (has links)
Orientador: Carlos Alberto Canesin / Banca: Guilherme de Azevedo e Melo / Banca: Júlio Borges de Souza / Banca: Ruben Barros Godoy / Banca: Luigi Galotto Junior / Resumo: Esta tese de doutorado se baseia na necessidade atual e tendência mundial da busca por tornar mais inteligentes os sistemas de distribuição de energia elétrica, por isso, o objetivo geral deste trabalho é desenvolver uma Arquitetura de Simulação em Tempo Real e Controle (ASTR&C) para alimentadores elétricos de distribuição, com o intuito de analisar a qualidade da energia e melhorar as ações de controle nos sistemas de distribuição, procurando assim aumentar a confiabilidade e sustentabilidade do sistema de potência. A ASTR&C utiliza uma plataforma VHDL-AMS como interface gráfica do usuário (Graphical user interface - GUI) para desenvolver a simulação do sistema elétrico e a linguagem VHDL (Very High Speed Integrated Circuit Description Language) para o desenvolvimento do sistema de gerenciamento e controle da rede de distribuição (Distribution Management System and Control - DMS&C), através de um dispositivo FPGA (Field Programmable Gate Array). Ambas as linguagens de descrição de hardware VHDL e VHDL-AMS (VHDL analog and mixed-signal), juntamente com as informações do sistema elétrico de distribuição, tornam possível a simulação em tempo real e controle de alimentadores de distribuição de energia elétrica. A GUI na plataforma VHDL-AMS, além de executar a simulação do sistema elétrico de distribuição, envolve dois processos: 1) Importação de todos os parâmetros do sistema de distribuição real, a partir de um arquivo de texto, possibilitando a alteração de quaisquer dados deste alimentador de distribuição em ambiente VHDL-AMS e 2) Envio dos dados de controle necessários para o dispositivo FPGA. O DMS&C desenvolvido está focado no gerenciamento do perfil de tensão do alimentador admitido como estudo de caso, realizado através de um dispositivo FPGA, o qual dispõe como prioridade o controle do regulador de tensão do sistema de distribuição, com base na comutação de TAP do mesmo. Neste... / Abstract: This doctoral thesis is based on current need and global trend in the search for making smarter electric power distribution systems. For this reason, the objective of this work is to develop a Real-Time Simulation and Control (RTSC) architecture of electrical distribution feeders, in order to analyze power quality and improve the control actions in distribution systems, to increase power system reliability, and sustainability. The RTSC architecture uses VHDL-AMS platform as graphical user interface (GUI) to develop the simulation of the electrical system and VHDL (Very High Speed Integrated Circuit Description Language) language for developing the Distribution Management System and Control (DMS&C) through a FPGA device. Both VHDL and VHDL-AMS (VHDL analog and mixed-signal) hardware description languages along with electric distribution system information make possible the real-time simulation and control for electrical distribution feeders. The GUI in VHDL-AMS platform, which, besides running the simulation of the electrical distribution system, involves two processes: 1) Import of all parameters of the distribution system from a text file, making it possible to change any data of this distribution feeder into a VHDL-AMS environment, and 2) Sending necessary control data to the FPGA device. The developed DMS&C is focused on voltage profile management of admitted feeder as a case study, performed through a FPGA device, which provides as priority control of the distribution system voltage regulator, based on the voltage regulator TAP switching. In this context, DMS&C was developed to propose feeder voltage level regulation actions to the distribution system real controller, considering the real feeder characteristics, with concentrated loads and network reduction, for constituting the case study of this thesis. It stands out as the main contribution of this thesis work, the presentation of a novel real-time simulation and control ... / Doutor
218

Análise do impacto de sistemas fotovoltaicos conectados à rede de distribuição na qualidade da energia de uma smart city: Análise do impacto de sistemas fotovoltaicos conectados à rede de distribuição na qualidade da energia de uma smart city /

Falcão, Mariana Costa. January 2015 (has links)
Orientador: Falcondes José Mendes de Seixas / Co-orientador: Dionízio Paschoareli Júnior / Banca: Fábio Berequini Leão / Banca: Rogério Andrade Flauzino / Resumo: Este trabalho apresenta análises do impacto da conexão de sistemas fotovoltaicos conectados à rede de distribuição na qualidade de energia elétrica em três consumidores de uma cidade aonde está se iniciando um projeto de Smart City. É utilizado como referência para as análises o módulo 8 dos Procedimentos de Distribuição (PRODIST). As análises realizadas são de grande importância para se ter uma avaliação de como a qualidade da energia elétrica dos consumidores será afetada quando os sistemas fotovoltaicos forem conectados as suas residências, aos seus estabelecimentos ou até as suas industrias. Os conceitos apresentados no levantamento bibliográfico foram utilizados para a compreensão tanto da temática de Smart Cities e Smart Grid, como dos problemas de qualidade de energia elétrica que foram analisados. Os resultados das medições de qualidade de energia são analisados a partir de uma comparação dos parâmetros encontrados antes e após a instalação dos sistemas fotovoltaicos nos consumidores. Ao se observar as diferenças entre os resultados foi possível concluir quais foram os impactos causados pela presença da fonte de geração distribuída em questão / Abstract: This paper presents analysis of the impact of PV systems connected to the distribution network in the electric power quality in three consumers in a city where is launching a Smart City project. It is used as a reference for the analysis the module 8 of Distribution Procedures (PRODIST). The analyzes are of great importance to have an evaluation of how the consumers power quality will be affected when PV systems are connected to their homes, their businesses or even to their industries. The concepts presented in the literature were used for the understanding subjects such as Smart Cities, Smart Grid and power quality problems. The results of power quality measurements are analyzed from a comparison of estimated coefficients before and after the installation of photovoltaic systems on consumers. By observing the differences between the results it was possible to conclude which the impacts were caused by the presence of the source of distributed generation in question / Mestre
219

Avaliação dos riscos de violações de conformidade de tensão em sistemas de distribuição, utilizando método probabilístico e conjuntos fuzzy. / Risk assessment of voltage levels violations in distribution systems using probabilistic approach and fuzzy sets.

Renato Oliveira Guimarães 09 June 2008 (has links)
Nesta tese são apresentadas metodologias alternativas ao enfoque determinístico de avaliação de desempenho elétrico de sistemas de distribuição, especificamente na análise dos riscos de violações de conformidade de tensão em sistemas de distribuição, utilizando para isto, métodos probabilísticos e teoria de conjuntos fuzzy. A Agência Nacional de Energia Elétrica estabeleceu a resolução nº 505/2001 que especifica indicadores de variação de tensão de longa duração, contendo os indicadores individuais e coletivos a serem mensurados, assim como, as penalidades pelo não cumprimento dos prazos limites estabelecidos para regularização. A ENERSUL, Empresa Distribuidora do Grupo ENBR Energias do Brasil e o ENERQ Centro de Estudos em Regulação e Qualidade de Energia Elétrica desenvolveram um projeto de P&D para a obtenção de metodologia e software de simulação dos indicadores de variação de tensão de longa duração. No projeto de P&D foi especificado e desenvolvido um módulo computacional para calcular o fluxo de carga com uma abordagem probabilística, partindo-se das curvas de carga típicas de consumidores, que representam a variação temporal da carga (demanda máxima e desvio padrão), obtendo-se as curvas de distribuição de probabilidades da tensão, que permitiram calcular, para cada ponto da rede, os riscos de transgressão dos indicadores de variação de tensão de longa duração. Após o projeto de P&D, uma nova abordagem que utiliza a teoria de conjuntos difusos (fuzzy) foi desenvolvida e foi possível a comparação com o método probabilístico. Baseado em números fuzzy que representam a estimativa de níveis tensão para cada ponto na rede, e com métodos específicos de classificação fuzzy, calculam-se os indicadores de DRP e DRC. / In this thesis are presented alternatives methodologies for deterministic approach for evaluation of performance of electrical distribution systems, specifically in the risk assessment of voltage levels violations in distribution systems, using for this, probabilistic methods and theory of fuzzy sets. ANEELs Resolution 505/2001 specifies long-term voltage variation indicators, with the following items to be measured: individual and collective indicators, and the penalties for not complying with the established limits. ENERSUL, the distribution company of the ENBR Group Energias do Brasil and ENERQ Center for Regulation and Power Quality Studies carryied out an R&D project for the development of a methodology and simulation software that will enable the company to evaluate long-term voltage variation indicators. A computational module was specified and developed to calculate the load flow with a probabilistic approach. Based on typical daily load curves, representing the time variation of the load (average and standard deviation curves), distribution curves are obtained for voltage probability, so that the risk of violating indicators can be calculated, for each point in the network. After the R&D project, a new approach based on fuzzy sets theory was developed and make possible the comparison with the probabilistic approach. Based on fuzzy numbers that represents an estimative for voltage levels for each point in the network, and with specific fuzzy classification methods, the RDI and RDC indicators can be calculated.
220

Combate, prevenção e otimização das perdas comerciais de energia elétrica. / Combat, prevention and optimization of non technical losses of electric power distribution.

Carlos Alexandre de Sousa Penin 28 April 2008 (has links)
As perdas de energia elétrica devidas a furtos e fraudes, também chamadas de Perdas Não-Técnicas (PNT) ou Perdas Comerciais, têm sido matéria prioritária das empresas concessionárias de distribuição de energia elétrica, bem como dos órgãos reguladores, tanto pelo seu crescimento nos últimos anos quanto pelo seu impacto no sistema elétrico brasileiro. As formas de fraude são as mais variadas possíveis, o que gera enormes dificuldades para as concessionárias. Este trabalho tem como objetivo o estudo do problema das PNT utilizando-se de uma abordagem multidisciplinar, que analisa a experiência tanto de concessionárias no Brasil como no exterior. O trabalho discute as melhores práticas para mitigação das mesmas e propõe melhorias nos processos de combate e de prevenção, e nos procedimentos legais para recuperação de receitas, apoiados sobre uma cuidadosa contextualização regulatória. Chamase a atenção para a diversidade sócio-econômica nacional, compara-se com diversos exemplos internacionais, e propõe-se identificar os aspectos mais relevantes a serem considerados na regulação sobre o tema, discutindo procedimentos e metodologias para o equacionamento do montante de recursos a serem aplicados pelas companhias distribuidoras para a adequada redução dessas perdas de energia. Observa-se que grande parte das PNT tem origem em questões de cunho social. O Estado pode e deve estabelecer políticas para resolver tais questões, possibilitando a universalização do acesso e subsidiando o fornecimento de energia elétrica. Não fez parte dessa pesquisa discutir se estes instrumentos são suficientes ou devem ser aprimorados, mas sim analisar amplamente a questão das PNT com base nos condicionantes regulatórios atuais, que obrigam as concessionárias a reduzir estas perdas visando entre outros a modicidade tarifária dos consumidores regulares. / The electric power losses due to thefts and frauds, also called Non technical Losses (NTL), have been priority matter for concessionary companies of electric power distribution, as well as for government regulatory agencies, not only due to rapid growth over the past years but also due to its impact on Brazilian electrical system. There is a wide range of possible types and methods of frauds, causing enormous difficulties to licensed companies. The objective of this work is to study the problem of NTL using a wide approach, analyze the experience of dealerships in Brazil and abroad, discuss the best practices for mitigation of those losses and propose improvements in the combat and prevention processes, and the legal procedures for recovery of incomes, leaning on a careful regulatory context. This study draws attention to Brazil\'s socioeconomic diversity, comparing it to various international examples, and intends to identify the most relevant aspects that must be considered on the theme, discussing procedures and methodologies for the equation of the amount of resources to be applied by distributing companies to achieve the appropriate reduction of NTL. A large part of the commercial losses has its origin in issues of social stamp. The State owes and can establish policies to solve such issues, making possible the access to electric power supply for all consumers. It was not part of this research to discuss if these instruments are enough, but to analyze the issue of the commercial losses thoroughly based in the regulatory policies that push dealerships to reduce NTL objecting reasonable regular consumers\' tariff.

Page generated in 0.0844 seconds