• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 266
  • 227
  • 34
  • 18
  • 15
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 3
  • 3
  • Tagged with
  • 684
  • 684
  • 488
  • 262
  • 261
  • 233
  • 171
  • 115
  • 108
  • 87
  • 76
  • 67
  • 66
  • 65
  • 53
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
441

Detection of Back-Fed Ground Faults Using Smart Grid Distribution Technology

January 2014 (has links)
abstract: The safety issue in an electrical power distribution system is of critical importance. In some circumstances, even the continuity of service has to be compromised for a situation that can cause a hazard to the public. A downed conductor that creates an electrical path between a current carrying conductor and ground pose a potential lethal hazard to anyone in the near proximity. Electric utilities have yet to find a fully accepted and reliable method for detecting downed conductors even with decades of research. With the entry of more automation and a smarter grid in the different layers of distribution power system supply, new doors are being opened and new feasible solutions are waiting to be explored. The 'big data' and the infrastructures that are readily accessible through the smart metering system is the base of the work and analysis performed in this thesis. In effect, the new technologies and new solutions are an artifact of the Smart Grid effort which has now reached worldwide dimensions. A solution to problems of overhead distribution conductor failures / faults that use simple methods and that are easy to implement using existing and future distribution management systems is presented. A European type distribution system using three phase supply is utilized as the test bed for the concepts presented. Fault analysis is performed on the primary and the secondary distribution system using the free downloadable software OpenDSS. The outcome is a set of rules that can be implemented either locally or central using a voltage based method. Utilized in the distribution management systems the operators will be given a powerful tool to make the correct action when a situation occurs. The test bed itself is taken from an actual system in Norway. / Dissertation/Thesis / Masters Thesis Electrical Engineering 2014
442

Metodologia de localização de defeitos em redes subterrâneas integrando PSCAD/EMTDC e sistemas inteligentes

Gastaldello, Danilo Sinkiti [UNESP] 03 August 2012 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:22:34Z (GMT). No. of bitstreams: 0 Previous issue date: 2012-08-03Bitstream added on 2014-06-13T19:08:09Z : No. of bitstreams: 1 gastaldello_ds_me_bauru.pdf: 1214010 bytes, checksum: 29dee0e501a74b98535a82f676d332d4 (MD5) / Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Com a modernização da sociedade e o grande crescimento tecnológico visto nos últimos anos, é difícil de imaginar a ausência da energia elétrica nos dias atuais, pois tudo depende da energia para funcionar. A energia elétrica é fundamental para todos os setores da sociedade: residencial, comercial e industrial. A qualidade de seu fornecimento também é muito importante, pois é a qualidade que garante o correto funcionamento de todos os processos realizados no dia-a-dia. No entanto, nenhum sistema, por melhor que seja, é imune à ocorrências de falhas. Assim sendo, uma boa monitoração destas falhas é necessária para realização de manobras de correção mais eficientes. Além disso, a crescente preocupação ambiental faz com que as concessionárias busquem melhores formas de levar a energia à energia à população, com redes mais seguras, mais confiáveis e também mais baratas. Os sistemas subterrâneos têm demonstrado ser uma boa solução no que diz respeito à segurança, confiabilidade e preocupação ambiental, porém a sua instalação ainda é muito cara em comparação com as redes aéreas convencionais. Como todos os sistemas, as redes subterrâneas também estão sujeitas a defeitos. A correta localização a falta (defeito) em cabos subterrâneos de distribuição de energia elétrica não é uma tarefa trivial. Além da dificuldade de acesso ao sistema, existe o alto custo das medições dos parâmetros e a necessidade de uma análise de um especialista dos sinais medidos, ocasionando erros que têm se mostrado custosos. A proposta desta dissertação consiste em estudar os sistemas subterrâneos através de ferramentas computacionais e desenvolver um sistema inteligente que auxilie com a precisão de localização de faltas subterrâneos de distribuição de energia elétrica / With the modernization of society and the great technological growth in the last years, it is hard to imagine the absence of electric power nowadays, because everything depends on energy to work. Electricity is fundamental to all sectors of society: residential, commercial and industrial. The quality supply is also very important, since quality guarantees the correct functioning of all processes performed in a daily basis. However, no system is immune to the occurrence of faults. Therefore, a good monitoring of these faults is necessary for more efficient correction adjustments. In addition, the growing environmental concerns make the power utilities to find better ways to take energy to the population, through safer more reliable and also cheaper networks. The underground system has be found to be a good approach to improve safety, reliability and environmental features, but its installation is still very expensive when compared to conventional overhead systems. Like any system, the underground networks are subjects to defects. The correct fault localization (defect) in eletricity distribution underground networks is not a trivial task, it is not just due to a difficult system acess, the high cost of measurements of the parameters and the required expert analysis of the measured signals. These factors are source of errors that have proven costly. The purpose of this dissertation is to study underground system using computational tools and develop an intelligent system to accurately assist to locating of faults in underground cables of power distribution networks
443

Controle de uma microrrede ilhada baseada em geração eólica-diesel com alto nível de inserção de geração eólica / Control of an islanded wind-diesel microgrid with high penetration level of wind generation

Lukasievicz, Tiago 25 April 2016 (has links)
FINEP; Capes; CNPq; Fundação Araucária; SETI; UTFPR / A inserção de unidades de geração distribuída no sistema elétrico de potência tem contribuído para a popularização do conceito de microrrede. Vários benefícios potenciais podem ser alcançados no que tange a qualidade de energia e confiabilidade de fornecimento. No entanto, vários desafios técnicos referentes ao controle e operação de microrredes deverão ser superados, considerando a alta inserção de sistemas de geração baseados em conversores estáticos. Dentre as oportunidades no contexto das microrredes, está a operação ilhada da microrrede no caso de microrredes interconectadas ao sistema elétrico de potência, e também a operação autônoma de microrredes isoladas geograficamente do sistema elétrico de potência. A frequência em sistemas de potência de grande porte é tradicionalmente controlada por unidades de geração síncronas. A inserção de unidades de geração distribuída com conversores estáticos de potência pode trazer dificuldades ao controle de frequência da microrrede devido à redução da inércia equivalente dos geradores síncronos convencionais presentes em microrredes ilhadas autônomas ou isoladas geograficamente. Nesse contexto, se torna necessário que novas estratégias operacionais e de controle sejam propostas para o controle de microrredes, levando em consideração a presença de unidades de geração distribuída baseadas em conversores estáticos de potência plenos. Este trabalho propõe uma estratégia operacional e de controle para a operação ilhada autônoma de uma microrrede com geração híbrida eólica-diesel com elevado nível de inserção da geração eólica. A microrrede adotada no estudo é composta por um sistema de conversão de energia eólica com gerador síncrono baseada em conversor pleno e um gerador síncrono movido a diesel (GDI) e um banco de carga (DL, do inglês, dump load). Devido ao alto nível de inserção da geração eólica, a unidade eólica de geração opera no modo Vf e o gerador diesel no modo PQ. O gerador a diesel e a dump load são empregados para regular a tensão do barramento CC do conversor da unidade eólica. O controle proposto permite a operação ilhada da microrrede somente com a geração eólica, modo somente eólica (SE), e a operação híbrida eólica-diesel, modo eólica-diesel. Para o modo somente-eólica, modo com 100% de inserção da geração eólica, propõe-se uma malha de controle da tensão do barramento CC baseada na utilização de uma dump load CC. Para o modo de operação eólica-diesel propõese uma malha de controle de tensão do barramento CC adicionada ao gerador diesel conectado à microrrede CA com atuação coordenada com a dump load. A estratégia operacional e de controle proposta não requer o uso de baterias e visa maximizar a produção de energia a partir da geração eólica, garantindo a operação ininterrupta da microrrede. Os resultados obtidos demonstraram que a estratégia operacional e de controle permitiu a operação da microrrede ilhada de modo estável e que as malhas de controle da tensão do barramento CC adicionadas ao gerador diesel e à dump load se mostraram eficazes durante as variações típicas de velocidade de vento e de carga. / The insertion of distributed generation units in the electric power systems have contributed to the popularization of microgrid concepts. With the microgrids, several potential benefits can be achieved in regard to power quality and supply reliability. However, several technical challenges related to the control and operation of microgrids, which are associated with high insertion of generation systems based on static converters, must be overcame. Among the opportunities in the context of microgrids, there is the islanded operation of microgrids temporarily disconnected from the electric power systems and also the autonomous operation of geographically isolated microgrids. The frequency in large power systems is traditionally controlled by the generation units based on traditional synchronous generator. The insertion of distributed generation units based on static power converters may bring difficulties to the frequency control in microgrids, due to the reduction of the equivalent inertia of conventional synchronous generators present in islanded and isolated microgrids. In this context, it becomes necessary the proposition of new operational and control strategies for microgrids control, taking into account the presence of distributed generation units based on full-rated converter. This paper proposes an operational and control strategy for the islanded operation of a winddiesel microgrid with high insertion level of wind generation. The microgrid adopted in this study comprises of a wind energy conversion system with synchronous generator based on full rated converter, a diesel generator (DIG) and a dump load. Due to the high insertion level of wind generation, the wind unit operates in Vf mode and the diesel generator operates in PQ mode. The diesel generator and the dump load are used to regulate the DC-link voltage of the wind generation unit. The proposed control allows the islanded operation of the microgrid only with wind generation, wind-only mode (WO), and with wind-diesel generation, wind-diesel mode (WD). For the wind-only mode, with 100% of penetration level of wind generation, it is proposed a DC-link voltage control loop based on the use of a DC dump load. For the winddiesel mode, it is proposed a DC-link voltage control loop added to the diesel generator, which is connected to the AC side of the microgrid, in coordinated action with the dump load. The proposed operational and control strategy does not require the use of batteries and aims to maximize the energy production from wind generation, ensuring the uninterrupted operation of the microgrid. The results have showed that the operational and control strategy allowed the stable operation of the islanded microgrid and that the DC-link voltage control loop added to the diesel generator and the dump load proved to be effective during the typical variations of wind speed and load.
444

Development of an IEC 61850 standard-based automation system for a distribution power network

Julie, Ferdie Gavin January 2014 (has links)
Thesis submitted in fulfillment of the requirements for the degree Master of Technology: Electrical Engineering in the Faculty of Engineering at the Cape Peninsula University of Technology / The electric power distribution network, an essential section of the electric power system, supplies electrical power to the customer. Automating the distribution network allows for better efficiency, reliability, and level of work through the installation of distribution control systems. Presently, research and development efforts are focused in the area of communication technologies and application of the IEC 61850 protocol to make distribution automation more comprehensive, efficient and affordable. The aim of the thesis is to evaluate the relevance of the IEC61850 standard-based technology in the development and investigation of the distribution automation for a typical underground distribution network through the development of a distribution automation algorithm for fault detection, location, isolation and service restoration and the building of a lab scale test bench Distribution Automation (DA) has been around for many decades and each utility applies its developments for different reasons. Nowadays, due to the advancement in the communication technology, authentic and automatic reconfigurable power system that replies swiftly to instantaneous events is possible. Distribution automation functions do not only supersede legacy devices, but it allows the distribution network to function on another lever. The primary function of a DA system is to enable the devices on the distribution network to be operated and controlled remotely to automatically locate, isolate and reconnect supply during fault conditions. Utilities have become increasingly interested in DA due to the numerous benefits it offers. Operations, maintenance and efficiencies within substations and out on the feeders can be improved by the development of new additional capabilities of DA. Furthermore, the new standard-based technology has advanced further than a traditional Distribution Supervisory and Control Data Acquisition (DSCADA) system. These days the most important components of a DA system include Intelligent Electronic Devices (IEDs). IEDs have evolved through the years and execute various protection related actions, monitoring and control functions and are very promising for improving the operation of the DA systems. The thesis has developed an algorithm for automatic fault detection, location, isolation and system supply restoration using the functions of the IEC61850 standard-based technology. A lab scale system that would meet existing and future requirements for the control and automation of a typical underground distribution system is designed and constructed. The requirement for the lab scale distribution system is to have the ability to clear faults through reliable and fast protection operation, isolate faulted section/s, on the network and restore power to the unaffected parts of the network through automation control operation functions of the IEC61850 standard. Various tests and simulations have been done on the lab scale test bench to prove that the objective of the thesis is achieved. Keywords: IEC61850 Standard, Distribution automation, Distribution automation system, IEDs, Lab scale test bench, Protection, Algorithm for automatic control
445

Aplicação de técnicas metaheurísticas para resolver o problema de coordenação de carregamento de veículos elétricos em sistemas de distribuição /

Bañol Arias, Maria Nataly. January 2015 (has links)
Orientador: Marina Lavorato de Oliveira / Co-orientador: John Fredy Franco Baquero / Banca: Sergio Azevedo de Oliveira / Banca: Fernanda Caseño Lima Trindade / Resumo: O problema do carregamento de veículos elétricos consiste em determinar a programação ótima da recarga dos PEVs (do inglês Plug-in Electric Vehicles) de forma que o custo de operação seja minimizado e as condições de operação do sistema de distribuição de energia elétrica (SDEE) sejam satisfeitas. Neste trabalho são propostas as técnicas de otimização metaheurística: Busca Tabu e GRASP para resolver o problema da coordenação do carregamento de veículos elétricos em sistemas de distribuição, modelado como um problema de programação não linear inteira mista. Posteriormente, é proposto um algoritmo híbrido chamado GRASP-BT com o objetivo principal de melhorar as soluções obtidas com as metodologias Busca Tabu e GRASP. As soluções propostas pelas metaheurísticas desenvolvidas neste trabalho indicam os períodos de tempo em que deve ser carregado cada veículo ligado no SDEE, minimizando os custos totais de operação, satisfazendo as restrições operacionais do SDEE, considerando prioridade de carregamento dos PEVs e permitindo a entrega de soluções de qualidade em tempo real. Para demonstrar a eficiência da metodologia proposta e a adaptação de cada metaheurística na resolução do problema, foi usado um sistema teste de 449 nós que considera os sistemas primário e secundário do SDEE e duas fontes de geração distribuída. Os testes são feitos com níveis de 47% e 63% de penetração de PEVs dentro do sistema / Abstract: The main objective of the plug-in electric vehicles (PEV) charging problem is to determine the optimal schedule for charging the PEV batteries with the aim of minimizing the total operational cost of the electrical distribution system in order to obtain an efficient and secure system operation. The optimization techniques used to resolve the plug-in electric vehicles charging problem on electrical distribution systems are two metaheuristic: Tabu Search and GRASP. The mathematical model used to represent the PEV charging problem is a mixed-integer nonlinear programing problem. On the other hand, a hybrid algorithm named GRASP-BT is also proposed in order to improve the solutions obtained by the Tabu Search and GRASP methodologies. The solutions found by the proposed methodologies designate the time periods where each PEV battery connected to the electrical distribution system need to be charged, minimizing the total operational costs, satisfying the operational constraints, considering PEV charging priority and providing quality solution on real time. In order to show the efficiency of the proposed methodologies, a 449 nodes test system with HV and LV network and two sources of distributed generation are used. Test cases consider a 47% and a 63% of PEV penetration / Mestre
446

Análise de oportunidades de poligeração para edifícios e cidades /

Vargas, Adriana Lopez. January 2016 (has links)
Orientador: José Antonio Perrella Balestieri / Banca: Rubens Alves Dias / Banca: José Rui Camargo / Resumo: A geração de energia distribuída em edificações e cidades tem sido proposta como uma importante alternativa para que os países ampliem a base tecnológica de suas matrizes energéticas. No caso do Brasil, a possibilidade da incorporação da geração distribuída em edificações apresenta amparo legal por meio de recentes regulamentações do setor elétrico e das normas de melhoria da eficiência energética de edificações. Por estas razões, novos empreendimentos imobiliários com visão de sustentabilidade ambiental, estão avaliando o uso da geração distribuída na etapa de planejamento. Nesta dissertação, foi analisada uma proposta para atender as necessidades energéticas de um hospital (vapor, água quente, resfriamento e eletricidade) considerando as informações de demanda, classificadas em oito dias típicos do ano, dois por cada estação do ano (outono, inverno, primavera e verão) sendo um dia de trabalho normal e outro de final de semana. A proposta consiste na otimização de uma superestrutura composta de diferentes tecnologias de geração e cogeração incluindo equipamentos solares, para assim obter a melhor configuração em termos econômicos. A superestrutura é flexível, ou seja, permite a venda ou compra de eletricidade e analisa três casos, verificando-se a viabilidade de gerar mais eletricidade. Finalmente são apresentados os resultados da configuração final obtida pela otimização / Abstract: Distributed generation in buildings and cities has been proposed as an important option for countries in order to include more technologies in their energy mixes. In Brazil, the possibility of including distributed generation in buildings has recent advances in energy policy and building energy efficiency standards. For these reasons, new construction projects of sustainable buildings include the assessment of distributed generation in the initial stages. In this work, we present an approach for attending energy needs (steam, hot water, cooling and electricity) of a hospital. The information about demand is classified in eight typical days, two for each season of the year (autumn, winter, spring and summer); a workday and a weekend day. The approach consists in the optimization of a superstructure containing different energy generation and cogeneration technologies like solar panels, for obtaining the best configuration in economic terms. The superstructure is flexible, this is, it allows buying or selling electricity. It also analyzes three cases, verifying the feasibility for generating more electricity. Finally, the results present the final configuration obtained from the optimization process / Mestre
447

Sistema de conexão de mini e micro centrais hidrelétricas às redes monofásicas das concessionárias

Bertoncello, Ricardo 19 August 2011 (has links)
Este trabalho tem por objetivo desenvolver um sistema de conexão entre unidades de geração trifásica e uma rede de distribuição de energia elétrica rural monofásica. O sistema proposto baseia-se em um conversor CA/CA. Este conversor é composto por um retificador trifásico modulado por largura de pulso e um inversor monofásico. O controle do sistema é realizado através de um controlador digital de sinais (DSC). Atualmente o custo para conexão de mini e micro centrais hidrelétricas às redes de distribuição das concessionárias é bastante elevado, principalmente pelo custo de implantação das redes de distribuição trifásicas, e isso gera impacto principalmente nos pequenos empreendimentos. Para os empreendimentos maiores, este custo é diluído no custo total da obra, não impactando de forma significativa na viabilidade do negócio. Este trabalho visa desenvolver um sistema de conexão que atenda os requisitos técnicos e as exigências legais e que ao mesmo tempo consiga reduzir os custos para a conexão de pequenos agentes geradores no sistema elétrico nacional, em localidades onde somente a rede monofásica esteja disponível. Com isso, pretende-se viabilizar economicamente a inserção de pequenos produtores no cenário de geração e comercialização de energia elétrica. / The objective of this work is to develop a connection system between three-phase generation units and a single phase rural distribution electricity network. The proposed system is based on an AC/AC converter. This converter consists in a threephase PWM rectifier and a single-phase PWM inverter. System control is performed by a Digital Signal Controller (DSC). Currently, the cost for connecting mini and micro hydropower plants to distribution networks of utilities is very high, especially because of the three phase distribution networks deployment cost, which generates impact mainly in small businesses. For larger businesses, this cost is diluted within the total work costs, not significantly impacting business viability though. This work aims at developing a system that meets the technical and legal connection requirements and, at the same time, will be capable of reducing costs for connecting small generating agents in the national power system in locations where only a single-phase network is available. Therefore, we intend to make economically viable insertion of small producers in the generation and sale electricity scenario.
448

Aplicação da otimização por colônia de formigas ao problema de múltiplos caixeiros viajantes no atendimento comercial e emergencial em uma empresa de distribuição de energia elétrica / Applying the ant colony optimization to solve the multiple traveling salesmen problem to execution of commercial and emergency services in a electric power distribution company

Barbosa, Denilson Fagundes 03 December 2015 (has links)
O atendimento comercial e emergencial consiste basicamente na execução de serviços por equipes de eletricistas em diferentes pontos do sistema de distribuição de energia elétrica, compreendendo as atividades necessárias para a manutenção corretiva do sistema de distribuição e para a gestão comercial dos consumidores. Esta atividade reflete diretamente na qualidade das empresas de distribuição de energia, que procuram executar os serviços de forma a cumprir as metas da Agência Nacional de Energia Elétrica e a diminuir o tempo de resposta às solicitações dos clientes. A partir da análise do método manual utilizado em uma empresa real para designará os serviços às equipes, foi constatada a necessidade de uma metodologia computacional que utilize os dados disponíveis nos sistemas de informação da empresa para orientar o despacho de serviços, a fim de que mais serviços sejam atendidos pelas equipes no mesmo intervalo de tempo. O problema foi abordado em duas etapas. Na primeira etapa, foi configurado o Problema de Despacho Estático, no qual todos os serviços são conhecidos antes da otimização. Na segunda etapa, foi abordado o Problema de Despacho Dinâmico, no qual novos serviços surgem e são despachados às equipes durante o dia de trabalho, podendo ser emergenciais. Para o problema estático foram construídas instâncias do Problema de Múltiplos Caixeiros Viajantes a partir das posições dos serviços, que foram submetidas a dois algoritmos da Otimização por Colônia de Formigas. Para o problema dinâmico, foi desenvolvido um protótipo de um sistema para orientar o despacho dos serviços durante o dia de trabalho, denominado Sistema de Despacho Dinâmico, que aplica a metodologia estática até o surgimento de um novo serviço. Quando surge um novo serviço, o sistema reage de acordo com o tipo do serviço: se emergencial, é despachado imediatamente à equipe mais próxima; se comercial, uma nova instância é construída e novamente otimizada. A experimentação da metodologia estática foi realizada com 17 instâncias construídas a partir de dados reais, e reduziu em 44,43%, em média, a maior rota individual dos dias de trabalho utilizando custos temporais previstos para representação das instâncias. Os experimentos para a metodologia dinâmica, que simularam o surgimento de novos serviços durante o dia de trabalho a partir dos seus horários de despacho reais, reduziram em média 15,48% o custo total e 17,18% o custo da maior rota individual dos dias de trabalho. Esses resultados comprovam que tanto a metodologia estática quanto a dinâmica são capazes de equilibrar a carga de trabalho das equipes, possibilitando que mais serviços sejam executados no mesmo intervalo de tempo, melhorando o método atual de despacho de serviços na empresa. / The commercial and emergency service consist of the execution of service orders by electrician teams in different points of the electric power distribution system, comprising the activities required for corrective maintenance of the distribution system and the commercial management of consumers. This activity directly reflects in the quality of the power distribution companies, which seek to execute the services in order to meet the rules of the Brazilian National Agency of Electric Energy and to reduce the response time of customer requests. From the analysis of manual method used in an actual company to assign the services to the teams, we found the need for a computational method that uses the available data in the information systems of company to guide the dispatching services, in order that teams execute more services in the same time interval. We approach the problem in two steps. In the first step, we configure the Static Dispatch Problem, in which all services are known before the optimization. In the second step, we approach the Dynamic Dispatch Problem, in which new services arise and are dispatched to the teams during the workday and can be emergency orders. For the static problem, we build instances of the Multiple Traveling Salesmen Problem with the locations of orders, which were submitted to two Ant Colony Optimization algorithms. For the dynamic problem, we developed a system prototype called Dynamic Dispatch System to guide the dispatch of orders during the workday, which applies the static approach until the appearance of a new order. When a new order arises, the system reacts accordingly to the type of order: if it is an emergency order, then it is dispatched immediately to the nearest team; if it is a commercial order, a new instance is constructed and optimized again. For the static methodology, we performed experiments using 17 instances constructed from actual data. The experiments with the static methodology has reduces the largest route of single teams by an average of 44.43%, using predicted time costs for representation of instances. The experiments for the dynamic methodology, which simulated the appearance of new orders during the workday from actual dispatch times, reduced the total cost by 15.48% on average and the cost of larger individual routes by 17.18% on average. These results show that both the static and the dynamic methodologies are able to balance the workload of the teams, enabling that more services are performed in the same time interval, improving the current method of dispatching services in the company.
449

Estratégias para redução de perdas técnicas e melhoria nas condições de operação de redes de distribuição de energia elétrica / Strategies for technical losses reduction and improvements on operational conditions of power distribution networks

Vizcaino González, José Federico 18 August 2018 (has links)
Orientadores: Christiano Lyra Filho, Celso Cavellucci / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e de Computação / Made available in DSpace on 2018-08-18T02:44:14Z (GMT). No. of bitstreams: 1 VizcainoGonzalez_JoseFederico_D.pdf: 9526841 bytes, checksum: 9fc3b73df592526f56693f9b329fc70c (MD5) Previous issue date: 2011 / Resumo: O trabalho desenvolve alternativas de otimização combinatória para a redução de perdas técnicas e melhoria das condições de operação de sistemas de distribuição de energia elétrica. Sua principal contribuição é na área de redução dos fluxos de reativos através da instalação e controle de bancos de capacitores. Duas alternativas de otimização são desenvolvidas. A primeira, propõe um algoritmo genético híbrido com buscas locais nas representações fenotípicas e genotípicas das soluções. A segunda alternativa utiliza conceitos de programação dinâmica no projeto de algoritmos que encontram soluções ótimas globais para o problema de localização, dimensionamento e controle de capacitores. Outro algoritmo genético híbrido, para a instalação de reguladores de tensão, complementa a possibilidade de melhoria nos perfis de tensão proporcionada pelos capacitores. Os algoritmos baseados em programação dinâmica são de complexidade polinomial; adicionalmente, suas complexidades são lineares para instâncias reais. As características desses algoritmos estabelecem novas referências para a área de localização e controle de capacitores em sistemas de distribuição de energia elétrica, hoje povoada por métodos heurísticos / Abstract: This work develops combinatorial optimization alternatives for technical loss reduction and improvements on operational conditions of power distribution networks. Its main contribution is in the area of loss reduction by decreasing reactive flows, through allocation and control of shunt capacitors banks. Two optimization strategies are proposed. The first one develops a hybrid genetic algorithm with local searches in both genotypical and fenotypical representations of solutions. The second alternative uses dynamic programming concepts in the design of algorithms that unveil global optimal solutions for capacitor location, sizing and control. Another hybrid genetic algorithm for allocation of voltage regulators complements the improvement in voltage profiles obtained with the allocation of capacitors. The algorithms based on dynamic programming concepts have polynomial-time complexity; further, they have linear-time complexity for practical applications. Therefore, these algorithms establish a new reference for the area of shunt capacitors allocation and control on power distribution systems, which is today populated by heuristic methods / Doutorado / Energia Eletrica / Doutor em Engenharia Elétrica
450

Algoritmos geneticos hibridos para redução de perdas tecnicas em redes primarias de distribuição considerando variações de demandas / Hybrid genetic algorithms for loss reduction in distribution systems under variable demand

Queiroz, Leonardo Mendonça Oliveira de 06 September 2005 (has links)
Orientador: Christiano Lyra Filho / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-06T02:47:37Z (GMT). No. of bitstreams: 1 Queiroz_LeonardoMendoncaOliveirade_M.pdf: 695151 bytes, checksum: 1dd5cfdea3e5f570eac87a0b801c8e25 (MD5) Previous issue date: 2005 / Resumo: Esse trabalho propõe um Algoritmo Genético Híbrido para o problema de redução de perdas em redes de distribuição de energia elétrica através de reconfigurações da rede, considerando-se as variações das demandas ao longo do dia. É adotada uma formulação que evita reconfigurações freqüentes, procurando encontrar uma única configuração para operação ao longo de todo o período em estudo, mas considerando explicitamente no processo de otimização a diversidade de variações de demanda ao longo da rede. A representação implementada garante a factibilidade dos indivíduos após a realização de cruzamento e mutação no processo de busca da melhor solução com o algoritmo genético. Foi incluída uma fase de busca local, o que caracteriza o método como um algoritmo genético híbrido. Com o objetivo de alternar entre estratégias de intensificação e diversificação, foram utilizadas técnicas de adaptação de parâmetros; mais especificamente, da probabilidade de mutação. Estudos com redes reais de médio e grande porte ilustram a aplicabilidade da metodologia proposta e sugerem alternativas para desdobramentos do trabalho / Abstract: This work proposes a Hybrid Genetic Algorithm approach to the problem of loss reduction in distribution systems by network reconfiguration strategies, under variable demands. A formulation that avoids frequent reconfigurations is adopted, searching for a fixed configuration to operate for the whole planning period, but taking into account demand variations on the optimization processo The chromosome representation adopted in the algorithm guarantees the factibility of the individuaIs after crossover and mutation operations on the process of searching for the best solution. A local search procedure is included, characterizing an hybrid implementation. Techniques of adaption of parameters were used (specifically mutation probability), to provide alternation between intensification and diversification strategies. Case studies with real distribution networks provide information on the possibilities of the approach and suggest alternatives to further investigations / Mestrado / Automação / Mestre em Engenharia Elétrica

Page generated in 0.0954 seconds