• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 2
  • 1
  • Tagged with
  • 8
  • 8
  • 8
  • 8
  • 5
  • 4
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Understanding inter-organisational relationships in public-private partnerships : a study of educational PPPs in Pakistan

Irfan, Sidra January 2015 (has links)
Given the increasing proliferation of public-private partnerships (PPPs) in both developed and developing countries, and the huge challenges that are often associated with establishing and managing them, and ensuring that they achieve their objectives, it is important to understand multiple aspects of their operation. Whilst the structural and economic aspects of PPPs have long been recognised and researched, the relational aspects of PPPs remain under-researched. This thesis is a contribution to addressing this gap in the literature. It uses a dimensional approach to understand the nature of inter-organisations relationships (IORs) in PPPs and considers the factors that shape these relationships. It also investigates whether a particular pattern of relationships is needed for PPPs to deliver more than could have been achieved by each partner working alone (synergistic benefits). These issues are studied empirically in three educational PPP programmes in Pakistan. In two of these, not-for-profit organisations ‘adopt’ state schools. In the third, the state funds private sector schools on the condition that they offer free education to students and achieve threshold quality standards. A case study methodology is used and an integrative conceptual framework, derived from a wide-ranging literature review, is used to guide both data collection and analysis. The research finds that partners’ motives for entering into a PPP play a dominant role in shaping inter-organisational relationships. These motives are, in turn, influenced by a range of contextual and organisational factors. Inter-organisational relationships can be broadly characterised as collaborative, contractual, cooperative or conflictual. Whereas much of the existing literature emphasises that collaborative relationships are a prerequisite for PPPs to deliver synergistic outcomes, this research finds that these outcomes are also present in PPPs characterised by cooperative relationships. However, inter-organisational relationships in PPPs are not static; they develop and change over time. These changes result from a dynamic interplay between contextual factors, organisational factors, partner motives and the perceived outcomes of the partnership. The research reported in the thesis makes a number of contributions to knowledge. It sheds new light on the relational aspects of PPPs and offers a new conceptual framework for explaining and investigating inter-organisational relationships, which integrates insights from the largely separate literatures on PPPs and inter-organisational relations. It counters an apparent pro-collaboration emphasis in the existing PPP literature by documenting and explaining the benefits associated with cooperative relationships. It also offers new empirical evidence on the operation of PPPs in a developing country context, which contributes to redressing the predominance of evidence from developed countries in the existing literature. The insights from the research have theoretical and practical implications for the development and management of PPPs and future research in this area.
2

Multi-modelo de referência para planejamento em espectro de alta complexidade / A multi-model reference for planning high complexity spectrum

Oliveira, Selma Regina Martins 22 May 2009 (has links)
A presente tese tem por propósito contribuir para uma política de planejamento no campo da educação a distância (EAD). Para isto concebe uma proposta multi-modelo de referência lastreada na definição de estratégias em espectro de alta complexidade, que considera uma seqüência de procedimentos sistematizados nas seguintes fases: (i) Determinação das necessidades de informação, em duas etapas: (a) identificação dos fatores críticos de sucesso (FCS) e (b) identificação das áreas de informação; (ii) Determinação das competências, em três etapas: (a) determinação dos conhecimentos, (b) determinação das habilidades, e (c) determinação das atitudes; (iii) Determinação dos graus de avaliação de competências; (iv) Determinação das estratégias em redes de conhecimentos. Evidencia-se a aplicação a um estudo de caso nas concessões rodoviárias no Brasil, na perspectiva das parcerias público-privadas (PPPs). A consecução da pesquisa foi por meio da intervenção de especialistas e um grupo pequeno de estudantes de um programa de EAD (MBA) aplicado às PPPs. A coleta de dados foi por meio de um formulário semi-estruturado, do tipo escalar, em uma matriz de julgamento, com a intervenção de especialistas. Vários instrumentos de apoio foram utilizados na elaboração da modelagem, com vistas a reduzir a subjetividade dos resultados alcançados: escalagem psicométrica - Lei dos Julgamentos Categóricos de Thurstone (LJC), Multicriteriais-Compromise Programinng, Electre III, e Promethee II; Análise Multivariada; Krigagem, Redes Neurais Artificiais (RNA); Redes Neurofuzzy. Os resultados produzidos mostraram-se satisfatórios, validando o procedimento proposto para EAD. Procedimento este, fundamental na definição de programas destinados para planejar a capacitação de recursos humanos a distância, bem como para a constituição de outros elementos do capital intelectual em políticas de EAD. / This thesis intends to contribute to the planning guidelines in the field of distance education (DE). Thus, it develops a multi-model reference proposal supported by the definition of a highly complex spectrum of strategies that considers a sequence of systematic procedures in the following phases: (i) Determining the information needs in two stages: (a) identification of the critical success factors (CSF), and (b) identification of the information areas; (ii) Determination of competences in three stages, determining: (a) knowledge, (b) skills, and (c) attitudes; (iii) Determination of the degree of competence evaluation; and (iv) Determination of strategies in knowledge networks. There is the application to a case study of the road concessions in Brazil, within the perspective of public-private partnerships (PPPs). The research was achieved through the intervention of specialists and a small group of students from a DE program (MBA) applied to the PPPs. The data collection was conducted by means of a semi-structured form, the scalar type in a trial matrix, to which experts ascribed their assessments. Several support instruments were used in the modeling elaboration in order to reduce subjectivity in the results: psychometric scales - Thurstones Law of Comparative Judgment (LCJ), Multi-criteria Compromise Programming, Electre III, and Promethee II; Multivariate Analysis; Krigage, Artificial Neural Networking (ANN); Neuro-fuzzy networks. The results produced are satisfactory, validating the proposed procedure for DE. This is an essential procedure for the definition of programs designed to plan the training of human resources at a distance, as well as to establish other elements of intellectual capital for DE guidelines.
3

Multi-modelo de referência para planejamento em espectro de alta complexidade / A multi-model reference for planning high complexity spectrum

Selma Regina Martins Oliveira 22 May 2009 (has links)
A presente tese tem por propósito contribuir para uma política de planejamento no campo da educação a distância (EAD). Para isto concebe uma proposta multi-modelo de referência lastreada na definição de estratégias em espectro de alta complexidade, que considera uma seqüência de procedimentos sistematizados nas seguintes fases: (i) Determinação das necessidades de informação, em duas etapas: (a) identificação dos fatores críticos de sucesso (FCS) e (b) identificação das áreas de informação; (ii) Determinação das competências, em três etapas: (a) determinação dos conhecimentos, (b) determinação das habilidades, e (c) determinação das atitudes; (iii) Determinação dos graus de avaliação de competências; (iv) Determinação das estratégias em redes de conhecimentos. Evidencia-se a aplicação a um estudo de caso nas concessões rodoviárias no Brasil, na perspectiva das parcerias público-privadas (PPPs). A consecução da pesquisa foi por meio da intervenção de especialistas e um grupo pequeno de estudantes de um programa de EAD (MBA) aplicado às PPPs. A coleta de dados foi por meio de um formulário semi-estruturado, do tipo escalar, em uma matriz de julgamento, com a intervenção de especialistas. Vários instrumentos de apoio foram utilizados na elaboração da modelagem, com vistas a reduzir a subjetividade dos resultados alcançados: escalagem psicométrica - Lei dos Julgamentos Categóricos de Thurstone (LJC), Multicriteriais-Compromise Programinng, Electre III, e Promethee II; Análise Multivariada; Krigagem, Redes Neurais Artificiais (RNA); Redes Neurofuzzy. Os resultados produzidos mostraram-se satisfatórios, validando o procedimento proposto para EAD. Procedimento este, fundamental na definição de programas destinados para planejar a capacitação de recursos humanos a distância, bem como para a constituição de outros elementos do capital intelectual em políticas de EAD. / This thesis intends to contribute to the planning guidelines in the field of distance education (DE). Thus, it develops a multi-model reference proposal supported by the definition of a highly complex spectrum of strategies that considers a sequence of systematic procedures in the following phases: (i) Determining the information needs in two stages: (a) identification of the critical success factors (CSF), and (b) identification of the information areas; (ii) Determination of competences in three stages, determining: (a) knowledge, (b) skills, and (c) attitudes; (iii) Determination of the degree of competence evaluation; and (iv) Determination of strategies in knowledge networks. There is the application to a case study of the road concessions in Brazil, within the perspective of public-private partnerships (PPPs). The research was achieved through the intervention of specialists and a small group of students from a DE program (MBA) applied to the PPPs. The data collection was conducted by means of a semi-structured form, the scalar type in a trial matrix, to which experts ascribed their assessments. Several support instruments were used in the modeling elaboration in order to reduce subjectivity in the results: psychometric scales - Thurstones Law of Comparative Judgment (LCJ), Multi-criteria Compromise Programming, Electre III, and Promethee II; Multivariate Analysis; Krigage, Artificial Neural Networking (ANN); Neuro-fuzzy networks. The results produced are satisfactory, validating the proposed procedure for DE. This is an essential procedure for the definition of programs designed to plan the training of human resources at a distance, as well as to establish other elements of intellectual capital for DE guidelines.
4

Examining the structuration processes in the financial accountability and governance practices pertaining to the public private joint venture partnerships (LIFT) in the UK health sector

Agyenim-Boateng, Cletus January 2012 (has links)
Shaoul et al. (2012) state that the accounting, scrutiny and oversight of Public Private Partnerships (PPPs) remain areas of concern. Also, there have been calls for a more socio-technical and multidisciplinary approach to accounting and governance studies (Broadbent, 2012; Broadbent and Guthrie 2008), especially in relation to the empirical study of PPPs (Hodge et al., 2010). This thesis responds to these calls in part by drawing on Giddens’ structuration theory to examine the financial accountability and governance concerns that are created in PPP joint venture structures. The empirical work focuses on the health sector, which is identified as one of the sectors inundated by PPP activities, particularly in the UK (Treasury, 2012; Whitfield, 2010). It adopts a case study approach, based on qualitative methodology, which involves documentary analysis of secondary data and interviews in relation to two PPP schemes under the Local Improvement Finance Trust (LIFT) scheme in the UK’s health sector.The thesis investigates: the extent to which the corporate structures of the LIFT scheme do complicate financial accountability and governance including external scrutiny; the extent to which the LIFT scheme does enhance partnership working between the public and private sector partners; the structures in financial accountability and governance in the LIFT scheme; the human agents that provide agency in financial accountability and governance in the LIFT scheme and; whether and in what ways structures and human agency in financial accountability and governance interact in the LIFT scheme and what the implications are.The thesis finds firstly that the complex corporate structure of the LIFT scheme is very complicated and the joint venture mechanism cannot be relied upon to deliver transparency of reporting. Secondly, as limited companies, all financial reporting follows private sector accounting regulations and Company Law and there is minimal disclosure in terms of information available to the general public. This is worsened by lack of information sharing between partners as evidenced in one case study group. Thirdly, there was considerable inconsistency in the reporting due to multiplicity of interpretive schemas between the two case study groups. Fourthly, there was considerable change in the reporting due both to changes in accounting regulations and changes in organisational structure and interpretive schemas throughout the period. Fifthly, there is lack of continuity of public sector oversight and monitoring as the public sector, in practice, restricts its activities to pre-operational phase and limited oversight after construction phases. Moreover, partnership working is very difficult in the context of profit seeking under the LIFT structure. Partnership working and success of the LIFT scheme may depend on trust, key personalities working together as well as leadership. From the structuration perspective, the study finds structural contradictions and conflicts of interests in financial accountability and governance practices. Therefore, transparency, public accountability, oversight and scrutiny are necessarily undermined and, policy makers should pay attention to not only the private sector technologies but also the manner in which they are used to benefit finance capital.
5

Fundamentos para incorporar la cláusula de progreso de seguridad vial en los contratos de concesión de la red vial nacional

Rivera Olivera, Stefany Jaquelyn January 2024 (has links)
Fundamentos para incorporar la cláusula de progreso de seguridad vial en las concesiones viales encargados de la infraestructura nacional”, es el contenido que se ha desarrollado en este presente tema, habiéndose realizado un tipo de investigación cualitativa, junto a un método analítico, con un análisis documental, tomándose como objeto de estudio el proponer la implementación de la cláusula de progreso de Seguridad Vial en las carreteras concesionadas de la Red Vial Nacional, explicando la relevancia de implementar esta condición en los contratos de concesión, debido a que establece la obligación continuada por parte del concesionario de incorporar normas que permitan la ejecución, desarrollo y cumplimiento de una obra pública. En ese mismo orden de ideas, se realizó un estudio de distintos autores con aportes importantes, que hablen sobre los contratos de concesión y cláusula de progreso, complementado con al análisis de las Asociaciones Público Privadas (en adelante APP) y seguridad vial. De tal manera, se pudo concluir que es muy común ver accidentes de tránsito y que éstos, en lugar de disminuir, siguen aumentando, debido a hechos imprevisibles, como casos fortuitos o fuerza mayor, que no se pudieron prever o predecir, sin embargo, no son las únicas causas, pues, también está el factor humano, como la imprudencia de los peatones o los conductores, y el factor mecánico, que serían aquellas fallas que puedan tener los vehículos automotores, por tanto, implementar una cláusula de progreso para la seguridad vial, resultaría una medida que busca reducir accidentes de tránsito mediante el equilibrio económico en los contratos de concesión ante normativas que puedan surgir después de celebrado dicho acto. / Fundamentals for incorporating the road safety progress clause in the concession contracts of the national road network, is the content that has been developed in this topic, having carried out a type of qualitative research, together with an analytical method, with an analysis documentary, taking as an object of study the proposal to implement the Road Safety progress clause on the concessioned highways of the National Road Network, explaining the relevance of implementing this condition in the concession contracts, since it establishes the continued obligation for part of the concessionaire to incorporate regulations that allow the execution, development and fulfillment of a public work. In the same order of ideas, a study was carried out by different authors with important contributions, who talk about concession contracts and progress clauses, complemented by the analysis of Public Private Associations (hereinafter APP) and road safety. In this way, it was possible to conclude that it is very common to see traffic accidents and that these, instead of decreasing, continue to increase, due to unforeseeable events, such as acts of God or force majeure, which could not be foreseen or predicted, however, These are not the only causes, since there is also the human factor, such as the recklessness of pedestrians or drivers, and the mechanical factor, which would be those failures that motor vehicles may have, therefore, implement a progress clause for the road safety, would be a measure that seeks to reduce traffic accidents through economic balance in concession contracts before regulations that may arise after said act is celebrated.
6

Avaliação do impacto da utilização de parceria público-privada para construção e operação de unidades municipais de educação infantil em Belo Horizonte

Rodrigues, Bruno da Costa Lucas 16 December 2015 (has links)
Submitted by Bruno da Costa Lucas Rodrigues (brunor270@gmail.com) on 2016-01-18T08:25:33Z No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br) on 2016-02-01T19:28:30Z (GMT) No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2016-02-11T13:08:07Z (GMT) No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Made available in DSpace on 2016-02-11T13:08:21Z (GMT). No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) Previous issue date: 2015-12-16 / School Infrastructure Public-Private Partnerships (PPPs) are being increasingly used over the globe. However, the literature that analyzes the role and impact of PPP models in education is still incipient. The present study aims to contribute to the literature investigating the impact of a school infrastructure PPP contract used in municipal schools in Belo Horizonte. The methodology was based in the comparison of 46 schools under two models, being 27 schools under a PPP model and 19 schools built and operated under traditional public procurement model. The results show that the time to build schools under the PPP Model is 45% shorter and that 79% of the schools under traditional model were delivered out of the contracted term of 13 months, while all PPP units were delivered below this time. In the same vain, the satisfaction level regarding maintenance services is substantially higher under PPP than under traditional model. Specifically in relation to IT services it was not observed positive results for PPPs. Finally, principals in PPP schools have 25% more time to focus on pedagogical activities, as they spend less time with the management of non- pedagogical services. One limitation of this study is not to provide a comparative analysis between the two models in terms of costs. This study aims to contribute to the improvement of PPP regulatory models used in the education and to the discussion of the role that could be played by PPPs in the reduction of school infrastructure deficit. / As Parcerias Público-Privadas (PPP) de infraestrutura escolar são cada vez mais utilizadas no mundo, entretanto as avaliações de impacto desse modelo ainda são escassas. O presente estudo contribui para essa área do conhecimento ao avaliar o impacto da utilização de PPP tanto na construção como na operação das Unidades Municipais de Educação Infantil (UMEIs) de Belo Horizonte (BH). A metodologia de pesquisa foi baseada na comparação de 46 UMEIs, sendo 27 unidades de PPP e 19 unidades construídas e operadas no modelo tradicional de contratação pública. Em relação ao impacto na construção, os principais resultados são que o tempo de obra das unidades de PPP foi 45% menor e que 79% das unidades tradicionais foram entregues fora do prazo contratado de 13 meses, enquanto que nenhuma PPP foi entregue acima deste prazo. Além disso, a PPP permitiu aumentar a escala na construção das UMEIs, superando as limitações do modelo tradicional. Dentre as principais evidências encontradas quanto ao impacto na operação, pode-se citar que os diretores de unidades de PPP afirmam ter 25% mais tempo para focar nas atividades pedagógicas, pois gastam menos tempo na gestão dos serviços não pedagógicos, e que o grau de satisfação com os serviços de manutenção das instalações físicas é substancialmente maior nessas unidades. Os resultados positivos para PPP só não apareceram em relação aos serviços de manutenção de TI. Uma limitação deste trabalho foi não conseguir realizar a comparação de custos das duas modalidades. O estudo pretende contribuir para o aprimoramento dos modelos regulatórios de PPPs em educação e para a discussão sobre o papel que pode ser desempenhado pelas PPPs na redução do déficit de infraestrutura escolar.
7

Optimising benefits for rural communities in and around Protected Areas through ecotourism Public Private Partnerships (PPPs): the case of De Hoop Nature Reserve

Mnyani, Siphokazi January 2019 (has links)
Magister Artium - MA / Recent years have seen an upsurge of interest from governments and development organisations in adopting the Public Private Partnership (PPP) approach when developing and operating ecotourism projects. A PPP is a contract between a public sector institution and a private party, in which the private party assumes substantial financial, technical and operational risk in the design, financing, building and operation of a project (South African National Treasury 2004). Countries such as India, China and Kenya have developed numerous projects through PPPs. Protected Areas have followed suit in adopting the PPP approach, to be able to focus on their core business, namely conservation. To date, relevant research on PPP ecotourism projects, specifically pro-poor tourism approach is fragmented, limited in scope, and lacks examples that can assist practitioners in embedding pro-poor tourism principles in the PPP methodology. Academically, studies are largely evaluations that compare progress against projects’ defined objectives or broad based sustainable tourism goals. However, this study is an assessment of a tourism development from a pro-poor tourism perspective. Thus, this study interrogated the extent to which ecotourism PPP at De Hoop is pro-poor. Furthermore, the study sought to establish if rural local communities living in and near De Hoop PPP benefit and how their benefits can be enhanced. Pro-poor tourism indicators are used in this study as a theoretical base to evaluate De Hoop PPP.
8

Corporate Japan Goes to School: Case Studies Examining Corporate Involvement in Public Schools in Japan

Takano, Kaori 22 August 2011 (has links)
No description available.

Page generated in 0.1137 seconds