• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 7
  • 7
  • 7
  • 7
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A new hope: Public social partnerships

McIntosh, Bryan, West, Sue 11 1900 (has links)
Yes
2

New decision support systems for Public Private Partnership projects

Rajabi, Mohammad January 2017 (has links)
It is well established that one of the key contributing factors to the growth of countries’ economies is the existence of appropriate economic and social infrastructures. The setup of these infrastructures and their operation or delivery of public services associated with them have proved to be a costly and often unaffordable business for most governments. Therefore, private sector participation in the delivery of public services has been opted for by governments under Public-Private Partnerships (PPPs). Additional reasons for the public sector to choose a PPP framework to deliver public services include the public sector representatives’ lack of sufficient technical knowledge and specifications required by most projects; the required amount of investment to implement such projects is too high to be affordable by the public sector alone; the increasing difficulties of predicting and controlling the uncertainties that typically govern the phases of such projects including the level of actual demand for the related services by the time the project is operational; the level of bureaucracy in the public sector and its implications on the time frame of decision-making processes; the relatively low efficiency in project execution by the public sector; and most importantly the fact that, in practice, these difficulties are often better managed by the private sector who seem to possess both the financial and the executive capabilities to undertake such projects Currently, there is a gap in the game theory literature on modelling PPP related decisions and issues. This thesis contributes to reducing such gap by proposing three novel and practice-oriented game theoretical models along with algorithms for solving them, namely an ordinal game for the shortlisting of potential private sector partners; two non-cooperative dynamic games for negotiation with shortlisted private sector partners and selection of private sector partner to award the PPP contract to; and a non-cooperative dynamic game for financial renegotiation post-PPP contract award. In sum, each novel game addresses an important problem faced by the private sector during the typical stages of the life cycle of PPPs, namely private sector partner selection at the tendering stage; negotiation between the public sector and shortlisted bidders to select the candidate to whom to award a PPP contract to at the post-tendering stage; and financial re-negotiation between the public sector and the selected private sector partner at the post-contract award stage.
3

Design of Public-Private Partnership for Waste Management in Port-Au-Prince, Haiti

Bessonova, Ekaterina January 2012 (has links)
Waste management is a growing concern in rapidly urbanizing developing countries and Haiti is noexception. Excessive amounts of improperly discharged waste endangers unique tropical environment, appears to bea reason of fast spread of epidemic diseases, increases risk of floods during the hurricane season and contributes toclimate change. Due to various historical, economic, natural and socio-political reasons, public sector of Haitianstate is not able to provide decent waste management service. Public-private partnerships are a highly-advocateddevelopmental tool for involvement of private sector in delivery of public service, relocation of stress fromgovernment budgets, privatization and decentralization. The study was conducted in order to suggest an option ofPublic-Private Partnership project that would suit the context of Haiti. In compliance with the principles ofsustainable development and in order to increase energy self-sufficiency, waste-to-energy approach is considered asa suitable option for waste management delivery. Public-Private Partnership is understood as a social system,models of partnership are created with the use of system theory approach. Theoretical base is complemented withthe concept of PPP and Waste Management Theory. This descriptive single case-study is a examining the choice oftechnology for energy recovery from waste, degree of privatization and general problematic issues that might occurduring the implementation of the project in the context of Haiti. Small-scale anaerobic digestion through concessioncontracting with service providers was picked up as the most favorable option after the analysis of surveys amongqualified experts, local citizens and literature review on the matter. It was also concluded that lack of publicmanagement capacity is a major obstacle for implementation of public-private partnership for waste management inthe context of Haiti.
4

Extension du domaine de la finance ? : partenariats public privé (PPP) et "financiarisation" de la commande publique : une proposition d'analyse par la sociologie économique / PPPs, or the financialisation of public procurement ? : a new "financial market" analysed through economic sociology

Deffontaines, Géry 07 November 2013 (has links)
Engagée à l’occasion de l’introduction en France de contrats de commande publique de type "partenariat public-privé" [PPP] – elle fut initiée peu après la promulgation de l’Ordonnance du 17 juin 2004 créant les « Contrats de Partenariat » – notre recherche explore les PPP, modalités de commande publique complexe à caractéristiques financières, en tant qu’ils constituent un marché émergent pour des acteurs financiers, fournisseurs de capitaux et de techniques de financement, potentiellement porteurs de valeurs, modes de raisonnement, et logiques économiques, exogènes au monde de la commande publique. Aiguillonné par notre désir de participer aux débats disciplinaires des mondes de la sociologie économique, des études sociales de la finance, et d’autres approches hétérodoxes des phénomènes économiques, par notre souci de contribuer à la compréhension des formes d’organisation des services publics et des infrastructures urbaines, stimulé également par notre curiosité à l’égard des mutations des économies occidentales, interpellé évidemment par l’actualité incontournable de la grande crise financière, puis économique, entamée en 2007-08, notre travail prend prétexte de ce "phénomène" – l’immixtion, par l’entremise des PPP, de nouveaux acteurs financiers dans une partie de la commande publique de grands équipements – pour nous inscrire dans le programme de recherche qui vise à caractériser le mouvement socio-économique plus large parfois qualifié de "financiarisation". Ce terme recouvre, sans grande précision ni définition consacrée et indiscutable, un ensemble d’évolutions liées à l’extension du domaine de la finance, que ce soit au niveau macroéconomique, sectoriel, ou cognitif, dans l’ordre de la connexion de pans entiers de la vie économique et sociale aux "marchés" financiers et à leurs exigences. Notre ambition est donc, à partir d’un sujet particulier et technique, non réductible à sa seule dimension financière4, de considérer la valeur heuristique du cas des PPP pour interroger plusieurs dimensions caractéristiques de ce mouvement de "financiarisation" – voire essayer d’en identifier les principaux éléments constitutifs. Ce dessein passe par une analyse en termes de sociologie économique menée à plusieurs niveaux / Committed (Hired) on the occasion of the introduction in France of contracts of state commission of type(chap) "Public Private Partnership" [ PPP] - She (it) was introduced shortly after the promulgation of the Prescription of June 17th, 2004 creating "Partnership agreements" - our search (research) explores the PPP, the modalities(methods) of complex state commission with financial characteristics, as they establish (constitute) an emerging market for financial actors, suppliers of capital and techniques of financing, potentially valuable carriers, ways of reasoning, and economic, exogenous logics to the world of the state commission
5

The effects of the development of Private Finance Initiatives (PFIs) in the UK and their relevance in the implementation of Build-Operate-Transfer (BOT) projects in Chinese road and water sectors

Huang, Jingchi January 2012 (has links)
There has been a rapid growth of private participation in infrastructure projects throughout the world in the last three decades. China as the largest developing country in the world has a huge amount of demands for high quality infrastructure projects and public services. The government has actively developed and used the Build-Operation-Transfer (BOT) model to deliver public facilities and services, particularly after 2002. Certain benefits have been brought by the adoption of the BOT model in China's motorway and water sectors. However, issues were also found in the processes behind BOT applications. International organisations as well as scholars suggested that China should learn experiences and lessons from the UK and its PFI scheme. The UK has been the leading country to use private finance in developing public buildings and services. However, very little has been written addressing how lessons from British PFIs can be learnt by China to improve its BOT practice. This study is an attempt to address this vacuum in the existed literature. It was designed to explore the current problems of using BOTs in Chinese motorway and water sectors and looks at what needs to be improved, based upon the PFI lessons in the UK. A mixture of qualitative and quantitative methods has been employed and various methods of data collection used in this study. These included: 21 interviews, 2 observations and one focus group and the analysis on 14 government reports about BOTs in China. The governments' decision-makers, directors, project managers and contractors were involved in the research to explore the results and emerging issues involving the implementation of BOT models in 87 Chinese motorway and water projects in 10 cities covering six provinces. As a result of its findings, the research is able to discuss and identify the relevant experiences and lessons from PFIs in the UK to improve further application of China's BOTs. This study fills the gap in knowledge regarding comparisons between PFIs and BOTs. It also gives recommendations for good practice in relation to Chinese BOT policy decision making, development and evaluation. Finally, the study hopes to give recommendations that enable the implementation of BOT model in Chinese motorway and water sectors to be more successful in the future.
6

Die Rolle kommunaler Elektrizitätsversorgungsunternehmen im Zentrum einer kooperativen Aufgabenerledigung zwischen Staat und Privatwirtschaft im Bereich der örtlichen Elektrizitätsversorgung / The Role of Municipal Electric Utilities in Cooperative Execution Agreements between the Government and Private Sector within the Context of Local Electricity Supply

Nönnig, Constanze 24 August 2012 (has links) (PDF)
Gegenstand der Dissertation ist die Verantwortung der Kommunen für die Versorgung der örtlichen Bevölkerung mit Elektrizität: Woraus kann sie hergeleitet werden, welche Konsequenzen ergeben sich aus ihr für die Kommunen und welche Bedeutung kommt hierbei der Kooperation mit der Privatwirtschaft zu? Die in drei Teile gegliederte Arbeit befasst sich in ihrem ersten Teil mit den allgemeinen Grundlagen und der Entwicklung kommunaler Elektrizitätsversorgungsunternehmen. Im zweiten Teil geht es um die gesetzlichen Zielvorgaben in der Elektrizitätswirtschaft und die kommunale Verantwortung für ihr Erreichen. Der dritte Teil schließlich befasst sich mit den Voraussetzungen kooperativer Staatstätigkeit und dem Potenzial der Anwendung von Kooperationsmodellen im Bereich der örtlichen Elektrizitätsversorgung. / The dissertation ist focused on the responsibility of municipalities to supply local populations with electricity: Where can it be derived from, what consequences for municipalities arise from it and what role does the cooperation with private sector have in this context? The thesis is divided into three parts; the first part deals with the basic principles and the development of municipal electric utilities. The second part focuses on both statutory normative targets in the electricity supply industry and the municipality's responsibility to achieve them. Finally, the third part discusses the preconditions of cooperative government activity and the potential of cooperation models for application to local power supply.
7

Die Rolle kommunaler Elektrizitätsversorgungsunternehmen im Zentrum einer kooperativen Aufgabenerledigung zwischen Staat und Privatwirtschaft im Bereich der örtlichen Elektrizitätsversorgung

Nönnig, Constanze 14 June 2011 (has links)
Gegenstand der Dissertation ist die Verantwortung der Kommunen für die Versorgung der örtlichen Bevölkerung mit Elektrizität: Woraus kann sie hergeleitet werden, welche Konsequenzen ergeben sich aus ihr für die Kommunen und welche Bedeutung kommt hierbei der Kooperation mit der Privatwirtschaft zu? Die in drei Teile gegliederte Arbeit befasst sich in ihrem ersten Teil mit den allgemeinen Grundlagen und der Entwicklung kommunaler Elektrizitätsversorgungsunternehmen. Im zweiten Teil geht es um die gesetzlichen Zielvorgaben in der Elektrizitätswirtschaft und die kommunale Verantwortung für ihr Erreichen. Der dritte Teil schließlich befasst sich mit den Voraussetzungen kooperativer Staatstätigkeit und dem Potenzial der Anwendung von Kooperationsmodellen im Bereich der örtlichen Elektrizitätsversorgung. / The dissertation ist focused on the responsibility of municipalities to supply local populations with electricity: Where can it be derived from, what consequences for municipalities arise from it and what role does the cooperation with private sector have in this context? The thesis is divided into three parts; the first part deals with the basic principles and the development of municipal electric utilities. The second part focuses on both statutory normative targets in the electricity supply industry and the municipality's responsibility to achieve them. Finally, the third part discusses the preconditions of cooperative government activity and the potential of cooperation models for application to local power supply.

Page generated in 0.0665 seconds