• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • Tagged with
  • 20
  • 20
  • 20
  • 13
  • 13
  • 10
  • 10
  • 8
  • 7
  • 6
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Concepção, métodos construtivos e dimensionamento de terminais para contêineres. / Conception, construction methods and design of containers terminal.

Fábio Dollinger Fanti 14 November 2007 (has links)
O presente trabalho pretende mostrar, as principais etapas de projeto de uma obra portuária, mais especificamente, um terminal de contêineres (cais e retroárea). Para tanto, foi feita uma pesquisa dos tipos estruturais existentes para entender melhor a evolução das estruturas ao longo do tempo e quais tipos adequam-se melhor em cada situação. Para cada função a que o porto se destina, existe um conjunto de ações e combinações muito particulares a considerar. Assim, um terminal de contêineres é muito diferente de um terminal petroleiro. Portanto, procurou-se mostrar os tipos de carregamentos mais importantes num terminal de contêineres, que é objeto deste trabalho, levando-se em conta critérios das Normas NBR-9782 e NBR-8681. Outro fator de grande peso nos projetos portuários e que não poderia ficar de fora, está ligado às fundações, principalmente aos problemas geotécnicos envolvidos. Para tanto, procurou-se dar uma visão geral dos principais problemas até hoje encontrados e comentar algumas soluções em cada caso. Por fim, foi proposto um método de modelagem simplificado para um tipo estrutural muito utilizado hoje em dia (sistema de lajes e vigas premoldadas solidarizadas apoiadas sobre estacas) através de um conjunto de modelos planos e um modelo espacial de checagem. / The present paper intends to show the main stages of port design, particularly, a container terminal (quay and back area). Therefore, it was done a research about the current structures types so it can be better to understand the development process of these structures during the years and which types are more appropriate to each condition. For each function of the port there are particulars actions and combinations to consider. However, a container terminal is very different from a petroleum one. Therefore, it intended to show the most important types from a container terminal, which is the aim of this research, considering the NBR-9782 and NBR-8681 rules recommendations. Another important fact, which has to be mentioned, is about the foundations, especially those related to geotechnical issues involved. Therefore, it was intended to present a general view of the main problems found so far and discuss some solutions for each case. Finally, it was suggested a method to model a kind of structure very used nowadays (a marble slab system and premolded beams settled over piles) through a group of model plans a checking space model.
12

Processo construtivo de edifícios de alvenaria estrutural sílico-calcária. / Calcium silicate bricks engineered masonry building process.

Fernando Henrique Sabbatini 05 June 1984 (has links)
O emprego de processos construtivos inovadores sem o domínio da tecnologia apropriada e sem a observância de requisitos mínimos de desempenho, conduz de maneira geral, a edifícios com sérios problemas patológicos. Por estas razões, a Alvenaria Estrutural, que tem sido empregada com prioridade na construção de edifícios habitacionais, nos últimos anos no Brasil, tem apresentado aqueles problemas com indesejável extensão e gravidade. Este trabalho procura estabelecer a tecnologia mais adequada para a construção de edifícios em Alvenaria Estrutural Não Armada, em especial, para a que utiliza o bloco sílico-calcário. Procura-se também salientar os aspectos ainda não suficientemente conhecidos e que necessitam, por isto, ser pesquisados. São apresentadas as principais características dos materiais empregados. O elemento construtivo essencial do processo - a parede resistente - é sistemicamente analisado sob diferentes abordagens. Como complemento, a análise é extendida para o edifício. No estudo, é enfatizado o mais comum e menos compreendido problema patológico da alvenaria sílico-calcária: as fissuras por retração na secagem. A tecnologia construtiva apropriada é estritamente condicionada pela necessidade de que seja evitada a ocorrência destas fissuras. Em resumo, este trabalho objetiva colaborar para o projeto e a construção de edifícios competentes e duráveis, o que, infelizmente, não tem sido a regra, quando processos inovadores são empregados. / Pathological buildings problems certainly occur when innovative constructive processes are employed without knowing their own technology and without getting to minimum performance requirements. Based on these reasons, the engineered masonry which has been mainly employed on housing constructions in Brazil during the last years, shows up severs pathological problems. This study aims to describe the most appropriate known technology for unreinforced engineered brickworks, mainly for that one employing calcium silicate bricks. Therefore, the important parameters which are not yet suitably known are pointed out, thus requiring further research. The materials main characteristics are introduced. The bearing wall which is the most important constructing element is systemically analised under different approaches. Coming at the end the concepts are extended to the whole building itself. Emphasis is given in this study to drying shrinkage cracking as the most usual problem in calcium silicate brickworks and to its mechanisms not yet fully understood. The correct building technology avoids the cracking problems by using the mentioned materials and processes. Summarising , this study intends to cooperate for the correct and durable housing buildings which unfortunately are not usual nowadays when innovative constructive processes are applied.
13

A modelagem da informação da construção (BIM) em empresas instaladoras de sistemas prediais. / Building Information Modeling (BIM) in building systems companies.

Guerretta, Luis Felipe 06 February 2017 (has links)
Modelagem da Informação da Construção ou BIM (Building Information Modeling) é um processo inovador aplicado na gestão de todo o ciclo de vida de um empreendimento. Por meio do BIM, desenvolve-se o modelo virtual do empreendimento a ser construído. Os componentes deste modelo contêm geometria e parâmetros com dados técnicos relevantes para sua caracterização e utilização. No segmento de obras de sistemas prediais, os contratantes ditam os valores dos contratos, cabendo às empresas construtoras e instaladoras fazerem uma estimativa de orçamento acurada para dominar os custos e mensurar seus riscos no contrato almejado. Dada esta perspectiva, existe a necessidade de determinar com precisão os quantitativos do projeto, ponto de partida de qualquer orçamento analítico ou detalhado. Este trabalho, dividido em dois estudos de caso, destina-se a compreender como a Modelagem da Informação da Construção pode alterar o processo de orçamentação nas empresas instaladoras, auxiliando na extração de quantitativos e compatibilização dos projetos. Baseando-se em um fluxo de trabalho BIM descrito por Eastman et al. (2011) e utilizando-se em conjunto o processo de modelagem proposto por Nguyen (2010), propõe-se que o desenvolvedor do modelo BIM de sistemas prediais seja a empresa instaladora, por esta ser o agente ativo na orçamentação e execução dos sistemas prediais. Nos estudos de caso, foi comparado a acurácia dos quantitativos de componentes do empreendimento dentre as propostas orçamentarias das empresas instaladoras, o modelo BIM criado, e o quantitativo real utilizado na execução de uma obra de um centro comercial. Os resultados desta pesquisa sugerem que a utilização do BIM é uma alternativa viável para as empresas instaladoras em seus processos de orçamentação, considerando-se o nível de detalhamento e as informações inseridas e a serem extraídas do modelo, conforme o processo apresentado e o guia de modelagem criado no decorrer deste trabalho. / Building Information Modeling is an innovative process applied to the management of the entire lifecycle of a project. Through BIM, the virtual model of the project to be constructed is developed. The components of this model contain geometry and parameters with relevant technical data for their characterization and use. In the building systems works market segment, contractors dictate the values of contracts and is up to the construction and installation companies to make an accurate estimate of the budget to master the costs and measure their risks on the desired contract. Given this perspective, there is a need to accurately determine the quantities of the project, which are the starting point of any analytical or detailed budget. This work, divided into two case studies, was designed to understand how Building Information Modeling can change the budgeting process in the building systems companies, assisting in the quantity take off and design coordination processes. Relying on a BIM workflow described by Eastman et al. (2011) and jointly using the modeling process proposed by Nguyen (2010), it is proposed the building systems company to be the developer of the MEP model, as this is the active agent in the costing and execution of building systems. In these case studies, we compare the accuracy of the quantitative components of the project, among: the building systems companies, the BIM model and the actual quantities used in the execution of a small shopping center. These results suggest that the use of BIM is a viable alternative to the MEP companies in their budgeting processes, considering the level of detail and the model information input and output, according to the process and modeling guide proposed here.
14

Métodos construtivos de pontes estaiadas - estudo da distribuição de forças nos estais. / Construction methods of cabled-stayed bridges - study of cable forces distribution.

Quintana Ytza, María Fernanda 12 February 2009 (has links)
As pontes estaiadas são pontes que consistem de um tabuleiro suportado por cabos retos e inclinados (estais) fixados nos mastros. Este tipo de estrutura é altamente hiperestática, bastante sensível à seqüência construtiva, mas mesmo assim aceitando, por conta a flexibilidade do tabuleiro uma considerável gama de esforços de instalação dos estais. É importante escolher uma distribuição inicial apropriada para esses esforços sob carregamento permanente tal que a flexão no tabuleiro seja limitada. A presente pesquisa tem como objetivo estudar diferentes métodos para a obtenção de uma boa distribuição de esforços nos estais em pontes estaiadas. Os métodos estudados nesta pesquisa são: o método do tabuleiro articulado (uma articulação em cada cruzamento com os estais - MTA), o método de anulação dos deslocamentos (MAD), o método de anulação das reações em apoios fictícios (MAR) e o método de anulação dos deslocamentos ao longo do processo construtivo. A idéia final de todos eles é obter para o tabuleiro uma resposta próxima à de uma viga continua. Porém, se for necessário, pode-se controlar também os deslocamentos do mastro. Os três primeiros métodos são estudados para a configuração final da ponte, mas também foram verificados seus resultados considerando o processo construtivo, já que durante esta etapa ocorrem variações nos esforços internos da ponte alterando assim o resultado final. Todos os resultados são comparados com a finalidade de escolher um método que além de controlar a configuração final da ponte apresente uma distribuição aceitável de esforços ao final da construção. Desta forma, pode-se obter uma boa estimativa dos esforços de instalação dos estais. / Cable-stayed bridges consists of a deck supported by inclined and straight cables anchored to the pylons. This type of structure is highly hyperestatic and quite sensitive to the construction sequence, but yet supporting a considerable range of loadings from the cable installation due to the deck flexibility. Nevertheless, due to the deck flexibility the cables can accept a considerable range of loadings. It is important to choose an appropriate initial distribution for those loadings under permanent load, so that the bending moment on the bridge deck is limited. The main goal of this research is to study the different methods for obtaining a good load distribution in cables in cable-stayed bridges. The methods that are studied in this research are: The articulated deck method (there is a joint in every cable-deck junction - MTA), the zero displacement method (MAD), the ficticious support force equilibrium method (MAR), and the construction process zero displacement method. The objective of them all is to obtain a deck bending moment similar to that of a continuous beam. However, if necessary, the displacements of the pylon can be controlled. The first three methods are studied for the bridge final configuration. However, their results for the initial configuration during the construction process are also verified, since there are significant bridge internal loading variations which may change the final outcome. All the results are evaluated in order to choose a method that not also controls the bridge final configuration, but also presents an acceptable cable loading distribution at the end of the construction. This way, a good estimative of the loadings from the pylons installation can be obtained.
15

O conjunto habitacional de \"Via Cenni\" em Milão como contribuição para habitações sociais de madeira no Brasil / The \"Via Cenni\" residential complex in Milan as a contribution to wooden social housing in Brazil

Grinover, Enzo 16 May 2018 (has links)
Este trabalho se propõe avaliar e investigar novas tecnologias construtivas de madeira para habitação social no Brasil. O campo desta investigação é o conjunto residencial social de \"Via Cenni\" em Milão Itália. O estudo do caso Cenni, dos seus aspectos financeiros-econômicos, projetuais, construtivos de madeira e de ocupação do conjunto, relacionará este conjunto habitacional às possíveis diretrizes e estudos preliminares para sistemas construtivos de madeira no Brasil. Pretendemos difundir o uso da madeira na construção habitacional social com sistemas semelhantes ao CLT (cross laminated timber) ou XLAM (painéis de laminas maciças fixadas em X) e criar melhoria das condições de vida da população urbana e rural mais necessitada. / The main aim of this thesis is to evaluate and reserch new technologies in wood construction for social housing in Brazil. The field of this investigation is the \"Via Cenni\" residential complex in Milan, Italy. The study of \"Via Cenni\"\'s case, its financial and economics aspects, projectuals, wood building and the complex occupation will connect this residential complex to possible guidelines and to preliminary studies for wood constructions systems in Brazil. It is expected to diffuse the uses of wood in the social housing construction with similar systems to CLT(cross laminated timber) or XLAM (solid blades panels fixed in X) and to improve life conditions to the needy urban and rural population.
16

A evolução das técnicas construtivas em São Paulo: residências unifamiliares de alto padrão. / The evolution of constructive techniques in São Paulo: high standard single-family residences.

Sato, Luana 08 June 2011 (has links)
Existe uma lacuna de registros históricos relacionada à evolução das técnicas construtivas utilizadas em São Paulo, sobretudo as envolvidas na construção de edificações de pequeno porte, que ficaram à margem das pesquisas desde o advento da construção em altura. Isto torna apropriado o levantamento de tais técnicas, bem como a investigação sobre os aspectos históricos que contribuíram para a sua modificação. O objetivo do presente estudo foi o registro sistemático das técnicas construtivas de habitações unifamiliares de alto padrão - representantes da boa técnica, por não haver a barreira de recursos, falta de planejamento e projeto -, bem como a análise dos motivos que levaram a suas transformações. Desse modo, este estudo visa a contribuir para o registro da história da construção paulistana. Para tanto, realizou-se uma ampla revisão bibliográfica, incluindo a consulta de publicações relevantes e periódicos especializados. / There is a lack of historical data related to evolution of the constructive techniques used in Sao Paulo, especially those involved in the construction of small buildings, which have become a subject of minor interest to researches since the advent of high-rise buildings. This makes a survey of the constructive techniques appropriate, as well as a research on the historical aspects that contributed to their modification. The aim of this study was to systematically record the high standard single-family residences constructive techniques - which represent good technique, for in this case there is no lack of resources, planning and design -, as well as to analyze the reasons that led to changes in such techniques. Therefore, this study seeks to contribute to the record of the construction history of Sao Paulo. To this end, we carried out an extensive literature review, including consultation of relevant publications and specialized serials.
17

A evolução das técnicas construtivas em São Paulo: residências unifamiliares de alto padrão. / The evolution of constructive techniques in São Paulo: high standard single-family residences.

Luana Sato 08 June 2011 (has links)
Existe uma lacuna de registros históricos relacionada à evolução das técnicas construtivas utilizadas em São Paulo, sobretudo as envolvidas na construção de edificações de pequeno porte, que ficaram à margem das pesquisas desde o advento da construção em altura. Isto torna apropriado o levantamento de tais técnicas, bem como a investigação sobre os aspectos históricos que contribuíram para a sua modificação. O objetivo do presente estudo foi o registro sistemático das técnicas construtivas de habitações unifamiliares de alto padrão - representantes da boa técnica, por não haver a barreira de recursos, falta de planejamento e projeto -, bem como a análise dos motivos que levaram a suas transformações. Desse modo, este estudo visa a contribuir para o registro da história da construção paulistana. Para tanto, realizou-se uma ampla revisão bibliográfica, incluindo a consulta de publicações relevantes e periódicos especializados. / There is a lack of historical data related to evolution of the constructive techniques used in Sao Paulo, especially those involved in the construction of small buildings, which have become a subject of minor interest to researches since the advent of high-rise buildings. This makes a survey of the constructive techniques appropriate, as well as a research on the historical aspects that contributed to their modification. The aim of this study was to systematically record the high standard single-family residences constructive techniques - which represent good technique, for in this case there is no lack of resources, planning and design -, as well as to analyze the reasons that led to changes in such techniques. Therefore, this study seeks to contribute to the record of the construction history of Sao Paulo. To this end, we carried out an extensive literature review, including consultation of relevant publications and specialized serials.
18

Métodos construtivos de pontes estaiadas - estudo da distribuição de forças nos estais. / Construction methods of cabled-stayed bridges - study of cable forces distribution.

María Fernanda Quintana Ytza 12 February 2009 (has links)
As pontes estaiadas são pontes que consistem de um tabuleiro suportado por cabos retos e inclinados (estais) fixados nos mastros. Este tipo de estrutura é altamente hiperestática, bastante sensível à seqüência construtiva, mas mesmo assim aceitando, por conta a flexibilidade do tabuleiro uma considerável gama de esforços de instalação dos estais. É importante escolher uma distribuição inicial apropriada para esses esforços sob carregamento permanente tal que a flexão no tabuleiro seja limitada. A presente pesquisa tem como objetivo estudar diferentes métodos para a obtenção de uma boa distribuição de esforços nos estais em pontes estaiadas. Os métodos estudados nesta pesquisa são: o método do tabuleiro articulado (uma articulação em cada cruzamento com os estais - MTA), o método de anulação dos deslocamentos (MAD), o método de anulação das reações em apoios fictícios (MAR) e o método de anulação dos deslocamentos ao longo do processo construtivo. A idéia final de todos eles é obter para o tabuleiro uma resposta próxima à de uma viga continua. Porém, se for necessário, pode-se controlar também os deslocamentos do mastro. Os três primeiros métodos são estudados para a configuração final da ponte, mas também foram verificados seus resultados considerando o processo construtivo, já que durante esta etapa ocorrem variações nos esforços internos da ponte alterando assim o resultado final. Todos os resultados são comparados com a finalidade de escolher um método que além de controlar a configuração final da ponte apresente uma distribuição aceitável de esforços ao final da construção. Desta forma, pode-se obter uma boa estimativa dos esforços de instalação dos estais. / Cable-stayed bridges consists of a deck supported by inclined and straight cables anchored to the pylons. This type of structure is highly hyperestatic and quite sensitive to the construction sequence, but yet supporting a considerable range of loadings from the cable installation due to the deck flexibility. Nevertheless, due to the deck flexibility the cables can accept a considerable range of loadings. It is important to choose an appropriate initial distribution for those loadings under permanent load, so that the bending moment on the bridge deck is limited. The main goal of this research is to study the different methods for obtaining a good load distribution in cables in cable-stayed bridges. The methods that are studied in this research are: The articulated deck method (there is a joint in every cable-deck junction - MTA), the zero displacement method (MAD), the ficticious support force equilibrium method (MAR), and the construction process zero displacement method. The objective of them all is to obtain a deck bending moment similar to that of a continuous beam. However, if necessary, the displacements of the pylon can be controlled. The first three methods are studied for the bridge final configuration. However, their results for the initial configuration during the construction process are also verified, since there are significant bridge internal loading variations which may change the final outcome. All the results are evaluated in order to choose a method that not also controls the bridge final configuration, but also presents an acceptable cable loading distribution at the end of the construction. This way, a good estimative of the loadings from the pylons installation can be obtained.
19

A modelagem da informação da construção (BIM) em empresas instaladoras de sistemas prediais. / Building Information Modeling (BIM) in building systems companies.

Luis Felipe Guerretta 06 February 2017 (has links)
Modelagem da Informação da Construção ou BIM (Building Information Modeling) é um processo inovador aplicado na gestão de todo o ciclo de vida de um empreendimento. Por meio do BIM, desenvolve-se o modelo virtual do empreendimento a ser construído. Os componentes deste modelo contêm geometria e parâmetros com dados técnicos relevantes para sua caracterização e utilização. No segmento de obras de sistemas prediais, os contratantes ditam os valores dos contratos, cabendo às empresas construtoras e instaladoras fazerem uma estimativa de orçamento acurada para dominar os custos e mensurar seus riscos no contrato almejado. Dada esta perspectiva, existe a necessidade de determinar com precisão os quantitativos do projeto, ponto de partida de qualquer orçamento analítico ou detalhado. Este trabalho, dividido em dois estudos de caso, destina-se a compreender como a Modelagem da Informação da Construção pode alterar o processo de orçamentação nas empresas instaladoras, auxiliando na extração de quantitativos e compatibilização dos projetos. Baseando-se em um fluxo de trabalho BIM descrito por Eastman et al. (2011) e utilizando-se em conjunto o processo de modelagem proposto por Nguyen (2010), propõe-se que o desenvolvedor do modelo BIM de sistemas prediais seja a empresa instaladora, por esta ser o agente ativo na orçamentação e execução dos sistemas prediais. Nos estudos de caso, foi comparado a acurácia dos quantitativos de componentes do empreendimento dentre as propostas orçamentarias das empresas instaladoras, o modelo BIM criado, e o quantitativo real utilizado na execução de uma obra de um centro comercial. Os resultados desta pesquisa sugerem que a utilização do BIM é uma alternativa viável para as empresas instaladoras em seus processos de orçamentação, considerando-se o nível de detalhamento e as informações inseridas e a serem extraídas do modelo, conforme o processo apresentado e o guia de modelagem criado no decorrer deste trabalho. / Building Information Modeling is an innovative process applied to the management of the entire lifecycle of a project. Through BIM, the virtual model of the project to be constructed is developed. The components of this model contain geometry and parameters with relevant technical data for their characterization and use. In the building systems works market segment, contractors dictate the values of contracts and is up to the construction and installation companies to make an accurate estimate of the budget to master the costs and measure their risks on the desired contract. Given this perspective, there is a need to accurately determine the quantities of the project, which are the starting point of any analytical or detailed budget. This work, divided into two case studies, was designed to understand how Building Information Modeling can change the budgeting process in the building systems companies, assisting in the quantity take off and design coordination processes. Relying on a BIM workflow described by Eastman et al. (2011) and jointly using the modeling process proposed by Nguyen (2010), it is proposed the building systems company to be the developer of the MEP model, as this is the active agent in the costing and execution of building systems. In these case studies, we compare the accuracy of the quantitative components of the project, among: the building systems companies, the BIM model and the actual quantities used in the execution of a small shopping center. These results suggest that the use of BIM is a viable alternative to the MEP companies in their budgeting processes, considering the level of detail and the model information input and output, according to the process and modeling guide proposed here.
20

Implantação do Processo BIM no apoio à  execução dentro de uma construtora. / Implementation of the BIM process to support to execution in a construction company.

Lima, Fabiana Karenina de 26 April 2019 (has links)
A Modelagem da Informação da Construção (Building Information Modeling - BIM) veio ajudar a modernizar a indústria da construção civil. No Brasil, com a instabilidade do mercado AEC (Arquitetura, Engenharia e Construção), o BIM se torna um diferencial para as empresas que optam por este processo. São várias as opções de uso para construtoras e sua abrangência corre por todo o ciclo de vida da edificação. Através de revisão bibliográfica e estudo de caso dentro de uma construtora, o presente trabalho visa mostrar as possíveis aplicações do BIM dentro do canteiro de obras, identificando as barreiras para sua aplicação plena. A partir do material de estudo levantado e de survey aplicada a funcionários da construtora estudada, são realizadas propostas de uso da Modelagem da Informação da Construção durante a fase de execução do empreendimento, ou seja, durante a obra. Apesar de serem propostas baseadas em casos de uma empresa de porte e bem situada no mercado, procurou-se generalizar de forma a que distintas construtoras possam se identificar e tirar o máximo proveito dos estudos e conclusões aqui apresentados. / The Building Information Modeling (BIM) is helping to modernize the construction industry. In Brazil, faced with AEC (Architecture, Engineering & Construction) market instability, BIM becomes a differential for companies that opt for this process. There are several construction options for builders and their use throughout the lifecycle of the building. Through a bibliographic review and case study within a construction company, the present research aims to show the possible applications of BIM in construction site, identifying the barriers for its full implantation. From the study material collected and survey applied to employees of the construction company studied, proposals are made to use the Building Information Modeling during the execution phase of the project, that is, during the construction. In spite of being proposals based on cases of a company of size and well placed in the market, it was tried to generalize so that different constructors can identify and take full advantage of the studies and conclusions presented here.

Page generated in 0.1253 seconds