• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 18
  • 16
  • 7
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 85
  • 85
  • 32
  • 18
  • 17
  • 13
  • 13
  • 13
  • 12
  • 12
  • 12
  • 12
  • 10
  • 10
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

On the Dynamics and Statics of Power System Operation : Optimal Utilization of FACTS Devicesand Management of Wind Power Uncertainty

Nasri, Amin January 2014 (has links)
Nowadays, power systems are dealing with some new challenges raisedby the major changes that have been taken place since 80’s, e.g., deregu-lation in electricity markets, significant increase of electricity demands andmore recently large-scale integration of renewable energy resources such aswind power. Therefore, system operators must make some adjustments toaccommodate these changes into the future of power systems.One of the main challenges is maintaining the system stability since theextra stress caused by the above changes reduces the stability margin, andmay lead to rise of many undesirable phenomena. The other important chal-lenge is to cope with uncertainty and variability of renewable energy sourceswhich make power systems to become more stochastic in nature, and lesscontrollable.Flexible AC Transmission Systems (FACTS) have emerged as a solutionto help power systems with these new challenges. This thesis aims to ap-propriately utilize such devices in order to increase the transmission capacityand flexibility, improve the dynamic behavior of power systems and integratemore renewable energy into the system. To this end, the most appropriatelocations and settings of these controllable devices need to be determined.This thesis mainly looks at (i) rotor angle stability, i.e., small signal andtransient stability (ii) system operation under wind uncertainty. In the firstpart of this thesis, trajectory sensitivity analysis is used to determine themost suitable placement of FACTS devices for improving rotor angle sta-bility, while in the second part, optimal settings of such devices are foundto maximize the level of wind power integration. As a general conclusion,it was demonstrated that FACTS devices, installed in proper locations andtuned appropriately, are effective means to enhance the system stability andto handle wind uncertainty.The last objective of this thesis work is to propose an efficient solutionapproach based on Benders’ decomposition to solve a network-constrained acunit commitment problem in a wind-integrated power system. The numericalresults show validity, accuracy and efficiency of the proposed approach. / <p>The Doctoral Degrees issued upon completion of the programme are issued by Comillas Pontifical University, Delft University of Technology and KTH Royal Institute of Technology. The invested degrees are official in Spain, the Netherlands and Sweden, respectively.QC 20141028</p>
62

Uma contribuição ao problema de desligamento ótimo de linhas de transmissão para otimização da operação de um sistema de energia elétrica /

Flores Tinoco, Moises Ariste January 2018 (has links)
Orientador: Rubén Augusto Romero Lázaro / Resumo: Neste projeto de pesquisa, é abordado o problema de desligamento ótimo de linhas de transmissão, chamado de Problema OTS, para otimizar os custos de operação de um sistema de energia elétrica, isto é, para minimizar os custos de operação da geração para atender um perfil de demanda especificado. Foram priorizados tópicos de pesquisas considerados problemáticos na otimização do problema OTS, tópicos identificados através de uma revisão bibliográfica das publicações mais relevantes relacionadas com o problema OTS. Assim, um tópico abordado na pesquisa é o desenvolvimento de estratégias para reduzir o número relativamente elevado de linhas de transmissão que são desligadas, já que o desligamento de muitas linhas de transmissão produzem uma redução de custo insignificante. Outro tópico abordado é o problema de geração de soluções ótimas que produzem ilhamento do sistema elétrico ou até a formação de vários setores do sistema de energia elétrica operando de forma independente. O terceiro tópico é o desenvolvimento de um modelo matemático que representa as linhas iguais conectadas em paralelo entre duas barras por uma linha simples equivalente. Finalmente, é iniciada a análise teórica para encontrar os argumentos consistentes que permitam explicar os motivos pelos quais o desligamento de uma linha de transmissão melhora a operação de um sistema de energia elétrica contradizendo a lógica fundamental existente entre os engenheiros de operação. Esse tópico, chamado de paradoxo de Brae... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: In this research project, the optimal transmission switching (OTS) problem is addressed to optimize the operating costs of an electric power system, i.e., to minimize the generation costs to meet a specified demand profile. Priority was given to topics of research considered problematic in the optimization of the OTS problem, that were identified through a review of the most relevant publications related to the OTS problem. Thus, a topic addressed in the work is the development of strategies to reduce the relatively high number of disconnected transmission lines, since disconnecting many transmission lines produces insignificant cost reduction. Another topic addressed is the problem of generating optimal solutions that produce islanding of the electrical system or even the formation of several sectors of the electric power system operating independently. The third topic is the development of a mathematical model that represents the equal lines connected in parallel between two buses by an equivalent simple line. Finally, the theoretical analysis to find consistent arguments that allow explaining the reasons why the disconnection of a transmission line may improve the operation of an electric power system contradicting the fundamental logic existing among the operation engineers, is introduced. This topic, called the Braess paradox, is not addressed in any of the references reviewed during the development of this research project. In all of these proposals, the fundamental ide... (Complete abstract click electronic access below) / Doutor
63

A Distribution-class Locational Marginal Price (DLMP) Index for Enhanced Distribution Systems

January 2013 (has links)
abstract: The smart grid initiative is the impetus behind changes that are expected to culminate into an enhanced distribution system with the communication and control infrastructure to support advanced distribution system applications and resources such as distributed generation, energy storage systems, and price responsive loads. This research proposes a distribution-class analog of the transmission LMP (DLMP) as an enabler of the advanced applications of the enhanced distribution system. The DLMP is envisioned as a control signal that can incentivize distribution system resources to behave optimally in a manner that benefits economic efficiency and system reliability and that can optimally couple the transmission and the distribution systems. The DLMP is calculated from a two-stage optimization problem; a transmission system OPF and a distribution system OPF. An iterative framework that ensures accurate representation of the distribution system's price sensitive resources for the transmission system problem and vice versa is developed and its convergence problem is discussed. As part of the DLMP calculation framework, a DCOPF formulation that endogenously captures the effect of real power losses is discussed. The formulation uses piecewise linear functions to approximate losses. This thesis explores, with theoretical proofs, the breakdown of the loss approximation technique when non-positive DLMPs/LMPs occur and discusses a mixed integer linear programming formulation that corrects the breakdown. The DLMP is numerically illustrated in traditional and enhanced distribution systems and its superiority to contemporary pricing mechanisms is demonstrated using price responsive loads. Results show that the impact of the inaccuracy of contemporary pricing schemes becomes significant as flexible resources increase. At high elasticity, aggregate load consumption deviated from the optimal consumption by up to about 45 percent when using a flat or time-of-use rate. Individual load consumption deviated by up to 25 percent when using a real-time price. The superiority of the DLMP is more pronounced when important distribution network conditions are not reflected by contemporary prices. The individual load consumption incentivized by the real-time price deviated by up to 90 percent from the optimal consumption in a congested distribution network. While the DLMP internalizes congestion management, the consumption incentivized by the real-time price caused overloads. / Dissertation/Thesis / M.S. Electrical Engineering 2013
64

Přirozené monopoly v elektroenergetice a plynárenství (právní aspekty) / Natural monopolies in Electricity and Gas Sectors (the legal aspects)

Kadlecová, Eliška January 2017 (has links)
The purpose of this diploma thesis is to use relevant economic knowledge for the analysis of the key legal aspects of the natural monopoly, particularly the main theoretical aspects thereto. The interpretation is not limited to principle features, however, it covers also the related issues. The text is focused mainly on electricity and gas industries. Apart from applicable law and legal books, the relevant case law of the Constitutional Court and Supreme Administrative Court of Czech Republic has been also a significant source of knowledge hereto. The European Union legal regulations and expert opinions of the European Commission have been taken into account as well. The diploma thesis is divided into five chapters. The first chapter is focused on economic aspects of the applicable law. It provides thorough overview concerning the model and its introduction into reviewed fields. The principal information, historical background and view of the critics are introduced. This chapter also labels the entities under the Czech law that are considered to be the natural monopolies. Furthermore, three basic fields of legal institutes that are subject to subsequent review are outlined. The second chapter defines elementary terms relevant for further research. Specifically, it covers the distribution,...
65

Performance Evaluation Of Distance Relays For FACTS Compensated Transmission Lines

Maturu, Suresh 03 1900 (has links) (PDF)
With limited enhancement or expansion of the transmission infrastructure, the contemporary power systems are operating under more stressed conditions. It becomes important to fully utilize the existing transmission system to supply load demand as much as possible, thus eliminating or reducing the need for new transmission investment. Flexible AC Transmission System (FACTS) technology provides an alternative to fully utilize the existing transmission lines as well as new and upgraded lines, by controlling power and also enhancing the power transfer capability of transmission lines. However, the implementation of FACTS controllers in the transmission system has introduced new power system dynamics that must be addressed in the area of power system protection, such as rapid changes in line impedance, power angle, line currents, transients introduced by the occurrence of fault and associated control action of the FACTS controller. Therefore, the performance of the protection system must be carefully analyzed in the presence of FACTS controllers. The thesis aims at evaluating the performance of distance relays when different types of FACTS controllers, in particular Voltage Source Converter (VSC) based FACTS controllers, are incorporated at the midpoint of the transmission system to achieve voltage profile improvement and power transfer capability. The detailed models of these controllers and their control strategies are described. The presence of FACTS controllers in the loop affects both steady state and transient components of voltage and current signals. The rapid response of FACTS controllers to different power system configurations significantly affects the apparent impedance seen by distance relays. The apparent impedance seen by distance relays would be different from that of the system without FACTS controller. Due to this, the distance relay may malfunction, resulting in unreliable operation of the power system during faults. Furthermore, the effect of FACTS controllers on distance relay operation depends on the type of FACTS controller used, the application for which it has been installed and its location in the power system. The distance relay is evaluated for different loading conditions and for various fault conditions. Simulation studies are carried out using PSCAD/EMTDC based transient simulation package.
66

[pt] APLICAÇÕES DO MÉTODO DA ENTROPIA CRUZADA EM ESTIMAÇÃO DE RISCO E OTIMIZAÇÃO DE CONTRATO DE MONTANTE DE USO DO SISTEMA DE TRANSMISSÃO / [en] CROSS-ENTROPY METHOD APPLICATIONS TO RISK ESTIMATE AND OPTIMIZATION OF AMOUNT OF TRANSMISSION SYSTEM USAGE

23 November 2021 (has links)
[pt] As companhias regionais de distribuição não são autossuficientes em energia elétrica para atender seus clientes, e requerem importar a potência necessária do sistema interligado. No Brasil, elas realizam anualmente o processo de contratação do montante de uso do sistema de transmissão (MUST) para o horizonte dos próximos quatro anos. Essa operação é um exemplo real de tarefa que envolve decisões sob incerteza com elevado impacto na produtividade das empresas distribuidoras e do setor elétrico em geral. O trabalho se torna ainda mais complexo diante da crescente variabilidade associada à geração de energia renovável e à mudança do perfil do consumidor. O MUST é uma variável aleatória, e ser capaz de compreender sua variabilidade é crucial para melhor tomada de decisão. O fluxo de potência probabilístico é uma técnica que mapeia as incertezas das injeções nodais e configuração de rede nos equipamentos de transmissão e, consequentemente, nas potências importadas em cada ponto de conexão com o sistema interligado. Nesta tese, o objetivo principal é desenvolver metodologias baseadas no fluxo de potência probabilístico via simulação Monte Carlo, em conjunto com a técnica da entropia cruzada, para estimar os riscos envolvidos na contratação ótima do MUST. As metodologias permitem a implementação de software comercial para lidar com o algoritmo de fluxo de potência, o que é relevante para sistemas reais de grande porte. Apresenta-se, portanto, uma ferramenta computacional prática que serve aos engenheiros das distribuidoras de energia elétrica. Resultados com sistemas acadêmicos e reais mostram que as propostas cumprem os objetivos traçados, com benefícios na redução dos custos totais no processo de otimização de contratos e dos tempos computacionais envolvidos nas estimativas de risco. / [en] Local power distribution companies are not self-sufficient in electricity to serve their customers, and require importing additional energy supply from the interconnected bulk power systems. In Brazil, they annually carry out the contracting process for the amount of transmission system usage (ATSU) for the next four years. This process is a real example of a task that involves decisions under uncertainty with a high impact on the productivity of the distributions companies and on the electricity sector in general. The task becomes even more complex in face of the increasing variability associated with the generation of renewable energy and the changing profile of the consumer. The ATSU is a random variable, and being able to understand its variability is crucial for better decision making. Probabilistic power flow is a technique that maps the uncertainties of nodal injections and network configuration in the transmission equipment and, consequently, in the imported power at each connection point with the bulk power system. In this thesis, the main objective is to develop methodologies based on probabilistic power flow via Monte Carlo simulation, together with cross entropy techniques, to assess the risks involved in the optimal contracting of the ATSU. The proposed approaches allow the inclusion of commercial software to deal with the power flow algorithm, which is relevant for large practical systems. Thus, a realistic computational tool that serves the engineers of electric distribution companies is presented. Results with academic and real systems show that the proposals fulfill the objectives set, with the benefits of reducing the total costs in the optimization process of contracts and computational times involved in the risk assessments.
67

Rozbor souvislostí mezi cenami silové elektřiny, podpůrných služeb, regulační energie, emisních povolenek CO2 a primárních zdrojů energie / Analysis of relationships among prices of electricity, supplying services, regulatory energy, carbon dioxide emission allowances and primary sources of energy

Srna, Jan January 2013 (has links)
This thesis describes possibilities of electricity trading. The thesis deals with subjects at the electricity market, defines their competences, obligations and relationships among these subjects. Trading places and their advantages and disadvantages are also described in the thesis. The thesis shows composition of the electricity price and informs about its partial components. Types of ancillary services are spoken and there is also comparison between selling wholesale electricity and providing ancillary services. An influence of primary fuels and emission allowances on the electricity price is included at the end of the thesis.
68

Technologie příjmu extrémně slabých radiových signálů meziplanetárních sond / Technology of Receiving of Very Weak Signals from Interplanetary Spacecrafts

Špaček, Jiří January 2012 (has links)
The work deals with the problematics of receiving very weak radio signals and it is focused especially on systems for low rate telemetry with carrier-subcarrier modulation. The part of this work is dedicated to calculation the link budget of typicall telemetry data transmission system between the Mars and the Earth in respect of the receiving equipment, which could be developed in the Experimental sattelites laboratory on the Institute of radio electronics BUT. The main part of this work is dedicated to developing and testing the low rate telemetry data transmission system model. The model is developed for the purpose of study the effects of AWGN and phase noise on the whole system and also on its component parts. The model has been developed and described in the way of easy parameters modification. The design for each parameter of the model is described carefully. With the developed model, the study of the effects of AWGN and phase noise on the whole system and also on its component parts has been performed.
69

Modelo matemático para a melhoria da estabilidade transitória de sistemas elétricos de potência baseado na mudança estrutural do sistema de transmissão /

Silva, Tatiana Rondon Viegas da January 2019 (has links)
Orientador: Carlos Roberto Minussi / Resumo: Apresenta-se um modelo matemático, baseado na análise de sensibilidade, para a realização de controle de segurança dinâmica para a melhoria da estabilidade transitória de sistemas elétricos de potência. O controle de segurança dinâmica implementado consiste na alteração da impe-dância do sistema elétrico pela retirada/inclusão de linhas de transmissão. A proposta consiste em determinar um modelo de sensibilidade da margem de segurança do sistema em relação à admitância (impedância) do elemento considerado. Deste modo, pode-se estimar o impacto que as alterações no sistema de transmissão podem causar sobre a estabilidade transitória do sistema. Com as devidas adaptações, os resultados aqui apresentados podem ser estendidos para o caso do uso de dispositivos FACTS. A análise da estabilidade é realizada, via uso do conceito de sensibilidade da margem de segurança do sistema, que é determinada pelo Méto-do Direto de Lyapunov, por meio da função de energia total do sistema. Trata-se de um resul-tado que visa dar maior suporte ferramental aos planejadores e aos operadores dos sistemas de energia elétrica. Visando ilustrar os resultados auferidos com a aplicação do modelo proposto, são apresentados os resultados via simulações considerando-se dois sistemas de energia elétri-ca (sistema de 9 barras / sistema clássico Anderson & Fouad, e uma versão do sistema sul bra-sileiro). / Abstract: This work presents a mathematical model based on sensitivity analysis for the implementation of Security Dynamic Control for improvement of transient stability of electric power systems. The Security Dynamic Control performed corresponds to system impedance change by out-put/input of transmission lines (TL’s). The propose aims to determine a sensitivity model for the security margin of the system in relation to the impedance (susceptance) of the considered element. Thus, it is possible estimate the influence of TL’s on transient stability. Considering adaptations and some simplifications, the results obtained with this proposal can be used for FACTS devices. The stability analysis is achieved using the Security Margin concept deter-mined by the direct Lyapunov (energy) method; it is a supporting tool to the planners and op-erators of electric power systems. In order to illustrate the results obtained with the application of the proposed model, the simulation results are presented considering two electric power systems (9-bus system / Anderson & Fouad classic system, and one version of the South Bra-zilian system). / Doutor
70

Electricity transmission line planning: Success factors for transmission system operators to reduce public opposition

Perras, Stefan 26 February 2015 (has links)
Europe requires significant transmission grid expansions to foster the integration of electricity markets, enhance security of supply and integrate renewable energies. However, next to lengthy authorization processes, transmission system operators (TSOs) in Europe are currently facing extreme public opposition in their transmission line projects leading to significant project delays. These delays imply significant additional costs for TSOs as well as society as a whole and put the transformation of the European energy system at risk. Existing scientific literature currently lacks comprehensive studies that have tried to identify generalizable success factors to overcome public opposition in transmission line projects. The goal of work at hand was to close this research gap. Potential success factors were collected through extensive literature review and interviews throughout Europe with respective stakeholders such as citizen action groups, NGOs or energy experts. Experiences from analogue large infrastructure projects like wind parks, carbon capture and storage facilities, hydro dams, nuclear waste repositories, etc. were also used to form hypotheses. The findings were transformed into a structural equation model and tested through a questionnaire answered by almost all European TSOs. Results revealed that people’s trust in the TSO is of utmost importance for less public opposition. It can be regarded as the critical success factor per se. TSOs can create trust through stakeholder participation, sufficient communication, proper organizational readiness and liaison with stakeholders. Furthermore, appropriate technical planning can help to reduce public opposition in transmission line projects. In total 18 concrete and actionable success factors were identified for TSO management to facilitate the establishment of these aforementioned aspects. They will help European TSOs to reduce public opposition and thus accelerate the implementation of new transmission lines. Interestingly, economic benefits for people did not turn out to be a Significant success factor in reducing their opposition against new transmission lines.:Contents I List of tables VIII List of figures IX List of abbreviations XI List of symbols XV List of country codes XVI 1 Introduction 1 1.1 Problem statement 1 1.2 Thematic classification and research gap 2 1.3 Objective, research questions and scop e of work 3 1.4 Methodology and structure of work 5 2 Fundamentals of electricity transmission line planning 7 2.1 History of the European electricity transmission network 7 2.2 Transmission technologies 9 2.2.1 High-voltage alternating current (HVAC) 9 2.2.1.1 High - voltage alternating current overhead lines (HVAC OHL) 9 2.2.1.2 High - voltage alternating underground cables (HVAC UGC) 10 2.2.2 High - voltage direct current (HVDC) 12 2.2.2.1 High - voltage direct current overhead lines (HVDC OHL) 12 2.2.2.2 High - voltage direct current underground cables (HVDC UGC) 13 2.2.3 Gas - insulated lines (GIL) 14 2.3 Major players 15 2.3.1 European Transmission System Operators (TSOs) and related associations 15 2.3.1.1 National Transmission System Operators (TSOs) 15 2.3.1.2 ENTSO - E 16 2.3.2 Energy regulators and related associations 18 2.3.2.1 National regulatory authorities (NRA) 18 2.3.2.2 European associations of energy regulators 19 2.4 Development of new transmission lines 20 2.4.1 Planning objectives 20 2.4.2 Planning process 21 2.4.2.1 Identification of needs 22 2.4.2.2 Feasibility study 23 2.4.2.3 Spatial planning 24 2.4.2.4 Strategic Environmental Assessment (SEA) 25 2.4.2.5 Environmental Impact Assessment (EIA) 26 2.4.2.6 Permitting procedure 28 2.4.2.7 Securing land rights and way - leaves 28 2.4.2.8 Construction, commissioning and operation 29 2.5 Project delays and obstacles 31 2.5.1 Project delays 31 2.5.2 Rationales for delay 33 2.5.2.1 Minor obstacles 34 2.5.2.2 Public opposition 35 2.5.2.3 Insufficient authorization procedures 36 2.5.3 Excursus: Recent governmental measures to overcome delays 38 2.5.3.1 Austria 38 2.5.3.2 Denmark 38 2.5.3.3 Germany 39 2.5.3.4 Great Britain 41 2.5.3.5 Netherlands 42 2.5.3.6 European Union 43 2.5.3.7 Further recommendations 48 2.6 Interim conclusion on the fundamentals of transmission line planning 49 3 Fundamentals of social acceptance 51 3.1 Definition and classification 51 3.2 Contextual factors that influence stakeholders’ attitudes 54 3.2.1 Proximity of stakeholders to a facility 54 3.2.2 Risk perception of individuals 55 3.2.3 Individual knowledge base 56 3.2.4 Existing and marginal exposure 56 3.2.5 Land valuation and heritage 57 3.2.6 Trust in project developer 58 3.2.7 Energy system development level 59 3.3 The history of social movement against infrastructure facilities 60 3.4 Forms of public opposition 61 3.5 Interim conclusion on the fundamentals of social acceptance 63 4 Fundamentals and methodology of success factor research 64 4.1 The goal of success factor research 64 4.2 Defining success factor terminology 64 4.2.1 Success 64 4.2.2 Success factors 65 4.3 Success factor research history and current state 67 4.4 Classification of success factor studies 67 4.4.1 Specificity 68 4.4.2 Causality 69 4.5 Success factor identification approaches 70 4.5.1 Systematization of success factor identification approaches 70 4.5.2 Approach assessment 72 4.6 Criti cism to success factor research 73 4.7 Interim conclusion on the fundamentals of success factor research 75 5 Success factor res earch on social acceptance in transmission line planning – a combination of research streams 77 5.1 State of research 77 5.1.1 Social acceptance in electricity transmission line planning (A) 77 5.1.2 Success factor research on social acceptance (B) 83 5.1.3 Success factor research in transmission line planning (C) 89 5.2 Value add and classification of this work 89 5.3 Research design 90 5.3.1 Identification of potential success factors through a direct, qualitative - explorative approach 92 5.3.1.1 Overview of methodologies 92 5.3.1.2 Survey 93 5.3.2 Quantitative - confirmatory approach to validate potential success factors 95 5.3.2.1 Overview of statistical methodologies 95 5.3.2.2 Structural equation modeling (SEM) 96 5.3.2.2.1 Path analysis 97 5.3.2.2.2 Structure of SEM 99 5.3.2.2.3 Methods for SEM estimation 102 5.3.2.2.4 PLS algorithm 106 6 Identification of reasons for public opposition and derivation of potential success factors 112 6.1 Conducted interviews 112 6.1.1 Selection of interviewees 112 6.1.2 Preparation, conduction and documentation of interviews 115 6.2 Reasons for public opposition 117 6.2.1 Health and safety issues 118 6.2.1.1 Electric and magnetic fields (EMF) 118 6.2.1.2 Falling ice 124 6.2.1.3 Toppled pylons and ruptured conductors 125 6.2.1.4 Flashover 125 6.2.2 Reduced quality of living 126 6.2.2.1 Visual impact 126 6.2.2.2 Noise 128 6.2.3 Economic unfairness 130 6.2.3.1 Devaluation of property and insufficient compensation 130 6.2.3.2 Expropriation 131 6.2.3.3 Negative impact on tourism 132 6.2.3.4 Lack of direct benefits and distributional unfairness 132 6.2.3.5 Agricultural disadvantages 133 6.2.4 Lack of transparency and communication 135 6.2.4.1 Insufficient justification of line need 135 6.2.4.2 Insufficient, inaccurate and late information 137 6.2.4.3 Intransparent decision making 138 6.2.4.4 Inappropriate appearance 138 6.2.4.5 Expert dilemma 139 6.2.5 Lack of public participation 140 6.2.5.1 Lack of involvement 140 6.2.5.2 One - way communication 141 6.2.5.3 Lack of bindingness 141 6.2.5.4 Inflexibility 142 6.2.6 Environmental impact 142 6.2.6.1 Flora 143 6.2.6.2 Fauna 145 6.2.7 Distrust 146 6.3 Potential success factors to reduce public opposition 147 6.3.1 Communication 149 6.3.1.1 Communication strategy 149 6.3.1.2 Early communication 150 6.3.1.3 Line justification 150 6.3.1.4 Direct personal conversation 151 6.3.1.5 Appropriate communication mix 153 6.3.1.6 Comprehensibility 156 6.3.1.7 Sufficient and honest information 157 6.3.1.8 Stakeholder education 158 6.3.1.9 Post - communication 159 6.3.2 Participation 160 6.3.2.1 Pre - polls 160 6.3.2.2 Participation possibilities 161 6.3.2.3 Participation information 164 6.3.2.4 Macro - planning involvement 165 6.3.2.5 Pre - application involvement 166 6.3.2.6 Neutral moderation/mediation 166 6.3.2.7 Joint fact finding 169 6.3.2.8 Flexibility, openness and respect 170 6.3.2.9 Commitment and bindingness 171 6.3.2.10 Transparent decision making 172 6.3.3 Economic benefits 173 6.3.3.1 Local benefits 173 6.3.3.2 Individual compensations 174 6.3.3.3 Muni cipality compensations 176 6.3.3.4 Socio - economic benefits 177 6.3.3.5 Excursus: Social cost - benefit analysis of a new HVDC line between France and Spain 177 6.3.4 Organizational readiness 182 6.3.4.1 Stakeholder analysis and management 182 6.3.4.2 Qualification and development 184 6.3.4.3 Sufficient resources 186 6.3.4.4 Internal coordination 187 6.3.4.5 Cultural change 187 6.3.4.6 Top - management support 188 6.3.4.7 Best practice exchange 188 6.3.5 Stakeholder liaison 189 6.3.5.1 Stakeholder cooperation 189 6.3.5.2 Supporters / Multiplicators 190 6.3.5.3 Local empowerment 191 6.3.6 Technical planning 191 6.3.6.1 Line avoidance options 191 6.3.6.2 Route alternatives 194 6.3.6.3 Transmission technology options 194 6.3.6.4 Piloting of innovations 198 6.3.6.5 Excursus: Exemplary transmission line innovations 198 6.3.6.6 Avoidance of sensitive areas 206 6.3.6.7 Bundling of infrastructure 206 6.3.6.8 Line deconstruction 207 6.3.6.9 Regulatory overachievement 208 7. Development of research model 209 7.1 Procedure 209 7.2 Development of hypotheses on causal relationships 209 7.2.1 Stakeholder liaison 209 7.2.2 Participation 210 7.2.3 Communication 210 7.2.4 Organizational readiness 211 7.2.5 Economic benefits 212 7.2.6 Technical planning 212 7.2.7 Trust 213 7.2.8 Summary of hypotheses 213 7.3 Development of path diagram and model specification 214 7.3.1 Structural model 214 7.3.2 Measurement model 215 7.3.2.1 Formative measurements 215 7.3.2.2 Reflective measurements 2 7.4 Identifiability of model structure 217 8 Empirical validation of potential success factors 219 8.1 Data acqu isition 219 8.1.1 Concept of using questionnaires for data acquisition 219 8.1.2 Target group and sample size 220 8.1.3 Questionnaire design 222 8.1.3.1 Form and structure 222 8.1.3.2 Operatio nalization 224 8.1.3.2.1 Operationalization of potential success factors 224 8.1.3.2.2 Operationalization of construct TRUST 225 8.1.3.2.3 Operationalization of construct REDUCED PUBLIC OPPOSITION 226 8.1.3.2.4 Operationalization of control variables 226 8.1.3.3 Bias 227 8.1.3.3.1 Common method bias 227 8.1.3.3.2 Key i nformation bias 229 8.1.3.3.3 Hypothetical bias 229 8.1.4 Pretest 230 8.1.5 Questionnaire return and data preparation 231 8.2 Model estimation 236 8.2.1 Software selection for modeling 236 8.2.2 Estimation results 237 8.3 Model evaluation 239 8.3.1 Evaluat ion of reflective measurement models 240 8.3.1.1 Content validity 240 8.3.1.2 Indicator reliability 243 8.3.1.3 Construct validity 245 8.3.1.3.1 Convergent validity 245 8.3.1.3.1.1 Average var iance extracted (AVE) 245 8.3.1.3.1.2 Construct reliability 245 8.3.1.3.2 Discriminant validity 247 8.3.1.3.2.1 Fornell/Larcker criterion 247 8.3.1.3.2.2 Cross loadings 248 8.3.2 Evaluation of formative measurement models 250 8.3.2.1 Content validity 250 8.3.2.2 Indicator reliability / relevance 250 8.3.2.2.1 Indicator weights and significance 250 8.3.2.2.2 Multicollinearity 254 8.3.2.3 Construct validity 256 8.3.3 Evaluation of structural model 256 8.3.3.1 Multicollinearity 256 8.3.3.2 Explanatory power 257 8.3.3.3 Predictive relevance 259 8.3.4 Evaluation of total model 260 8.4 Verification of hypotheses and discussion of results 260 8.5 Success factors for reducing public opposition in transmission line planning: Recommendations for TSO management 264 8.5.1 Measures to create stakeholder trust 266 8.5.1.1 Sufficient stakeholder participation 266 8.5.1.2 Proper stakeholder communication 267 8.5.1.3 TSO’s organizational readiness for stakeholder management 267 8.5.1.4 Creating liaison with stakeholders 268 8.5.2 Important aspects in technical planning 268 8.5.3 Consolidated overview 269 9 Concluding remarks 270 9.1 Summary of results 270 9.2 Contribution, limitations, and directions for further research 272 10 Appendix 276

Page generated in 0.1119 seconds