• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 9
  • 8
  • 3
  • 3
  • 1
  • 1
  • Tagged with
  • 35
  • 35
  • 35
  • 23
  • 18
  • 11
  • 11
  • 11
  • 10
  • 9
  • 8
  • 8
  • 7
  • 7
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Uma análise crítica sobre o value for money de um protótipo de linha de metrô em São Paulo tendo como referência as atuais PPP das linhas 4 e 6. / A critical analysis about the value for money of a metro line prototype in São Paulo acting as reference the current PPP lines 4 and 6.

Ponchio, Caoní Farias 22 September 2016 (has links)
A modalidade de contratação via parceria público-privada (PPP) vem sendo cada vez mais utilizada no mundo todo. No Brasil, foi criada pela Lei nº 11.079 e vem crescendo impulsionada pelos megaeventos esportivos como a Copa do Mundo de 2014 e as Olimpíadas em 2016, especialmente na área de infraestrutura em mobilidade urbana. Esta dissertação tem como objetivo fazer uma avaliação por value for money (VfM) da contratação e mérito de um projeto de PPP em um protótipo de uma linha de metrô na cidade de São Paulo baseado na atual Linha 6-Laranja. Após a avaliação, também será verificado o mérito pela escolha de um projeto de PPP de um segundo protótipo similar a Linha 4-Amarela do metrô de São Paulo, o que possibilitará a análise de qual o maior VfM entre dois protótipos de PPP de linhas de metrô, com escopo e divisão de riscos distintos, sendo um similar à Linha 6-Laranja e outro similar à Linha 4-Amarela, permitindo verificar qual a opção de melhor eficiência e retorno exigido pelo ente privado em projetos dessa magnitude, além de identificar as principais dificuldades e propor recomendações e melhorias. A metodologia do estudo é baseada na construção de um modelo de estimativa de custo e receita de linha-protótipo na cidade de São Paulo, tendo como base projetos similares no Brasil e no exterior, fundamentação teórica especializada do setor bem como avaliação de aspectos jurídicos e econômico-financeiros. Dentre as conclusões, observou-se a existência de mérito pela escolha por projetos de PPP em futuras linhas de metrô e, em razão das dificuldades do setor público em tocar grandes obras, com a falta de investimento e expertise em planejamento, da necessidade de melhoria no regime de contratação, com a criação de câmaras especializadas para discutir a viabilidade e a adequada transferência dos riscos entre o ente privado e o Estado em projetos de PPP verificados por meio da comparação do VfM entre os dois protótipos propostos. / The contracting mode public-private partnership (PPP) has been increasingly used in the world, and in Brazil, created by Law No. 11,079, is growing driven by mega sporting events like the World Cup 2014 and the Olympics in 2016, especially in infrastructure of urban mobility area. This thesis aims to make a value for money analysis for a PPP model contracting and therefore the credit through the contractual mode (PPP) of a prototype subway line in the city of Sao Paulo based on current Line 6 - Orange. After such an evaluation, it will also be verified through another prototype like Line 4 - Yellow which will enable the analysis of the higher value for money between the two prototypes of PPP existing in São Paulo with different scopes, one based on subway Line 4 - Yellow and other as the Line 6 - Orange, allowing to check the returns required by private entity in projects of this magnitude, in addition to predict the main difficulties and make recommendations and improvements. The study methodology is based on building a model to estimates costs and revenues of a prototype subway line in Sao Paulo city through a PPP model, based on Brazilian and international similar projects, specialized literature of the sector as well the assessment of legal, economic and financial aspects. Among conclusions, it was found that, given the difficulties of the public sector in leading major projects, such as lack of investment and expertise in planning, there is need for improvement in the procurement regime, such as the creation of specialized chambers to discuss the feasibility and appropriate division of risks between the private entity and the State in PPP projects through the comparison of both prototypes value for money proposed.
22

Value-for-money e geração de valor público na atuação das organizações sociais de saúde: contribuições para o governo do estado de São Paulo

Souza, Lívia Magro de, Saad, Maria Ligia Migliorato, Faria, Ernesto Martins 25 September 2015 (has links)
Submitted by Lívia Magro de Souza (liviamagro@gmail.com) on 2015-10-26T17:35:14Z No. of bitstreams: 1 Dissertação_out2015_FINAL.pdf: 3497467 bytes, checksum: 830e2d68aa1f2066156ea38e40652cb6 (MD5) / Approved for entry into archive by Fabiana da Silva Segura (fabiana.segura@fgv.br) on 2015-10-26T17:35:49Z (GMT) No. of bitstreams: 1 Dissertação_out2015_FINAL.pdf: 3497467 bytes, checksum: 830e2d68aa1f2066156ea38e40652cb6 (MD5) / Made available in DSpace on 2015-10-26T17:54:38Z (GMT). No. of bitstreams: 1 Dissertação_out2015_FINAL.pdf: 3497467 bytes, checksum: 830e2d68aa1f2066156ea38e40652cb6 (MD5) Previous issue date: 2015-09-25 / The fact that the Brazilian State shall, in accordance with its Constitution, guarantee the right of its citizens to health does not necessarily mean that the provision of these services must be made directly by the government. Partnerships with social organizations, established by Federal Law 9.637 / 1998 and regulated by the Management Contract, claim to offer an alternative to the efficiency, agility and flexibility in health care. However, the structure of management contracts with Health Social Organizations (OSS, in Portuguese), drawn up with the negotiation of goals and performance indicators, cannot be considered, in isolation, as guarantee factor to the adequate provision of such public services. In this context, it is crucial to consider the arrangements organized by the government to ensure that the services offered represent what citizens consider value. This work focuses on the partnerships established with OSS under the state government of Sao Paulo. The interviews and research undertaken for this study show that, in order to operate this partnerships from the perspective of value-for-money and fostering public value, it is necessary to implement some improvements, such as: the listening mechanisms to citizens, collaborative governance arrangements among federated entities, alignment with regulatory agencies and, above all, qualifying the organizational capacity of the state and OSS, through the review of the willing targets and indicators in management contracts. / O fato de que o Estado brasileiro deve, de acordo com sua Carta Magna, garantir o direito de seus cidadãos à saúde não significa, necessariamente, que a provisão destes serviços tem de ser feita diretamente pelo poder público. As parcerias com organizações sociais, previstas na Lei Federal 9.637/1998 e regulamentadas pelos Contratos de Gestão, pretendem oferecer uma alternativa à eficiência, agilidade e flexibilidade na assistência à saúde. Entretanto, a estrutura dos contratos de gestão com Organizações Sociais de Saúde (OSS), elaborada com a pactuação de metas e indicadores de desempenho, não pode ser considerada, isoladamente, como fator garantidor da prestação adequada de tais serviços públicos. É fundamental considerar neste contexto os arranjos organizados pelo poder público para assegurar que os serviços oferecidos representam o que, de fato, os cidadãos consideram valor. O presente trabalho tem como objeto as parcerias com OSS no âmbito do governo do estado de São Paulo. As entrevistas realizadas e as pesquisas empreendidas na confecção deste estudo revelam que, caso se pretenda trabalhar com estas parcerias sob uma perspectiva de value-for-money e geração de valor público, faz-se necessário aprimorar os mecanismos de escuta aos cidadãos, os arranjos de governança colaborativa entre entes federados, o alinhamento com órgãos de controle e, sobretudo, qualificar a capacidade organizacional do Estado e das OSS, por meio da revisão das metas e indicadores dispostos nos contratos de gestão.
23

The 'death of improvement' : an exploration of the legacy of performance and service improvement reform in English local authorities, 1997-2017

Glennon, Russell J. January 2017 (has links)
When Tony Blair's New Labour administration took control in 1997, it sought to establish a programme of organizational, performance, and democratic reform. Initially badged as the modernizing government programme, it was later developed in the Best Value regime for local government, which imposed a centrally-controlled performance regime on all local authorities. This was characterized by a managerialist regime of external inspections, league tables, and reliance on extensive performance management, overseen by the Audit Commission. One of the first acts of the 2010 Coalition government was to dismantle this regime, along with announcing the abolition of the Audit Commission. This research sought to examine the legacy of the 1997-2010 performance regime on six English local authority case studies, identified via a deviant case analysis. An examination of the literature developed a conceptual model of seven dimensions of reform, and the research used an exploratory approach to examine the legacy of the performance regimes through a range of qualitative interviews and focus groups. The inductive analysis of interview data found that financial austerity dominated the local government environment, and the impacts of these cuts were felt across the entire group of case studies. These savings requirements had effectively broken the expectation of continuous improvement explicit in the Best Value duty what we refer to here as the death of improvement . Authorities were reducing staffing, which resulted in the loss of expertise and skills. They were also scaling back many universal services through managed decline , and deregulation of performance regimes was stimulating divergent responses to performance management arrangements, as well as influencing the relationship between politicians and performance management, and central performance staff and departmental staff. There were challenges raised around the residual inspections, largely restricted to social care and education, and how these interacted with central performance team models. The discussion develops a three-part model of performance as a system of governance , which integrates three key areas of theoretical and empirical development: performance management frameworks, accountability, and value for money. This allows four main contributions to knowledge: The concept of public value for money , Further development of our understanding of multiple forms of accountability A new model of performance management zones that articulates different roles for performance management at points within the organization A categorisation of the main changes in reform paradigms It concludes that understanding the values underpinning public sector reforms through a range of interpretive lenses is essential to fully comprehending the impact of reforms at three levels: conceptualization, operationalization, and implementation. The legacy of Comprehensive Performance Assessment and Comprehensive Area Assessment can be seen in the increased capacity and capability of local authorities to engage with performance management, and data and evidence-driven policy making. Yet, these capabilities may not have prepared authorities sufficiently for the demands of significant budget cuts driven by the post-2010 political environment.
24

Patients' satisfaction with health care services provided in the city of Johannesburg municipality clinics

Ramela, Irene Ntebo 11 1900 (has links)
The study aimed at describing patients’ satisfaction with health care services provided in the city of Johannesburg. The research sample consisted of adult male and female patients who visited region E clinics for health services. Questionnaires were used to collect data and descriptive statistics for data analysis. Findings indicated that patients were generally satisfied with health care services provided. Recommendations included ongoing staff training to improve quality of health care and public information and education campaigns to foster community awareness and understanding of health services, develop a sense of ownership thereof, and encourage positive participation. / Health Studies / M.A. (Health studies)
25

Uma análise crítica sobre o value for money de um protótipo de linha de metrô em São Paulo tendo como referência as atuais PPP das linhas 4 e 6. / A critical analysis about the value for money of a metro line prototype in São Paulo acting as reference the current PPP lines 4 and 6.

Caoní Farias Ponchio 22 September 2016 (has links)
A modalidade de contratação via parceria público-privada (PPP) vem sendo cada vez mais utilizada no mundo todo. No Brasil, foi criada pela Lei nº 11.079 e vem crescendo impulsionada pelos megaeventos esportivos como a Copa do Mundo de 2014 e as Olimpíadas em 2016, especialmente na área de infraestrutura em mobilidade urbana. Esta dissertação tem como objetivo fazer uma avaliação por value for money (VfM) da contratação e mérito de um projeto de PPP em um protótipo de uma linha de metrô na cidade de São Paulo baseado na atual Linha 6-Laranja. Após a avaliação, também será verificado o mérito pela escolha de um projeto de PPP de um segundo protótipo similar a Linha 4-Amarela do metrô de São Paulo, o que possibilitará a análise de qual o maior VfM entre dois protótipos de PPP de linhas de metrô, com escopo e divisão de riscos distintos, sendo um similar à Linha 6-Laranja e outro similar à Linha 4-Amarela, permitindo verificar qual a opção de melhor eficiência e retorno exigido pelo ente privado em projetos dessa magnitude, além de identificar as principais dificuldades e propor recomendações e melhorias. A metodologia do estudo é baseada na construção de um modelo de estimativa de custo e receita de linha-protótipo na cidade de São Paulo, tendo como base projetos similares no Brasil e no exterior, fundamentação teórica especializada do setor bem como avaliação de aspectos jurídicos e econômico-financeiros. Dentre as conclusões, observou-se a existência de mérito pela escolha por projetos de PPP em futuras linhas de metrô e, em razão das dificuldades do setor público em tocar grandes obras, com a falta de investimento e expertise em planejamento, da necessidade de melhoria no regime de contratação, com a criação de câmaras especializadas para discutir a viabilidade e a adequada transferência dos riscos entre o ente privado e o Estado em projetos de PPP verificados por meio da comparação do VfM entre os dois protótipos propostos. / The contracting mode public-private partnership (PPP) has been increasingly used in the world, and in Brazil, created by Law No. 11,079, is growing driven by mega sporting events like the World Cup 2014 and the Olympics in 2016, especially in infrastructure of urban mobility area. This thesis aims to make a value for money analysis for a PPP model contracting and therefore the credit through the contractual mode (PPP) of a prototype subway line in the city of Sao Paulo based on current Line 6 - Orange. After such an evaluation, it will also be verified through another prototype like Line 4 - Yellow which will enable the analysis of the higher value for money between the two prototypes of PPP existing in São Paulo with different scopes, one based on subway Line 4 - Yellow and other as the Line 6 - Orange, allowing to check the returns required by private entity in projects of this magnitude, in addition to predict the main difficulties and make recommendations and improvements. The study methodology is based on building a model to estimates costs and revenues of a prototype subway line in Sao Paulo city through a PPP model, based on Brazilian and international similar projects, specialized literature of the sector as well the assessment of legal, economic and financial aspects. Among conclusions, it was found that, given the difficulties of the public sector in leading major projects, such as lack of investment and expertise in planning, there is need for improvement in the procurement regime, such as the creation of specialized chambers to discuss the feasibility and appropriate division of risks between the private entity and the State in PPP projects through the comparison of both prototypes value for money proposed.
26

RelaÃÃo entre lealdade de marca e os atributos de compra em lojas especializadas e lojas de fÃbrica / Relationship between brand loyalty and purchase attributes in specialty stores and factory outlets

Ana Luisa Trajano Parente 06 June 2014 (has links)
nÃo hà / O estudo da lealdade de uma marca permite que as empresas que atuam no varejo possam desenvolver estratÃgias assertivas para manter clientes atuais e atrair novos consumidores. Partindo deste pressuposto, a presente pesquisa tem por objetivo principal analisar a diferenÃa da relaÃÃo entre a lealdade de marca e os atributos de compra de confecÃÃo infantil em lojas especializadas e lojas de fÃbrica. Como forma de analisar essa relaÃÃo, foi desenvolvida uma pesquisa quantitativa, composta de 20 variÃveis relacionadas aos atributos da relaÃÃo preÃo qualidade, qualidade do produto e atmosfera de loja. A amostra do estudo foi composta de 201 mulheres, consumidores e compradoras da marca pesquisa. Os dados da pesquisa foram coletados em novembro de 2013 e submetidos a testes estatÃsticos de anÃlise fatorial e regressÃo mÃltipla. A partir dos testes estatÃsticos, foi identificado que, dos 20 itens pesquisados, os atributos com maior relaÃÃo com a lealdade de marca sÃo: imagem da loja, diferenciaÃÃo do produto, produto melhor que a concorrÃncia, acabamento do produto e relaÃÃo preÃo-qualidade / The study of the loyalty of a mark allows companies operating in retail can develop assertive strategies to retain current customers and attract new consumers. Under this assumption, the present study has as its main objective to analyze the difference of the relationship between brand loyalty and purchase attributes of infant clothing at specialty stores and factory outlets. In order to analyze this relationship, a quantitative survey was developed, consisting of 20 variables related to the attributes of value for money, product quality and store atmosphere. The study sample consisted of 201 women, consumers and buyers of brand research. The survey data was collected in November 2013 and submitted to statistical tests of factor analysis and multiple regression. From the statistical tests, it was identified that, of the 20 items surveyed, attributes more related to the brand loyalty are: store image, product differentiation, product better than the competition, product workmanship and value for mon
27

Rozhodovací proces v projektech PPP / Decision Making Process in PPP Projects

Ištok, Peter January 2009 (has links)
In master´s thesis I deal with analysing of decision-making in PPP projects and searching for an optimal solutions. On an example of hypothetical project there is shown a decision making process which consists from three main parts: cost evaluation, revenue evaluation and risk identification. The result of this analyse is based on a public sector comparator where you can demonostrate suitability or unsuitability of particular PPP offers coming from private sphere.
28

英國VfM評估制度之研究

惲大宏 Unknown Date (has links)
英國政府認為公共投資計畫案,必須具備公帑節省之價值(value for money),才能採取民間融資創建(private finance initiative)。本文是從制度面探討如何評估公帑節省之價值(VfM)。一旦部會有初步的證據支持PFI是適當的採購模式,部會就應該開始進行三階段的VfM評估。在第一階段,採購當局應該對可能適用PFI的採購計畫進行定性(qualitative assessment)和定量評估(quantitative assessment)。在第二階段專案團隊應該對計畫中的組成專案執行更細部的分析,這個分析結果將成為未來要公告的專案概要樣本(OBC)的一部分。當第二階段的評估結果顯示此時PFI專案具有VfM,第三階段(在OBC刊登於歐盟公告至採購程序結束的這段期間)仍須持續地進行評估VfM,以確保VfM的結果不會變化。 本文結論的後半部闡明了採購當局在做VfM評估時常會遇到的實務問題,並根據專家、學者的看法以及實際評估報告的結果提出建議,以供未來政府部門在進行VfM評估時之參考。
29

Capacity building for effective school financial management : ensuring value for money

Mmako, Emanuel Tebogo 15 November 2018 (has links)
Schools today are entrusted with the duty of managing their funds in such a way that that the educational outcomes of the primary beneficiaries of these funds are maximised. This places more responsibility on the school governing bodies as the legal custodians of these funds, at local level, which need to be used economically, effectively and efficiently. To achieve this, school governing bodies need capacity in the form of appropriate skills and knowledge needed to connect school funding to educational outcomes. This study focuses on how capacity building for school governing body can contribute to value for money in school financial management. It sought to examine possible impediments to effective financial management, which result from the existing gaps in the current capacity building programmes and the financial management frameworks and procedures relating to school financial management. A qualitative research methodology involving in-depth interviews with members of governing bodies and Circuit officials was followed to examine the problem and possible improvement strategies. Themes that emerged from the data include, comprehensiveness, duration and frequency of the training programme, competency of training facilitators, monitoring, assessment and evaluation and other follow-up modalities, presentation style of the training facilitators, internal records and audited financial statements, the involvement of senior officials in school financial management, and the effectiveness of financial management. Findings suggested that, training of SGBs in financial management is inadequate, training facilitators lack requisite skills, the duration of the training for SGBs is short, the training programme is not provided frequently, the training programme’s presentation style is ineffective, mismatch between internal records and audited financial statements, lack of support and monitoring by circuit officials in the schools’ financial management, questionable conduct of external auditors, and ineffective cluster approach by SGBs. / Educational Leadership and Management / M. Ed. (Education Management)
30

Výběr kvantitativních a kvalitativních metod pro komplexní hodnocení PPP projektů / Selection of quantitative and qualitative methods for comprehensive evaluation of PPP projects

Jílek, Petr January 2015 (has links)
Abstract Dissertation deals with theoretical concepts and providing the basis for the use of forms of financing and acquisition of public goods and services through partnerships between the public and private sectors, as well as PPP (Public Private Partnership). Suitability PPP project in this work is assessed primarily in terms of developing a new methodology for evaluating projects. The theoretical part of the thesis aims to clarify the issue of PPPs in the context of regional and local regional development theories, principles and mechanisms of PPP legislative and institutional backing of the PPP, clarify the distinction between PPP and public procurement procedures and current assessment of PPP projects. The practical part focuses on the development of a methodology using a selection of qualitative and quantitative methods for evaluating investments and to form a complex output that will clearly and distinctly testify about the appropriateness of using the PPP method. For this purpose it is used in work processes, which are normally used for business valuation-generators values, property valuation, yield valuation, valuation based on market analysis, combining technologies and their incorporation / recast in the current assessment methodology, which is based on a Public Sector Comparator and determinants of value for money

Page generated in 0.0615 seconds