• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Aktiviteter för passivhus : en innovations omformning i byggprocesser för energisnåla bostadshus /

Glad, Wiktoria, January 2006 (has links)
Diss. Linköping : Linköpings universitet, 2006.
2

LCA OCH LCC FÖR FLERBOSTADSHUS : Trä och betong ur ett miljö- och ekonomiperspektiv på uppdrag av Kommunfastigheter i Eskilstuna AB / LCA AND LCC FOR MULTI-RESIDENTIAL HOUSES : Wood and concrete from an environmental and economic perspective on behalf of Kommunfastigheter i Eskilstuna AB

Bakkour, Taofik, Khazal, Larsa January 2021 (has links)
The building construction business in Sweden stands for approximately a third of greenhouse gas emissions nationally. Great focus on environmental work and a good attitude towards a climate-smart construction process have today evolved to a genuine discussion about the way that fits in to secure future generations. Wood construction, an old but continuous method are today under a growth process to cater for the need of housing. Wood construction on a high level however has its difficulties environmentally and economically, where high wood construction buildings have possibly been seen as unnecessary especially in higher apartment buildings. But with time and development forward has it been found that concrete has a high carbon dioxide emission value when producing apartment buildings and the thought of using wood instead has been increasing in the business.  The municipality of Eskilstuna is planning a new residential area in Norra Årby, where three apartment buildings is planning on being built on a deserted parking lot. The designers of these three apartment buildings are examining the possibility to use wood as a main construction material instead of concrete. As a mission of Kommunfastigheter i Eskilstuna AB explores this study this possibility using LCA and LCC over a period of 50 years on one of these buildings that can be later used for future projects. Out of documents on the designers thought of construction has LCA och LCC been produced in the shape of global warming potential per square meter living space and price per square meter living space. The results of LCA and LCC showed that it is cheaper building the apartment building in wood in comparison to concrete, and that the global warming potential was significantly smaller even though the building is designed to be 9 levels. Wood can therefore be used as a substitute for concrete even though the building is high. To secure the results a sensitivity analysis was produced to see of changing the parameters of the study had an impact on the results. This showed that the most significantly economical parameter was the discount rate of the projects.
3

Situationsanpassat ledarskap för byggproduktion

Hellström, Simon January 2013 (has links)
A large cost at the construction sites today is the labour cost of the workers. But unfortunately the worker potential is not used to full. It is not unusual to take into a count with a work-­‐place-­‐additional-­‐time of 50% in some cases. By increasing the workers' motivation and responsibility for their tasks may reduce the time considerably, which also increases the potential for greater gains in construction projects. By using the situational leadership may the workers level of maturity develop entirely. They become broadly self-­‐propelled with high efficiency and the construction leader can after that get more time for his/hers own tasks. The work gets done more efficiently and the potential for greater profits increase. Good leadership at the construction site also improves the working environment for all. More people may be motivated to go to work and such sickness absence may decline.

Page generated in 0.073 seconds