• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Dricka återvunnet vatten? : En enkätundersökning angående attityder till återvunnet vatten utförd i tre områden i Karlstad

Vester, Josefin January 2024 (has links)
Sverige har stora vattentillgångar, men kan trots detta uppleva torka i perioder. Vid torrare perioder kan grundvattennivåerna sjunka markant vilket kan öka risken för ändrade flödesriktningar och saltvatteninträngningar. Det avloppsvatten som renas idag släpps ut i vattendrag, men med de rådande klimatförändringarna kan kommuner behöva hitta alternativa råvattenkällor. Ett alternativ är återvunnet vatten; spillvatten som renas till den grad att det går att nyttja som dricksvatten igen. Studier visar att det är ytterst viktigt att inkludera allmänheten för att öka acceptans mot återvunnet vatten. Många accepterar att använda återvunnet till bevattning och annat som inte inkluderar kroppskontakt, men vill inte duscha i vattnet eller dricka det. Syftet med projektet var att se om attityder till återvunnet vatten skiljer sig i följande målgrupper: kön, ålder, utbildning och boendetyp. En enkät lämnades ut i ett lägenhetsområde och två husområden. Resultatet visade att många är positivt inställda till att återvinna vatten, men den positiva inställningen minskar ju närmare inpå kroppen det återvunna vattnet kommer. De olika målgrupperna hade knappa skillnader i åsikter, och i denna undersökning var det inte någon skillnad i attityd beroende på bostadstyp.
2

Technical Possibilities of Wastewater Reclamation for Potable Use in Hurva, Scania : Regarding the Waterbalance and From a Process Technical Point of View

Frihammar, Esmeralda January 2020 (has links)
During recent years both Sweden and the rest of Europe have experienced periods of drought as a consequence of hot summers with low levels of precipitation. For villages provided with drinking water from water plants with groundwater as raw water source droughts can lead to considerable problems if the groundwater reservoir would be affected. One Swedish village which is provided with drinking water from a groundwater drinking plant and which has faced problems regarding their drinking water production is Hurva, located outside of Eslöv in Scania and with a population of almost 400 people. The problem has been periods of water shortage in the drinking water system. The solution to this problem has consisted in filling up the water reservoir in the drinking water system with drinking water delivered in trucks. This is not considered a sustainable solution to the problem and a transmission pipe connecting Hurva to the regional drinking water system has been suggested. This project is written in collaboration with VA SYD, the joint municipal authority in Hurva, and consisted of two main objectives. The first objective was to examine the possibilities of implementation of a circular wastewater system in Hurva from a process technical and health and safety point of view. The second objective was to estimate the waterbalance in the system to make sure that there was enough water for a circular water system. According to the calculations regarding the waterbalance estimation there has been enough water in the system every month of the period January 2018-December 2019 with exception for June 2018 which was a month with extreme droughts in Sweden. The results indicates that there is a risk for water shortage in the system although this is probably not the case for months with normal conditions. Two possible treatment chains was designed, based on the requirement that they should have the capacity to treat the wastewater from Hurva WWTP into drinking water quality. The first chain, treatment chain 1 consisted of ultrafiltration, reversed osmosis, granular activated carbon, pH/hardness adjustment and UV treatment. The second chain, treatment chain 2, consisted of ultrafiltration, ozonation, granular activated carbon and UV treatment. / Under de senaste åren har både Sverige och övriga Europa upplevt perioder av torka till följd av varma somrar med lite nederbörd. För byar som förses av dricksvatten från vattenverk med grundvatten som råvattenkälla kan torka leda till stora problem om grundvattenreservoaren blir påverkad. En by som förses med dricksvatten från ett grundvattenverk och som stött på problem gällande dricksvattenproduktionen under de senaste åren är Hurva, som är beläget utanför Eslöv i Skåne och har en befolkning på strax under 400 personer. Problemen har bestått i att det inte alltid funnits tillräckligt mycket vatten i grundvattenmagasinet. Vid dessa tillfällen har lösningen varit att fylla på drickvattenreservoaren med dricksvatten transporterat i lastbilar från ett annat vattenverk. Detta anses inte som en hållbar lösning och ett förslag har lagts fram om att koppla på Hurva till det regionala dricksvattennätet med hjälp av en överföringsledning. Detta projekt har utförts i samarbete med VA SYD, som är VA-huvudman i Hurva. Projektets syfte var att undersöka möjligheterna till att implementera ett cirkulärt dricksvattsystem med avloppsvatten som primär råvattenkälla i Hurva utifrån två huvudaspekter. Den första delen av projektet handlade om att beräkna vattenbalansen i systemet för att underöka om det finns tillräckligt med vatten. I den andra delen undersöktes möjligheterna till att implementera ett cirkulärt vattenverk i Hurva utifrån processtekniska aspekter samt hälso- och säkerhetsaspekter. Enligt beräkningar av vattenbalans har det funnits tillräckligt mycket vatten i systemet för alla månader mellan januari 2018 och december 2019 med undantag för juni 2018, vilket var ett extremt torrt år i Sverige. Utifrån resultaten kan slutsatsen dras att under normala år har det funnits tillräckligt mycket vatten för att kunna implementera ett cirkulärt dricksvattensystem men att det föreligger en viss risk för vattenbrist i torra perioder. Två möjliga vattenverk, i rapporen kallade treatment chain 1 och treatment chain 2, togs fram. Båda verken designades för att uppfylla kravet om att ha kapacitet att rena avloppsvattnet från Huvas reningsverk till dricksvattenkvalitet. Treatment chain 1 bestod av följande 5 behandlingssteg: ulftrafiltrering, omvänd osmos, granulärt aktivt kol, hårdhet+pH justering och UV disinfektion. För treatment chain 2 valdes följande 4 behandlingssteg: ulftrafiltrering, ozonering, granulärt aktivt kol och UV disinfektion.

Page generated in 0.0916 seconds