• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 53
  • 1
  • 1
  • 1
  • Tagged with
  • 56
  • 56
  • 38
  • 35
  • 32
  • 29
  • 28
  • 25
  • 24
  • 23
  • 21
  • 20
  • 19
  • 18
  • 18
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Wellness Čeladná / Wellness Čeladná

Kozumplíková, Markéta January 2022 (has links)
The aim of this master thesis is to design a low-energy building for civic amenities, specifically the design of a recreational wellness centre. The building has an L-shaped floor plan with a flat roof and is designed with two above ground and one underground floor. The ground floor will serve as a wellness centre with a swimming pool and saunas. Massages and solariums are proposed on the 2nd floor. Technical facilities are located in the basement. The first part of the thesis is devoted to the architectural and structural design. Structurally, the building is divided into two parts. The part of the administrative facilities and the massage rooms consists of a construction of the character of a transverse wall system made of cut brick blocks and insulated with ETICS. The internal masonry is designed in ceramic ground bricks. Ceiling structures are in the form of continuous reinforced concrete slab. The building is based on footings and waist foundations. The roof of the building is single-skin flat with a gravel. The wellness part is made up of a monolithic diaphragm skeleton with high slenderness columns. The horizontal load-bearing structure in this case again consists of a continuous monolithic reinforced concrete slab. The second part of the thesis deals mainly with the environmental engineering of the buildings. The building will be heated by a pellet boiler and will also use energy from photovoltaic panels. Ventilation in the building is provided by air handling units with heat recovery. The third part of the thesis deals with the assessment of solar gains in the indoor environment of the pool hall. Three variants are proposed with multi-criteria evaluation and the optimal option is selected. The thesis is mainly elaborated in Archicad, Deksoft, MS Excel and Word software.
42

Stavebně technologického řešení Vzdělávacího komplexu v Brně / Technological solution for the education complex in Brno

Blažek, David January 2012 (has links)
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy label of objects.
43

Stavebně technologický projekt hotelu Nábřeží u Kunovské přehrady / Construction-technological project of the Hotel Nábřeží near Kunov dam

Vavřínek, Dominik Unknown Date (has links)
This diploma thesis deals with construction and technological solution of hotel Nábřeží near Kunovská dam. The aim of this work is to choose the appropriate construction process of rough construction. Thesis contains technical report of main object, technological prescription and test plan for reinforced concrete ceiling, work plan and schedule of work also project of site equipment, main construction machinery and noise measurement survey. Further there is financial and time demand comparison of existing and alternative design of vertical load-bearing system in the connection with thermal insulation.
44

Mateřská škola Kuřim - stavebně technologický projekt / Kindergarten Kuřim - construction technology project

Kurka, Jan Unknown Date (has links)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
45

Hotel "Na vyhlídce" / The Hotel "On the View"

Brandýská, Veronika Unknown Date (has links)
The content of this bachelor work is the project documentation of the hotel On the View in Nový Hradec Králové. The build has three ground floors, without partial basement and it is roofed by flat roof with pea gravel. A build has 2 parts. First part si for guests and second part is for employees. The build has 2 entrance. In the first floor is reception with facility, toilet, restaurant with kitchen, food warehouses, untility room and background for employees. From a restaurant is access to the terrace. In the second and third floor are rooms for 34 guests (of which 2 for handicapped) and background for cleaning women. A Hotel has car park for guests with 13 places ( of which 2 fort handicapped) and car park for employees with 4 places. The construction system is mostly made of polished ceramic blocks Porotherm. Horizontal construction is made up as Porotherm ceiling with brick inserts MIAKO and ceramic-concrete ceiling beams. Part of the proposal is thermal engineering assessment, fire safety solutions and assessments in terms of acoustic and daylight.
46

Experiences in the Leadership Advancement of African American Women

Dubose, Lisa E. 17 November 2017 (has links)
No description available.
47

Sportovní centrum Hodonín / Sports centre Hodonín

Svatek, Michal January 2018 (has links)
The content of this thesis is elaboration of technical documentation for realization of a sports centre. The building is situated in Hodonín in flattened terrain. It is a building with two floors, non-cellar, flat vegetation roof and sloping roof of the wooden glued laminated trusses. The building is based on plain concrete strip foundations and concrete foundations footing. Both peripheral and internal walls are made of ceramic blocks Porotherm. In open spaces, reinforced concrete columns are designed. The ceiling structure is designed from pre-stressed Spiroll ceiling panels. The peripheral walls are insulated with the ETICS external thermal insulation system in the western part of the building. On the rest of the building there is a ventilated facade with a cladding made of wood and Cetris tiles. The building is functionally divided into two parts with a common entrance. On the north and south side there are sports grounds. The rest consists of a restaurant, a kitchen with facilities, a hygienic background for employees and visitors. The whole building is barrier-free.
48

Příprava realizace montované haly s administrativou v Praci / Preparation of a prefabricated hall with administration

Schrámek, Martin January 2019 (has links)
The subject of the diploma thesis is a preparation of a prefabricated hall with administration in Prace. The production hall will be used to produce glass fiber reinforced concrete. Next part and extension is an administrative part. The text part of the thesis contains a technical report on the building technological project, time and financial plan of the building - object, coordinating situation of the building with broader relations of the transport routes, study of the realization of the main technological stages of the building object, item budget of the main building object, time schedule of the main building, sets of the main technological stages, detection protocols for individual months, limits, balance of resources and personnel, plan of selected material sources, technical report of construction site equipment, technological regulation of precast reinforced concrete frame, technological regulation of precast concrete frame coverings Kingspan panels, Control and test plan of precast concrete frame, covering of precast concrete frame panels Kingspan and ceiling panels of the Spiroll administration, alternative suggestion of the exchange ceiling construction administration and comparison, noise study and thermal technology.
49

Stavebně technologický projekt výjezdové základny zdravotnické záchranné služby v Zábřehu na Moravě / CONSTRUCTION AND TECHNOLOGICAL PROJECT OF THE BASE OF THE EMERGENCY MEDICAL SERVICE IN ZABREH NA MORAVE

Tůma, František January 2019 (has links)
This diploma thesis deals with the construction project of the outbound base of the emergency medical service in Zabreh na Morave. More specifically, this thesis deals with the study of the development of the building, the technological regulation for the flat roof, and the subsequent chapters - design and assessment of the lifting mechanism, optimal design of the building site, timetable, itemized budget, control and test plan, etc. An interesting point is the simulation of the construction, where a 3D model and a video are created. The thesis is based on a borrowed documentation of the project.
50

Stavebně technologický projekt výstavby komplexu RD SLAVKOV - Pod Zlatou horou / Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou

Kurková, Dita January 2020 (has links)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.

Page generated in 0.081 seconds