• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1007
  • 30
  • 15
  • 11
  • 6
  • 6
  • 6
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • Tagged with
  • 1066
  • 560
  • 344
  • 196
  • 135
  • 107
  • 100
  • 93
  • 81
  • 80
  • 78
  • 78
  • 76
  • 73
  • 71
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
541

Planejamento da expansão de curto prazo de redes de distribuição considerando geração distribuída e confiabilidade /

Paiva, Rodrigo Rodrigues da Cunha January 2016 (has links)
Orientador: José Roberto Sanches Mantovani / Resumo: O planejamento de sistemas de distribuição consiste em encontrar uma configuração otimizada, a um baixo custo, que permita manter a qualidade e confiabilidade do fornecimento de energia. Fontes de Geração Distribuída (GD) quando inseridas na rede alteram as suas características físicas e operacionais e tornam o problema de planejamento de curto prazo mais complexo para ser resolvido. Portanto, é importante desenvolver ferramentas computacionais eficientes para reduzir custos e o tempo na tomada de decisão para o setor de planejamento das empresas, indicando onde, quando e quais os tipos de componentes devem ser instalados e/ou substituídos nas redes de distribuição na presença de fontes de GD. Neste trabalho propõe-se uma metodologia para o planejamento de curto prazo para alocação das fontes de GD do tipo eólica (considerando as incertezas presentes neste tipo de fonte primária de energia), alocação de bancos de capacitores, dispositivos de proteção e controle, bem como a possibilidade de recondutoramento e troca de estruturas da rede de distribuição, mantendo-se os índices de qualidade para o fornecimento de energia dentro dos padrões estabelecidos pela agência reguladora. O problema de planejamento de curto prazo é formulado como um modelo de programação inteira multiobjetivo, o qual consiste em minimizar os custos de investimento e perdas técnicas na rede (energia não suprida e perdas ôhmicas nos condutores) e está sujeito a restrições físicas, econômicas e operacionais. ... (Resumo completo, clicar acesso eletrônico abaixo) / Doutor
542

Aplicação de um framework baseado nos conceitos de Workload Control para identificação dos problemas relacionados à confiabilidade de entrega em uma empresa do setor de manutenção aeronáutica

Kodama, Tatiana Kimura 08 June 2015 (has links)
Submitted by Aelson Maciera (aelsoncm@terra.com.br) on 2017-10-10T13:29:21Z No. of bitstreams: 1 DissTKK.pdf: 6363757 bytes, checksum: c18f1887d457c1920bc3a2ff568e2f25 (MD5) / Approved for entry into archive by Ronildo Prado (producaointelectual.bco@ufscar.br) on 2017-10-10T17:27:10Z (GMT) No. of bitstreams: 1 DissTKK.pdf: 6363757 bytes, checksum: c18f1887d457c1920bc3a2ff568e2f25 (MD5) / Approved for entry into archive by Ronildo Prado (producaointelectual.bco@ufscar.br) on 2017-10-10T17:27:20Z (GMT) No. of bitstreams: 1 DissTKK.pdf: 6363757 bytes, checksum: c18f1887d457c1920bc3a2ff568e2f25 (MD5) / Made available in DSpace on 2017-10-10T17:31:49Z (GMT). No. of bitstreams: 1 DissTKK.pdf: 6363757 bytes, checksum: c18f1887d457c1920bc3a2ff568e2f25 (MD5) Previous issue date: 2015-06-08 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / The improvement in the delivery reliability performance in Make-To-Order (MTO) companies has been becoming an important competitive criterion in the recent market context. Thus, it gets clear the importance of researches able to present tools to help the identification of enhancement opportunities in the matter of delivery reliability. The identification of opportunities requires a structure of diagnosis of the recent situation. However, depending on the performance problem to be diagnosed, a theoretical understructure based on specific scientific knowledge is needed. This work presents the framework developed by Soepenberg et al. (2012c) based on Workload Control (WLC) concepts. Such framework is composed by a structure for the diagnosis process of the reliability performance that allows browsing from the obtained performance to the subjacent causes related to Production Planning and Control (PPC). The aim of the present work is to present the WLC as well as the diagnostic tools with the purpose of elucidating their applicability through the framework developed by Soepenberg et al. (2012c) in a real context through a case study. The results of the case study indicated that the framework is a key instrument for diagnosis due to the accuracy by which it defines the causes of delays of the orders related to the PPC decisions. The application of the framework indicated that the lack of spare parts is the most impacting factor on delays, however this is not a cause only related to the company PPC decisions, but to external factors that are out of the company’s reach. Another result obtained is the verification that most of the orders are concluded before the date set. This is due to the lack of accuracy in the definition of the delivery dates and to the estimative mistakes of the capacity to be used for the maintenance of each part number, whose responsibilities rely on PPC. / A melhoria no desempenho da confiabilidade de entrega em empresas Make-To-Order (MTO) vem se tornando um importante critério competitivo na atual conjuntura de mercado. Diante do exposto, fica evidente a importância de pesquisas que apresentem ferramentas para o auxílio na identificação de oportunidades de melhorias no que se refere à confiabilidade de entrega. A identificação de oportunidades de melhorias requer uma estrutura de diagnóstico do desempenho da situação atual. No entanto, dependendo do problema de desempenho a ser diagnosticado, um arcabouço teórico com base no domínio de conhecimentos específicos da científica é necessário. Este trabalho apresenta o framework desenvolvido por Soepenberg et al. (2012c), que se baseia nos conceitos de WLC. Tal framework consiste em uma estrutura para o processo de diagnóstico do desempenho da confiabilidade de entrega, que permite navegar a partir do desempenho alcançado para as causas subjacentes relacionadas ao PCP. O objetivo do presente trabalho é apresentar o WLC, bem como as ferramentas de diagnóstico com o propósito de elucidar suas aplicabilidades através do framework desenvolvido por Soepenberg et al. (2012c) em um contexto real através de um estudo de caso. Os resultados do estudo de caso apontaram que o framework é um importante instrumento de diagnóstico devido à precisão para a determinação das causas de atraso das ordens relacionadas às decisões de PCP. A aplicação do framework identificou que a falta de peças é o fator mais impactante nos atrasos, porém a mesma não é uma causa relacionada somente as decisões de PCP da empresa, mas a fatores externos que não podem ser controlados pela empresa. Outro resultado obtido é a constatação de que a maioria das ordens é concluída antes das datas estabelecidas. Esse fato é resultado da falta de acurácia na determinação das datas de entrega e do erro na estimativa da capacidade a ser utilizada para a manutenção de cada part number, cuja responsabilidade dessas atividades é do PCP.
543

Análises e estudos para alocação e ajustes de dispositivos de proteção em redes de média tensão de energia elétrica com geração distribuída

Campitelli, Eduardo Moreti [UNESP] 06 July 2007 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:22:35Z (GMT). No. of bitstreams: 0 Previous issue date: 2007-07-06Bitstream added on 2014-06-13T19:48:57Z : No. of bitstreams: 1 campitelli_em_me_ilha.pdf: 1263646 bytes, checksum: 8c37b7f4ddd0230d76c35d0ab31e2adf (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Devido a alta competitividade do mercado de energia junto com a redução dos custos de novas tecnologias que disponibilizam no mercado geradores de energia elétrica de diferentes modelos de variadas capacidades, a custos competitivos, atualmente há uma tendência de utilização de novas fontes para geração de energia elétrica. Neste sentido, de acordo com análises técnicas e econômicas, a inserção de tais geradores pode ser adequada não somente ao longo de redes de transmissão, mas também nas redes de média e baixa tensão. No entanto, estes geradores distribuídos (GDs) podem fazer com que partes do alimentador percam radialidade. Isto possui influência direta na coordenação e ajustes dos dispositivos de proteção instalados ao longo do alimentador, já que a alocação de GD na rede de distribuição acarreta em alterações no perfil de tensão, nos níveis de curto-circuito, estabilidade do sistema, e pode resultar em ilhamento de algumas áreas da rede na ocorrência de falta. Neste trabalho é proposto e implementado um algoritmo computacional que permite a realização de projetos para alocar de forma integrada e otimizada geradores distribuídos e dispositivos de proteção em alimentadores aéreos de distribuição. No desenvolvimento do algoritmo considera-se de forma totalmente integrada os aspectos técnicos e econômicos da alocação, realocação, especificação e coordenação dos dispositivos de proteção em redes aéreas de distribuição com GDs. Para avaliação da eficiência do sistema computacional desenvolvido, são apresentados resultados de testes efetuados em dois alimentadores reais de distribuição, sendo um de 134 e outro de 660 barras. / Currently, there is a tendency for using new generation sources of electric power due to the high competitiveness of the electric power market along with costs reduction of new technologies that make available electric power generators of different types and capabilities. Thus, according to technical and economical analyses, the insertion of such generators can be suitable on not only transmission networks, but also on medium- and low-voltage networks. Nevertheless, these distributed generators (DGs) can make sections of an originally radial feeder turn into loops. It directly affects the coordination and adjustments of protective devices placed on the feeder, because the DG placement changes the voltage profile, the short-circuit currents, the system stability, and can result on islanding of some areas of the faulted network. A computational algorithm that allows the design of projects for placement, in an integrated and optimized way, of distributed generators and protective devices on overhead distribution feeders is presented and implemented in this research project. Technical and economical aspects of placement, replacement, specification and coordination of protective devices on distribution feeders presenting DGs are simultaneously considered for developing the algorithm. In order to analyze the efficiency of the developed computational system, the results for performed tests for two real-life distribution feeders, one 134-node and another 660-node, are presented.
544

Confiabilidade humana e o funcionamento normal de uma refinaria de petróleo

Borges, Fábio Morais 22 June 2012 (has links)
Made available in DSpace on 2016-06-02T19:50:16Z (GMT). No. of bitstreams: 1 4566.pdf: 4290545 bytes, checksum: 63aeb413c2591785ebf23066bcbceb15 (MD5) Previous issue date: 2012-06-22 / Financiadora de Estudos e Projetos / There is a distance between a design as planed and one developed effectively. It varies according to both the constraints involved in the design process and accuracy of design conception. Many projects are designed without taking into account the user‟s real needs. It makes difficult or impossible the developing of the tasks. To improve this scenario, the Ergonomics seeks to understand the activity to incorporate the workers perspective in the design and operation of sociotechnical systems. To reach this goal, it uses the Activity Analysis approach. It is on the situated activity that emerge the own skills and characteristics of human, in order to ensure the system stability. Thus, the human is the reliability factor of the system. It is called Human Reliability. It follows in this research, the assumption that the Activity Analysis is the most appropriate method to provide subsidies for a design focused on the needs of the task, increasing the supports that help ensure the operational reliability of the system. It were used analyzes carried out in a Petroleum Refinery for 3 years and a half of study. They enabled the development of designs that take into account the role of refinery workers as the most experts of his work. The analyzes used photographs and videos to understand more deeply the activity of the refinery workers. From these analyzes were extracted actions and strategies used to refinery workers to correct instabilities that are present at all times. It can generate incidents which lead to lose of control of the system as a whole, if not noticed at time. The workers do it using the representation of the system. The actions were classified into five categories, according to the elements mobilized for the recovery of the normal state of the system. It is proposed a Design Resilient Model that incorporates these actions and aims to ensure that new strategies, built from new constraints, are constantly evaluated and incorporated on the project, if possible. It emphasizes that even with the construction of the Model, it been possible realize that the conflicts that operators face in the daily routine of the Refinery are dynamic and cannot be translated for a Model. There will always be a remnant. There will always be hysteresis. Thus, the activity will continue to be the place where operators respond to these conflicts. Showing that, for the most appropriate to the needs of the task that is a model, the refinery workers will continue having to resolve conflicts in situated action. / A distância que existe entre um projeto como concebido e como ele, efetivamente, é desenvolvido, varia de acordo com as restrições envolvidas no processo de projetação e a precisão das informações sobre a atividade de trabalho. Diversos projetos são concebidos sem levar em conta as reais necessidades de seus usuários. O que acaba por dificultar ou mesmo impossibilitar que as tarefas sejam desenvolvidas. No intuito de melhorar esse cenário, a ergonomia busca compreender a atividade para incorporar a perspectiva dos trabalhadores na concepção e operação dos sistemas sociotécnicos. Faz isso utilizando a abordagem da Análise da Atividade. É na atividade situada que se manifestam as competências e características próprias do ser humano, no intuito de garantir a estabilidade do sistema, sendo, desta forma, fator de confiabilidade operacional. Ao que se dá o nome de Confiabilidade Humana. Parte-se, nesta pesquisa, do pressuposto que a Análise da Atividade é o método mais apropriado a fornecer subsídios para um projeto voltado às necessidades da tarefa, aumentando os suportes que contribuem para assegurar a confiabilidade operacional do sistema. Utilizaram-se análises realizadas em uma Refinaria de petróleo, durante 3 anos e meio de estudos e propiciaram a elaboração de projetos que levassem em conta o papel dos operadores como maiores conhecedores de seu trabalho. As análises utilizaram registros fotográficos e de vídeo para compreender mais profundamente a atividade dos operadores. Destas análises, foram extraídas estratégias e ações que os operadores utilizam, a partir da representação que têm do sistema, para corrigir instabilidades que se apresentam a todo o momento. Podendo gerar incidentes que, caso não percebidos a tempo, levam à perda de controle do sistema como um todo. As ações foram classificadas em cinco categorias, segundo os elementos mobilizados para a recuperação do estado normal de funcionamento. Propõe-se, ao final, um Modelo de Projeto Resiliente que incorpora essas ações e visa garantir que novas estratégias, construídas a partir de novos constrangimentos, sejam constantemente avaliadas e, se possível, também incorporadas no projeto. Ressalta-se que, mesmo com a construção do Modelo, pôde-se perceber que os conflitos que os operadores enfrentam na rotina diária da Refinaria são dinâmicos e não conseguem ser transpostos, por completo, para um Modelo. Sempre haverá um resquício. Sempre haverá histerese. Assim, continuará a ser na atividade que os operadores respondem a esses conflitos. Atestando que, por mais adequado às necessidades da tarefa que seja um Modelo, os operadores continuarão tendo que resolver os conflitos na ação situada.
545

Análise probabilística da estabilidade de taludes via teoria da confiabilidade / Probabilistic analysis of slope stability by reliability theory

Giacon Junior, Admir José 26 January 2018 (has links)
Submitted by Admir José Giacon Junior null (juniorgiacon@gmail.com) on 2018-03-06T14:12:14Z No. of bitstreams: 1 Análise probabilística da estabilidade de taludes via teoria da confiabilidade - GIACON JUNIOR - 2018.pdf: 4258233 bytes, checksum: 777c3f6fb0d3f477af5650ac6adc895a (MD5) / Approved for entry into archive by Maria Marlene Zaniboni null (zaniboni@bauru.unesp.br) on 2018-03-07T17:37:24Z (GMT) No. of bitstreams: 1 giaconjunior_aj_me_bauru.pdf: 4258233 bytes, checksum: 777c3f6fb0d3f477af5650ac6adc895a (MD5) / Made available in DSpace on 2018-03-07T17:37:24Z (GMT). No. of bitstreams: 1 giaconjunior_aj_me_bauru.pdf: 4258233 bytes, checksum: 777c3f6fb0d3f477af5650ac6adc895a (MD5) Previous issue date: 2018-01-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Devido às consequências negativas associadas à ruptura e deslizamentos de taludes, a análise de estabilidade desses assume uma parte primordial na área da engenharia geotécnica. A maioria dessas análises é realizada de maneira determinística, não incorporando as incertezas inerentes ao sistema. A constatação dessas incertezas em projetos de taludes associa-se a previsão de uma probabilidade de falha no desempenho de taludes quanto à segurança. Nesse contexto, esta dissertação busca avaliar a segurança de taludes através de uma abordagem probabilística, simulando taludes com geometrias e solos variados, verificando ainda a influência da elevação da posição do nível d´água. Para essa finalidade foram realizadas análises probabilísticas utilizando First Order Reliability Method (FORM) com base nos métodos de Equilíbrio Limite, através dos programas computacionais acadêmicos RASS (análises determinísticas) e RELgen (análises probabilísticas). Com base nos resultados, verificou-se que as superfícies críticas obtidas pelos métodos determinísticos podem não coincidir com as superfícies que apresentam a maior probabilidade de falha. Isto é verificado ainda na análise de inclinação da superfície do talude, em que inclinações apresentando fatores de segurança admissíveis, apresentaram probabilidades de falha não aceitáveis. Estas divergências são atribuídas às incertezas inerentes ao sistema. Sendo assim, as análises de estabilidade de talude baseadas apenas nos resultados de análises determinísticas não apresentam todas as variáveis presentes no contexto do projeto. Por fim, através dos resultados obtidos nesta pesquisa é possível inferir que a adoção da análise probabilística em projeto de taludes auxilia de uma forma consistente a avaliação da segurança dos taludes, contribuindo de maneira satisfatória na prática de projetos de engenharia geotécnica. / Due to the negative consequences associated with slope rupture and landslides, the stability analysis of these slopes plays an important role in geotechnical engineering. Most of these analyzes are carried out in a deterministic manner, not incorporating the uncertainties inherent to the system. The observation of these uncertainties in slope projects is associated with the forecast of a probability of failure in slope performance in terms of safety. In this context, this paper present research seeks to evaluate slope safety in a probabilistic manner, simulating slopes with varied geometries and soils, also verifying the influence of elevation of the water level position. For this purpose, were performed probabilistic analyzes using First Order Reliability Method (FORM), based on the Limit Equilibrium methods, RASS (deterministic analysis) and RELgen (probabilistic analyzes). Based on the results, it was found that the critical surfaces obtained by the deterministic methods may not coincide with the highest most probability surfaces to fail. This is still verified in surface slope analysis, where inclinations with acceptable safety factors presented probabilities of failure unacceptable. These divergences are attributed to the uncertainties inherent in the system. Therefore, slope stability analyzes based only on the results of deterministic analyzes do not present all the variables present in the project context. Finally, through the results obtained in this research it is possible to infer that the adoption of probabilistic analysis in slope design assists in a consistent way the assessment of slope safety, contributing in a satisfactory way in the practice of geotechnical engineering projects.
546

Estudo da aplicação do GPS no monitoramento de deslocamentos em estruturas / Study of application of GPS in monitoring of dislocation in structures

Poleto, Leandro José do Carmo 04 June 2010 (has links)
Made available in DSpace on 2015-03-26T13:27:57Z (GMT). No. of bitstreams: 1 texto completo.pdf: 1485878 bytes, checksum: f829fc0c21a5e142f4f6f116c9928af5 (MD5) Previous issue date: 2010-06-04 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The objective of this thesis was to present a study of the global positioning system used to monitor the displacement of structures. A methodology to determine the observations, processing and data adjustment besides of the application of relevant statistical analysis to evaluate the obtained data was presented. Two positioning stations of the IBGE, which possess coordinates and accuracy known, were used to obtain the observations. At the same time were also obtained the observations in a simulation plate of displacement, which was installed in a third station. Five days of field observations were performed. The position of the GPS receiver in the plate was changed in each day. In order to have a greater number of observations to the same number of parameters to be determined, five sections of observations per day were achieved. The positions of the GPS in the plate were 00, 05, 15, 35 e 60 mm in each day of observation, respectively. The analysis of displacement among these positions and the combinations between them was achieved. All the observations were obtained in the Campus of the Federal University of Viçosa. The baselines were obtained through the GPS observations. Then, these baselines were submitted to the adjustment using routines programmed in the MATLab. In these routines were performed the adjustment, the analysis of reliability and the test of congruence. As a result, the coordinates of the points in the cartesian and topocentric systems with their respective accuracy were achieved. The test of congruence detected existence of displacement. It was possible to identify the difference between the distance dislocated in the field and the distance obtained using the GPS. Additionally, by the ellipse of errors was possible to identify the errors in all the directions. / O objetivo desta dissertação foi apresentar um estudo quanto ao uso do sistema de posicionamento global aplicado no monitoramento de deslocamento de estruturas. Uma metodologia para determinação das observações, processamento e ajustamento dos dados, além da aplicação de análises estatísticas pertinentes para avaliar os dados obtidos foi apresentada. Duas estações de posicionamento do IBGE, as quais possuem coordenadas e precisão conhecidas, foram utilizadas para obtenção das observações. Ao mesmo tempo foram obtidas, também, as observações em uma placa de simulação de deslocamento instalada em uma terceira estação. Realizou-se cinco dias de observações de campo, sendo que a posição do receptor GPS na placa mudou a cada dia. Para se ter um maior número de observações para o mesmo número de parâmetros a serem determinados, cinco seções de observações por dia foram realizadas. As posições do GPS na placa foram 00, 05, 15, 35 e 60 mm em cada dia de observação, respectivamente. A análise de deslocamento entre estas posições e também das combinações entre elas foi realizada. Todas as observações foram obtidas no Campus da Universidade Federal de Viçosa. A partir das observações GPS obtiveram-se as linhas de base, as quais foram submetidas ao ajustamento com o apoio de rotinas programadas em MATLab. Nestas rotinas foram realizados o ajustamento, a análise de confiabilidade e o teste de congruência. Como resultado, as coordenadas dos pontos no sistema cartesiano e no sistema topocêntrico com suas respectivas precisões foram obtidas. Com o teste de congruência foi possível detectar a existência de deslocamento. Foi possível identificar a diferença entre a distância deslocada em campo e a obtida com GPS. Adicionalmente, pelo cálculo das elipses dos erros, foi possível identificar, também, o erro em todas as direções.
547

Planejamento da expansão de curto prazo de redes de distribuição considerando geração distribuída e confiabilidade / The short term planning expansion of distribution networks considering distributed generation and reliability

Paiva, Rodrigo Rodrigues da Cunha [UNESP] 09 December 2016 (has links)
Submitted by RODRIGO RODRIGUES DA CUNHA PAIVA null (rodrigorcp@hotmail.com) on 2017-01-27T17:19:53Z No. of bitstreams: 1 Tese_Rodrigo_Paiva.pdf: 2424828 bytes, checksum: 304f20862a283a2556f7f0f3576eb60e (MD5) / Approved for entry into archive by LUIZA DE MENEZES ROMANETTO (luizamenezes@reitoria.unesp.br) on 2017-01-31T15:33:23Z (GMT) No. of bitstreams: 1 paiva_rrc_dr_ilha.pdf: 2424828 bytes, checksum: 304f20862a283a2556f7f0f3576eb60e (MD5) / Made available in DSpace on 2017-01-31T15:33:24Z (GMT). No. of bitstreams: 1 paiva_rrc_dr_ilha.pdf: 2424828 bytes, checksum: 304f20862a283a2556f7f0f3576eb60e (MD5) Previous issue date: 2016-12-09 / O planejamento de sistemas de distribuição consiste em encontrar uma configuração otimizada, a um baixo custo, que permita manter a qualidade e confiabilidade do fornecimento de energia. Fontes de Geração Distribuída (GD) quando inseridas na rede alteram as suas características físicas e operacionais e tornam o problema de planejamento de curto prazo mais complexo para ser resolvido. Portanto, é importante desenvolver ferramentas computacionais eficientes para reduzir custos e o tempo na tomada de decisão para o setor de planejamento das empresas, indicando onde, quando e quais os tipos de componentes devem ser instalados e/ou substituídos nas redes de distribuição na presença de fontes de GD. Neste trabalho propõe-se uma metodologia para o planejamento de curto prazo para alocação das fontes de GD do tipo eólica (considerando as incertezas presentes neste tipo de fonte primária de energia), alocação de bancos de capacitores, dispositivos de proteção e controle, bem como a possibilidade de recondutoramento e troca de estruturas da rede de distribuição, mantendo-se os índices de qualidade para o fornecimento de energia dentro dos padrões estabelecidos pela agência reguladora. O problema de planejamento de curto prazo é formulado como um modelo de programação inteira multiobjetivo, o qual consiste em minimizar os custos de investimento e perdas técnicas na rede (energia não suprida e perdas ôhmicas nos condutores) e está sujeito a restrições físicas, econômicas e operacionais. Este problema é resolvido através de um algoritmo genético multiobjetivo baseado no Non-dominated Sorting Genetic Algorithm (NSGA-II), e a metodologia proposta e implementada foi testada em um sistema de distribuição real de 135 barras, e os resultados obtidos mostram eficácia e robustez da metodologia proposta. / The planning of distribution systems consists of finding an optimized configuration, at a low cost, which allows to maintain the quality and reliability of the power supply. Distributed Generation (DG) sources, when inserted into the network, change their physical and operational characteristics and make the short-term planning problem more complex to be solved. Hence, it is important to develop efficient computational tools aiming to reduce costs and the impact of time limits on decision making for the utility planning sector, indicating where, when and what types of components should be installed and / or replaced in distribution networks in the presence of sources. Accordingly, this work proposes a new methodology for the short-term planning which considers the allocation of wind-type DG sources (considering the uncertainties present in this type of primary energy source capacitor banks, protection and control devices, as well as the possibility of reconnecting and exchanging structures of the distribution network, maintaining the quality indices for the supply of energy within the standards established by the regulatory agency. The short-term planning problem is formulated as an integer multiobjective programming model, which consists of minimizing the investment costs and technical losses in the network (energy not supplied and ohmic losses in the conductors) by subjecting to physical, economic and operational constraints. Thus, this problem is solved here by using a multiobjective genetic algorithm based on the Non-dominated Sorting Genetic Algorithm (NSGA-II). In order to testthe proposed methodology, a real distribution system, containing 135-buses, is implemented and analyzed. In short, the obtained results demonstrate its efficacy and robustness in light of the proposed methodology.
548

Análises e estudos para alocação e ajustes de dispositivos de proteção em redes de média tensão de energia elétrica com geração distribuída /

Campitelli, Eduardo Moreti. January 2007 (has links)
Orientador: José Roberto Sanches Mantovani / Banca: Antonio Padilha Feltrin / Banca: José Carlos de Melo Vieira Júnior / Resumo: Devido a alta competitividade do mercado de energia junto com a redução dos custos de novas tecnologias que disponibilizam no mercado geradores de energia elétrica de diferentes modelos de variadas capacidades, a custos competitivos, atualmente há uma tendência de utilização de novas fontes para geração de energia elétrica. Neste sentido, de acordo com análises técnicas e econômicas, a inserção de tais geradores pode ser adequada não somente ao longo de redes de transmissão, mas também nas redes de média e baixa tensão. No entanto, estes geradores distribuídos (GDs) podem fazer com que partes do alimentador percam radialidade. Isto possui influência direta na coordenação e ajustes dos dispositivos de proteção instalados ao longo do alimentador, já que a alocação de GD na rede de distribuição acarreta em alterações no perfil de tensão, nos níveis de curto-circuito, estabilidade do sistema, e pode resultar em ilhamento de algumas áreas da rede na ocorrência de falta. Neste trabalho é proposto e implementado um algoritmo computacional que permite a realização de projetos para alocar de forma integrada e otimizada geradores distribuídos e dispositivos de proteção em alimentadores aéreos de distribuição. No desenvolvimento do algoritmo considera-se de forma totalmente integrada os aspectos técnicos e econômicos da alocação, realocação, especificação e coordenação dos dispositivos de proteção em redes aéreas de distribuição com GDs. Para avaliação da eficiência do sistema computacional desenvolvido, são apresentados resultados de testes efetuados em dois alimentadores reais de distribuição, sendo um de 134 e outro de 660 barras. / Abstract: Currently, there is a tendency for using new generation sources of electric power due to the high competitiveness of the electric power market along with costs reduction of new technologies that make available electric power generators of different types and capabilities. Thus, according to technical and economical analyses, the insertion of such generators can be suitable on not only transmission networks, but also on medium- and low-voltage networks. Nevertheless, these distributed generators (DGs) can make sections of an originally radial feeder turn into loops. It directly affects the coordination and adjustments of protective devices placed on the feeder, because the DG placement changes the voltage profile, the short-circuit currents, the system stability, and can result on islanding of some areas of the faulted network. A computational algorithm that allows the design of projects for placement, in an integrated and optimized way, of distributed generators and protective devices on overhead distribution feeders is presented and implemented in this research project. Technical and economical aspects of placement, replacement, specification and coordination of protective devices on distribution feeders presenting DGs are simultaneously considered for developing the algorithm. In order to analyze the efficiency of the developed computational system, the results for performed tests for two real-life distribution feeders, one 134-node and another 660-node, are presented. / Mestre
549

Análise de confiabilidade aplicada aos ensaios de óleos lubrificantes para motores de tratores /

Alves, Gilmar Ferreira, 1958- January 2007 (has links)
Resumo: As análises de óleos lubrificantes de motores de tratores agrícolas são importantes como meio gerador de informações à manutenção mecânica e da racionalização quando da substituição dos mesmos. Porém, a confiabilidade da permanência destes óleos no cárter pode ser tratada de maneira formal através de métodos estatísticos. Foram utilizados dados referentes ao tempo, em horas, de uso dos óleos lubrificantes dos motores de dois grupos de tratores, marca Massey Ferguson, modelo 275 4x2. Os dados do primeiro grupo são oriundos de seis tratores onde foram obtidas setenta observações. Os do segundo grupo de sete tratores foram verificadas quarenta e seis observações. Avaliou-se o tempo de uso do óleo através das seguintes variáveis explanatórias: viscosidade, ponto de fulgor, diluição por combustível, fuligem, presença de água e desgaste metálico (Fe, Cu, Cr, Pb, Al e Si) para ambos os grupos de tratores. No segundo grupo foram verificados também níquel e molibdênio. O modelo de Cox foi utilizado para análise de tais variáveis. Estudaram-se as curvas de confiabilidade do óleo lubrificante para cada trator, utilizando-se o estimador de Kaplan-Meier. No primeiro grupo, as variáveis explanatórias não foram significativas para o período de troca do óleo lubrificante de motores dos tratores. Para o segundo grupo apenas o Pb apresentou diferença significativa com relação ao tempo de troca do óleo lubrificante. A utilização do estimador de Kaplan-Meier permitiu identificar o comportamento do óleo lubrificante durante o período de uso. O modelo de Cox mostrou-se apropriado para explicar o comportamento das variáveis explanatórias. / Abstract: The analysis of the motors lubricant oil of agricultural tractors are important as information generating to the mechanical maintenance and to the rationalization when of its substitution. However, the permanence reliability of these oils in the crankcase can be treated to formal way through the statistical methods. Data over time, in hours, of the use of motor lubricant oils of two tractors groups, all Massey Ferguson 275 model 4x2 were utilized. The data of the first group are from six tractors and seventy observations were obtained. The data of the second group are fom seven tractors, obtaining forty-six observations. It was evaluated the oil use time according to the following explanatory variables: viscosity, glow point, dilution by fuel, soot, water and metallic wear (Fe, Cu, Cr, Pb, Al, Si) for both groups; molybdenum for the second group. The Cox model was utilized for analyses of these variables. The reliability curves were studied for each tractor using Kaplan-Meier estimator. In the first group, the explanatory variables were not significant for the time of lubricant oil exchange to the motors of tractors second group only Pb showed difference in relation to time of lubricant oil exchange. The Kaplan-Meier estimator allowed to visualize the lubricant oil behavior during the use time. The Cox model was appropriated to explain the explanatory variables behavior. / Orientador: Marcos Roberto Bormio / Coorientador: João Candido Fernandes / Banca: João Eduardo Guarnetti Santos / Banca: José Eduardo Corrente / Banca: Jair Rosas da Silva / Banca: Abilio Garcia dos Santos Filho / Doutor
550

Desenvolvimento de técnicas e modelos matemáticos para solução de problema de planejamento da expansão e operação de sistemas de distribuição de energia elétrica com geradores distribuídos /

Peñuela Meneses, César Augusto. January 2012 (has links)
Orientador: Jose Roberto Sanches Mantovani / Banca: Antonio Padilha Feltrin / Banca: Antonio Marcos Cossi / Banca: Benemar Alencar de Souza / Banca: Walmir de Freitas Filho / Resumo: Neste trabalho é proposto um modelo matemático para determinar o impacto da penetração de fontes de geração distribuída nos estudos de planejamento da expansão e de operação de sistemas elétricos de distribuição. A geração distribuída é usada para expandir a capacidade de fornecimento de energia da rede, melhorar a sua eficiência e ainda melhorar os índices de continuidade no fornecimento de energia elétrica aos usuários. O modelo proposto busca minimizar os custos na operação da rede, mantendo a regulação da tensão e obedecendo as restrições de capacidade de fluxo de corrente nos alimentadores e transformadores das subestações, e, por outro lado, maximizar os índices de confiabilidade do sistema. Os índices de confiabilidade da rede estão relacionados com o cálculo do custo da energia não fornecida devido à resposta do sistema de proteção na eliminação de faltas temporárias, assim como do isolamento de faltas permanentes. Neste cálculo é levado em consideração o tipo de cliente que é afetado pela operação normal do sistema de proteção, assim como o funcionamento próprio de cada dispositivo de proteção, sendo, no caso, considerada a instalação de elos-fusíveis, religadores e relés de sobrecorrente. Adicionalmente, considera-se a possibilidade da operação ilhada das fontes de geração distribuída a partir da instalação adequada de relés de sobrecorrente com característica direcional e capacidade de religamento sincronizado. Isto, com vistas à criação de um sistema restaurativo que minimize o custo da energia não fornecida aos usuários conectados à zona ilhada. Para mostrar as vantagens do modelo matemático e da técnica de solução propostos são apresentados e discutidos os resultados obtidos de simulações em um alimentador real de 135 barras / Abstract: This work proposes a mathematical model to analyze the impact of installing distributed generation sources in expansion planning studies and electrical operation of distribution systems. The main focus is to determine the trade-off between the reliability and operational costs of distribution networks when the operation of isolated areas is allowed. The model searches to minimize the network costs by mean of optimal settings of the active power delivered from the power sources connected to the grid. Meanwhile the voltage regulation and the overload condition at the substation transformer and the grid lines are guaranteed. Simultaneously, the type and location of the protective devices initially installed on the protection system are reconfigured in order to minimize the interruption cost, as well as the expenditure for adjusting the protection system to the conditions imposed by the operation of dispersed units. In addition, in order to increase the system reliability, the model attempts to minimize the cost of the energy not supplied to customers due to normal tripping of the protection system in the elimination of temporary faults, as well as the isolation of permanent faults. This calculation takes into account the type of customer being affected by such normal tripping. The isolated operation of dispersed generation is allowed by installing directional overcurrent relays with synchronized reclose capability. The results for a 135-bus real-life power system are presented in order to evidence the advantage of the proposed model / Doutor

Page generated in 0.0615 seconds