• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 124
  • Tagged with
  • 130
  • 129
  • 56
  • 44
  • 44
  • 44
  • 44
  • 44
  • 37
  • 30
  • 29
  • 26
  • 23
  • 23
  • 22
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Propuesta de reducción del costo de transporte por pedidos no planificados (urgentes) en una empresa constructora

Vela Sánchez, Alexandra 01 December 2012 (has links)
El presente artículo tiene como objetivo reducir los costos implicados en el transporte de pedidos no planificados; es decir se dará solución a los problemas de planificación que existen en el área de compras de una empresa del sector construcción. La solución se dará implementando una serie de mejoras. Primero se desarrollará el marco teórico, describiendo temas como Logística, Gestión de Abastecimiento, Gestión de compras, Plan de compras, importancia del área de compras y finalmente la Matriz de Kraljic. Seguido a este capítulo se realiza el análisis de la empresa y los problemas que se han detectado en la empresa, el cual origina una pérdida considerable de dinero, se describen las causas y posibles soluciones que se darán para la solución del problema. En el tercer capítulo se desarrolla la implementación de cada una de las soluciones: Implementación de Gestión de Compras, Estratégicas por Categorías, Implementación del Plan de Compras, Formación de un puesto de trabajo y Desarrollo de Indicadores. Finalmente se da paso a las conclusiones y recomendaciones respectivas para la propuesta de mejora.
42

Optimización de costos en la etapa de ejecución y propuesta de secuencia de procesos para la gerencia de proyectos privados de edificaciones

Cuipal Roldán, Milagros, Parra Medina, Liz Araceli, Pingo Román, John Miguel, Seguin La Rosa, Amelia 23 January 2017 (has links)
La presente tesis tiene como objetivos optimizar costos en la etapa de ejecución, proponer una secuencia de procesos para obras privadas bajo la dirección de una gerencia de proyectos y mostrar mediante entrevistas la relevancia de contar con una gerencia de proyectos para obras de edificaciones. El caso motivo de estudio contempla el análisis en la etapa de casco de un Apart Hotel cinco estrellas en el distrito de Miraflores, departamento de Lima. La metodología empleada en el presente estudio es de tipo explicativa ya que ésta responde el porqué de lo investigado, el enfoque es cuantitativo pues es secuencial y probatorio, es de forma aplicada ya que se dirige a su aplicación inmediata. Finalmente se concluyó que se puede optimizar los costos en la etapa de ejecución a través de los indicadores de adicionales y deductivos que representó para el cliente un ahorro del 7.09% y 3.47% respectivamente del monto total de la ejecución y en cuanto al monto total del proyecto una incidencia del 3.23%. Con estos indicadores queda demostrada la importancia y utilidad de contar con una gerencia de proyectos. ABSTRACT The object of the present thesis is optimize costs in the performance phase, propose a process sequence for privated builidings under the direction of a project management and show through interviews the relevance of having a project management for construction buildings. The case of this study envolves the structural phase of an Apart Hotel with five stars in Miraflores's district, department of Lima. The methodology used in the present study is explicative and this one answers the reason of the investigated, the focus is quantitative because it is sequential and evidential, it is applied form since it goes to his immediate application. Finally we concluded that it is possible to optimize the costs in the performance phase across the indicators of additional and deductive, these represented for the client a saving of 7.09 % and 3.47 % respectively of the total amount of the performance and in the total amount of the Project an incidence of 3.23%. With these indicators we can show the importance and usefulness of having a project management in buildings.
43

Propuesta de mejora de la gestión logística de una empresa constructora de Carreteras

Fernandini Puga, Luis Felipe 19 March 2013 (has links)
El presente Proyecto de Investigación aplicado será desarrollado en una empresa que se dedica a la ejecución y supervisión de proyectos de construcción de carreteras. Las empresas que, como ésta, trabajan por proyectos suelen ser difíciles de gerenciar, pues no controlan sus procesos. Para medir la eficiencia de los proyectos que estas empresas desarrollan resulta necesario construir valores de comparación, indicadores de gestión y de operación, los cuales se pueden comparar con los indicadores de otras empresas del rubro a manera de Benchmarking. Actualmente, la Empresa en estudio se encuentra saliendo de un proceso de reestructuración, por lo que le resulta fundamental mejorar su gestión. La falta de una estructura adecuada afecta al desarrollo óptimo de los proyectos, los cuales si bien responden a las expectativas de los clientes, no optimizan el uso de recursos. A partir del análisis de la coyuntura que atraviesa la Empresa, el presente Proyecto de Investigación analizará y propondrá un rediseño de la gestión logística, el punto crítico que garantiza el correcto funcionamiento de los proyectos de la Empresa. / Tesis
44

Modelo de gestión de diseño para proyectos inmobiliarios basado en lean design

Calderón Gutiérrez, María Gabriela, Negrini Mavila, Giuseppe Renato 01 July 2017 (has links)
El presente estudio propone mejoras en la planificación y diseño de los proyectos inmobiliarios, en base a la implementación de un Modelo de Gestión que responde a los principios de la filosofía Lean, tomando como referencia las etapas del Last Planner Delivery System. Para ello se plantea una serie de pasos a seguir desde la concepción del proyecto hasta el desarrollo del expediente técnico y toda la documentación necesaria para llevar a cabo la ejecución del mismo. El capítulo 1 brinda un alcance de los lineamientos generales tenidos en cuenta para el desarrollo de este trabajo de investigación. En el capítulo 2 se lleva a cabo una revisión de los principales conceptos y herramientas Lean (orientadas al diseño) -incluidas las dos fases iniciales del Last Planner Delivery System- que servirán de base para el desarrollo del Modelo de Gestión propuesto. El capítulo 3 muestra un diagnóstico de la situación actual de la construcción y las pérdidas que se tienen originadas por una gestión deficiente del diseño, haciendo énfasis en el desfase que existe entre las etapas de construcción y diseño. En el capítulo 4 se detalla la metodología a seguir para la aplicación del Modelo de Gestión sugerido. En el capítulo 5 se aplica dicho modelo a un caso real, analizando cada uno de los puntos de desarrollo y presentando alternativas que permiten concluir en resultados concretos. Palabras clave: Lean Design, Last Planner Delivery System, diseño inmobiliario, gestión, rentabilidad.
45

Propuesta de un manual de gestión de calidad basado en la norma iso 9001:2015 y la guía del Pmbok® 5ta edición para la gestión de las empresas dedicadas a la gerencia de proyectos en. Una etapa previa a la construcción

Chayña Yupanqui, Romell, Miki Ninomiya, Juan José, Tapia Herrera, Ericka 01 August 2017 (has links)
La gestión de proyectos es el soporte para iniciar un proyecto ya que es la actividad con mayor responsabilidad dentro de la empresa que garantiza la adecuada comunicación y control de los proyectos cumpliendo con el tiempo establecido para cada fase, pudiendo así reducir los costos y anticipándose a posibles problemas que puedan surgir; sin embargo en los proyectos actuales se viene desarrollando una gestión de proyectos carente de estándares y de metodologías eficientes que vienen perjudicando el éxito de los proyectos1, generando problemas posteriores durante la construcción. El presente trabajo desarrolla un Manual de Gestión de Calidad basado en estándares reconocidos para la gerencia de proyectos guiados por la Organización Internacional de Normalización (ISO) y el Project Management Institute (PMI), en la etapa previa a la construcción planteando un modelo integral orientado a la mejora continua, mayor rentabilidad, sostenibilidad y optimización de recursos.
46

Propuesta de implementación de un plan de mantenimiento de equipos bajo las técnicas del TPM en una empresa constructora

Villena Andia, Ali Omar 21 September 2017 (has links)
Presenta un plan de Mantenimiento que permita mejorar la disponibilidad y rendimiento de las maquinarias en los proyectos, lo que a su vez busca que los equipos cumplan con sus funciones operativas de manera eficiente, permitiendo culminar los proyectos en los plazos establecidos sin incurrir en gastos no presupuestados, por ende lograr mejorar tanto los ingresos de la empresa de constructora como la percepción que tiene el cliente sobre el servicio brindado. En el primer capítulo se desarrolla el marco teórico para dar los cimientos básicos del desarrollo de un Sistema de Gestión de Mantenimiento. Entre dichos puntos, se describen los principales tipos de mantenimiento, los elementos fundamentales en la implementación de sistemas de gestión, los lineamientos del TPM como modelo de gestión, el resultado de la implementación del TPM a nivel mundial. En el segundo capítulo, se desarrolla los siguientes puntos: Análisis del sector industrial, la descripción de la empresa, descripción del servicio que brinda la empresa, descripción del problema y su impacto económico debido a las demoras en las reparaciones de los equipos y el bajo rendimiento de los mismos, auditoria del área de Mantenimiento y finalmente un análisis de las causas principales entre otros puntos. En el tercer capítulo, se presenta la evaluación de propuestas de solución, las metodología elegida para la solución del problema, la descripción de los pasos de la implementación, cronograma de actividades y sus responsables, el desarrollo del plan de mantenimiento y sus indicadores de gestión, Finalmente, en el cuarto capítulo se expone la validación del proyecto, plan piloto de mantenimiento en la excavadora y el cargador frontal, los resultados obtenidos, evaluación económica financiera con las herramientas de simulación, finalmente se dan las conclusiones y recomendaciones del proyecto.
47

Indicadores de desempeño en empresas promotoras constructoras de vivienda. El caso de México

Luna Villarreal, Kevin 03 November 2017 (has links)
ABSTRACT Performance measurement in residential housing, at a company or project level, is usually assessed using financial indicators. There are other performance indicators that can be also applied to the construction industry. The literature review identifies papers and reports that propose a set of indicators that can be applied to different areas. However, there is no evidence of a system that comprises the key performance indicators at the design-bid-build-delivery stages of the life-cycle of developer and homebuilder companies. Therefore, the main goal of this research is to create a model of performance indicators (at the strategic, tactical and operative levels), based on the production chain of a developer and homebuilder company. Once the theoretical proposal is set, a Delphi study is developed; therefore, a panel of 11 experts assesses and summarizes the indicators that allow measuring the performance of Mexican developer and homebuilder companies. Once the model is simplified and adjusted, it is validated through multiple case studies of two Mexican developer and homebuilder companies; the model has to be implemented and monitored in two whole productive cycles of each one of these case studies. Finally, the basic indicators obtained are: time, production cost, administrative cost, housing internal delivery, housing technical report, housing external delivery, warrantees, quality, and customer service. These indicators are aligned with an intrinsic traceability among them. This research also proposes an indicator of global performance (IDGC). This way, developer and homebuilder companies achieve project success considering the proposed indicators, focused on three key areas of the value supply chain: construction, housing internal delivery, and housing delivery to the final customer. / RESUMEN La medición del desempeño en la edificación residencial, tanto a nivel empresarial como de proyecto, se ha evaluado normalmente mediante indicadores de tipo financiero. Existen otros indicadores de desempeño que también son aplicables al sector de la construcción. En la revisión de la literatura se identifican diversos artículos e informes que proponen una serie de indicadores aplicables a diferentes áreas. Sin embargo, no hay evidencia de un sistema específico que integre los indicadores clave de desempeño en las etapas de diseño-contratación-construcción-entrega del ciclo de vida de las empresas promotoras-constructoras de vivienda. Por lo tanto, el objetivo principal de esta investigación es cubrir esta laguna del conocimiento, generando un modelo de indicadores de desempeño (a nivel estratégico, táctico y operativo), basado en la cadena productiva de una empresa promotora-constructora de viviendas. Una vez realizada la propuesta de modelo teórico, se lleva a cabo un estudio Delphi con la finalidad de que un panel de 11 expertos valore y sintetice los indicadores que permitan medir el desempeño de las empresas promotoras constructoras de vivienda, en el contexto de la industria de la construcción mexicana. Una vez simplificado y adaptado, el modelo se somete a una validación práctica mediante estudios de caso múltiple de dos empresas promotoras-constructoras mexicanas; se requiere la implementación y seguimiento del modelo durante dos ciclos productivos completos en cada uno de los dos casos planteados. Finalmente, los indicadores básicos obtenidos son: tiempo, coste de producción, coste administrativo, entrega interna de vivienda, dictamen técnico de la vivienda, entrega externa de la vivienda, garantía, calidad y posventa. Estos indicadores se encuentran alineados con una trazabilidad intrínseca entre ellos. La presente investigación también propone un indicador de desempeño global (IDGC). De este modo, las empresas promotoras-constructoras de vivienda determinan el éxito de sus proyectos en base a los indicadores propuestos, centrados en tres áreas de fundamentales de la cadena de valor: construcción, entrega interna de vivienda, y entrega de vivienda al usuario final. / RESUM El mesurament del rendiment en l'edificació residencial, tant a nivell empresarial com de projecte, s'ha avaluat normalment per mitjà d'indicadors de tipo financer. Hi ha altres indicadors de rendiment que també són aplicables al sector de la construcció. En la revisió de la literatura s'identifiquen diversos articles i informes que proposen una sèrie d'indicadors aplicables a diferents àrees. No obstant això, no hi ha evidència d'un sistema específic que integre els indicadors clau de rendiment en les etapes de disseny-contractació-construcció-entrega del cicle de vida de les empreses promotores- constructores de vivenda. Per tant, l'objectiu principal d'esta investigació és cobrir esta llacuna del coneixement, generant un model d'indicadors de rendiment (a nivell estratègic, tàctic i operatiu), basat en la cadena productiva d'una empresa promotora-constructora de vivendes. Una vegada realitzada la proposta de model teòric, es du a terme un estudi Delphi amb la finalitat que un panell de 11 experts valore i sintetitze els indicadors que permeten mesurar el rendiment de les empreses promotores constructores de vivenda, en el context de la indústria de la construcció mexicana. Una vegada simplificat i adaptat, el model és sotmés a una validació pràctica per mitjà d'estudis de cas múltiple de dos empreses promotores-constructores mexicanes; es requerix la implementació i seguiment del model durant dos cicles productius complets en cada un dels dos casos plantejats. Finalment, els indicadors bàsics obtinguts són: temps, cost de producció, cost administratiu, entrega interna de vivenda, dictamen tècnic de la vivenda, entrega externa de la vivenda, garantia, qualitat i postvenda. Estos indicadors es troben alineats amb una traçabilitat intrínseca entre ells. La present investigació també proposa un indicador de rendiment global (IDGC). D'esta manera, les empreses promotores-constructores de vivenda determinen l'èxit dels seus projectes basant-se en els indicadors proposats, centrats en tres àrees fonamentals de la cadena de valor: construcció, entrega interna de vivenda, i entrega de vivenda a l'usuari final. / Luna Villarreal, K. (2017). Indicadores de desempeño en empresas promotoras constructoras de vivienda. El caso de México [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/90447 / TESIS
48

Diseño de un sistema de gestión de mantenimiento para flota de concretos

Moran Pittman, Eduardo 03 January 2016 (has links)
Esta investigación tiene como objetivo mejorar la disponibilidad y confiabilidad de los equipos de concreto. Siendo unos principales activos de la empresa, estos equipos en gran porcentaje son antiguos y tienen un sistema de mantenimiento de baja calidad. Para poder cumplir con los objetivos planteados se realizó un reconocimiento y el levantamiento de la información de la flota. Adicionalmente, la antigüedad de la flota es uno de los factores por el cual se tiene una baja disponibilidad y confiabilidad en la operación. Por otro lado, la importancia de diseñare un sistema de gestión de mantenimiento para flota y un plan de mantenimiento efectivo radica en lograr adelantarse a las fallas, es decir, evitar paradas de máquinas, accidentes, que ocasionen desviaciones de presupuesto, con lo cual se asegura la rentabilidad de una empresa. Además, ello permitirá que la prestación del servicio llegue a tiempo al cliente, exceptuando hechos aleatorios, lo que significa el cumplimiento de los estándares del mercado y de la competencia. Sin embargo, el avance y desarrollo de una empresa no suele estar acompañado de actividades de apoyo como el mantenimiento, ya que desde siempre, ha sido considerado como un mal necesario. La mayoría de las empresas solo tienen en cuenta los costos directos de mantenimiento, sin embargo, no visualizan los costos indirectos de una mala gestión de mantenimiento y cómo estos afectan en los resultados de la empresa, más aún si es una empresa de servicios. / Tesis
49

Propuesta de mejora de seguridad y salud ocupacional para incrementar la rentabilidad de una empresa constructora

Cavero Doria, Moises Felix 04 May 2017 (has links)
Plantea una Propuesta de Implementación de un Sistema de Gestión de Seguridad y Salud Ocupacional bajo la norma OHSAS 18001 en una empresa de construcción, estudio que podrá replicarse en empresas similares. En los dos primeros capítulos se presentan los fundamentos teóricos y se describe el proceso de implementación de un Sistema de Gestión de Seguridad y Salud Ocupacional y todas las terminologías, criterios y operaciones que conlleva este proceso y que se emplearán a lo largo del estudio. En el tercer capítulo se presenta la empresa, definiendo su conformación y procesos principales, para poder planificar el proyecto de implementación, se define la propuesta de implementación y se diseña el sistema de gestión de seguridad bajo la norma OHSAS 18001:2007, se explican los procesos de revisión y auditoría a realizarse para corroborar los logros de objetivos; y se dan a conocer los beneficios del sistema de gestión de seguridad y salud ocupacional. Finalmente en el capítulo cuatro se presentan algunas conclusiones y recomendaciones. / Tesis
50

Desarrollo de un modelo de gestión de proyectos para la oficina de ingeniería de una empresa del sector construcciones de muelles marítimos en el Perú

Ramírez Espinoza, Carlos Hernán 03 January 2016 (has links)
El presente trabajo analizó el impacto generado al desarrollar un modelo de gestión de proyectos para la oficina de Diseño de Ingeniería en el Perú de una empresa del sector de construcción de muelles marítimos. La hipótesis es que el impacto generado es la ejecución de proyectos con los procesos bajo control y en consecuencia la reducción de los sobrecostos. Seconcluyó que la aplicación de un modelo de gestión de proyectos permite mantener bajo control los procesos y en consecuencia el control del presupuesto, el cronograma programado y el cumplimiento con los alcances. / Tesis

Page generated in 0.372 seconds