• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 3
  • 1
  • Tagged with
  • 7
  • 7
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Capacity Trading In Electricity Markets

Cubuklu, Omer 01 January 2012 (has links) (PDF)
In electricity markets, capacity cost must be determined in order to make capacity trading. In this thesis, capacity cost and the factors deriving the capacity cost are studied. First, fixed capacity cost of power plants is examined. Direct and indirect costs of fixed capacity cost are detailed with respect to different types of power plants and the impact of these factors to the capacity cost is given. Second, interconnection and system utilization costs of transmission and distribution system are considered in order to simulate energy flow from the producer to the customer. Finally, a capacity cost calculation program is practiced. By the help of this program, capacity cost of power plants is figured out, different cases are compared and the main factors affecting the capacity cost are discussed in detail.
2

Stochastic Renewal Process Models for Maintenance Cost Analysis

Cheng, Tianjin January 2011 (has links)
The maintenance cost for an engineering system is an uncertain quantity due to uncertainties associated with occurrence of failure and the time taken to restore the system. The problem of probabilistic analysis of maintenance cost can be modeled as a stochastic renewal-reward process, which is a complex problem. Assuming that the time horizon of the maintenance policy approaches infinity, simple asymptotic formulas have been derived for the failure rate and the cost per unit time. These asymptotic formulas are widely utilized in the reliability literature for the optimization of a maintenance policy. However, in the finite life of highly reliable systems, such as safety systems used in a nuclear plant, the applicability of asymptotic approximations is questionable. Thus, the development of methods for accurate evaluation of expected maintenance cost, failure rate, and availability of engineering systems is the subject matter of this thesis. In this thesis, an accurate derivation of any m-th order statistical moment of maintenance cost is presented. The proposed formulation can be used to derive results for a specific maintenance policy. The cost of condition-based maintenance (CBM) of a system is analyzed in detail, in which the system degradation is modeled as a stochastic gamma process. The CBM model is generalized by considering the random repair time and delay in degradation initiation. Since the expected cost is not informative enough to estimate the financial risk measures, such as Value-at-Risk, the probability distribution of the maintenance cost is derived. This derivation is based on an interesting idea that the characteristic function of the cost can be computed from a renewal-type integral equation, and its Fourier transform leads to the probability distribution. A sequential inspection and replacement strategy is presented for the asset management of a large population of components. The finite-time analyses presented in this thesis can be combined to compute the reliability and availability at the system level. Practical case studies involving the maintenance of the heat transport piping system in a nuclear plant and a breakwater are presented. A general conclusion is that finite time cost analysis should be used for a realistic evaluation and optimization of maintenance policies for critical infrastructure systems.
3

Stochastic Renewal Process Models for Maintenance Cost Analysis

Cheng, Tianjin January 2011 (has links)
The maintenance cost for an engineering system is an uncertain quantity due to uncertainties associated with occurrence of failure and the time taken to restore the system. The problem of probabilistic analysis of maintenance cost can be modeled as a stochastic renewal-reward process, which is a complex problem. Assuming that the time horizon of the maintenance policy approaches infinity, simple asymptotic formulas have been derived for the failure rate and the cost per unit time. These asymptotic formulas are widely utilized in the reliability literature for the optimization of a maintenance policy. However, in the finite life of highly reliable systems, such as safety systems used in a nuclear plant, the applicability of asymptotic approximations is questionable. Thus, the development of methods for accurate evaluation of expected maintenance cost, failure rate, and availability of engineering systems is the subject matter of this thesis. In this thesis, an accurate derivation of any m-th order statistical moment of maintenance cost is presented. The proposed formulation can be used to derive results for a specific maintenance policy. The cost of condition-based maintenance (CBM) of a system is analyzed in detail, in which the system degradation is modeled as a stochastic gamma process. The CBM model is generalized by considering the random repair time and delay in degradation initiation. Since the expected cost is not informative enough to estimate the financial risk measures, such as Value-at-Risk, the probability distribution of the maintenance cost is derived. This derivation is based on an interesting idea that the characteristic function of the cost can be computed from a renewal-type integral equation, and its Fourier transform leads to the probability distribution. A sequential inspection and replacement strategy is presented for the asset management of a large population of components. The finite-time analyses presented in this thesis can be combined to compute the reliability and availability at the system level. Practical case studies involving the maintenance of the heat transport piping system in a nuclear plant and a breakwater are presented. A general conclusion is that finite time cost analysis should be used for a realistic evaluation and optimization of maintenance policies for critical infrastructure systems.
4

Vem betalar den kommunalainfrastrukturen? : Tillämpning av exploateringsavtal / Who Pays for the Municipality’s Infrastructure? : Application of Land Development Agreements

Hallbäck, Hanna January 2019 (has links)
I takt med att samhällen utvecklas och exploateras behöver även infrastruktur byggas ut. Samhället harett gemensamt behov av allmänna platser såsom vägar, gator, grönområden samt platser för rekreation,lek och motion. Som utgångspunkt är det kommunen som är ansvarig för dessa allmänna platser.Kommunernas resurser är dock begränsade och infrastruktur är kostsam. Till följd av offentliga investeringarökar värden på marken hos de fastigheter som har möjlighet att använda de allmänna platserna.Dessa värden kan anses som oförtjänta då de uppstår på grund av offentliga investeringar. Utefterdetta har system för fördelning av kostnader motiverats.År 2015 infördes ett nytt system för exploateringsavtal som delvis har till syfte till att kunna finansierade offentliga investeringar som behövs vid genomförandet av en detaljplan. Lagregleringenhar som ändamål att skapa ett system för förutsägbarhet och lagstöd och samtidigt en möjlighet tillanpassning i varje unik situation. System för fördelning av värden har generellt som mål att vara rättvisaoch effektiva. Vid lagstiftning behöver det ske en avvägning mellan rättvisa och effektivitet föratt skapa ett ändamålsenligt system.Genom exploateringsavtalen har kommunen möjlighet att ålägga exploatörer att vidta och finansieraåtgärder för anläggandet av allmänna platser. Det finns restriktioner genom huvudsakligen tvårekvisit; åtgärden måste vara nödvändig för genomförandet av planen och åtagandet måste vara rimligti förhållande till exploatörens nytta av planen.Syftet med denna studie har varit att utreda vem det är som betalar för vilka allmänna platser.Den situation som studerats är när kommunen är huvudman och använder sig av exploateringsavtal.Med en rättsdogmatisk metod har rättsläget för exploateringsavtal utretts. Förfarandet ska visa vemsom ska betala för vilka allmänna platser enligt lag. Utöver detta har studien använt ett samhällsvetenskapligtperspektiv i syfte att se hur tillämpandet av exploateringsavtal sker i praktiken i förhållandetill gällande rätt. För att kunna analysera resultatet på ett systematiskt sätt har fördelningssystemetjämförts med vedertagna rättviseteorier och principer.Resultatet av sammanställningen tyder på att det finns avtal som inte stämmer överens med gällandelagstiftning. En del avtal tycks gå utöver det som är stadgat i lag. Det finns avtal som åläggerexploatörer åtgärder som inte kan anses vara nödvändiga. Dessutom är det många gånger ifrågasättbartom fördelningen mellan de olika parterna är i enighet med lagen. Tvivel finns angående vilken omfattningexploatören ska vara med och finansiera för att det fortfarande ska gå att anses som nödvän diga åtgärder. Rekvisitet angående att åtagandet ska vara rimligt i förhållande till nyttan borde varauppfyllt i de undersökta avtalen. Bestämmelsen kan även ha använts för att skapa en fördelning avkostnaderna mellan olika exploatörer. I dessa fall är det svårare att bedöma om villkoret använts enligtlag.Vem som faktiskt betalar för kostnaderna i slutändan verkar bero på i vilken marknadssituationprojektet befinner sig. Ett alternativ innebär att det är bostadskonsumenterna som påverkas av deökade kostnaderna. Ett annat tänkbart alternativ innebär att när ett exploateringsprojekt påförs merkostnader påverkar detta vilket pris exploatören kan tänkas köpa marken för. Därmed blir det den ursprungligamarkägaren som huvudsakligen påverkas av de ökade kostnaderna.Om systemet är rättvist beror på vilka värderingar som anses ligga till grund för rättvisan ochdessa är subjektiva. Dock bör tillämpningen vara i enlighet med lagen för att systemet ska vara effektivt.När tillämpningen inte följer lagen finns risk för fler konfliktpunkter samt minskat förtroende ochnegativ inställning till projektet hos exploatörerna. / When urban areas are developed, it is often necessary to develop the infrastructure. The society has aneed for public places such as roads, squares, parks and playgrounds. The outset is that the municipalityis responsible for the public places. However, the resources are limited and infrastructure is costly.When the values on the land increases as a result of the public investments there is a possibility toimpose the landowners to pay for these.New rules about land development agreements were introduced in 2015 with the purpose of distributingthe costs for public places through the agreements. A general goal for the legislation of distributionsystems is to be effective and fair. There has to be a consideration of both justice and effectivenessin order to make the distribution system fulfill its purpose. Through the development agreementsthe municipality can impose the developers to pay for the public places that is necessary to carryout the plan and reasonable in comparison to the landowner’s benefit of the plan.The aim with this study is to investigate who pays for which public places. This study have examinedthe situation where the municipality has the responsibility for public places and uses land developmentagreements. An investigation of existing law has been done in order to show who is possibleto impose to pay for what. In addition has this study investigated how the usage of the land developmentagreements are used in practice. A comparison between the legislation and practice has beencarried out in order to see if the agreements are in accordance with the legislation. Furthermore, thesystem has been compared to some theories and concepts of justice.The result shows that there are agreements that does not seem to be in accordance with the legislation.Some of the public places does not seem to be necessary and it is questionable how much of themeasure can be imposed to the developer. The agreements are neither specified enough in order to bein accordance with law.Who actually pays for the public places in the end seems to depend on the market situation inwhich they are carried out. If the system is fair depends on the subjective values that lays ground forjustice. The legislation and implementation also shows faults in the system in order for it to be effective.When the municipality goes further than the law allows there is a risk for increase in conflicts andalso reduced trust and a bad attitude towards the project.
5

Kalkulácia nákladov na zákazku - ďiaľkovo ovládaný úsekový odpojovač vysokého napätia / Cost calculation of high voltage disconnector, MARTEL Slovakia s.r.o.

Šurina, Ľubomír January 2009 (has links)
In theoretical part of diploma thesis are written basic information about cost calculation, types and methods of cost calculation especially in building industry. Practical part identifies cost types in company MARTEL Slovakia and cost-distribution sheet for the most frequent company order - high voltage disconnector.
6

Godstransporter inom Landstinget i Östergötland : Behov och kostnadsfördelning / Transportation of Goods within the County Council of Östergötland : Demand and Cost Distribution

Rydén, Anders January 2005 (has links)
<p>Landstinget i Östergötland upphandlar sedan 2001 samtliga godstransporter från externa leverantörer. Detta examensarbete har som syfte att inför en kommande transportupphandling 2006 utreda behovet av godstransporter och hur kostnaderna för dessa transporter ska fördelas inom Landstinget i Östergötland. Målet var att förenkla existerande avtal och ta fram en lösning på hur förändringar av transportnätet ska kunna hanteras med minimal administrativ arbetsinsats. Lösningen skulle också innebära att landstingets kostnader kunde hållas låga.</p><p>Studien har visat att det genom att standardisera transporttider går att förenkla transportavtalen avsevärt. Transportören erbjuds också större frihet att anpassa landstingets körningar till övriga uppdrag, vilket möjliggör lägre priser. Genom att införa enhetstaxa inom huvudorterna Motala, Linköping och Norrköping och ortstaxa för övriga verksamhetsorter kan avtalsförhandlingar i möjligaste mån undvikas, eftersom det redan i avtalet är stipulerat hur förändringar ska hanteras ekonomiskt.</p><p>Landstinget i Östergötland har ett köp-och-säljsystem där varor och tjänster interndebiteras varje enhet. Huvuddelen av landstingets transporter är av sådan art att de inte kan påverkas av den betalande enheten, till exempel måste medicinska prover skickas in till centrallaboratoriet dagligen. Eftersom den styrande effekten av internpriset då uteblir kan transportkostnaden istället tas på högre nivå, vilket minskar administrationsbehovet. Därför rekommenderas Landstinget i Östergötland att föra upp kostnaden från varje enskild enhet upp på centrumnivå.</p><p>Då flera enheter från olika centrum delar på en transport bör kostnaden fördelas efter en viktningsprocent där enheter av olika typ har olika vikt. En vårdcentral har till exempel större behov av en provtransport än vad en tandvårdsklinik har av att frakta post med samma transport. Därför ska också vårdcentralen betala mer för denna transport.</p><p>Transportavtalet föreslås upphandlas i fem olika delar: lättgodstransporter i Motala, Linköping, Norrköping och Övriga Östergötland, samt förrådstransporter. Centrum för lättgodsnätet blir Universitetssjukhuset i Linköping.</p><p>Genom att genomföra de föreslagna förändringarna bör Landstinget i Östergötland kunna effektivisera sin avtalshantering, samtidigt som möjligheten för låga kostnader finns.</p> / <p>The County Council of Östergötland (CCÖ) purchases since year 2001 all transportation of goods from external suppliers. The purpose of this report is to investigate the need for transportation of goods and how to distribute the costs for the transports within the CCÖ. The underlying reason is a new procurement in year 2006. The goal was to simplify the supplier contracts and find a solution to how to handle changes in the transportation net with minimal need for administrative work. The solution should also make it possible to keep transportation costs low.</p><p>The study has shown that it through standardisation of transport time limits is possible to achieve considerable simplifications of contracts. The transport supplier is also given more time space to adjust the CCÖ transports to those of other customers. This will reduce the transportation cost and make lower prices possible. By introducing a unified fare for transports within the main cities Motala, Linköping and Norrköping and a specified fare to each other town or village where CCÖ has any activity, time consuming contract negotiations can be avoided. This can be achieved thanks to the fact that it is stipulated in the contract how to economically handle changes.</p><p>CCÖ uses a buy-and-sell system where costs for goods and services are distributed through transfer pricing to each unit. The main part of the CCÖ transports is of a kind that is not possible for each unit to have any influence on. For example the laboratory tests must be sent daily to the central laboratory. Since the cost managing effect of the transfer price then is zero the transportation cost can be moved to a higher organisational level instead, which will reduce administrative work. Therefore, the CCÖ is recommended to move transportation costs from single units to centres.</p><p>When several units from different centres share one transport a percentage share should divide the cost where different types of units will have different shares. A health centre is in more need of a test transport, than a dental clinic is of transporting mail with the same transport. Therefore the health centre should pay a bigger part of the cost than the dental clinic.</p><p>The transportation contract is suggested to be divided into five parts: supply transports as one and transport of mail, tests and parcels in Motala, Linköping, Norrköping and Other Östergötland as the other four. The transportation centre for mail, tests and parcels will be the Linköping University Hospital.</p><p>By conducting the suggested changes the CCÖ should be able to make its contract handling more effective. By doing that, there is also a possibility for low costs.</p>
7

Godstransporter inom Landstinget i Östergötland : Behov och kostnadsfördelning / Transportation of Goods within the County Council of Östergötland : Demand and Cost Distribution

Rydén, Anders January 2005 (has links)
Landstinget i Östergötland upphandlar sedan 2001 samtliga godstransporter från externa leverantörer. Detta examensarbete har som syfte att inför en kommande transportupphandling 2006 utreda behovet av godstransporter och hur kostnaderna för dessa transporter ska fördelas inom Landstinget i Östergötland. Målet var att förenkla existerande avtal och ta fram en lösning på hur förändringar av transportnätet ska kunna hanteras med minimal administrativ arbetsinsats. Lösningen skulle också innebära att landstingets kostnader kunde hållas låga. Studien har visat att det genom att standardisera transporttider går att förenkla transportavtalen avsevärt. Transportören erbjuds också större frihet att anpassa landstingets körningar till övriga uppdrag, vilket möjliggör lägre priser. Genom att införa enhetstaxa inom huvudorterna Motala, Linköping och Norrköping och ortstaxa för övriga verksamhetsorter kan avtalsförhandlingar i möjligaste mån undvikas, eftersom det redan i avtalet är stipulerat hur förändringar ska hanteras ekonomiskt. Landstinget i Östergötland har ett köp-och-säljsystem där varor och tjänster interndebiteras varje enhet. Huvuddelen av landstingets transporter är av sådan art att de inte kan påverkas av den betalande enheten, till exempel måste medicinska prover skickas in till centrallaboratoriet dagligen. Eftersom den styrande effekten av internpriset då uteblir kan transportkostnaden istället tas på högre nivå, vilket minskar administrationsbehovet. Därför rekommenderas Landstinget i Östergötland att föra upp kostnaden från varje enskild enhet upp på centrumnivå. Då flera enheter från olika centrum delar på en transport bör kostnaden fördelas efter en viktningsprocent där enheter av olika typ har olika vikt. En vårdcentral har till exempel större behov av en provtransport än vad en tandvårdsklinik har av att frakta post med samma transport. Därför ska också vårdcentralen betala mer för denna transport. Transportavtalet föreslås upphandlas i fem olika delar: lättgodstransporter i Motala, Linköping, Norrköping och Övriga Östergötland, samt förrådstransporter. Centrum för lättgodsnätet blir Universitetssjukhuset i Linköping. Genom att genomföra de föreslagna förändringarna bör Landstinget i Östergötland kunna effektivisera sin avtalshantering, samtidigt som möjligheten för låga kostnader finns. / The County Council of Östergötland (CCÖ) purchases since year 2001 all transportation of goods from external suppliers. The purpose of this report is to investigate the need for transportation of goods and how to distribute the costs for the transports within the CCÖ. The underlying reason is a new procurement in year 2006. The goal was to simplify the supplier contracts and find a solution to how to handle changes in the transportation net with minimal need for administrative work. The solution should also make it possible to keep transportation costs low. The study has shown that it through standardisation of transport time limits is possible to achieve considerable simplifications of contracts. The transport supplier is also given more time space to adjust the CCÖ transports to those of other customers. This will reduce the transportation cost and make lower prices possible. By introducing a unified fare for transports within the main cities Motala, Linköping and Norrköping and a specified fare to each other town or village where CCÖ has any activity, time consuming contract negotiations can be avoided. This can be achieved thanks to the fact that it is stipulated in the contract how to economically handle changes. CCÖ uses a buy-and-sell system where costs for goods and services are distributed through transfer pricing to each unit. The main part of the CCÖ transports is of a kind that is not possible for each unit to have any influence on. For example the laboratory tests must be sent daily to the central laboratory. Since the cost managing effect of the transfer price then is zero the transportation cost can be moved to a higher organisational level instead, which will reduce administrative work. Therefore, the CCÖ is recommended to move transportation costs from single units to centres. When several units from different centres share one transport a percentage share should divide the cost where different types of units will have different shares. A health centre is in more need of a test transport, than a dental clinic is of transporting mail with the same transport. Therefore the health centre should pay a bigger part of the cost than the dental clinic. The transportation contract is suggested to be divided into five parts: supply transports as one and transport of mail, tests and parcels in Motala, Linköping, Norrköping and Other Östergötland as the other four. The transportation centre for mail, tests and parcels will be the Linköping University Hospital. By conducting the suggested changes the CCÖ should be able to make its contract handling more effective. By doing that, there is also a possibility for low costs.

Page generated in 0.1276 seconds