• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1231
  • 781
  • Tagged with
  • 2012
  • 1976
  • 1945
  • 194
  • 171
  • 137
  • 126
  • 125
  • 121
  • 114
  • 107
  • 105
  • 101
  • 94
  • 89
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
671

Herons ångkula : Bestämning av verkningsgrad

Hermansen, Johan January 2008 (has links)
<p>Detta arbete beskriver hur Herons ångkula fungerar och hur den har byggts.</p><p>Ånkulan konstruerades för ca 2000 år av Heron.</p><p>Meningen var att få fram en verkningsgrad eftersom denna var okänd. Verkningsgraden blev aldrig konstaterad. Endast en teoretisk beräkning för verkningsgraden gjordes. Kulan sattes inte i rotation av ångtrycket som byggdes upp när det eldades under denna.</p><p>Anledningen var troligen att det var för mycket friktion i tätningen som skulle tillföra matarvatten in i kulan. Värmeöverföringen mellan gaslågan och kulkroppen var inte heller den mest optimala.</p><p>Kulan med tillhörande kringutrustning byggdes under dec-07/jan-08 efter eget tycke och utan någon existerande ritning. Den byggdes för att efterlikna originalet så mycket som möjligt. Dessutom hade en mindre ångkula byggts några år tidigare och denna hade visat sig fungera. Denna något större ångkula fick därför samma utseende.</p><p>Eftersom ångkulan inte orkade rotera råder det inga tvivel om hur ineffektiv denna tidiga reaktionsmotorn är.</p><p>Den fick ingen praktisk betydelse för 2000 år sedan, och det har den inte idag heller.</p><p>En framräknad verkningsgrad finns redovisad och denna blev mycket låg.</p><p>Det var stimulerandel att bygga Herons ångkula men konstruktionen i sig tillhör inte de mest lyckade.</p> / <p>This work describes how the Herons steam ball was built and how it works. It was constructed by Heron 2000 years ago. The purpose was to determine the efficiency of the steam ball because it was unknown. The efficiency was never determined. It was only theoretically determined by calculations. The steam pressure never gave the steam ball rotation when heat was added underneath the construction. A possible reason was that friction in the sealing for supplying feed water into the steam ball was too high.</p><p>The heat transfer was also a reason that the construction did not rotate.</p><p>The steam ball and necessary equipment was fabricated in dec-07/jan-08. It was built without any drawings. The goal was to make it look like the original as much as possible. A smaller steam ball was built some years before. This one did rotate and therefore was the same design given to the bigger one.</p><p>Because of the lack of rotation there was no doubt if the steam ball was a sucsess or not.</p><p>It was not used for any real purpose 2000 years ago and this has not changed.</p><p>A calculated figure of the efficiency was documented in this rapport, and it was very low.</p><p>It was amusing to design and build the steam ball but the construction was clearly no success.</p>
672

Specifik värmeanvändning : Metod för framtagning av den specifika värmeanvändningen för fjärrvärmeanslutna flerbostadshus via Metrias fastighetsregister

Nilsson, Christophe, Beckne, Olle January 2013 (has links)
Fjärrvärme är idag den vanligaste uppvärmningsformen för flerbostadshus i Sverige, med en täckningsgrad uppemot 90 %. Länge har fjärrvärme varit det billigaste uppvärmningsalternativet för fastigheter i tätorter, men har på senare tid fått konkurrens av bland annat billiga och effektiva värmepumpar. För att behålla sina fjärrvärmekunder ställs det krav på leverantören att jobba mer kundorienterat genom att bland annat analysera kunders värmeanvändning samt värmebehov. Ett sätt att göra detta är att få fram kundens specifika värmeanvändning uttryck i kWh/m2. Rapporten presenterar en metod för att få fram den specifika värmeanvändningen för flerbostadshus bland Öresundskrafts fjärrvärmekunder i Helsingborg och Ängelholm. Metoden utgår ifrån Metrias fastighetsregister för sammanställning av ytorna för Öresundskrafts fjärrvärmekunder. Därefter matchas ytorna för respektive fastighet med uppgifter om leverarad fjärvärmemängd från Öresundskrafts kundregister. Totalt är det 1 326 fastigheter med flerbostadshus som undersökts. Resultatet uppvisar en spridning mellan 2,8 kWh/m2 till strax över 2600 kWh/m2 med en median på 109 kWh/m2. Ungefär 85 % av fastigheterna har en specifik värmeanvändning mellan 64 kWh/m2 och 170 kWh/m2, vilket anses vara den normala spridningen. Värden på den uppvärmda ytan som räknats fram utifrån Metrias fastighetsregister har jämförts med värden som fåtts direkt från fastighetsbolag. Resultatet från jämförelsen är blandat och uppvisar i flertalet fall olika värden för samma fastighet. Dock går det inte urskilja om Metras eller fastighetsbolagets värde som är mest korrekt. Vidare har den uppvärmda ytan och mängden levererad fjärrvärme för ett antal fastigheter med extrem hög och låg specifik värmeanvändning jämförts med dess energideklarationer. I flertalet av dessa fall har orsaken till extremvärdena gått att lösa vid kontakt med ägare till byggnaderna, med hjälp av flygfoton över området kring fastigheten eller genom att urskilja byggnadens användningsområde.   Metoden är enkel, billig och kan implementeras omgående i företaget. Resultaten ger en tydlig överblick över den specifika värmeanvändningen för fjärrvärmeanslutna flerbostadshus och metoden används med fördel som första gallring för att se vilka fastigheter som behöver åtgärder. / District heating is currently the most common form of heating for apartment buildings in Sweden, with a ratio up to 90%. It has for a long time been the cheapest heating option for real estate in urban areas but has recently been challenged by cheap and efficient heat pumps. Suppliers are required to work more customer oriented to keep their heating customers, for instance by analyzing the customers heating usage. One way to do that is to get the customer's specific heat consumption expressed in kWh/m2. This report presents a method for obtaining the specific heat consumption of apartment buildings among Öresundskraft’s district heating customers in Helsingborg and Ängelholm. The method assumes Metria’s land registry to compile surfaces for Öresundskraft’s heating customers. The area for each property is matched with the delivered heat from Öresundskraft’s customer database. In total there are 1,326 properties with apartment buildings. The results show a variation between 2.8 kWh/m2 to over 2,600 kWh/m2 with a median of 109 kWh/m2. Approximately 85% of the properties have a specific heat use between 64 kWh/m2 and 170 kWh/m2, which is considered the normal distribution. The values ​​of the heated areas as calculated from Metria’s land registry are compared with values ​​obtained directly from the real-estate company. The result of the comparison is mixed and has in most cases different values ​​for the same property. However, it can’t be distinguished if Metra or the real-estate company’s value is the most accurate. The heated surface and the quantity delivered heating for a number of properties with extreme high and low specific heat consumption are compared with its energy return. In most of these cases the cause of the extreme values ​​has been resolved through contact with the owners of the buildings, with the help of aerial photographs or by identifying the building's usage. The method is inexpensive, easy to use and can be used instantly to companies. The results provides a clear overview of the specific heat consumption for district heating connected apartment buildings and the method is ideal as a first screening to see which properties needs improvements.
673

Fjärrvärmesystem

Holmström, Susanne January 2008 (has links)
This is a report written for an examination project C-level, on the subject of energy. The examination project is a product of the FVB Sweden AB (district heating bureau). It started with a meeting with Stefan Jonsson FVB Sweden AB, were he explained the content of the project, and from this a presentation of the problem was made. The problem that needed to be solved was how they could control the valves in the system to provide heating to everyone in the system. The valves are often oversized so the pump in the heating plant would have to be enormous to be able to provide enough flow to be sufficient, if everyone in the system had there valves fully opened.   I came up with two solutions to the problem, one was a wireless network that could keep track of the valves and the other solution was an extra sensor that was placed on the radiator. The purpose for that was to open the valve if the temperature dropped more than one degree inside. With the help of a program called IDA it was calculated that, if the temperature drop five degrees, they would have sixteen hours at the heating power plant to open the flow before the sensor open the valves.   After careful consideration I came up with the conclusion that the wireless network must be the best solution. Mostly because you can monitor all the clients in the system from the heating power plant and that will make it easier to discover faults and temperature differences. Wireless networks is already a well tested solution in form of wireless controlled electricity meters so it shouldn’t be to much of a problem connecting these sensors to it either.
674

District heating to replace an electrical installation

Serra Ramon, Lourdes, Montañes Asenjo, Alba January 2009 (has links)
This project has been developed at the company Gavlegardarna. The companyowns a large part of the buildings of Gävle and two of them are the objective ofthe project. Gavlegardana is highly concerned about the environment; for thisreason, they cooperate on the subject with the energy management from theirtechnical department. Gävle is one of the Swedish cities where the DH (district heating) network isdistributed, arriving to most of the dwellings, industries and commercialbuildings. As DH uses environmentally friendly sources of energy,Gavlegardana is introducing it in its buildings. Electrical radiators and boilers were installed in the buildings when the price ofelectricity was more affordable than nowadays. The price of the electricity canbe considered 1,23 SEK/kWh while the DH price is 0,45 SEK/kWh. Consequently, this is another reason why the objective of the company at thepresent time is to replace electrical space heating systems by means of districtheating. The energy balance of the buildings is analysed in order to study their currentenergy situation. This entails the consideration of heat gains and lossesinvolved. The heat gains of the building are the heat from solar radiation whicharrives at the building trough the windows, the heat internally generated (bypersons, lighting and other devices) and the heat supplied. The heat losses are composed by the transmission trough walls and windows, the infiltrations, the heat used for hot tap water and the ventilation losses. An important part of the work required to calculate the energy balance hasconsisted of the collection and organization of all the data (areas, types ofmaterial, electrical devices, lighting, number of employees, opening hours...).This data comes from the drawings of the buildings provided by the companyand from the information gathered during the visits to the installation. In addition, the ventilation flows were measured in-situ using the tools provided by Theorells. Gavle Energi, the DH distributor company, has been contacted in order to fixthe cost and other details related to the district heating connection. The heatexchanger models, selected from Palmat System AB, are TP20 for Building Aand TP10 for Building B. TP20 provides 100 kW of heating and 0,4 l/s of hot tap water and TP10 provides 50 kW and 0,31 l/s respectively. The capital cost is 187500 SEK which includes the heat exchangers and the connection cost. As the secondary circuit is not currently installed because the existing system iscomposed by electrical radiators, the installation of the piping network in thebuilding has been designed. The radiators’ power is calculated taking intoaccount the need of heat in each room which is estimated as the transmissionlosses. This need of heat calculated is higher than the energy currently supplied which means that the thermal comfort is not achieved in all the rooms of the buildings. In spite of using more energy for space heating, the change of heat sourceentails a lower energy cost per year. The selected radiators are from Epeconand the investment cost (including the installation) is 203671 SEK. The brand of the selected pipes is Broson and the investment cost of the total piping system is 66000 SEK. The initial investment of the new installation is 457171 SEK, considering the DHconnection, heat exchangers, radiators and pipes. If the initial investment istotally paid in cash by the company the payback will be fulfilled in 6 years. Incase of borrowing the money from the bank (considering an interest rate of 5%), two possibilities can be considered: paying back the money in annual rates over 15 years or 30 years of maturity. The paybacks are 11 and 8 years respectively. After designing the DH piping system in the buildings, estimating the total costs of the investment and studying the project’s feasibility by suggesting different payment options, some possible energy savings are recommended.   The first of the options refers to the transmission losses trough the windowswhose values’ are considerably high. Using a glass with a lower U-value, theselosses can decrease until 66% (with triple glass windows). Consequently, thepower required for space heating can also be reduced until 26%. Regarding the ventilation, rotating heat exchangers are currently used, whichentails the problem of smells mixture detected by the users of the buildings. By changing them with flat-plate heat exchangers, the problem is solved and the efficiency is increased from 66% to 85%. The new heat exchanger cost is340387 SEK and it has a payback of 10 years.
675

Herons ångkula : Bestämning av verkningsgrad

Hermansen, Johan January 2008 (has links)
Detta arbete beskriver hur Herons ångkula fungerar och hur den har byggts. Ånkulan konstruerades för ca 2000 år av Heron. Meningen var att få fram en verkningsgrad eftersom denna var okänd. Verkningsgraden blev aldrig konstaterad. Endast en teoretisk beräkning för verkningsgraden gjordes. Kulan sattes inte i rotation av ångtrycket som byggdes upp när det eldades under denna. Anledningen var troligen att det var för mycket friktion i tätningen som skulle tillföra matarvatten in i kulan. Värmeöverföringen mellan gaslågan och kulkroppen var inte heller den mest optimala. Kulan med tillhörande kringutrustning byggdes under dec-07/jan-08 efter eget tycke och utan någon existerande ritning. Den byggdes för att efterlikna originalet så mycket som möjligt. Dessutom hade en mindre ångkula byggts några år tidigare och denna hade visat sig fungera. Denna något större ångkula fick därför samma utseende. Eftersom ångkulan inte orkade rotera råder det inga tvivel om hur ineffektiv denna tidiga reaktionsmotorn är. Den fick ingen praktisk betydelse för 2000 år sedan, och det har den inte idag heller. En framräknad verkningsgrad finns redovisad och denna blev mycket låg. Det var stimulerandel att bygga Herons ångkula men konstruktionen i sig tillhör inte de mest lyckade. / This work describes how the Herons steam ball was built and how it works. It was constructed by Heron 2000 years ago. The purpose was to determine the efficiency of the steam ball because it was unknown. The efficiency was never determined. It was only theoretically determined by calculations. The steam pressure never gave the steam ball rotation when heat was added underneath the construction. A possible reason was that friction in the sealing for supplying feed water into the steam ball was too high. The heat transfer was also a reason that the construction did not rotate. The steam ball and necessary equipment was fabricated in dec-07/jan-08. It was built without any drawings. The goal was to make it look like the original as much as possible. A smaller steam ball was built some years before. This one did rotate and therefore was the same design given to the bigger one. Because of the lack of rotation there was no doubt if the steam ball was a sucsess or not. It was not used for any real purpose 2000 years ago and this has not changed. A calculated figure of the efficiency was documented in this rapport, and it was very low. It was amusing to design and build the steam ball but the construction was clearly no success.
676

Improving of the heat transfer from a moulding block in an industrial oven

Rafart, Jordi January 2008 (has links)
This thesis presents a study of the cooling process of a solid block performed by a turbulent air flow channel. The study focuses on the turbulent flow and its influence in the heat transfer of the block. The first part of the thesis is an analysis of the different turbulent model and their adaptation on the necessities of this study. Once the turbulent model has been confirmed it makes a study of the behavior of the cooling process by CFD (Computational Fluid Dynamics), and an analysis of the numerical accuracy of this computational study. When the procedure of the study of the cooling process is defined it proposes some different variations in the initial solution to improve this process. The study concentrates in variations of the turbulence and the geometry of the studied block. Finally, the different improving are discussed analyzing parameters as the heat transfer, pressure drop, time consuming or energy consuming.
677

Utredning av en möjlig fjärrvärmeinstallation på Norrmejerier i Umeå / Investigation of a possible district heating installation on Norrmejerier in Umeå

Hurtig, Måns January 2014 (has links)
Denna rapport beskriver arbetet med att sammanställa ångförbrukande processer på Norrmejeriers Mejeri i Umeå som skulle kunna konverteras till fjärrvärmedrift. En del arbete har också lagts ner på att hitta förbättringsförslag på mejeriets ångsystem och beräkna nödvändig maxeffekt på en ny biobränsleeldad panna som är planerad att driftsättas före slutet på 2017. Processdata, som till stor del uppmätts av Sweco Systems för en energikartläggning av mejeriet, har använts till att undersöka 23 olika processer med en årlig energianvändning på ca 22 000 MWh. 11 av dessa processer har så låga temperaturkrav att fjärrvärme skulle kunna driva dessa året om, de anses därför vara mer lämpade för fjärrvärmedrift än de övriga. Dessa 11 processer har ett sammanlagt årligt energibehov på ca 15 000 MWh och hit hör bland annat uppvärmning av vatten till processer och tapp, värme till mejeriets ventilationssystem och förvärmning av nytt pannvatten. Resterande processer anses olämpliga att driva med fjärrvärme då kostnaden för att göra detta troligen blir högre än i dagsläget och en del av dessa processer enbart kan drivas med fjärrvärme en begränsad del av året. Till dessa processer hör värmning av mjölk och grädde vid några av mejeriets pastörer och återuppvärmning av diskvatten. I arbetet presenteras 3 olika förslag på hur fjärrvärmen kan kopplas in till undersökta processer. De två första förslagen ger framtida visioner om hur alla 23 undersöka processer kan konverteras till fjärrvärme. Det tredje förslaget visar däremot hur en fjärrvärmeanslutning kan se ut inom en snar framtid och i detta förslag ansluts endast de 11 mest lämpade processerna till fjärrvärmen. Det tredje förslaget användes till att göra en ekonomisk jämförelse mellan att värma processerna med ånga eller fjärrvärme. Det enda som jämfördes i beräkningarna var kostnaden för uppvärmning av processerna och ingen hänsyn togs till installationskostnader av fjärrvärmen eller den nya pannan. Beräkningarna visade att störst ekonomisk vinst kunde göras genom att använda sig av fjärrvärme för basbehovet och sedan toppa på detta med ånga när värmeförbrukningen var hög. Med ångproduktion i de befintliga pannorna skulle Norrmejerier kunna spara 1,8 miljoner kr/år med denna lösning. När den nya biobränslepannan installeras så sjunker däremot den möjliga besparingen till någonstans mellan 420 000- 860 000 kr/år. Förutom de besparingar som skulle kunna göras med en fjärrvärmeinstallation har flera förlustfaktorer identifierats i gångsystemet. Bland annat förloras ca 9 000 MWh årligen som flashånga eller genom att kondensat inte återförs till pannorna. Förbättringsförslag för att minska förlorade energimängder och effektivisera andra processer tas därför upp. Med nuvarande kostnadsbild på fjärrvärmen anses investeringskostnaden för denna inte väga upp den möjliga årliga besparingen efter att biobränslepannan konstruerats. Fjärrvärmen ses däremot som ett bättre miljömässigt alternativ och genom att installera fjärrvärme skulle maxeffekten på den nya biobränslepannan kunna minskas. Hur maxeffekten på den nya pannan bör dimensioneras vid en möjlig fjärrvärmeinkoppling och vid olika effektiviseringsförslag diskuteras därför också. / This report describes the work of compiling steam consuming processes that could be converted to district heating in the dairy plant Norrmejerier in Umeå. Some work has also been put into finding possible improvement for the dairy's steam system and calculating the necessary maximum output of a new biofuel boiler that is to be built before the end of 2017.   Process data, which has been gathered by Sweco systems for an energy audit of the dairy, has been used to further investigate 23 different processes with an annual energy consumption of approximately 22 000 MWh. 11 of these processes have such low temperature requirements that district heating could be utilized to power them throughout the whole year. These 11 processes are those considered most suitable for a district heating installation and they have an annual energy consumption of about 15 000 MWh. The processes include heat to process- and tap-water, preheating new boiler water and heat to the dairy’s ventilation. The remaining processes are considered less suitable for a district heating installation since the cost of using district heating to power these probably would be more expensive than using self-produced steam. Some of these processes also have such high temperatures that district heating only could power them for a short period of the year. These processes include heating of milk and cream at some of the dairy's pasteurs and reheating dish water in the dairy’s dish system. Three different proposals for connecting the dairy to the district heating network have been suggested. Two of these proposals provide a futuristic vision for how Norrmejerier could connect district heating in the future to access all 23 investigated processes. The last proposal shows how a district heating installation could be utilized in the near future and in this suggestion only the 11 most suitable processes are connected.   The basic data from the last connection suggestion was used to make a financial comparison between district heating and self-generated steam for heating. The only thing compared in the calculations are the energy costs for heating and no consideration was taken to the installation costs of district heating or the new boiler. The calculations showed that the largest economical gain could be achieved by using district heating for the base load and then adding self-produced steam for peak loads. With steam productions in the current boilers Norrmejerier could save 1.8 million SEK annually with this solution. However, with the installation of a new biofuel boiler the possible savings drops to somewhere between 420 000 to 860 000 SEK/year. In addition to the savings that could be made with a district heating installation, several loss factors have been identified in the steam system. Among other things, about 9,000 MWh are annually lost as flash steam or condensate that disappears from the system. Suggestions to reduce losses in the system and improving energy use in different processes are therefore presented.   The possible savings that can be achived by installing district heating are not considered to be worth the big investment cost once the new steam boiler is installed. District heating is however seen as a better environmental option and by installing district heating the new boiler would be able to be constructed with a smaller maximum output, which would lower the installation costs. How suggested improvements to the steam system and a possible district heating installation would affect the new boiler is therefor also discussed.
678

Förutsättningar för absorptionskyla : Examensarbete på Öresundskraft

Fältström, Mattias, Ferdinandsson, Mikael January 2014 (has links)
Efterfrågan av kyla ökar i Sverige trots det kalla klimatet vilket då medför att behovet av fjärrkyla kan öka. Fjärrkyla är en centraliserad kylproduktion med fördelar som säkrare drift, minskade haverier samt att buller avlägsnas i jämförelse med lokala kylanläggningar. Således är absorptionskyla ett alternativ till fjärrkyla som börjar bli mer och mer intressant för fjärrvärmeintegrering. Syftet med rapporten är att ge företaget Öresundskraft ett underlag över de tekniska och ekonomiska förutsättningarna för absorptionskyla i Helsingborg. Problemställningarna har varit att undersöka: temperaturen på fjärrvärmen som ska användas till absorptionsanläggningen, hur absorptionsmaskinens kylfaktor påverkar förutsättningarna, hur absorptionsanläggningen ska dimensioneras, utreda olika placeringsalternativ för absorptionsanläggningen, om den befintliga ackumulatortanken kan användas i framtiden och om det är lönsamt att investera i en absorptionsanläggning. Problemställningarna besvarades genom intervjuer, sammanställning och beräkning av data, granskning av forskningslitteratur samt annan litteratur. Slutsatser som författarna har kommit fram till är att absorptionsmaskinen ska dimensioneras till 2,2 MW och att den ska placeras på Västhamnsverket. Under de förutsättningar att det fanns tillgång till billig värme samt att driften endast sker på sommaren fick resultatet ett utfall som gav lönsamhet i en absorptionsanläggning. / The cooling demand increases in Sweden despite the cold climate, which could cause the increase of district cooling. District cooling is a centralized cooling system with multiple benefits such as safer operations, reduced failures and removal of rumbling that will otherwise occur in local cooling systems. That’s why the absorption chiller is becoming more and more interesting to incorporate indistrict heating.The purpose of this report is to give the company Öresundskraft the technical and economic conditions for absorption cooling in Helsingborg. The main goal with the report have been to investigate: which temperature from the district heating system will be used for the absorptions chiller, how the coefficient of performance affects the conditions of absorption chiller, different dimensions for absorption chiller, different placement options for absorption chiller, if the existing cool water storage tank can be used in the future, is it profitable to invest in an absorption plant. The main goal questions have been answered through interviews, compilation and calculation of data, examination of research literature and other literature. Conclusions the authors were able to find is that the absorption chiller should be sized to 2,2 MW and it should be placed on Västhamnsverket. Under the conditions that there was access to cheap heat and only operating during the summer the result to invest in an absorption plant was profitable.
679

Minskad användning av verksamhetsel i sjukhusmiljöer : Mänskliga och tekniska faktorer på Sahlgrenska Universitetssjukhuset / Reduced use of tenant electricity in hospital environments

Hilmersson, Alvin January 2018 (has links)
This thesis aimed to find how to affect and reduce the tenant electricity use in Sahlgrenska University Hospital (SU) through behavioural and technical factors. It also aimed to, in detail, chart and categorize the equipment that constitutes the tenant electricity and how large their contribution is to the total electricity usage. The research was delimitated to two separate departments within SU. To meet the goal of the thesis, a literature study on relevant fields of behavioural change science was carried out together with qualitative interviews with hospital staff. In addition to this, electricity use in both office and medical equipment was measured. The resulting analysis showed that lighting is by far the category of equipment that uses most electricity, about 50 % of the examined departments total use. The second largest category was office equipment, such as computers and computer monitors, followed by medical equipment. The analysis concluded that through use of feedback, nudging and transformational leadership it should be possible to change the staffs behavioural pattern. Although, it is probably more efficient to use technical solutions such as automated lighting and energy saving modes on computers to reduce electricity use. In addition to the analysis, or as a result thereof, this thesis resulted in a list of recommendations for the hospital, both for implementing a behavioural change programme and technical solutions aimed at reducing electricity use.
680

Planeringsnivåer och Störutrymme : En studie i övertonshalt och kravställning på lågspänningsnätet / PLANNING LEVELS AND SPACE FOR DISTURBANCES : A study in harmonic distortion levels and making demands on the low voltage grid

Mattias, Jonsson January 2018 (has links)
Elektricitet blir allt vanligare i hemmet och idag är stora delar av samhället beroende av en avbrottsfri elförsörjning. När transistorn gjorde sitt intåg runt 1950-1960-talet skedde en förändring i de elektriska lasterna på nätet; från att vara mestadels linjära resisistiva laster tillkom flera olinjära laster i form av till exempel radio och TV.Med dessa olinjära laster uppstod problem med elkvaliteten som tidigare inte funnits i större utsträckning. Umeå kommun har de senaste åren satsat på helelektriska bussar som en del av en lösning på de problem man haft med buller och dålig luftkvalitet i centrala Umeå. För att driva dessa elbussar används snabbladdare, vilket är en kraftigt olinjär last. I en tidigare studie påvisades att under tider när laddning skedde hos dessa snabbladdare kunde det förekomma höga övertonshalter, där elkvalitetsnormen EIFS 2013:1 emellanåt överskreds. Syftet med det här arbetet är att utröna vilka krav Umeå Energi bör ställa vid nya bussladdare och vilka krav som borde ställts vid de första bussladdarna, gällande elkvalitetsstörningar. Målet är att föreslå planeringsnivåer som Umeå Energi kan använda för att ställa krav och fördela störutrymme för kunder. Det finns flera olika modeller för att fördela störutrymme där målet är att föreslå en som passar Umeå Energis nät. Endast planeringsnivåer för övertoner föreslås då övertoner visade störst problematik i den tidigare studien. För att bestämma planeringsnivåer gjordes trendanalyser på övertonsdata från fyra nätstationer och fem transformatorer under fyra års tid. Trendlinjer plottades upp med minsta kvadratmetoden och planeringsnivåer bestämdes utifrån hur mycket övertonshalten hade ökat relativt elkvalitetsnormen EIFS 2013:1. De planeringsnivåer som föreslogs ligger mellan 85 % till 100 % av de krav som EIFS 2013:1 ställer. Metod för fördelning av störutrymme föreslås följa metoden i ”Fördelning av störutrymme” som publicerades i en energiforskrapport. Slutsatser från det här projektet är att det är svårt att bestämma generella planeringsnivåer på lågspänningsnätet och det saknas metoder som beskriver hur det ska göras. Vidare har det visat sig att de flesta övertoner, upp till 25:e övertonen,ökar på Umeå Energis elnät, på de punkter som undersökts. Framförallt uppvisar den 7:e övertonen en större ökning än de andra.

Page generated in 1.2142 seconds