• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 59
  • 20
  • 14
  • 5
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 114
  • 114
  • 47
  • 31
  • 27
  • 17
  • 17
  • 13
  • 13
  • 12
  • 11
  • 11
  • 11
  • 10
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Continuous Delivery : Utmaningar ett förvaltningsuppdrag kan stå inför vid en övergång till Continuous Delivery / Challenges a maintenance management project may face during a transition to Continuous delivery

Lööf, Erika, Mack, Colin January 2016 (has links)
Continuous delivery (CD) is a software engineering approach where the focus lays on creating a short delivery cycle by automating parts of the deployment pipeline which includes build, deploy-, test and release process. CD is based on that during development should be possible to always automatically generate a release based on the source code in its current state. One of CD's many advantages is that through continuous releases it allows you to get a quick feedback loop leading to faster and more efficient implementation of new functions, at the same time fixing errors. Although CD has many advantages, there are also several challenges a maintenance management project must manage in the transition to CD. These challenges may differ depending on the maturity level for a maintenance management project and what strengths and weaknesses the project has. Our research question was: "What challenges can a maintenance management project face in transition to Continuous delivery?" The purpose of this study is to describe Continuous delivery and the challenges a maintenance management project may face during a transition to Continuous delivery. A descriptive case study has been carried out with the data collection methods of interviews and documents. A situation analysis was created based on the collected data in a shape of a process model that represent the maintenance management projects release process. The processmodel was used as the basis of SWOT analysis and analysis by Rehn et al's Maturity Model. From these analyzes we found challenges of a maintenance management project may face in the transition to CD. The challenges are about customers and the management's attitude towards a transition to CD. But the biggest challenge is about automation of the deployment pipeline steps. / Continuous Delivery (CD) är en metod inom systemutveckling där fokus ligger på att skapa en kort leveranscykel genom att automatisera delar av deployment pipeline vilket innehåller bygg-, deploy-, test- och releaseprocessen. CD bygger på att det alltid under pågående utveckling skall vara möjligt att automatiskt generera en release utifrån källkoden i dess aktuella tillstånd. En av CD’s många fördelar är att man genom kontinuerliga releaser får en snabb feedbackloop vilket leder till snabbare och effektivare införande av nya funktioner, samtidigt som man åtgärdar fel. Även om CD har många fördelar finns det också flera utmaningar ett förvaltningsuppdrag måste hantera vid en övergång till CD. Dessa utmaningar kan skilja sig beroende på vilken mognadsnivå ett förvaltningsuppdrag befinner sig i och vilka styrkor och svagheter uppdraget har. Vår frågeställning har varit: "Vilka utmaningar kan ett förvaltningsuppdrag stå inför vid en övergång till Continuous Delivery?" Syftet med denna studie är att få en ökad förståelse för Continuous Delivery samt vilka utmaningar förvaltningsuppdrag kan stå inför vid en övergång till Continuous Delivery. En beskrivande fallstudie har genomförts med datainsamlingsmetoderna intervjuer och dokument. Av insamlad data skapades en nulägesanalys i form av en processmodell över förvaltningsuppdragens releaseprocess. Den har använts som grund för en SWOT- analys och en analys med hjälp Rehn mfl’s Maturity model. I från dessa analyser kom vi fram till utmaningar ett förvaltningsuppdrag kan stå inför vid en övergång till CD. Utmaningarna handlar dels om kunder och ledningens inställningar inför en övergång till CD. Men den största utmaningen gäller automatisering av delarna i deployment pipeline.
42

Nástroje pro projektové řízení v kontextu projektového prostředí organizace. / Software for project management in conditions of organization's project management

Baránek, Aleš January 2009 (has links)
Final thesis deals with functions and usage of software for project management in the specific conditions of project management background of organization. Introduction into project management software presents it's characteristics, usage and roles when providing support of project management activities and procedures. Models of organization's project management are defined by investigation of usage of software for project management in the specific conditions of organization. Based on detailed analysis of software functions we define functional spectra, which specify importance of functional areas of software for every model of organization's project management. Such concept of functinal spectra can be used when evaluating suitability of using existing software for project management in terms and conditions of concrete organization. Last chapter of the thesis gives example of usage of functional spectra concept for selection of the software which fits the best to the project management background of the company.
43

Vyuţití Microsoft Project Serveru 2010 pro účely výuky řízení portfolia projektů / Microsoft Project Server 2010 usage for education of portfolio management

Lojka, Tomáš January 2010 (has links)
The main theme of this diploma thesis is the implementation of Microsoft Project Server 2010 into practice. In the first part there is described a dilemma of project management and its role in domain of management by projects. Analysis of current situation in the field of taught portfolio management courses is also part of this section. This analysis is focused on czech universities environment and courses in private training centres. The most important part is the second part of this dissertation, which is focused on description of the Microsfot Project Server 2010 implementation. The general benefit from this description is the cumulative overview step by step from basic installation to local clients software configuration. From the functional side this thesis gives implemented SharePoint Server 2010 and Project Server 2010, which are going to be used as one of the cornerstone of new course in The University of Economics in Prag.
44

Analýza migrace zákazníků internetového připojení WiFi na xDSL / The Project of Migration of Customers from WiFi to Wired Connection

Wildová, Veronika January 2014 (has links)
Diploma thesis in theoretical part briefly describes the technology of wireless internet connection (WiFi) and wired connection ADSL/VDSL. The thesis analyzes the impact of changes in technology and customer satisfaction and on two scenarios predicts response of the entire segment. It describes the elements of the project management and suggests the optimal way of management and communication with customer. At the end of the practical part they are estimated network costs of change itself.
45

Optimalizace projektového managementu pomocí IT technologií / Optimization of Project Management using IT Technologies

Kořínek, Tomislav January 2014 (has links)
The goal of the dissertation is to find an effective form of optimization of the progress developer projects using IT technology in the point of view of a project manager. The theoretical part of the dissertation is dedicated to the project management's theory and clarification all used terms. After the theoretical part follows the description of progress of a standard developer project of building a department store. The fourth part is dedicated to the freely available software for a project management in perspective of applicability for a project control, a documentation process and sharing comments to be used inside a company in relation to the other external companies. Then follows a description of the concrete developer project in help of the management theory contained in the second part including activities definition, their logical sequence and competence math. Within the seventh part the first is identified a critical path in using CPM method (Critical Path Method) and then there are described the critical parts of the project and a description of solving the optimization of the project management, which provides a selected software product. At the end of the seventh part is appraised how successfully the critical parts of the project were optimized and increased the efficiency of the work of the project team.
46

Analýza a hodnocení úspěšnosti projektů a zralosti projektového managementu ve společnosti nkt cables Vrchlabí, k.s., člen skupiny NKT / Analysis and evaluation of the success of projects and project management maturity at nkt cables Vrchlabi, a member of the NKT Group

Hriech, David January 2012 (has links)
This thesis analyzes the project management and its maturity at the company nkt cables Vrchlabi k.s., člen skupiny NKT, which is focused on the production of cables and wires. The thesis is divided into theoretical and analytical parts. The first part describes the theoretical approaches to project management, the second part analyzes the process of current condition in the company. In the following part are listed recommendations for the company based on the analysis, and summary of the results and conclusions of this thesis.
47

Řízení projektového týmu v mezinárodní společnosti / Management of project team in international company

Šenková, Jana January 2013 (has links)
The aim of the thesis is application of project management theoretical knowledge for human resources in international automotive company. The thesis deals with project management in general and characterizes the most usable techniques. Afterwards it describes principles of human resources management in projects and its practical application in preselected company.
48

Aplikace nových trendů řízení projektů na konkrétním IT projektu / The Application of new project management trends within a specific IT project

Paduch, Jiří January 2014 (has links)
The Information technologies are becoming a key element in achieving an advantage above your competitors. Therefore, it is as important coming up with new and original ideas as well as having the ability to enforce those ideas by current management. The chances of enforcing new ideas are higher if you manage to implement the changes within set up forecast. The lack of flexibility and a low percentage of successful projects within these limits were the main motivation for composing this Master Thesis. There is an introduction to the agile project management in the first part of this paper and a specific implementation example of this method in the second part.
49

Návrh a realizace projektu pro neziskovou organizaci / Proposal and Implementation of the Project of Non-Profit Organization

Kopřiva, Josef January 2017 (has links)
The diploma thesis focuses on optimization of the current project management in the non-profit organization. It assesses compliance with the seven principles of project management according to the PRINCE2 methodology. The overall objective of the thesis is to implement project management tools in the non-profit company.
50

Návrh virtualizace ve společnosti / Virtualisation Design in Corporate

Mareček, Ján January 2017 (has links)
The purpose of my master's thesis is to make a proposal for optimalization of desktop infrastructure using virtualization. The master's thesis is divided into three main parts. First one is engaged in theoretical ground about virtualization. Second part is dedicated to analysis of current state of desktop infrastructure in company and the third contains proposal to modernization of existing infrastructure including project management

Page generated in 0.11 seconds