• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Implementering av mjukvarubaserat PLC-system för reglering av magnetiseringen av en synkrongenerator

Björkelund de Faire, Elias January 2011 (has links)
In order to reduce the price for, and improve the performance of automatic control systems for magnetization of synchronus generators, the possibilities of using a PC based software PLC system, Programmable Logic Controller, has been investigated. The result is a system based on the CoDeSys software PLC with runtime environment from 3S-Software, communicating with external units via Modbus fieldbus. System price is reduced from €5000 to €2000 and system processing speed is reduced from 10 ms for a Siemens S7 PLC to 4 ms with the CoDeSys PLC system though unsolved problems with runtime seizure caused by improper settings in the PC BIOS.
2

Riktlinjer för Pensionering av IT - System

Marcus, Elwin, Emil, Lehti January 2016 (has links)
Retirement of old IT - systems to newer ones has become more up-to-date, due to increases in performance in hardware and new programming languages. Nevertheless for companies it is not uncomplicated how this retirement process is best handled, and there are not many studies covering this phenomenon. In this thesis the goal is to find general guidelines regarding retirement of IT - systems. This is done by doing a case study on retirement for the old (MAPPER/BIS) platform to a more modern C# system which is currently used at Handelsbanken, one of Sweden’s largest banks. With the help of a qualitative research method, literature study and with interviews at Handelsbanken and external parts, we aim to understand and analyze what’s important in a retirement process. In order to create recommendations for our guidelines by also using some parts from the EM3: Software Retirement Process Model. The result of the thesis report is in total 16 guidelines that are presented as tables in the study, which companies can use in their retirement process. Ten guidelines are concerned with the retirement of the platform and six guidelines regarding conversion rules. Nonetheless the study has shown that not all systems on the MAPPER platform were possible to retire. / Pensionering av IT-system har idag blivit en mer aktuell fråga än någonsin, till följd av att system blir gamla och inte är anpassade till dagens hårdvara eller moderna programmeringsspråk. Det är inte okomplicerat hur en sådan pensionering ska ske, speciellt då det inte gjorts så många studier kring det ämnet. I denna uppsats är målet att ta fram riktlinjer gällande pensionering, detta gjordes genom att utföra en fallstudie. Fallstudien gjordes på uppdrag av Handelsbanken, en av de största bankerna i Sverige, kring pensionering av (MAPPER/BIS) plattformen till en annan mer moderna plattform i C#. Med hjälp av en kvalitativ forskningsmetod, litteraturstudie samt intervjuer med personal på Handelsbanken och externa parter, ämnar vi att förstå och analysera vad som är viktigt vid en pensioneringsprocess. För att kunna skapa rekommendationer till de riktlinjer kring pensionering som detta arbete presenterar. Vissa utvalda delar av EM3: Software Retirement Process Model kommer också att ligga till grund för riktlinjerna. Uppsatsrapporten har resulterat i totalt 16 riktlinjerna som presenteras i tabeller som företag kan använda i sina pensioneringsprocesser. Tio stycken riktlinjer grundar sig i pensioneringen av en plattform och ytligare sex stycken gäller konvertering. Studien visade dock att alla system på MAPPER plattformen inte var möjliga att pensionera.
3

The Rational Unified Process : A study on risk awareness / The Rational Unified Process : En studie om riskmedvetenhet

Eklund, Sophie, Gunnarsson, Daniel January 2002 (has links)
Introduction to problem: Many software development projects today have a tendency to fail on some level. Even though they may not fail entirely, they might be completed with schedule delays, budget overrun or with poor quality that do not meet the customer?s requirements. When a project fails in some way, it is because one or many project risks have occurred. Our own opinion in this matter is that if the project team members are more aware of the project?s risks, it might increase the probability of project success. Therefore, we wanted to explore the area of risk awareness. We contacted Volvo Information Technology AB and through discussions we decided to investigate risk awareness when using one of their software project methods. That method was the Rational Unified Process. This report has not been conducted because Volvo IT considers this to be a problem that they wanted to investigate. Instead, we wanted to investigate this since we find the area of risk awareness among project team members interesting and we were able to do this with help from Volvo IT. Even though we mention the term ?project success? in this report, we will not investigate this in the report. Hypothesis: ?By using the Rational Unified Process, a higher awareness of the risks can be achieved by all team members of the project? Aim: The aim of this report is to investigate if risk awareness among project team members increases when software development projects make use of the Rational Unified Process. Method: We have used a web-based questionnaire to gather information. Four projects at Volvo Information Technology AB were contacted and asked to participate in the questionnaire. Two of these were using RUP and two did not use RUP. Personal e-mails were later sent out to each of the project managers with a description of the aim of our research and the way it would be carried out. The participants had a total of seven workdays to fill out the questionnaire. After seven days the site of the questionnaire were closed down. Conclusion: The differences in answers to certain questions have been rather significant between the two project methods. On the whole though, the answers have been positive for both project methods from a risk awareness point of view. Therefore, it seems to us that risk awareness is not dependent on the project method that is being used. We feel that we have not received enough convincing proof that members of RUP projects possess a higher awareness of project risks than non-RUP project members. Therefore we are of the opinion that we cannot verify our hypothesis. / Introduktion till problem: Många av dagens mjukvaru-projekt har en tendens till att misslyckas på ett eller annat sätt. Även om de inte misslyckas helt, kan det hända att de slutförs med förseningar, stora kostnader utanför budgetens ramar eller med otillräcklig kvalitet som inte motsvarar kundernas krav. Anledningen till att ett projekt misslyckas på något sätt är att en eller flera projekt-risker har inträffat. Vår åsikt i detta ämne är att om projekt-medlemmarna har högre medvetenhet om sitt projekts risker kan detta leda till en ökad sannolikhet att projektet "lyckas". Vi ville därför undersöka området risk-medvetenhet närmare. Vi kontaktade Volvo Information Technology AB och genom diskussioner bestämde vi oss för att undersöka risk-medvetenhet vid användandet av en av deras mjukvaru-projekts metoder. Denna metod var The Rational Unified Process. Denna rapport har inte genomförts på grund av att Volvo IT anser detta vara ett problem som de ville ha undersökt. Istället ville vi själva undersöka detta eftersom vi tycker att risk-medvetenhet bland projektets medlemmar är ett intressant område som borde undersökas. Vi kunde genomföra detta tack vare hjälp från Volvo IT. Även om vi nämner begreppet "lyckade projekt" i rapporten, kommer vi i rapporten inte att undersöka detta. Hypotes: "Genom att använda sig av the Rational Unified Process, kan man uppnå en högre risk-medvetenhet bland projektets samtliga medlemmar" Syfte: Syftet med denna rapport är att undersöka om risk-medvetenheten bland projektets medlemmar ökar när mjukvaru-projekt använder sig av the Rational Unified Process. Metod: Vi har använt en web-baserad enkät för att samla information. Vi kontaktade fyra projekt på Volvo Information Technology AB och frågade om de ville medverka i vår enkät. Två av dessa projekt använde the Rational Unified Process och två gjorde det inte. Personliga e-mail skickades senare ut till varje projektledare med förklaring till syftet med undersökningen samt sättet den skulle genomföras på. Deltagarna hade totalt sju arbetsdagar att fylla i enkäten. Efter dessa sju dagar stängdes sidan med undersökningen. Slutsats: Skillnaden i svar på vissa av frågorna var ganska markanta mellan de två projekt metoderna. Dock, från ett risk-medvetenhets perspektiv, var svaren på det hela taget positiva för båda projekt metoderna. Därför verkar det som att risk-medvetenhet inte är beroende av vilken projekt-metod som används. Vi anser oss inte ha tillräckliga belägg för att medlemmar av projekt som använder the Rational Unified Process besitter en högre risk-medvetenhet än projekt som inte använder sig av denna metod. Vi anser därför att vi inte kan verifiera vår hypotes. / Sophie Eklund 0739-078698 Daniel Gunnarsson 0737-344243

Page generated in 0.0257 seconds