Planeamento de obraAraújo, Rui Alberto Lopes January 2008 (has links)
Tese de mestrado integrado. Engenahrai Civil (especialização em Vias de Comunicação). Faculdade de Engenharia. Universidade do Porto. 2008
|
62 |
Análise do campo de pressões em quebramares submersosNeves, Ana Cristina Gomes Rodrigues Valente January 2007 (has links)
Tese de doutoramento. Engenharia Civil. Faculdade de Engenharia. Universidade do Porto. 2007
|
63 |
Criterios de buena ejecución para el emplazamiento de muros de contención de hormigón ciclópeo respecto al proceso constructivo que esta siendo usado en nuestro medioAndrade Soliz, Edwin Omar January 2008 (has links)
En el presente proyecto se hace una evaluación a los métodos y procesos constructivos empleados en nuestro medio para el emplazamiento de muros de contención de hormigón ciclópeo, asimismo, se realiza el análisis de las actuales especificaciones técnicas del Gobierno Municipal de La Paz referente a este tipo de obras, esto ha permitido identificar una serie de deficiencias tales como malas practicas constructivas, escasez de estudios de suelos e insuficiencia de ensayos de control de calidad. En consecuencia se plantean criterios para que el GMLP modifique los pliegos de especificaciones técnicas y también considere la capacitación de profesionales y de obreros dedicados a la construcción de obras civiles
|
64 |
“ Programación y Costos de la Ejecución de las Obras Secundarias de Agua Potable y Alcantarillado para los Distritos de Santa Anita, Ate – Vitarte y Chaclacayo ” – Lote 8Ullauri Lupérdiga, Carlos Gustavo Martín January 2006 (has links)
No description available.
|
65 |
Diretrizes para o gerenciamento de riscos em contratos de obras públicas : estudo de caso da contratação integrada / Guidelines for risk management in public works contracts : case study of design-buildCaldeira, Daniel Matos 16 October 2015 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2015. / Submitted by Fernanda Percia França (fernandafranca@bce.unb.br) on 2016-04-29T17:39:53Z
No. of bitstreams: 1
2015_DanielMatosCaldeira.pdf: 2227339 bytes, checksum: 42afdee70a92b12bd6eaf18f42d4de55 (MD5) / Approved for entry into archive by Marília Freitas(marilia@bce.unb.br) on 2016-05-26T16:33:21Z (GMT) No. of bitstreams: 1
2015_DanielMatosCaldeira.pdf: 2227339 bytes, checksum: 42afdee70a92b12bd6eaf18f42d4de55 (MD5) / Made available in DSpace on 2016-05-26T16:33:21Z (GMT). No. of bitstreams: 1
2015_DanielMatosCaldeira.pdf: 2227339 bytes, checksum: 42afdee70a92b12bd6eaf18f42d4de55 (MD5) / As recentes alterações legislativas promovidas na área de licitações de obras públicas trazidas com a aprovação da Lei nº 12.462/2011, estabeleceram no ordenamento jurídico brasileiro um novo regime de execução de obras públicas, denominado contratação integrada. Nesse contexto, o presente trabalho objetivou consolidar e analisar criticamente os principais aspectos observados sobre o tema gerenciamento de riscos em diretrizes que fomentem o aprimoramento da gestão pública por meio de contribuições ao planejamento de licitações efetuadas nesta modalidade de contratação. De acordo com a sequência de etapas do método de pesquisa empregado foram levantados o conjunto de licitações realizadas nessa modalidade e elaboradas matrizes de avaliação do nível de maturidade dos órgãos visando com isso a avaliação das metodologias de precificação de riscos instituídas.Da análise realizada, verificou-se que o tema gerenciamento de riscos ainda não está bem entendido e difundido na Administração Pública Federal. Ao final foram propostas diretrizes para o gerenciamento de riscos em contratos dessa modalidade, levando em consideração o resultado da consolidação dos principais aspectos observados nas etapas anteriores e tendo como base um modelo referencial de gerenciamento de projetos e riscos, as práticas internacionais de contratação e avaliação de contingências e o arcabouço legal e jurisprudencial brasileiro para obras públicas. / Recent legislative changes introduced in the area of public works bids brought with the approval of Law no. 12.462/2011, established the Brazilian legal system a new enforcement regime for public works, called integrated contracts (Design-Build, in English). In this context, this study aimed to consolidate and critically analyze key aspects observed on the topic of risk management in guidelines that promote the improvement of governance through contributions to the planning of bids made on this type of contract. According to the sequence of employee research method steps have been raised the number of bids made in this modality and elaborate arrays of evaluation of organ maturity level targeting with this assessment of pricing methodologies established risks. Of the analysis, it was found that the risk management theme is still not well understood and widespread in the Federal Public Administration. At the end it was proposed guidelines for risk management in contracts of this type, taking into account the result of the consolidation of key aspects observed in the previous steps and based on a reference model of project management and risks, international practice of hiring and evaluation contingencies and the Brazilian legal and judicial framework for public works.
|
66 |
A postura das empresas construtoras de obras públicas da grande Florianópolis em relação ao PBQP-HGomes, Rubens Carlos Gustmann January 2007 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-graduação em Engenharia Civil / Made available in DSpace on 2012-10-22T23:22:22Z (GMT). No. of bitstreams: 1
241419.pdf: 1397158 bytes, checksum: e47665704692a918d04e4b3c9398d00e (MD5) / As obras públicas são fundamentais para a sociedade, pois dinamizam a economia e oferecem infra-estrutura para o desenvolvimento do país. Conseqüentemente, a qualidade da obra, abrangendo não somente a qualidade da construção física, mas a do projeto como um todo, é fundamental para o investimento adequado dos recursos públicos destinados à satisfação das demandas sociais, políticas e estratégicas. O processo de desenvolvimento de uma obra pública tem um rito complexo e regulamentado fundamentalmente pela lei 8.666 de 1993, que especifica a licitação do tipo menor preço como caso geral para contratação de obras públicas. Criado para estimular e disseminar a qualidade e a produtividade na construção civil brasileira, o Programa Brasileiro de Qualidade e Produtividade-Habitat (PBQP-H) encontra dificuldade para propagar sua ação no segmento de obras públicas. O trabalho analisa as conseqüências destes e de outros aspectos no contexto da construção de obras públicas no Brasil, visando à formulação de variáveis de influência para a qualidade em obras públicas. Também foram realizadas entrevistas junto a empresas construtoras de edificações públicas, bem como a organizações de interesse público, a fim de se ter uma perspectiva ampla e imparcial.
Public Works are fundamental for society because they strengthen the economy and offer infrastructure for the development of the country. Consequently, the quality of public works, concerning not only its physical characteristics but also the quality of the project as a whole, is essential for the appropriate inversion of public resources destined to the satisfaction of social, political and strategic needs. The process of a public work development has a complex rite and is regulated basically by the law 8.666/93, which specifies the lowest price criterium as a general rule for the public work contracts. Created for the incentive and widening of the quality and productivity in Brazilian civil construction, the Brazilian Program for Quality and Productivity-Habitat (PBQP-H) finds barriers to act in the field of public works. This dissertation analyses the consequences of these and others aspects in the context of construction of public works in Brazil aiming at the formulation of variables of influence for the quality in public works. Interviews with public buildings construction companies as well as organizations for public interest were carried out also with the aim of having a wide and impartial perspective.
|
67 |
A arquitetura do grupo do Paraná 1957-1980Pacheco, Paulo Cesar Braga January 2010 (has links)
Esta tese analisa a arquitetura produzida nas décadas de 1960 e 1970 por um grupo de jovens arquitetos residentes em Curitiba e ligados ao recém fundado Curso de Arquitetura e Urbanismo da Universidade Federal do Paraná (1962). Sem qualquer tipo de organização oficial, conformava-se por alguns poucos professores vindos dos grandes centros do país para atuar no CAU UFPR e por alunos recém formados nas primeiras turmas deste curso. Entre os professores imigrados estavam alguns paulistas graduados pela Faculdade de Arquitetura Mackenzie que haviam colaborado intensamente com arquitetos de renome em São Paulo, entre estes: Fábio Penteado, Eduardo Kneese de Mello e Pedro Paulo de Mello Saraiva. Organizados em torno do CAU UFPR estes arquitetos professores e ex-alunos realizariam trabalhos em grupos abertos e alternantes, com destaque para a participação sistemática em concursos de arquitetura, modalidade de projeto em que receberiam grande quantidade de prêmios, alguns destes resultados em obras importantes como os edifício-sede da Petrobrás (1968) e do BNDES (1974), ambos construídos na esplanada do Santo Antônio, no Rio de Janeiro. Estes arquitetos que repentinamente despertam atenção nacional seriam denominados pela crítica por Grupo do Paraná. Ao longo das décadas de 1960 e 1970 criam uma arquitetura de cunho brutalista bastante próxima à realizada pela Escola Paulista, na cidade de São Paulo. O objetivo da tese é analisar a obra produzida pelo Grupo do Paraná, no período citado e, comprovar que sua arquitetura, embora semelhante e contemporânea à Escola Paulista se mostrava, em boa parte, distinta e original. Por fim, esta tese também pretende defender que a arquitetura do Grupo do Paraná, por sua ligação com o ensino e com o aprendizado, por suas características de atuação, volume, longevidade e estética resultante, pode ser entendida segundo as mesmas características da Escola Carioca e Paulista, ainda que em escala menor. / The purpose of the thesis is to analyze the architecture produced in the 1960s and 1970s by a group of young architects whose lived in Curitiba on that time, fresh architects from the newly established course of Architecture and Urbanism of Universidade Federal do Paraná/ CAU UFPR (1962). With any official status, this group was made by young architects graduated from the first classes of this course and few professors coming from the biggest cities of the country to teach at CAU UFPR. Some of them graduated at Mackenzie University and worked closely to the well known architects in Sâo Paulo, among them: Fabio Penteado, Eduardo Kneese de Mello and Pedro Paulo de Mello Saraiva. Organized around the CAU UFPR, these architects, teachers and students used to work for different kinds of open groups, mainly to join architecture's contests, competitions, working on projects wich they would win several awards. Some of these winning projects, became important buildings such as: the headquarters of Petrobras (1968) and BNDES (1974), both builded at the Esplanada do Santo Antônio, in Rio de Janeiro. Those architects who suddenly attracted national attention would be called by the critics, “Group of Paraná”. Throughout the 1960's and 1970's they did developed a brutalistic architecture quite similar to the performed by the Escola Paulista, in São Paulo. The main point of this thesis is to analyze the work produced by the Group of Paraná, in the mentioned period, and demonstrates that this architecture is very similar to the Escola Paulista but, at the same time, distinct and original. Finally, this thesis also intends to discuss the architecture of the Group of Paraná, in connection with the teaching and learning, by their ways and means, size, longevity and aesthetic results, can be understood as the same characteristics of the Escola Carioca and Escola Paulista, although of being made on a smaller scale.
|
68 |
Diagnóstico do cumprimento da NR 18 no subsetor edificações da construção civil e sugestões para melhoriasRocha, Carlos Alberto Gurjão Sampaio de Cavalcante January 1999 (has links)
A segurança do trabalho é um elemento muito importante para o sucesso de um empreendimento, visto que influencia nos custos, produtividade, perdas e imagem da empresa, assim como está relacionado com o bem-estar de todos os envolvidos com o trabalho. Apesar de sua importância, a indústria da construção ainda apresenta índices de acidentes relativamente elevados. Um dos esforços recentes mais importantes no país no sentido de melhorar o nível de segurança nas obras foi a publicação da nova versão da norma NR 18 (Condições e Meio Ambiente de Trabalho na Indústria da Construção), do Ministério do Trabalho, que é dirigida exclusivamente para o setor. Considerando esse contexto, o presente trabalho faz um levantamento do cumprimento dessa norma em diversas empresas, totalizando 67 canteiros de obras espalhados por 6 cidades brasileiras. Baseando-se nos dados obtidos, em entrevistas e em outras informações é feita uma análise do comportamento dessas empresas em relação à aplicação da NR 18. Com base nessa análise, são apresentadas algumas sugestões para o aperfeiçoamento da norma. O estudo mostra que a NR 18 ainda é muito pouco cumprida nos canteiros de obras, apresentando um índice médio de cumprimento de 51%. O destaque negativo foi o desempenho das mesmas em relação ao requisito proteções periféricas. Em média, neste caso, apenas 6% do que é exigido pela norma está sendo atendido.
|
69 |
Entre textos e projetos : o arquiteto João Antônio Monteiro Neto em Porto AlegrePereira, Cristiano Zluhan January 2013 (has links)
Depois de alguns anos trabalhando no Paraná, em São Paulo e no Rio de Janeiro, o arquiteto João Antônio Monteiro Neto chega a Porto Alegre já no final do ano de 1929, cidade onde atuou até o ano de seu falecimento em 1956. No início de sua carreira na capital gaúcha atua como escritor de arquitetura no jornal Diário de Notícias, entre os anos 1930 e 1933. Sua coluna semanal, que tratava de construção, higiene, projetos econômicos, estilos arquitetônicos e urbanismo, entre outros assuntos, ganhou destaque quando se tornou um instrumento de interatividade com o leitor. Cartas solicitando orientação de projeto eram respondias nas edições seguintes do jornal. Estes artigos eram ilustrados com perspectivas e plantas baixas, além da descrição do projeto e justificativa da solução proposta. Contudo, a atuação de Monteiro Neto alcançou maior destaque através de projetos e obras, muitas das quais em estilo moderno, acompanhado de algumas incursões pelo ecletismo, pelo neocolonial e por um bom número de obras filiadas ao estilo californiano. Dono de numerosa produção durante os 26 anos que atuou em Porto Alegre, Monteiro Neto também fez parte de importantes empresas construtoras da época, como Barcellos & Cia., Azevedo Moura & Gertum e Spolidoro & Cia., entre outras, além de ter dirigido a sua própria empresa construtora. A maioria de seus projetos foram residências, mas outros gêneros como edifícios comerciais e residenciais, cinemas, escola e sinagoga foram alguns exemplos de sua versatilidade. Sua produtiva trajetória como arquiteto ilustra o quadro da arquitetura em Porto Alegre em seu tempo, assim como o debate arquitetônico em torno dela. / After a few years working in the state of Paraná and in the cities of São Paulo and Rio de Janeiro, the architect João Antônio Monteiro Neto arrived in Porto Alegre at the end of 1929. He worked in that city until the year of his death in 1956. Soon after his arrival in Porto Alegre he started to write about architecture in the daily newspaper Diário de Notícias, between the years 1930 and 1933. He was responsible for a weekly column that dealt with construction, hygiene, economic projects, architectural styles and urban design, among other issues. The column gained prominence when it became an instrument of interactivity with the readers. Letters requesting guidance in projects were responded in the following editions of the newspaper. These articles were illustrated with prospects and floor plans, aside from the project description and justification of the proposed settlement. But the work of Monteiro Neto was not restricted to writing about architecture. His main contribution to the field was a great number of buildings and projects, most aligned with modern architecture but also a number of works linked with eclectic historicism, nationalist neocolonial and the Californian (Spanish Missions) style. During his 26 years of activity in Porto Alegre, Monteiro Neto worked in some of the most important companies of the local building industry, such as Barcellos & Co. Azevedo Moura & Gertum, Spolidoro & Co., among others, and later directed his own company. Most of his projects were houses, but other types such as commercial and residential buildings, movie theaters, a school and a synagogue building were some examples of its versatility. The course of his productive career offers a profitable illustration of the architecture of his time in Porto Alegre and the architectural debate around it.
|
70 |
Avaliação de metodologias de inspeção como instrumento de priorização de intervenções em obras de arte especiais / Evaluation of inspection methodologies as an instrument of prioritization for bridge interventionsVerly, Rogério Calazans 29 June 2015 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2015. / Submitted by Fernanda Percia França (fernandafranca@bce.unb.br) on 2015-12-22T16:42:27Z
No. of bitstreams: 1
2015_RogerioCalazansVerly.pdf: 17157738 bytes, checksum: 784d769f21dc8263bcd02cc3c8a7a071 (MD5) / Approved for entry into archive by Patrícia Nunes da Silva(patricia@bce.unb.br) on 2016-01-24T14:43:10Z (GMT) No. of bitstreams: 1
2015_RogerioCalazansVerly.pdf: 17157738 bytes, checksum: 784d769f21dc8263bcd02cc3c8a7a071 (MD5) / Made available in DSpace on 2016-01-24T14:43:10Z (GMT). No. of bitstreams: 1
2015_RogerioCalazansVerly.pdf: 17157738 bytes, checksum: 784d769f21dc8263bcd02cc3c8a7a071 (MD5) / Intervenções adequadas realizadas em momentos oportunos são uma forma eficiente de se interferir no processo de deterioração de estruturas de Obras de Arte Especiais - OAEs. O objetivo deste trabalho é avaliar duas metodologias de inspeção de estruturas quanto à priorização das OAEs para intervenções: a primeira delas é aplicada pelo Departamento Nacional de Infraestrutura de Transportes - DNIT, e a segunda é a metodologia GDE/UnB, desenvolvida no Programa de Pós-graduação em Estruturas e Construção Civil da Universidade de Brasília - PECC/UnB. Foram realizadas inspeções visuais em 22 OAEs localizadas em Brasília/DF e os dados coletados foram utilizados para a avaliação das estruturas pelas duas metodologias estudadas. Os resultados obtidos foram analisados e a formulação da metodologia GDE/UnB foi alterada para um melhor ajuste à aplicação em um sistema de gestão de OAEs. Posteriormente, analisou-se a incidência dos diferentes danos nas estruturas inspecionadas. Concluiu-se que a metodologia GDE/UnB, com a formulação proposta neste trabalho, apresenta resultados com valores mais escalonados que os fornecidos pela metodologia do DNIT, o que facilitou a priorização das estruturas para intervenções. / Appropriate interventions, carried out at the right time, are an efficient way to interfere within the deterioration process of bridges’ structures. This research aims to evaluate two methodologies for inspection of these structures applied in the prioritization of bridges’ interventions: the first one is used by Departamento Nacional de Infraestrutura de Transportes - DNIT; the second one is a methodology developed by Programa de Pósgraduação em Estruturas e Construção Civil da Universidade de Brasília - PECC/UnB, called GDE/UnB. Throughout the research, 22 bridges were visually inspected and the collected data was applied into the evaluation of these structures using both methodologies. The results were analyzed and the formulation of the GDE/UnB methodology was adjusted to better suit application to a bridge management system. Later, an analysis of the incidence of different damages was made using the inspected structures. In conclusion, the GDE/UnB methodology and its proposed formulation showed better-calibrated results in comparison with the methodology used by DNIT, which made the prioritization process for intervention of structures easier.
|
Page generated in 0.0538 seconds